Highways Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date2 Sep 2024
Closing Date23 Sep 2024
Tender Amount₹ 3,50,30,000 
Notes
Download

Costs

Summary

Rasipuram (h) Candm Sub Division (slm-24)

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
3) Improvements to Riding Quality at km 3/0 - 4/0 of Mullukurichi - Kariyampatti road

153.75

3357

21.84

... More
4) Improvements to Riding Quality at km 8/0 - 9/4 of Km 8/4 of Mettala - Mullukuruchi -Periyavaragur combai road

153.75

3357

21.84

... More
Earth Work excavation in all classes of soil except hard rock not requiring blasting and deposting on bank with all leads and lifts as per SS20B including cost of all labour,materials,tools,equipments and all incidental charges and sheeting, shoring,bracing and their subsequent removal of all logs,stumps and other deleteriuos matter and obstructions,trimming of bottom of excavation,backfilling and clearing the site and disposal of all surplus materials away from the site with an average lead of 3.00 km etc.,complete as per standard specification for Boxing as per clause 111, 112, 201, 202, 301 to 305 & 900 of MORTH Vth Revision

-

-

-

... More
1) Widening from Intermediate Lane to Two Lane and Strengthening at km 5/0 - 7/0 of Rasipuram-Pattanam-Pudupatti road including Construction of Culvert at Km 6/10

2068.5

254963

123.26

... More
Construction of dry lean cement concrete Sub base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm,aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, concrete strength not to be less than 10 Mpa at 7 days, mixed at site, compacted using vibrator, finishing and curing as per clause 111, 112, 600-1 & 900 of MORTH Vth Revision

-

-

-

... More
1) Widening from Intermediate Lane to Two Lane and Strengthening at km 5/0 - 7/0 of Rasipuram-Pattanam-Pudupatti road including Construction of Culvert at Km 6/10

120

596227

4968.56

... More
Construction of granular sub-base by providing close graded Material,mixing in a mechanical mixplant at OMC, carriage of mixed Material to worksite, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 111, 112, 401 & 900 of MORTH Vth Revision etc., complete - for Grading- V Material

-

-

-

... More
1) Widening from Intermediate Lane to Two Lane and Strengthening at km 5/0 - 7/0 of Rasipuram-Pattanam-Pudupatti road including Construction of Culvert at Km 6/10

596.68

1061768

1779.46

... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam of specified thickness, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 406 & 900 of MORTH Vth Revision

-

-

-

... More
1) Widening from Intermediate Lane to Two Lane and Strengthening at km 5/0 - 7/0 of Rasipuram-Pattanam-Pudupatti road including Construction of Culvert at Km 6/10

860.1

1835367

2133.9

... More
2) Improvements to Riding Quality at km 4/2 - 5/6 of Km 4/2 of Mettala - Mullukurichi road to K.Kanavaipatti (via) P.Kanavaipattti road

69.75

148839

2133.9

... More
3) Improvements to Riding Quality at km 3/0 - 4/0 of Mullukurichi - Kariyampatti road

69.19

147644

2133.9

... More
4) Improvements to Riding Quality at km 8/0 - 9/4 of Km 8/4 of Mettala - Mullukuruchi -Periyavaragur combai road

69.2

147665

2133.9

... More
Providing and laying 50 mm thick Bituminous Macadam using course aggregate and VG-30 Bitumen which shall consist of construction in a single course base/binder course confirming to the specification on a previously prepared base (using Mini Mix Plant and Power Roller) including cost of material,labour charges,rentals for machinary,fuel and all other incidental charges etc.,complete as per clause 111,112,504 & 900 of MORTH Rev-5 (For Patch Works)

-

-

-

... More
1) Widening from Intermediate Lane to Two Lane and Strengthening at km 5/0 - 7/0 of Rasipuram-Pattanam-Pudupatti road including Construction of Culvert at Km 6/10

57

463960

8139.65

... More
Advance patch work 50mm thick using 45 mm IRC size HBG metal for making the pot holes and patching using VG 10 grade bitumen including mixing at the rate of 44 Kg / Cum of chips after trimming the pot holes or depression to proper shape and depth side painting with tack coat and compacting the layers as directed by Departmental officers etc., complete as per clause 111, 112, 501, 3004 & 900 of MORTH Vth Revision

-

-

-

... More
2) Improvements to Riding Quality at km 4/2 - 5/6 of Km 4/2 of Mettala - Mullukurichi road to K.Kanavaipatti (via) P.Kanavaipattti road

13

50208

3862.18

... More
3) Improvements to Riding Quality at km 3/0 - 4/0 of Mullukurichi - Kariyampatti road

10

39031

3903.15

... More
4) Improvements to Riding Quality at km 8/0 - 9/4 of Km 8/4 of Mettala - Mullukuruchi -Periyavaragur combai road

12

47181

3931.8

... More
Advance patch work 25mm thick using 13.20 mm IRC size HBG metal for making the pot holes and patching using VG 10 grade bitumen including mixing at the rate of 44 Kg / Cum of chips after trimming the pot holes or depression to proper shape and depth side painting with tack coat and compacting the layers as directed by Departmental officers etc., complete as per clause 111, 112, 501, 3004 & 900 of MORTH Vth Revision

-

-

-

... More
2) Improvements to Riding Quality at km 4/2 - 5/6 of Km 4/2 of Mettala - Mullukurichi road to K.Kanavaipatti (via) P.Kanavaipattti road

5

22059

4411.95

... More
3) Improvements to Riding Quality at km 3/0 - 4/0 of Mullukurichi - Kariyampatti road

3.55

15810

4453.65

... More
4) Improvements to Riding Quality at km 8/0 - 9/4 of Km 8/4 of Mettala - Mullukuruchi -Periyavaragur combai road

5

22410

4482

... More
Providing and laying Prime Coat over WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 502 & 900 of MORTH Vth Revision

-

-

-

... More
1) Widening from Intermediate Lane to Two Lane and Strengthening at km 5/0 - 7/0 of Rasipuram-Pattanam-Pudupatti road including Construction of Culvert at Km 6/10

3640.35

297489

81.72

... More
2) Improvements to Riding Quality at km 4/2 - 5/6 of Km 4/2 of Mettala - Mullukurichi road to K.Kanavaipatti (via) P.Kanavaipattti road

465

37990

81.7

... More
3) Improvements to Riding Quality at km 3/0 - 4/0 of Mullukurichi - Kariyampatti road

461.25

37688

81.71

... More
4) Improvements to Riding Quality at km 8/0 - 9/4 of Km 8/4 of Mettala - Mullukuruchi -Periyavaragur combai road

461.25

37688

81.71

... More
Providing and laying Tack Coat over WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 503 & 900 of MORTH Vth Revision

-

-

-

... More
1) Widening from Intermediate Lane to Two Lane and Strengthening at km 5/0 - 7/0 of Rasipuram-Pattanam-Pudupatti road including Construction of Culvert at Km 6/10

3640.35

68657

18.86

... More
2) Improvements to Riding Quality at km 4/2 - 5/6 of Km 4/2 of Mettala - Mullukurichi road to K.Kanavaipatti (via) P.Kanavaipattti road

465

8765

18.85

... More
3) Improvements to Riding Quality at km 3/0 - 4/0 of Mullukurichi - Kariyampatti road

461.25

8694

18.85

... More
4) Improvements to Riding Quality at km 8/0 - 9/4 of Km 8/4 of Mettala - Mullukuruchi -Periyavaragur combai road

461.25

8694

18.85

... More
Providing and laying Tack Coat over Existing BT surface using 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 503 & 900 of MORTH Vth Revision

-

-

-

... More
1) Widening from Intermediate Lane to Two Lane and Strengthening at km 5/0 - 7/0 of Rasipuram-Pattanam-Pudupatti road including Construction of Culvert at Km 6/10

11726.48

317670

27.09

... More
2) Improvements to Riding Quality at km 4/2 - 5/6 of Km 4/2 of Mettala - Mullukurichi road to K.Kanavaipatti (via) P.Kanavaipattti road

5241.03

141927

27.08

... More
3) Improvements to Riding Quality at km 3/0 - 4/0 of Mullukurichi - Kariyampatti road

3915.59

106034

27.08

... More
4) Improvements to Riding Quality at km 8/0 - 9/4 of Km 8/4 of Mettala - Mullukuruchi -Periyavaragur combai road

5235.76

141784

27.08

... More
Providing and laying Tack Coat over Dry Lean Cement Concrete surface using 3.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 111, 112, 501, 503 & 900 of MORTH Vth Revision

-

-

-

... More
1) Widening from Intermediate Lane to Two Lane and Strengthening at km 5/0 - 7/0 of Rasipuram-Pattanam-Pudupatti road including Construction of Culvert at Km 6/10

623.31

13301

21.34

... More
Providing, laying 100mm consolidated thick Dense Bituminous Macadam using 0.40cum of 37.50-13.20mm, 0.35 cum of 13.20-2.36 mm and 0.36 cum of 2.36 mm & below size IRC metal with 71.30 kgs of VG40 grade bitumen for premixing per 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing the min the required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to site, spreading the mix to uniform thickness of 100 mm with mechanical paver to the specified grades and cross section sand consolidated by Vibratory Roller to the required density etc., including labour for attending to paver to site etc.,including hire and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and allother tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per MoRTH specification clause No.111,112,501,505 & 900 - Grading I

-

-

-

... More
1) Widening from Intermediate Lane to Two Lane and Strengthening at km 5/0 - 7/0 of Rasipuram-Pattanam-Pudupatti road including Construction of Culvert at Km 6/10

424.09

3984838

9396.21

... More
Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG40 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 111, 112, 501, 504 & 900 of MORTH Vth Revision- Grading II

-

-

-

... More
1) Widening from Intermediate Lane to Two Lane and Strengthening at km 5/0 - 7/0 of Rasipuram-Pattanam-Pudupatti road including Construction of Culvert at Km 6/10

541.7

4680472

8640.34

... More
Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 111, 112, 501, 504 & 900 of MORTH Vth Revision- Grading II

-

-

-

... More
2) Improvements to Riding Quality at km 4/2 - 5/6 of Km 4/2 of Mettala - Mullukurichi road to K.Kanavaipatti (via) P.Kanavaipattti road

67.58

572466

8470.94

... More
3) Improvements to Riding Quality at km 3/0 - 4/0 of Mullukurichi - Kariyampatti road

50.47

427528

8470.94

... More
4) Improvements to Riding Quality at km 8/0 - 9/4 of Km 8/4 of Mettala - Mullukuruchi -Periyavaragur combai road

63.49

537819

8470.94

... More
Providing and laying Bituminous Concrete to 40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG 40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per clause No. 111, 112, 501, 507 & 900 of MORTH vth Revision

-

-

-

... More
1) Widening from Intermediate Lane to Two Lane and Strengthening at km 5/0 - 7/0 of Rasipuram-Pattanam-Pudupatti road including Construction of Culvert at Km 6/10

639.6

7060595

11039.08

... More
Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG 30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per clause No. 111, 112, 501, 507 & 900 of MORTH vth Revision

-

-

-

... More
2) Improvements to Riding Quality at km 4/2 - 5/6 of Km 4/2 of Mettala - Mullukurichi road to K.Kanavaipatti (via) P.Kanavaipattti road

171.19

1840503

10751.23

... More
3) Improvements to Riding Quality at km 3/0 - 4/0 of Mullukurichi - Kariyampatti road

131.31

1411744

10751.23

... More
4) Improvements to Riding Quality at km 8/0 - 9/4 of Km 8/4 of Mettala - Mullukuruchi -Periyavaragur combai road

170.91

1837492

10751.23

... More
Refilling the boxing earth to the extra width of the boxing portion including labour charges for filling in layers , watering , tamping under optimum moisture content to get the maximum density and all other incidental charges etc., complete as per clause 111, 112, 201, 202, 301 to 305, 900 of MORTH Vth Revision (Labour and Hire charges only)

-

-

-

... More
1) Widening from Intermediate Lane to Two Lane and Strengthening at km 5/0 - 7/0 of Rasipuram-Pattanam-Pudupatti road including Construction of Culvert at Km 6/10

310

8270

26.68

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For making up of low berms with conveyance with an avearge lead of 2.00km as per MORTH specification clause No. 111, 112, 301 to 305 & 900 of MORTH vth Revision

-

-

-

... More
2) Improvements to Riding Quality at km 4/2 - 5/6 of Km 4/2 of Mettala - Mullukurichi road to K.Kanavaipatti (via) P.Kanavaipattti road

266

52404

197.01

... More
4) Improvements to Riding Quality at km 8/0 - 9/4 of Km 8/4 of Mettala - Mullukuruchi -Periyavaragur combai road

264

52010

197.01

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For making up of low berms with conveyance with an avearge lead of 5.00km as per MORTH specification clause No. 111, 112, 301 to 305 & 900 of MORTH vth Revision

-

-

-

... More
3) Improvements to Riding Quality at km 3/0 - 4/0 of Mullukurichi - Kariyampatti road

196

46655

238.04

... More
Dismantling Culverts, Bridges and other Structures Dismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc as per clause No. 111, 112, 202 of MORTH vth Revision Dismantling Plain Cement Concrete

-

-

-

... More
1.1) Construction of Culvert at Km 6/10

10.77

5236

486.2

... More
Earth Work excavation in all classes of soil except hard rock not requiring blasting and deposting on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal of all logs,stumps and other deleteriuos matter and obstructions,trimming of bottom of excavation,backfilling and clearing the site and disposal of all surplus materials etc.,complete as per standard specification for Foundation of Culvert as per clause 111, 112, 201, 202, 301 to 305 & 900 of MORTH Vth Revision

-

-

-

... More
1.1) Construction of Culvert at Km 6/10

144.12

17764

123.26

... More
Plain Cement Concrete of grade M15 Nominal Mix using 40mm ISS size HBG metal including cost and conveyance of all materials to site complying with required standards and specifications. including cost of formwork, mixing, laying and compacting using vibrator including hire and fuel charges for all Tools and Plants and incidental charges such as maintaining of protective bunds, coffer dams strutting etc., complete as per relevant standard specification for Base Concrete of Culverts as per clause as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision

-

-

-

... More
1.1) Construction of Culvert at Km 6/10

9.61

58222

6058.5

... More
Vibrated Cement Concrete of grade M20 (Nominal mix) using 40mm ISS size HBG metal including cost and conveyance of all materials to site and cost cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths Tools and Plants and incidental charges etc., complete as per relevent standard specification for Stem and Body wall of the retaining wall as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision

-

-

-

... More
1.1) Construction of Culvert at Km 6/10

44.84

405245

9037.58

... More
Vibrated Reinforced Cement Concrete of grade M25 (Design mix) using 20mm and below ISS HBG metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for Base Slab, Side Walls, Top Slab, Cover Slab of Box Culvert as per clause 900, 1000, 1500, 1600, 1700, 2100, 2200 & 2300 of MORTH Vth Revision

-

-

-

... More
1.1) Construction of Culvert at Km 6/10

28.62

365626

12775.21

... More
Supply and fabrication of STEEL grade Fe500 D for all the reinforced cement concrete items of work involved in the schedule including cost of steel, cost of fabrication, labour charges for cleaning the rods, straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawing including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete. as per standard specification as per clause 1000, 1500, 1600, 1700, 2100 & 2300 of MORTH Vth Revision

-

-

-

... More
1.1) Construction of Culvert at Km 6/10

2.2

210531

95609.27

... More
Providing and fixing Class I PVC seepage pipes of 110mm dia of required lengths for abutments and return walls including costs and conveyance of all materials to work site and labour charges for fixing etc., complete to drain from the back fill as per section 2706 of MORTH specification (Rev- V)

-

-

-

... More
1.1) Construction of Culvert at Km 6/10

57.6

11088

192.5

... More
Providing and fixing of Bitumen Felt of 15mm thick Pad of required length for abutment and returns including cost and conveyance of all materials to worksite, cost and labour for semisperical backfill arrangements with 100mm size broken granite stones at the periphery and labour charges for fixing etc.,

-

-

-

... More
1.1) Construction of Culvert at Km 6/10

6.55

1534

234.3

... More
Refilling in between Retaining wall and Road with excavated earth including cost and conveyence to site including labour charges for filling in layers , watering , tamping under optimum moisture content to get themaximum density and all other incidental charges etc., complete as per clause 304 & 2907 of MORTH Vth Revision Specifications (labour charges only)

-

-

-

... More
1.1) Construction of Culvert at Km 6/10

37.53

1608

42.85

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

-

29682924

... More
Add GST at 18%

1

-

5342926

... More
Total Value put to Tender

1

-

35025850

... More
Negotiated Percentage

1

-

-

... More
Final Negotiated Value

1

-

-

... More
Add GST at 18% of Final Negotiated Value

1

-

-

... More
Total Value of Contract Including 18% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

29682924

-

... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.