Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Forest Department Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date10 Apr 2025
Closing Date25 Apr 2025
Tender Amount₹ 10,50,00,000 
Notes
Download

Costs

Summary

Strengthening The Road From Thurusanmpalayam Road To Solaganai Settlement Village

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete

23.04

-

-

... More
Culvert

41.58

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

21.43

-

-

... More
Culvert

41.58

-

-

... More
Km 0/000-1/000

150

-

-

... More
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

2.65

-

-

... More
Providing and fixing 15mm Bitumen felt for expansion joint Between Dirtwall &Deck slab

2.4

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

21.43

-

-

... More
Culvert

83.62

-

-

... More
Culvert

83.62

-

-

... More
Supplying fabricating and placing in position mild steel/ Ribber tor steel rods for all RCC works including cost of steel and binding wire also in all floors complete complying with standard specification

0.35

-

-

... More
Provision of Cement Concrete Pavement ( Hard Bed ) @ Ch 2650m-2723m

-

-

-

... More
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,

57.34

-

-

... More
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mildsteel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre andsupported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centrecomplete complying with standard specifications and as directed by departmentalofficers including conveyance of all materials to site and proper centering etc complete.

-

-

-

... More
Culvert

62.37

-

-

... More
Culvert

83.62

-

-

... More
Construction of RCC Slab Culvert 1.50m Span at Ch.3943m

-

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B

35.95

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B

35.95

-

-

... More
Cement concrete 1:4:8 mix using 40mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from Departmental section stores to the actual workspot and handling charges at each and including cost of form work mixing concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tools and plants and all other incidental charges such as baling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer

6.48

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

38.74

-

-

... More
Providing and fixing KRAFT paper Between Bed block & Deck slab

3.6

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B

35.95

-

-

... More
Supplying fabricating and placing in position mild steel/ Ribber tor steel rods for all RCC works including cost of steel and binding wire also in all floors complete complying with standard specification

0.35

-

-

... More
Supplying fabricating and placing in position mild steel/ Ribber tor steel rods for all RCC works including cost of steel and binding wire also in all floors complete complying with standard specification

0.35

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

120.5

-

-

... More
Providing and fixing 15mm Bitumen felt for expansion joint Between Dirtwall &Deck slab

2.4

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

2.69

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B

191.97

-

-

... More
Providing weep holes and fixing of 100 mm PVC Pipe

12

-

-

... More
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mildsteel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre andsupported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centrecomplete complying with standard specifications and as directed by departmentalofficers including conveyance of all materials to site and proper centering etc complete.

-

-

-

... More
Km 0/000-9/600

22819.2

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

2.69

-

-

... More
Earth work excavation & Depositing on bank with Initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth and earth mixed with small size boulder and in hard gravelly soils per SS 20B Including all other incidental charges such as slurring strutting, baling out water forming, protective bunds etc., complete for foundation.

54.75

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

21.43

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

2.69

-

-

... More
Cement concrete 1:3:6 mix using 40mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from Departmental section stores to the actual workspot and handling charges at each and including cost of form work mixing concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tools and plants and all other incidental charges such as baling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer

137.14

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

3.59

-

-

... More
Providing and fixing 15mm Bitumen felt for expansion joint Between Dirtwall &Deck slab

2.4

-

-

... More
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mildsteel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre andsupported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centrecomplete complying with standard specifications and as directed by departmentalofficers including conveyance of all materials to site and proper centering etc complete.

-

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B

35.95

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B

191.97

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

24.27

-

-

... More
Construction of RCC Slab Culvert 1.50m Span at Ch.738m

-

-

-

... More
Providing weep holes and fixing of 100 mm PVC Pipe

12

-

-

... More
Cement concrete 1:4:8 mix using 40mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from Departmental section stores to the actual workspot and handling charges at each and including cost of form work mixing concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tools and plants and all other incidental charges such as baling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer

180.75

-

-

... More
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

2.65

-

-

... More
Providing and fixing 15mm Bitumen felt for expansion joint Between Dirtwall &Deck slab

2.4

-

-

... More
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

6.48

-

-

... More
Culvert

83.62

-

-

... More
Construction of RCC Slab Culvert 3.00m Span at Ch.3757m

-

-

-

... More
Cement concrete 1:4:8 mix using 40mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from Departmental section stores to the actual workspot and handling charges at each and including cost of form work mixing concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tools and plants and all other incidental charges such as baling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer

322.5

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B

191.97

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

21.45

-

-

... More
Providing and fixing KRAFT paper Between Bed block & Deck slab

3.6

-

-

... More
Construction of RCC Slab Culvert 1.50m Span at Ch.8970m

-

-

-

... More
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

19.58

-

-

... More
Km 9/000-2/600

90

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete

23.04

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

2.69

-

-

... More
Construction of RCC Slab Culvert 6.00m Span at Ch.5852m

-

-

-

... More
Providing weep holes and fixing of 100 mm PVC Pipe

12

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

21.43

-

-

... More
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,

4.74

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

21.43

-

-

... More
Construction of RCC Slab Culvert 1.50m Span at Ch.3383m

-

-

-

... More
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

2.65

-

-

... More
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes 25x25x3mm for boarding laying over silver oak joists of single 10cm -6.5cm space of 75cm centre to centre complete complying with standard specificatinon

-

-

-

... More
Construction of RCC Slab Culvert 1.50m Span at Ch.2280m

-

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

2.69

-

-

... More
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

2.65

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

3.87

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

2.69

-

-

... More
Providing and fixing KRAFT paper Between Bed block & Deck slab

3.6

-

-

... More
Km 2/000-3/000

150

-

-

... More
Supplying fabricating and placing in position mild steel/ Ribber tor steel rods for all RCC works including cost of steel and binding wire also in all floors complete complying with standard specification

0.35

-

-

... More
Providing and fixing KRAFT paper Between Bed block & Deck slab

3.6

-

-

... More
Providing and fixing KRAFT paper Between Bed block & Deck slab

3.6

-

-

... More
Providing and fixing 15mm Bitumen felt for expansion joint Between Dirtwall &Deck slab

3.6

-

-

... More
Supplying fabricating and placing in position mild steel/ Ribber tor steel rods for all RCC works including cost of steel and binding wire also in all floors complete complying with standard specification

0.35

-

-

... More
Supplying fabricating and placing in position mild steel/ Ribber tor steel rods for all RCC works including cost of steel and binding wire also in all floors complete complying with standard specification

0.88

-

-

... More
Supplying fabricating and placing in position mild steel/ Ribber tor steel rods for all RCC works including cost of steel and binding wire also in all floors complete complying with standard specification

0.35

-

-

... More
Providing and fixing 15mm Bitumen felt for expansion joint Between Dirtwall &Deck slab

2.4

-

-

... More
Construction of RCC Slab Culvert 1.50m Span at Ch.6235m

-

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

2.69

-

-

... More
Earth work excavation & Depositing on bank with Initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth and earth mixed with small size boulder and in hard gravelly soils per SS 20B Including all other incidental charges such as slurring strutting, baling out water forming, protective bunds etc., complete for foundation.

201.75

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B

35.95

-

-

... More
Supplying fabricating and placing in position mild steel/ Ribber tor steel rods for all RCC works including cost of steel and binding wire also in all floors complete complying with standard specification

0.35

-

-

... More
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

19.58

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

21.43

-

-

... More
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,

4.74

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

3.59

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

152.47

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B

56.15

-

-

... More
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes 25x25x3mm for boarding laying over silver oak joists of single 10cm -6.5cm space of 75cm centre to centre complete complying with standard specificatinon

180.4

-

-

... More
Construction of RCC Slab Culvert 1.50m Span at Ch.8890m

-

-

-

... More
Construction of RCC Slab Culvert 1.50m Span at Ch.8777m

-

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

21.43

-

-

... More
Providing and fixing 15mm Bitumen felt for expansion joint Between Dirtwall &Deck slab

2.4

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

3.59

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

3.59

-

-

... More
Providing and fixing 15mm Bitumen felt for expansion joint Between Dirtwall &Deck slab

2.4

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

152.47

-

-

... More
Providing and fixing KRAFT paper Between Bed block & Deck slab

3.6

-

-

... More
Construction of RCC Slab Culvert 1.50m Span at Ch.1392m

-

-

-

... More
Culvert

41.58

-

-

... More
Providing weep holes and fixing of 100 mm PVC Pipe

12

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for Levelling course

3.59

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

24.27

-

-

... More
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mildsteel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre andsupported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centrecomplete complying with standard specifications and as directed by departmentalofficers including conveyance of all materials to site and proper centering etc complete.

-

-

-

... More
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m

-

-

-

... More
Cement concrete 1:4:8 mix using 40mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from Departmental section stores to the actual workspot and handling charges at each and including cost of form work mixing concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tools and plants and all other incidental charges such as baling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer

14.04

-

-

... More
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes 25x25x3mm for boarding laying over silver oak joists of single 10cm -6.5cm space of 75cm centre to centre complete complying with standard specificatinon

130.88

-

-

... More
Provision of Cement Concrete Pavement ( Hard Bed ) @ Ch 7787m-8057m,8093m-8160m,8516m-8533m,8650m-8665m,8750m-8790m

-

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

24.27

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

2.69

-

-

... More
Provision of Cement Concrete Pavement ( Hard Bed ) @ Ch 4062m-4160m,4550m-4698m,4977m-5000m

-

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

24.27

-

-

... More
Supply and fixing weephole 100mm dia PVC pipes as per specification and as directed by the departmental officer.

48

-

-

... More
Construction of RCC Slab Culvert 3.00m Span at Ch.3270m

-

-

-

... More
Culvert

83.62

-

-

... More
Supplying fabricating and placing in position mild steel/ Ribber tor steel rods for all RCC works including cost of steel and binding wire also in all floors complete complying with standard specification

0.88

-

-

... More
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mildsteel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre andsupported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centrecomplete complying with standard specifications and as directed by departmentalofficers including conveyance of all materials to site and proper centering etc complete.

-

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B

56.15

-

-

... More
Supplying fabricating and placing in position mild steel/ Ribber tor steel rods for all RCC works including cost of steel and binding wire also in all floors complete complying with standard specification

0.35

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

25.13

-

-

... More
Culvert

41.58

-

-

... More
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes 25x25x3mm for boarding laying over silver oak joists of single 10cm -6.5cm space of 75cm centre to centre complete complying with standard specificatinon

79.97

-

-

... More
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,

4.74

-

-

... More
Cement concrete 1:4:8 mix using 40mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from Departmental section stores to the actual workspot and handling charges at each and including cost of form work mixing concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tools and plants and all other incidental charges such as baling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer

191.25

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

9.9

-

-

... More
Construction of RCC Slab Culvert 1.50m Span at Ch.1822m

-

-

-

... More
Construction of RCC Slab Culvert 6.00m Span at Ch.140m

-

-

-

... More
Culvert

99.14

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B

35.95

-

-

... More
Culvert

83.62

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

21.43

-

-

... More
Supplying fabricating and placing in position mild steel/ Ribber tor steel rods for all RCC works including cost of steel and binding wire also in all floors complete complying with standard specification

0.35

-

-

... More
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,

4.74

-

-

... More
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mildsteel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre andsupported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centrecomplete complying with standard specifications and as directed by departmentalofficers including conveyance of all materials to site and proper centering etc complete.

-

-

-

... More
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mildsteel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre andsupported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centrecomplete complying with standard specifications and as directed by departmentalofficers including conveyance of all materials to site and proper centering etc complete.

-

-

-

... More
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

2.65

-

-

... More
Km 4/000-5/000

150

-

-

... More
Providing and fixing KRAFT paper Between Bed block & Deck slab

3.6

-

-

... More
Providing weep holes and fixing of 100 mm PVC Pipe

12

-

-

... More
Culvert

83.62

-

-

... More
Construction of RCC Slab Culvert 1.50m Span at Ch.524m

-

-

-

... More
Supplying fabricating and placing in position mild steel/ Ribber tor steel rods for all RCC works including cost of steel and binding wire also in all floors complete complying with standard specification

0.88

-

-

... More
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

2.65

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

3.12

-

-

... More
Construction of Retaining Wall For Culvert Portion Km of 3/0-4/00

-

-

-

... More
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes 25x25x3mm for boarding laying over silver oak joists of single 10cm -6.5cm space of 75cm centre to centre complete complying with standard specificatinon

102

-

-

... More
Provision of Cement Concrete Pavement ( Hard Bed ) @ Ch 6043m-6183m,6230m-6320m

-

-

-

... More
Construction of Retaining Wall For Culvert Portion Km of 2/0-3/00

-

-

-

... More
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mildsteel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre andsupported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centrecomplete complying with standard specifications and as directed by departmentalofficers including conveyance of all materials to site and proper centering etc complete.

-

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B

35.95

-

-

... More
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. complete.

-

-

-

... More
Providing and fixing KRAFT paper Between Bed block & Deck slab

3.6

-

-

... More
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

2.65

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

3.41

-

-

... More
Culvert

83.62

-

-

... More
Supplying fabricating and placing in position mild steel/ Ribber tor steel rods for all RCC works including cost of steel and binding wire also in all floors complete complying with standard specification

3

-

-

... More
Providing and fixing 15mm Bitumen felt for expansion joint Between Dirtwall &Deck slab

3.6

-

-

... More
Supplying fabricating and placing in position mild steel/ Ribber tor steel rods for all RCC works including cost of steel and binding wire also in all floors complete complying with standard specification

3

-

-

... More
Km 0/000-9/600

444

-

-

... More
Earth work excavation & Depositing on bank with Initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth and earth mixed with small size boulder and in hard gravelly soils per SS 20B Including all other incidental charges such as slurring strutting, baling out water forming, protective bunds etc., complete for foundation.

84.24

-

-

... More
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,

4.74

-

-

... More
Cement concrete 1:2:4 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete

56.78

-

-

... More
Providing and fixing 15mm Bitumen felt for expansion joint Between Dirtwall &Deck slab

2.4

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

134.5

-

-

... More
Supplying fabricating and placing in position mild steel/ Ribber tor steel rods for all RCC works including cost of steel and binding wire also in all floors complete complying with standard specification

0.35

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

2.69

-

-

... More
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mildsteel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre andsupported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centrecomplete complying with standard specifications and as directed by departmentalofficers including conveyance of all materials to site and proper centering etc complete.

-

-

-

... More
Culvert

62.37

-

-

... More
Culvert

83.62

-

-

... More
Supplying fabricating and placing in position mild steel/ Ribber tor steel rods for all RCC works including cost of steel and binding wire also in all floors complete complying with standard specification

0.35

-

-

... More
Construction of RCC Slab Culvert 1.50m Span at Ch.2820m

-

-

-

... More
Providing and fixing KRAFT paper Between Bed block & Deck slab

3.6

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete

23.04

-

-

... More
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.

-

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

3.59

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

21.43

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

3.59

-

-

... More
Culvert

41.58

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

3.87

-

-

... More
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for Deckslab

2.65

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

3.59

-

-

... More
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes 25x25x3mm for boarding laying over silver oak joists of single 10cm -6.5cm space of 75cm centre to centre complete complying with standard specificatinon

172

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

21.43

-

-

... More
Construction of RCC Slab Culvert 1.50m Span at Ch.9118m

-

-

-

... More
Construction of Retaining Wall For Culvert Portion Km of 0/0-1/00

-

-

-

... More
Providing and fixing 15mm Bitumen felt for expansion joint Between Dirtwall &Deck slab

2.4

-

-

... More
Earth work excavation & Depositing on bank with Initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth and earth mixed with small size boulder and in hard gravelly soils per SS 20B Including all other incidental charges such as slurring strutting, baling out water forming, protective bunds etc., complete for foundation.

162.75

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

3.59

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

2.69

-

-

... More
Providing and fixing KRAFT paper Between Bed block & Deck slab

3.6

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

24.27

-

-

... More
Culvert

62.37

-

-

... More
Supplying fabricating and placing in position mild steel/ Ribber tor steel rods for all RCC works including cost of steel and binding wire also in all floors complete complying with standard specification

0.35

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

40

-

-

... More
Providing and fixing 15mm Bitumen felt for expansion joint Between Dirtwall &Deck slab

2.4

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

3.59

-

-

... More
Providing and laying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.

-

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

3.59

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

2.69

-

-

... More
Provision of Cement Concrete Pavement ( Hard Bed ) @ Ch 7030m-7036m,7040m-7170m,7270m-7343m

-

-

-

... More
Providing and fixing KRAFT paper Between Bed block & Deck slab

3.6

-

-

... More
Providing weep holes and fixing of 100 mm PVC Pipe

12

-

-

... More
Providing weep holes and fixing of 100 mm PVC Pipe

12

-

-

... More
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mildsteel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre andsupported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centrecomplete complying with standard specifications and as directed by departmentalofficers including conveyance of all materials to site and proper centering etc complete.

-

-

-

... More
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,

4.74

-

-

... More
Culvert

41.58

-

-

... More
Provision of Cement Concrete Pavement ( Hard Bed ) @ Ch 6m-67m, 226m-320m, 353m-434m,458m-463m

-

-

-

... More
Culvert

83.62

-

-

... More
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,

4.74

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

3.41

-

-

... More
KM & HM Stone Reinforced cement concrete M15 grade kilometer and Hectometer stone\local stone of standard design as per IRC:8 fixing in position including painting and printing etc as per drawing and Technical Specication clause 1703

-

-

-

... More
Earth work excavation & Depositing on bank with Initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth and earth mixed with small size boulder and in hard gravelly soils per SS 20B Including all other incidental charges such as slurring strutting, baling out water forming, protective bunds etc., complete for foundation.

25.92

-

-

... More
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes 25x25x3mm for boarding laying over silver oak joists of single 10cm -6.5cm space of 75cm centre to centre complete complying with standard specificatinon

106.88

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B

35.95

-

-

... More
Providing weep holes and fixing of 100 mm PVC Pipe

12

-

-

... More
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,

4.74

-

-

... More
Km 0/000-9/600

9

-

-

... More
Culvert

41.58

-

-

... More
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

2.65

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

24.27

-

-

... More
Culvert

42.53

-

-

... More
Providing weep holes and fixing of 100 mm PVC Pipe

12

-

-

... More
Cement concrete 1:2:4 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete

56.78

-

-

... More
Construction of RCC Slab Culvert 1.50m Span at Ch.6405m

-

-

-

... More
Culvert

83.62

-

-

... More
Culvert

83.62

-

-

... More
Providing weep holes and fixing of 100 mm PVC Pipe

12

-

-

... More
Supplying fabricating and placing in position mild steel/ Ribber tor steel rods for all RCC works including cost of steel and binding wire also in all floors complete complying with standard specification

0.35

-

-

... More
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mildsteel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre andsupported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centrecomplete complying with standard specifications and as directed by departmentalofficers including conveyance of all materials to site and proper centering etc complete.

-

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

3.59

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

2.69

-

-

... More
Earth work excavation & Depositing on bank with Initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth and earth mixed with small size boulder and in hard gravelly soils per SS 20B Including all other incidental charges such as slurring strutting, baling out water forming, protective bunds etc., complete for foundation.

38.88

-

-

... More
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes 25x25x3mm for boarding laying over silver oak joists of single 10cm -6.5cm space of 75cm centre to centre complete complying with standard specificatinon

32

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

3.41

-

-

... More
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

2.65

-

-

... More
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

6.48

-

-

... More
Construction of RCC Slab Culvert 6.00m Span at Ch.8494m

-

-

-

... More
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming grills for all R.C.C works

0.35

-

-

... More
Construction of RCC Slab Culvert 1.50m Span at Ch.7210m

-

-

-

... More
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

2.65

-

-

... More
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,

57.34

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

21.43

-

-

... More
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mildsteel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre andsupported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centrecomplete complying with standard specifications and as directed by departmentalofficers including conveyance of all materials to site and proper centering etc complete.

-

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

25.13

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

3.59

-

-

... More
Providing and fixing KRAFT paper Between Bed block & Deck slab

3.6

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

21.43

-

-

... More
Providing and fixing KRAFT paper Between Bed block & Deck slab

3.6

-

-

... More
Construction of RCC Slab Culvert 1.50m Span at Ch.4198m

-

-

-

... More
Providing weep holes and fixing of 100 mm PVC Pipe

12

-

-

... More
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,

4.74

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B

35.95

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B

35.95

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

3.41

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B

35.95

-

-

... More
Construction of RCC Slab Culvert 1.50m Span at Ch.290m

-

-

-

... More
Culvert

83.62

-

-

... More
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Using Plastic Waste Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30 bitumen for premixing per 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks, paver finisher/9m paver finisher, vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5

-

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B

35.95

-

-

... More
Culvert

83.62

-

-

... More
Providing and fixing 15mm Bitumen felt for expansion joint Between Dirtwall &Deck slab

2.4

-

-

... More
Culvert

41.58

-

-

... More
Construction of RCC Slab Culvert 1.50m Span at Ch.2723m

-

-

-

... More
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

2.65

-

-

... More
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,

4.74

-

-

... More
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes 25x25x3mm for boarding laying over silver oak joists of single 10cm -6.5cm space of 75cm centre to centre complete complying with standard specificatinon

107.6

-

-

... More
Providing weep holes and fixing of 100 mm PVC Pipe

12

-

-

... More
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

2.65

-

-

... More
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,

4.74

-

-

... More
Supplying fabricating and placing in position mild steel/ Ribber tor steel rods for all RCC works including cost of steel and binding wire also in all floors complete complying with standard specification

0.35

-

-

... More
Culvert

83.62

-

-

... More
Providing and fixing OF Cautionary, mandatory and informatory sign board

-

-

-

... More
Culvert

83.62

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

2.69

-

-

... More
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,

4.74

-

-

... More
Culvert

41.58

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B

35.95

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

24.27

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B

35.95

-

-

... More
Providing and fixing 15mm Bitumen felt for expansion joint Between Dirtwall &Deck slab

2.4

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

3.59

-

-

... More
Supplying fabricating and placing in position mild steel/ Ribber tor steel rods for all RCC works including cost of steel and binding wire also in all floors complete complying with standard specification

0.35

-

-

... More
Culvert

83.62

-

-

... More
Supplying fabricating and placing in position mild steel/ Ribber tor steel rods for all RCC works including cost of steel and binding wire also in all floors complete complying with standard specification

0.35

-

-

... More
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,

4.74

-

-

... More
Culvert

41.58

-

-

... More
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,

4.74

-

-

... More
Culvert

41.58

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

6.48

-

-

... More
Supplying fabricating and placing in position mild steel/ Ribber tor steel rods for all RCC works including cost of steel and binding wire also in all floors complete complying with standard specification

0.35

-

-

... More
Providing weep holes and fixing of 100 mm PVC Pipe

12

-

-

... More
Construction of RCC Slab Culvert 1.50m Span at Ch.7741m

-

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

26.4

-

-

... More
Culvert

41.58

-

-

... More
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mildsteel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre andsupported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centrecomplete complying with standard specifications and as directed by departmentalofficers including conveyance of all materials to site and proper centering etc complete.

-

-

-

... More
Culvert

249.03

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

2.69

-

-

... More
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mildsteel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre andsupported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centrecomplete complying with standard specifications and as directed by departmentalofficers including conveyance of all materials to site and proper centering etc complete.

-

-

-

... More
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

2.65

-

-

... More
Km 0/000-9/600

1080.96

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

3.87

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

21.43

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

21.43

-

-

... More
Supplying fabricating and placing in position mild steel/ Ribber tor steel rods for all RCC works including cost of steel and binding wire also in all floors complete complying with standard specification

0.35

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for Superstructure

21.43

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

2.69

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B

35.95

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

24.27

-

-

... More
Cluvert

41.58

-

-

... More
Earth work excavation in all cases of soils except hard roack requiring blasting and depositing on bank within initial lead of 10m & initial lift of 2m including all labour charges and incidental charges such as shorting, strutting, providing coffer dams, bailing out of water as per 20A

-

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

2.69

-

-

... More
Providing and fixing KRAFT paper Between Bed block & Deck slab

3.6

-

-

... More
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mildsteel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre andsupported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centrecomplete complying with standard specifications and as directed by departmentalofficers including conveyance of all materials to site and proper centering etc complete.

-

-

-

... More
Culvert

83.62

-

-

... More
Km 7/000-8/000

150

-

-

... More
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mildsteel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre andsupported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centrecomplete complying with standard specifications and as directed by departmentalofficers including conveyance of all materials to site and proper centering etc complete.

-

-

-

... More
Earth work excavation & Depositing on bank with Initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth and earth mixed with small size boulder and in hard gravelly soils per SS 20B Including all other incidental charges such as slurring strutting, baling out water forming, protective bunds etc., complete for foundation.

38.88

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

24.27

-

-

... More
Providing and fixing 15mm Bitumen felt for expansion joint Between Dirtwall &Deck slab

2.4

-

-

... More
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,

57.34

-

-

... More
Construction of RCC Slab Culvert 1.50m Span at Ch.1946m

-

-

-

... More
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,

4.74

-

-

... More
Earth work excavation & Depositing on bank with Initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth and earth mixed with small size boulder and in hard gravelly soils per SS 20B Including all other incidental charges such as slurring strutting, baling out water forming, protective bunds etc., complete for foundation.

322.5

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

108.5

-

-

... More
Cement concrete 1:3:6 mix using 40mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from Departmental section stores to the actual workspot and handling charges at each and including cost of form work mixing concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tools and plants and all other incidental charges such as baling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer

42.49

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction & maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (for Construction & maintenance) above this row in column "BB" for all works in this package}

1

-

-

... More
Provision of Cement Concrete Pavement ( Hard Bed ) @ Ch 9100m-9180m

-

-

-

... More
Providing weep holes and fixing of 100 mm PVC Pipe

12

-

-

... More
Km 0/000-9/600

22819.2

-

-

... More
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,

4.74

-

-

... More
Providing weep holes and fixing of 100 mm PVC Pipe

12

-

-

... More
Providing weep holes and fixing of 100 mm PVC Pipe

12

-

-

... More
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mildsteel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre andsupported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centrecomplete complying with standard specifications and as directed by departmentalofficers including conveyance of all materials to site and proper centering etc complete.

-

-

-

... More
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,

4.74

-

-

... More
Culvert

99.14

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

24.27

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

3.59

-

-

... More
Providing and fixing KRAFT paper Between Bed block & Deck slab

3.6

-

-

... More
Supplying fabricating and placing in position mild steel/ Ribber tor steel rods for all RCC works including cost of steel and binding wire also in all floors complete complying with standard specification

0.35

-

-

... More
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mildsteel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre andsupported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centrecomplete complying with standard specifications and as directed by departmentalofficers including conveyance of all materials to site and proper centering etc complete.

-

-

-

... More
Km 1/000-2/000

150

-

-

... More
Providing and fixing 15mm Bitumen felt for expansion joint Between Dirtwall &Deck slab

2.4

-

-

... More
Supply and fixing weephole 100mm dia PVC pipes as per specification and as directed by the departmental officer.

32

-

-

... More
Construction of RCC Slab Culvert 1.50m Span at Ch.8993m

-

-

-

... More
Supplying fabricating and placing in position mild steel/ Ribber tor steel rods for all RCC works including cost of steel and binding wire also in all floors complete complying with standard specification

0.88

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B

35.95

-

-

... More
Providing weep holes and fixing of 100 mm PVC Pipe

12

-

-

... More
Strengthening the Road From Thurusanmpalayam Solaganai Settlement Village km 0/0-9/600

-

-

-

... More
Providing and fixing KRAFT paper Between Bed block & Deck slab

3.6

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

3.59

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

24.27

-

-

... More
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,

4.74

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

3.59

-

-

... More
Providing weep holes and fixing of 100 mm PVC Pipe

12

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

3.59

-

-

... More
Cement concrete 1:2:4 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete

56.78

-

-

... More
Km 0/000-9/600

648.57

-

-

... More
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mildsteel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre andsupported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centrecomplete complying with standard specifications and as directed by departmentalofficers including conveyance of all materials to site and proper centering etc complete.

-

-

-

... More
Culvert

249.03

-

-

... More
Culvert

62.37

-

-

... More
Culvert

41.58

-

-

... More
Supplying fabricating and placing in position mild steel/ Ribber tor steel rods for all RCC works including cost of steel and binding wire also in all floors complete complying with standard specification

3

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B

35.95

-

-

... More
Cement concrete 1:3:6 mix using 40mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from Departmental section stores to the actual workspot and handling charges at each and including cost of form work mixing concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tools and plants and all other incidental charges such as baling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer

111.14

-

-

... More
Culvert

41.58

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

3.59

-

-

... More
Km 5/000-6/000

150

-

-

... More
Supplying fabricating and placing in position mild steel/ Ribber tor steel rods for all RCC works including cost of steel and binding wire also in all floors complete complying with standard specification

3

-

-

... More
Supplying fabricating and placing in position mild steel/ Ribber tor steel rods for all RCC works including cost of steel and binding wire also in all floors complete complying with standard specification

0.35

-

-

... More
Culvert

249.03

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

2.69

-

-

... More
Km 0/000-9/600

5184

-

-

... More
Providing and fixing 15mm Bitumen felt for expansion joint Between Dirtwall &Deck slab

2.4

-

-

... More
Providing and fixing 15mm Bitumen felt for expansion joint Between Dirtwall &Deck slab

2.4

-

-

... More
Culvert

41.58

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

2

-

-

... More
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,

4.74

-

-

... More
Culvert

42.53

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

21.43

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

24.27

-

-

... More
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A.

-

-

-

... More
Providing and fixing KRAFT paper Between Bed block & Deck slab

3.6

-

-

... More
Supply and fixing weephole 100mm dia PVC pipes as per specification and as directed by the departmental officer.

48

-

-

... More
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mildsteel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre andsupported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centrecomplete complying with standard specifications and as directed by departmentalofficers including conveyance of all materials to site and proper centering etc complete.

-

-

-

... More
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mildsteel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre andsupported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centrecomplete complying with standard specifications and as directed by departmentalofficers including conveyance of all materials to site and proper centering etc complete.

-

-

-

... More
Culvert

41.58

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

24.27

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

3.41

-

-

... More
Construction of RCC Slab Culvert 1.50m Span at Ch.67m

-

-

-

... More
Providing and fixing 15mm Bitumen felt for expansion joint Between Dirtwall &Deck slab

2.4

-

-

... More
Providing and fixing KRAFT paper Between Bed block & Deck slab

3.6

-

-

... More
Culvert

41.58

-

-

... More
Culvert

83.62

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

24.27

-

-

... More
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mildsteel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre andsupported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centrecomplete complying with standard specifications and as directed by departmentalofficers including conveyance of all materials to site and proper centering etc complete.

-

-

-

... More
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

2.65

-

-

... More
Earth work excavation & Depositing on bank with Initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth and earth mixed with small size boulder and in hard gravelly soils per SS 20B Including all other incidental charges such as slurring strutting, baling out water forming, protective bunds etc., complete for foundation.

103.68

-

-

... More
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labo

2.65

-

-

... More
Supplying fabricating and placing in position mild steel/ Ribber tor steel rods for all RCC works including cost of steel and binding wire also in all floors complete complying with standard specification

0.35

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

24.27

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B

35.95

-

-

... More
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mildsteel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre andsupported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centrecomplete complying with standard specifications and as directed by departmentalofficers including conveyance of all materials to site and proper centering etc complete.

-

-

-

... More
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mildsteel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre andsupported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centrecomplete complying with standard specifications and as directed by departmentalofficers including conveyance of all materials to site and proper centering etc complete.

-

-

-

... More
Construction of RCC Slab Culvert 6.00m Span at Ch.3600m

-

-

-

... More
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,

4.74

-

-

... More
Cluvert

83.62

-

-

... More
Providing and laying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.

-

-

-

... More
Providing and fixing KRAFT paper Between Bed block & Deck slab

3.4

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

152.47

-

-

... More
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mildsteel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre andsupported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centrecomplete complying with standard specifications and as directed by departmentalofficers including conveyance of all materials to site and proper centering etc complete.

-

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

2.69

-

-

... More
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mildsteel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre andsupported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centrecomplete complying with standard specifications and as directed by departmentalofficers including conveyance of all materials to site and proper centering etc complete.

-

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

2.69

-

-

... More
Providing weep holes and fixing of 100 mm PVC Pipe

12

-

-

... More
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,

57.34

-

-

... More
Supplying fabricating and placing in position mild steel/ Ribber tor steel rods for all RCC works including cost of steel and binding wire also in all floors complete complying with standard specification

0.35

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks

2.69

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

36.5

-

-

... More
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,

4.74

-

-

... More
Supplying fabricating and placing in position mild steel/ Ribber tor steel rods for all RCC works including cost of steel and binding wire also in all floors complete complying with standard specification

0.35

-

-

... More
Culvert

83.62

-

-

... More
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,

4.74

-

-

... More
Construction of RCC Slab Culvert 1.50m Span at Ch.505m

-

-

-

... More
Supplying fabricating and placing in position mild steel/ Ribber tor steel rods for all RCC works including cost of steel and binding wire also in all floors complete complying with standard specification

0.35

-

-

... More
Culvert

41.58

-

-

... More
Providing weep holes and fixing of 100 mm PVC Pipe

12

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

3.12

-

-

... More
Culvert

41.58

-

-

... More
Culvert

41.58

-

-

... More
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes 25x25x3mm for boarding laying over silver oak joists of single 10cm -6.5cm space of 75cm centre to centre complete complying with standard specificatinon

96.4

-

-

... More
Cement concrete 1:4:8 mix using 40mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from Departmental section stores to the actual workspot and handling charges at each and including cost of form work mixing concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tools and plants and all other incidental charges such as baling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer

201.75

-

-

... More
Construction of RCC Slab Culvert 6.00m Span at Ch.140m

-

-

-

... More
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes 25x25x3mm for boarding laying over silver oak joists of single 10cm -6.5cm space of 75cm centre to centre complete complying with standard specificatinon

23.2

-

-

... More
Cement concrete 1:3:6 mix using 40mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from Departmental section stores to the actual workspot and handling charges at each and including cost of form work mixing concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tools and plants and all other incidental charges such as baling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer

31.76

-

-

... More
Provision of Cement Concrete Pavement ( Hard Bed ) @ Ch 3015m-3270m

-

-

-

... More
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mildsteel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre andsupported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centrecomplete complying with standard specifications and as directed by departmentalofficers including conveyance of all materials to site and proper centering etc complete.

-

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

225.5

-

-

... More
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

19.58

-

-

... More
Culvert

83.62

-

-

... More
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,

4.74

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

21.43

-

-

... More
Providing and fixing KRAFT paper Between Bed block & Deck slab

3.6

-

-

... More
Culvert

249.03

-

-

... More
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

2.65

-

-

... More
Providing and fixing 15mm Bitumen felt for expansion joint Between Dirtwall &Deck slab

2.4

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

3.87

-

-

... More
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms.

-

-

-

... More
Cement concrete 1:3:6 mix using 40mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from Departmental section stores to the actual workspot and handling charges at each and including cost of form work mixing concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tools and plants and all other incidental charges such as baling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer

51.49

-

-

... More
Providing weep holes and fixing of 100 mm PVC Pipe

12

-

-

... More
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,

4.74

-

-

... More
Cement concrete 1:4:8 mix using 40mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from Departmental section stores to the actual workspot and handling charges at each and including cost of form work mixing concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tools and plants and all other incidental charges such as baling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer

162.75

-

-

... More
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

19.58

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

3.59

-

-

... More
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes 25x25x3mm for boarding laying over silver oak joists of single 10cm -6.5cm space of 75cm centre to centre complete complying with standard specificatinon

281.35

-

-

... More
Construction of RCC Slab Culvert 1.50m Span at Ch.5325m

-

-

-

... More
Earth work excavation & Depositing on bank with Initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth and earth mixed with small size boulder and in hard gravelly soils per SS 20B Including all other incidental charges such as slurring strutting, baling out water forming, protective bunds etc., complete for foundation.

191.25

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B

35.95

-

-

... More
Providing and fixing KRAFT paper Between Bed block & Deck slab

3.6

-

-

... More
Providing and fixing 15mm Bitumen felt for expansion joint Between Dirtwall &Deck slab

3.6

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

3.59

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B

35.95

-

-

... More
Culvert

41.58

-

-

... More
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,

4.74

-

-

... More
Supply and fixing weephole 100mm dia PVC pipes as per specification and as directed by the departmental officer.

104

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B

191.97

-

-

... More
Cement concrete 1:4:8 mix using 40mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from Departmental section stores to the actual workspot and handling charges at each and including cost of form work mixing concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tools and plants and all other incidental charges such as baling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer

54.75

-

-

... More
Km 0/000-9/600

9606.67

-

-

... More
Km 3/000-4/000

150

-

-

... More
Earth work excavation & Depositing on bank with Initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth and earth mixed with small size boulder and in hard gravelly soils per SS 20B Including all other incidental charges such as slurring strutting, baling out water forming, protective bunds etc., complete for foundation.

180.75

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B

35.95

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

3.59

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

21.43

-

-

... More
Providing and fixing KRAFT paper Between Bed block & Deck slab

3.6

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

2.69

-

-

... More
Culvert

99.14

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

24.27

-

-

... More
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mildsteel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre andsupported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centrecomplete complying with standard specifications and as directed by departmentalofficers including conveyance of all materials to site and proper centering etc complete.

-

-

-

... More
Cement concrete 1:4:8 mix using 40mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from Departmental section stores to the actual workspot and handling charges at each and including cost of form work mixing concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tools and plants and all other incidental charges such as baling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer

172.5

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

24.27

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

38.74

-

-

... More
Km 0/000-9/600

2702.4

-

-

... More
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,

57.34

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B

35.95

-

-

... More
Providing and fixing 15mm Bitumen felt for expansion joint Between Dirtwall &Deck slab

2.4

-

-

... More
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mildsteel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre andsupported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centrecomplete complying with standard specifications and as directed by departmentalofficers including conveyance of all materials to site and proper centering etc complete.

-

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

24.27

-

-

... More
Construction of RCC Slab Culvert 1.50m Span at Ch.7477m

-

-

-

... More
Cement concrete 1:4:8 mix using 40mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from Departmental section stores to the actual workspot and handling charges at each and including cost of form work mixing concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tools and plants and all other incidental charges such as baling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer

338.25

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

3.41

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

21.43

-

-

... More
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

2.65

-

-

... More
Providing and fixing KRAFT paper Between Bed block & Deck slab

3.6

-

-

... More
Construction of Retaining Wall For Culvert Portion Km of 4/0-5/00

-

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

2.69

-

-

... More
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,

57.34

-

-

... More
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mildsteel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre andsupported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centrecomplete complying with standard specifications and as directed by departmentalofficers including conveyance of all materials to site and proper centering etc complete.

-

-

-

... More
Culvert

41.58

-

-

... More
Construction of RCC Slab Culvert 3.00m Span at Ch.9022m

-

-

-

... More
Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site,

-

-

-

... More
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

2.65

-

-

... More
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,

4.74

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

21.43

-

-

... More
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

2.65

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

24.27

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

3.12

-

-

... More
Supplying fabricating and placing in position mild steel/ Ribber tor steel rods for all RCC works including cost of steel and binding wire also in all floors complete complying with standard specification

3

-

-

... More
Providing weep holes and fixing of 100 mm PVC Pipe

12

-

-

... More
Culvert

41.58

-

-

... More
Construction of RCC Slab Culvert 1.50m Span at Ch.7292m

-

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B etc

35.95

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

115

-

-

... More
Earth work excavation & Depositing on bank with Initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth and earth mixed with small size boulder and in hard gravelly soils per SS 20B Including all other incidental charges such as slurring strutting, baling out water forming, protective bunds etc., complete for foundation.

338.25

-

-

... More
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,

4.74

-

-

... More
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

19.58

-

-

... More
Provision of Cement Concrete Pavement ( Hard Bed ) @ Ch 5000m-5007m,5310m-5740m

-

-

-

... More
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

19.58

-

-

... More
Culvert

42.53

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

2.69

-

-

... More
Culvert

83.62

-

-

... More
Cement concrete 1:2:4 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete

56.78

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

2.69

-

-

... More
Providing and fixing 15mm Bitumen felt for expansion joint Between Dirtwall &Deck slab

2.4

-

-

... More
Providing and fixing 15mm Bitumen felt for expansion joint Between Dirtwall &Deck slab

2.4

-

-

... More
Culvert

41.58

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

24.27

-

-

... More
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

6.48

-

-

... More
Providing and fixing 15mm Bitumen felt for expansion joint Between Dirtwall &Deck slab

2.4

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

24.27

-

-

... More
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes 25x25x3mm for boarding laying over silver oak joists of single 10cm -6.5cm space of 75cm centre to centre complete complying with standard specificatinon

92

-

-

... More
Cement concrete 1:4:8 mix using 40mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from Departmental section stores to the actual workspot and handling charges at each and including cost of form work mixing concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tools and plants and all other incidental charges such as baling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer

6.48

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B

35.95

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

21.43

-

-

... More
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,

4.74

-

-

... More
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

2.65

-

-

... More
Supplying fabricating and placing in position mild steel/ Ribber tor steel rods for all RCC works including cost of steel and binding wire also in all floors complete complying with standard specification

0.35

-

-

... More
Providing weep holes and fixing of 100 mm PVC Pipe

12

-

-

... More
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

2.65

-

-

... More
Supplying fabricating and placing in position mild steel/ Ribber tor steel rods for all RCC works including cost of steel and binding wire also in all floors complete complying with standard specification

3

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B

191.97

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B

35.95

-

-

... More
HM Stone

39

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B

35.95

-

-

... More
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,

4.74

-

-

... More
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

6.48

-

-

... More
Culvert

83.62

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

21.43

-

-

... More
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

2.65

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

2.69

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B

191.97

-

-

... More
Providing and fixing 15mm Bitumen felt for expansion joint Between Dirtwall &Deck slab

2.4

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

21.43

-

-

... More
Providing weep holes and fixing of 100 mm PVC Pipe

12

-

-

... More
Providing weep holes and fixing of 100 mm PVC Pipe

12

-

-

... More
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mildsteel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre andsupported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centrecomplete complying with standard specifications and as directed by departmentalofficers including conveyance of all materials to site and proper centering etc complete.

-

-

-

... More
Construction of Retaining Wall For Culvert Portion Km of 4/0-5/00

-

-

-

... More
Construction of RCC Slab Culvert 1.50m Span at Ch.5100m

-

-

-

... More
Earth work excavation & Depositing on bank with Initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth and earth mixed with small size boulder and in hard gravelly soils per SS 20B Including all other incidental charges such as slurring strutting, baling out water forming, protective bunds etc., complete for foundation.

172.5

-

-

... More
Providing and fixing 15mm Bitumen felt for expansion joint Between Dirtwall &Deck slab

2.4

-

-

... More
Culvert

83.62

-

-

... More
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes 25x25x3mm for boarding laying over silver oak joists of single 10cm -6.5cm space of 75cm centre to centre complete complying with standard specificatinon

86.8

-

-

... More
Culvert

83.62

-

-

... More
Cement concrete 1:2:4 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete

56.78

-

-

... More
Providing and fixing KRAFT paper Between Bed block & Deck slab

3.6

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

152.47

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

38.74

-

-

... More
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,

4.74

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete

23.04

-

-

... More
Construction of RCC Slab Culvert 6.00m Span at Ch.5852m

-

-

-

... More
Providing and fixing KRAFT paper Between Bed block & Deck slab

3.6

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

3.59

-

-

... More
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

2.65

-

-

... More
Providing weep holes and fixing of 100 mm PVC Pipe

12

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete

23.04

-

-

... More
Km 0/000-9/600

63

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

152.47

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

3.59

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

3.12

-

-

... More
Km Stone

9

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

215

-

-

... More
Providing weep holes and fixing of 100 mm PVC Pipe

12

-

-

... More
Culvert

41.58

-

-

... More
Providing and Fixing of Metal Beam Cross barrier Type Double Guard

-

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

3.59

-

-

... More
Culvert

83.62

-

-

... More
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

2.65

-

-

... More
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mildsteel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre andsupported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centrecomplete complying with standard specifications and as directed by departmentalofficers including conveyance of all materials to site and proper centering etc complete.

-

-

-

... More
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mildsteel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre andsupported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centrecomplete complying with standard specifications and as directed by departmentalofficers including conveyance of all materials to site and proper centering etc complete.

-

-

-

... More
Construction of RCC Slab Culvert 1.50m Span at Ch.7132m

-

-

-

... More
Providing and fixing KRAFT paper Between Bed block & Deck slab

3.6

-

-

... More
Culvert

42.53

-

-

... More
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mildsteel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre andsupported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centrecomplete complying with standard specifications and as directed by departmentalofficers including conveyance of all materials to site and proper centering etc complete.

-

-

-

... More
Providing weep holes and fixing of 100 mm PVC Pipe

12

-

-

... More
Cement concrete 1:4:8 mix using 40mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from Departmental section stores to the actual workspot and handling charges at each and including cost of form work mixing concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tools and plants and all other incidental charges such as baling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer

4.32

-

-

... More
Providing weep holes and fixing of 100 mm PVC Pipe

12

-

-

... More
Providing weep holes and fixing of 100 mm PVC Pipe

12

-

-

... More
Km 8/000-9/000

150

-

-

... More
Providing and fixing KRAFT paper Between Bed block & Deck slab

3.6

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

24.27

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

3.59

-

-

... More
Providing and fixing KRAFT paper Between Bed block & Deck slab

3.6

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for Foundation

24.27

-

-

... More
Providing and fixing KRAFT paper Between Bed block & Deck slab

3.6

-

-

... More
Providing and fixing 15mm Bitumen felt for expansion joint Between Dirtwall &Deck slab

2.4

-

-

... More
Culvert

249.03

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

21.43

-

-

... More
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mildsteel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre andsupported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centrecomplete complying with standard specifications and as directed by departmentalofficers including conveyance of all materials to site and proper centering etc complete.

-

-

-

... More
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes 25x25x3mm for boarding laying over silver oak joists of single 10cm -6.5cm space of 75cm centre to centre complete complying with standard specificatinon

348.12

-

-

... More
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mildsteel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre andsupported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centrecomplete complying with standard specifications and as directed by departmentalofficers including conveyance of all materials to site and proper centering etc complete.

-

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

21.43

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

3.59

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

2.69

-

-

... More
Culvert

42.53

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

127.5

-

-

... More
Km 6/000-7/000

150

-

-

... More
Providing and fixing 15mm Bitumen felt for expansion joint Between Dirtwall &Deck slab

3.6

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

24.27

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

25.13

-

-

... More
Culvert

42.53

-

-

... More
Providing and fixing KRAFT paper Between Bed block & Deck slab

3.6

-

-

... More
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

2.65

-

-

... More
Providing and fixing KRAFT paper Between Bed block & Deck slab

3.6

-

-

... More
Culvert

41.58

-

-

... More
Earth work excavation & Depositing on bank with Initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth and earth mixed with small size boulder and in hard gravelly soils per SS 20B Including all other incidental charges such as slurring strutting, baling out water forming, protective bunds etc., complete for foundation.

60

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B

56.15

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

21.43

-

-

... More
Construction of RCC Slab Culvert 3.00m Span at Ch.7939m

-

-

-

... More
Km 0/000-9/600

10368

-

-

... More
Supplying fabricating and placing in position mild steel/ Ribber tor steel rods for all RCC works including cost of steel and binding wire also in all floors complete complying with standard specification

0.35

-

-

... More
Providing weep holes and fixing of 100 mm PVC Pipe

12

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

25.13

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

24.27

-

-

... More
Providing weep holes and fixing of 100 mm PVC Pipe

12

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B

56.15

-

-

... More
Providing and fixing 15mm Bitumen felt for expansion joint Between Dirtwall &Deck slab

2.4

-

-

... More
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,

4.74

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B

35.95

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

38.74

-

-

... More
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,

4.74

-

-

... More
Cement concrete 1:4:8 mix using 40mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from Departmental section stores to the actual workspot and handling charges at each and including cost of form work mixing concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tools and plants and all other incidental charges such as baling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer

60

-

-

... More
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mildsteel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre andsupported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centrecomplete complying with standard specifications and as directed by departmentalofficers including conveyance of all materials to site and proper centering etc complete.

-

-

-

... More
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

2.65

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

2.69

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

24.27

-

-

... More
Providing and fixing 15mm Bitumen felt for expansion joint Between Dirtwall &Deck slab

2.4

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

3.59

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete

23.04

-

-

... More
Cement concrete 1:4:8 mix using 40mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from Departmental section stores to the actual workspot and handling charges at each and including cost of form work mixing concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tools and plants and all other incidental charges such as baling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer

17.28

-

-

... More
Providing and fixing 15mm Bitumen felt for expansion joint Between Dirtwall &Deck slab

2.4

-

-

... More
Supplying fabricating and placing in position mild steel/ Ribber tor steel rods for all RCC works including cost of steel and binding wire also in all floors complete complying with standard specification

0.35

-

-

... More
Culvert

83.62

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

152.47

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

21.43

-

-

... More
Culvert

41.58

-

-

... More
Supply and fixing weephole 100mm dia PVC pipes as per specification and as directed by the departmental officer.

128

-

-

... More
Culvert

249.03

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

2.69

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

24.27

-

-

... More
Cement concrete 1:2:4 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete

56.78

-

-

... More
Culvert

99.14

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B

35.95

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for superstructure

21.43

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.