GAIL India Limited Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
GAIL India Limited - GAIL Tender
Civil And Construction
Pipe Line Project
Eprocure
Opening Date13 Feb 2024
Closing Date5 Mar 2024
Tender AmountRefer Documents
Costs
EMD
₹ 9,80,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Pipeline Installation By Hdd Method
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_GAIL_185449_1Bid Award Id
ViewTender No
SM/B411-000-MK-T-9580/1011Tender Authority
GAIL India Limited ViewPurchaser Address
-Website
http://etenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Magnetic Cleaning:
Running of adequate no. of Magnet Pigs for pipeline including pig tracking for each segment, preparation of site report as per Specification and provisions of the bid document.
350
-
-
... More
Electronic Geometry Pigging:
Running of adequate no. of Electronic Geometry Pig (Caliper) including pig tracking for each segment, preparation of site report on pipeline, data analysis at Contractors facility as per Specification and provisions of the bid document.
350
-
-
... More
Defect Verification:
Defect verification at a max. of 3 locations for each segment inspected including supply of all tools, tackles, instruments, personnel and their transportation, all earth work, repair of pipeline coating wherever exposed, backfilling, work complete in all respect as per direction of engineer-in-charge.
NOTE: Unit EACH signifies each segment of the pipeline.
1
-
-
... More
Final Report:
Preparation of final work report as per agreed format and submission to Client / Client's Consultant in total of 4 copies.
1
-
-
... More
CATHODIC PROTECTION
-
-
-
... More
CP System for HDD portions of the pipeline:
-
-
-
... More
Survey, design, engineering, supply, installation, testing and commissioning of cathodic protection system to protect the external surface of the each HDD section of pipeline as per the enclosed specification vide document no.: B411-000-06-05-CSW-9580, R1. All work shall be carried out conforming to the scope of work, design basis, data sheets, specifications, standards, drawings, etc as per the provisions of GCC, SCC including specification no. 6-51-0027 , 6-51-0029 and all materials, equipment, consumables, start-up/ commissioning spares etc. which include transportation, storage of materials at site, manpower, in line with direction of Engineer-in -charge.
1
-
-
... More
INSTRUMENTATION
-
-
-
... More
TELECOMMUNICATION WORKS
-
-
-
... More
OPTICAL FIBRE CABLE INSTALLATION
-
-
-
... More
Submission of OFC alignment sheets, as-built drawings and all documentation in accordance with the specifications.
1
-
-
... More
Supply & installation of OFC distance markers (metal plates on pipeline markers) at all pipeline marker locations as per specifications and direction of CLIENT/CONSULTANT.
2
-
-
... More
Supply of Jointing closures, Factory acceptance testing, storage, and transportation to site, loading, unloading, jointing of OFC all complete as per specifications provided in the bid document and direction of CLIENT/CONSULTANT.
2
-
-
... More
Site acceptance Testing of the laid OFC, all complete as per specification and direction of CLIENT/CONSULTANT.
1
-
-
... More
Supply of following Optical Fibre Cables (OFC) including FAT, storage, transportation to site, loading, unloading etc. all complete
-
-
-
... More
24 fibres single mode (18 numbers of ITU-T G.652 fibres & 6 numbers of ITU-T G.655 fibres) Optical Fibre Cable
400
-
-
... More
Supply of Permanently lubricated HDPE conduit for following sizes in required length of pressure rating 6 kgf/cm2 to be laid in pipeline trench or in separate trench directly or inside CS conduit including FAT, storage, transportation to site, loading, unloading etc. all complete
-
-
-
... More
Duct with nominal diameter 40 mm or less
700
-
-
... More
Laying, Testing and commissioning of the following sizes of HDPE duct/pipe of pressure rating 6 kgf/cm2, including supply of clamps, small iron structures, spacers, and duct accessories like push-fit couplers, bends and elbows, end plugs, simple plugs, sonic heads, etc, and including small civil works, cleaning with compressed air, calibrating, testing for air tightness, sealing of ends, including all labour and materials, as per directions of the Engineer-in-Charge.
-
-
-
... More
Duct with nominal diameter 40 mm or less
700
-
-
... More
Supply and Installation of Jointing pit/ blowing pit, sand, OFC joint identification markers, electronic markers etc. including jointing of OFC (with OFC laid by other contractor at both ends of HDD) in jointing pits, back filling, pulling wire for OFC/Duct Pulling (rugged and durable) etc. all complete
2
-
-
... More
Installation and Laying of OFC through permanently lubricated HDPE conduit (which is sub-ducted in CS conduit) including supply and use of all materials required like couplers, end plug etc. all complete as per the job specification (Supply & Installation of CS Conduit are covered in the Pipeline laying Section of the tender)
350
-
-
... More
PIPELINES
-
-
-
... More
INSTALLATION OF PIPELINE BY TRENCHLESS TECHNIQUE (USING HORIZONTAL DIRECTIONAL DRILLING)
-
-
-
... More
Complete work for all type of crossings (RIVER/CANAL/ DRAIN/ NALA/ ROAD/ RAILWAY/ UTILITY) (between the limits as indicated in the drawing/ Scope of work) in all types of soil/ strata (including Normal Strata/ Hard Strata/ Hard Rock, as defined subsequently) including all additional drilled lengths necessitated by Contractor's design and based on site conditions, carrying out geo-technical investigation, carrying out topographical and hydrological survey and collection of data to establish the bed of the water body (for River/ Unlined waterbody); calculation of scour depth of water body crossings (for River/ Unlined Waterbody), including construction design calculation and engineering of the crossing for all types of crossings, "Receiving and taking-over", handling, loading, transportation and unloading of externally corrosion coated/ bare line pipes (as applicable) from designated place(s) of issue/ dump site(s) to Contractor's own stock-yard(s)/ work site; mobilization and de- mobilization at site(s), supply of all materials as per "Scope of Supply" all consumables, equipment, manpower, other resources, temporary acquisition of additional land as required for string preparations/ all other works, and execution of, but not limited to, the following works in accordance with specifications, drawings; preparation of all necessary construction drawings for Owner's approval, Preparation of detailed construction method statement, calculations and installation procedures, Strings preparation including welding, NDT of welds and re-beveled areas, radiography, weld repair and re-test, pre-hydro testing of completed string, corrosion coating of field joints with HDD sleeves, inspection of corrosion coating and repair of defects, installation of pipeline string by Horizontal directional drilling, Supply & Installation of 168.3mm size, 6.4 mm thk., API 5L Gr. B/ IS 3589 Fe 410 CS conduit for OFC (including 500µm of epoxy coating on CS Conduit as required) below the lowest level of the crossing including cover by separate horizontal directional drilling to the correct profile as per approved drawings and specification, Post-installation hydrotest including leaks and repair of defects and retesting, etc. for defects attributed to Contractor's faulty work, safe disposal of corrosion Inhibited water and bentonite, Supply, fabrication and construction of protective fencing as required; supply, fabrication and erection of pipeline markers; Restoration and clean-up etc., Preparation of as-built drawings and other records etc. All other works not specifically listed herein, but required as per drawings, scope of work, specifications, standards and provision of contract document, calculations, and instruction of Engineer-in- Charge, leading to successful completion of works. Notes: 1. Length of HDD shall be measured as actual curvilinear length between tie-ins at entry and exit. 2. Payment shall be made on pro rata basis for any Increase/ decrease in HDD length.
-
-
-
... More
Scope of Work Installation of Pipeline (Line Pipe Free issue from Owner) Pipe Material Grade API 5L Gr. X-70 PSL 2 Pipe OD 610 mm Type of Crossing Road/ Highway Type of Soil/Strata Hard Strata (Soft Rock/ Murrum / Weathered Rock etc.) Crossing Name Vehicle Over Pass (VOP) Chainage of Crossing 3.4 km Pipe Wall Thickness 12.7 mm
350
-
-
... More
PERMANENT MARKERS
-
-
-
... More
Supply, fabrication and installation of following types of permanent markers along the route including all associated civil works such as excavation in all types of soil, construction of pedestals and grouting with concrete, clearing, supply and application of approved color & text and quality of primer and paint, stencil letter cutting for numbers, direction, chainage etc., restoration of area to original condition and performing all works as per drawings, scope of work, specifications, standards and instructions of Engineer-in-Charge. Note: The painting of all markers shall conform to environments specified as per scope of work and protective coating specification.
-
-
-
... More
Type of Marker Pipeline Warning Marker
2
-
-
... More
LEAKS/ BURSTS (ATTRIBUTABLE TO OWNER)
-
-
-
... More
Repair of Leaks/ Bursts in Pipeline All works for locating any major leak/burst (occurred during hydrostatic testing) or any minor leak by sectionalizing or any other methods which cannot be located by visual means, including necessary repairing/ replacing defective pipe length, including cutting and removing out defective pipes, transportation, pretesting of replacement pipe and welding into mainline, NDT of welds and re-beveled area, repair and re-testing of defective welds, coating/ painting of welded joints, clean-up, retesting the pipeline/ pipe segment including providing all necessary equipment, labour, materials, consumables and inputs other than Owner supplied materials and performing all works as per drawings, scope of work, specifications, standards enclosed with the Contract and directions of Engineer-in-Charge. Note: 1. This rate is applicable for manufacturing defects in Company/ Owner supplied material only.
-
-
-
... More
Type of Leak Major Leak (detected by visual method) Pipe OD 610 mm
1
-
-
... More
IDLE TIME PRESERVATION WORKS
-
-
-
... More
Idle time preservation of Pipeline and Associated facilities: Preservation of complete pipeline and associated facilities and its maintenance by filling and pressurizing with nitrogen including supply and maintenance of nitrogen or by filling and pressurizing with corrosion inhibited water including supply and maintenance of water with regular dosing of inhibitor to maintain the effectiveness of the inhibitor water (along with disposal of corrosion inhibited water at a proper/ suitable location, after due preservation works) and supply of all consumables, all equipment, man- power, etc., complete as per the requirements of specifications, scope of work, standards, other provisions of Contract document and instructions of Engineer-in- Charge as per following details:
-
-
-
... More
Type of Preservation By Filling Corrosion Inhibited Water Pressure (Bar(g)) 2.0 Pipe OD 610 mm Period Up to 3 Month
350
-
-
... More
Type of Preservation By Filling Corrosion Inhibited Water Pressure (Bar(g)) 2.0 Pipe OD 610 mm Period 3 to 6 Month
350
-
-
... More
Type of Preservation By Filling Corrosion Inhibited Water Pressure (Bar(g)) 2.0 Pipe OD 610 mm Period 6 to 9 Month
350
-
-
... More
Type of Preservation By Filling Nitrogen Pressure (Bar(g)) 2.0 Pipe OD 610 mm Period Up to 3 Month
350
-
-
... More
Type of Preservation By Filling Nitrogen Pressure (Bar(g)) 2.0 Pipe OD 610 mm Period 3 to 6 Month
350
-
-
... More
Type of Preservation By Filling Nitrogen Pressure (Bar(g)) 2.0 Pipe OD 610 mm Period 6 to 9 Month
350
-
-
... More
PRE-COMMISSIONING AND COMMISSIONING ASSISTANCE FOR PIPELINES
-
-
-
... More
Carrying out pre-commissioning activities and pre-commissioning checks to the specified acceptance criteria, making the entire pipeline system including stations ready for commissioning, providing assistance during the complete duration of commissioning operations, supply of all equipment, man-power, consumables, including all type of pigs and required quantity of nitrogen (if & as required), materials for all temporary works and performing all associated works, complete as per the relevant specifications, scope of work, standards, other provisions of Contract document and instructions of Engineer-in-Charge
-
-
-
... More
Pre-Commissioning Works as per details: Type of Activity Dewatering Pipe OD 610 mm
350
-
-
... More
Pre-Commissioning Works as per details: Type of Activity Swabbing Pipe OD 610 mm
350
-
-
... More
Commissioning Assistance : All works for Commissioning assistance as per details below: Pipe OD 610 mm
350
-
-
... More
VIDEO FILM & PHOTOGRAPHY OF CONSTRUCTION ACTIVITIES
-
-
-
... More
Preparation of high resolution video films using drones or equivalent equipment as required (for minim 1 hr.) with audio commentary and Industrial photography covering all aspects/activities of pipeline construction annotated as required, conversion of same to video DVD/ Blue Ray/ USB Drive format, submitting three (3) sets of the same as per details in scope of work document.
1
-
-
... More
Total amount excluding GST for Part-A
-
-
-
... More
GST (CGST&SGST/UTGST or IGST) in percentage (%) on Net Total Amount
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements