Engineering Projects India Limited Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Engineering Projects India Limited Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date2 Jan 2024
Closing Date6 Feb 2024
Tender Amount₹ 5,62,84,084 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Contractor shall provide and maintain Field Laboratory in a satisfactory manner till the completion of work to ensure site control on quality of materials and the works and shall strictly comply with provision of Indian/ International Standards at no extra cost. All other regular tests including requisite materials shall be carried out as directed either at approved laboratory or at site at no extra cost.

-

-

-

... More
The dimensions shown in the drawings shall have to be verified by the contractor at site before execution of the items and necessary allowance's have to be made as per the actual dimensions available at site.

-

-

-

... More
The quantity and rates mentioned in the Bill of Quantities shall be applicable anywhere in the MSME- Sriperumbudur premises.

-

-

-

... More
All pre-fabrication works wherever possible shall be carried outside the Employer's premises, only assembling and finishing work will be allowed within the Site.

-

-

-

... More
Items of work provided in this schedule but not covered in the specifications shall be executed strictly as per instructions of the Project Manager.

-

-

-

... More
Unless specifically mentioned in the contract document, the tenderer shall quote for the finished items and shall provide for the complete cost towards labour, materials, plant and machinery, operational costs, necessary seafty measures, levies, taxes, royalty, octroi / LBT transport, repairs, rectification, maintenance till handing over to Owner, revenue expenses, contingencies, overheads, profits and all incidental items not specifically mentioned but reasonably implied and necessary to complete the works according to the contract.

-

-

-

... More
The quantities of the various items mentioned in the schedule of items are approximate and may vary up to any extent or may not be executed altogether. The quoted rates of each item shall remain firm as long as mentioned in the conditions under this contract. The contractor, in his own interest, should get an indication of the probable extent of the work to be executed under any particular item in this schedule, before undertaking any preliminary and enabling work or purchasing bought out components related to the work.

-

-

-

... More
Project Manager's decisions shall be final and binding on the contractor regarding clarifications of items in this schedule with respect to the other sections / parts of the Contract.

-

-

-

... More
The rates quoted shall be inclusive of all mock-ups, associated samples prior to any mass production or procurement as per complete satisfaction of the Project Manager including dismantling, demolishing and carting away the material and making good of the surface.

-

-

-

... More
Unless otherwise specified, the rates quoted shall be for complete item i.e. inclusive of supply, installation, testing, commissionng , handing over etc. complete with all necessary works not specifically mentioned but required for satisfactory performance of the systems / works.

-

-

-

... More
The rate to include barricading the ducts, openings, if any, by providing 20 gauge MS/Aluminium Jalli at those locations.

-

-

-

... More
Any fault that occurs during the time of production, shifting or installation of finished materials, the same should be replaced with good one as per the instruction from Project Manager.

-

-

-

... More
For pile boring, Direct mud circulation (DMC) or Bailer and chisel technique has been considered in BOQ. If any other approved method is used by contractor, the same shall not be paid extra and shall be paid as per the item rates of DMC or Bailer and chisel technique method only.

-

-

-

... More
If any item to be executed is not present in the specific section but available in other section of BOQ, then same item from other section shall be operated. No extra shall be paid under these circumstances.

-

-

-

... More
Unless otherwise explicitly mentioned, Portland Pozzolana Cement (PPC) shall be used.

-

-

-

... More
The abbreviations used in the Specification and Bill of Quantities shall be read as follows :

-

-

-

... More
INR :- Indian Rupees

-

-

-

... More
IS :- Indian Standard

-

-

-

... More
IRC : - Indian Road Congress

-

-

-

... More
EIC :- Engineer In Charge

-

-

-

... More
A.S.T.M :- American Society for Testing and Materials

-

-

-

... More
A.W.S :- American Welding Society

-

-

-

... More
MM or mm :- Millimetre /s

-

-

-

... More
CM & cm :- Centimetre /s

-

-

-

... More
RM (rm) / RMT (Rmt) / m :- Running metre /s

-

-

-

... More
KG (kg) :- Kilogram /s

-

-

-

... More
Tonne/t/M.T. :- Metric ton/s (1000 Kilogram's)

-

-

-

... More
Dia./ dia. :- Diameter

-

-

-

... More
Sq.m. / sqm :- Square metre

-

-

-

... More
Cu.m / cum :- Cubic metre

-

-

-

... More
Cu.Ft.:- Cubic feet

-

-

-

... More
Lit., L :- Liters

-

-

-

... More
No.:- Number/s

-

-

-

... More
Qty.:- Quantity

-

-

-

... More
L.S :- Lump sum.

-

-

-

... More
Drg.No. :- Drawing number

-

-

-

... More
PCC:- Plain Cement Concrete

-

-

-

... More
RCC:- Reinforced cement concrete

-

-

-

... More
HSD:- High Yield strength Deformed bars.

-

-

-

... More
M.S. / MS :- Mild Steel

-

-

-

... More
CRS:- Corrosion resistance steel.

-

-

-

... More
CTD:- Cold Twisted Deformed steel.

-

-

-

... More
TMT :- Thermo Mechanically Treated Bars

-

-

-

... More
EXCAVATION

-

-

-

... More
Rate shall include the Clearing and Grubbing of the fill area including, removal of shrubs, plants and stumps, disposal of rubbish / excavated stuff to contractor's own disposal area, watering, compaction etc. complte.

-

-

-

... More
The rate for excavation shall include carting away the debris, pieces of rock, earth etc. to the dumping ground for all lifts and leads (Inside the premises as per the instruction or Outside the site premises with the permission / NOC of local statutory authority.)

-

-

-

... More
The rates shall include all kinds of dewatering with approved means and as directed by Engineer-In-Charge, including disposing off of the water as directed.

-

-

-

... More
All excavation and backfiling shall be measured net. All type of excavation and backfilling shall be measured upto P.C.C. line only. The Contractor shall excavate additional minimum 600 mm on all directions, beyond PCC line, to facilitate working allowence for the works like waterproofing, painting etc as per IS 1200 (Part 1) - 1992, clause 4.2.5.1. No extra payment shall be made towards this additional excavation.

-

-

-

... More
The rate for excavation shall include for shoring the sides or trenches with approved timber/steel accessories wherever necessary to prevent the sides from falling including bailing or pumping out of water (natuarally occurring water met with while excavating the pits) if found necessary. If there are any shrubs, bushes, trees etc., are to be removed, roots of the trees should be removed for minimum depth 1.5m. All these materials shall be neatly stacked at site and to be handed over to the Employer.

-

-

-

... More
Boulders which may be encountered in the excavations and which can be removed by crow bars/bucket of poclain excavator from the parent-matrix shall be removed and shall form part of this item and no separate payment shall be made towards the same.

-

-

-

... More
Contour level to be taken jointly before starting any excavation/ filling at every 3 / 5 meter grids.

-

-

-

... More
Should contractor excavate to a greater depth or width than shown on the drawing or instructed by Project Manager, the contractor shall fill the same at his own expense in such greater depth or width of excavation with Plum concrete as described for foundation by Project Manager and no separate payment shall be made towards the same.

-

-

-

... More
Tree cutting and disposing of the trees (if any) to be done as per Project Manager's instructions.

-

-

-

... More
The excavated material,as directed by Project Manager, shall be retained at the locations within the site or disposed off outside the plot boundry in the approved dump yard of Local Municipal Authority or any other place. The rate of excavation includes cost of all necessary licences, Royalty charges and permissions from appropriate authorities and the owner for the disposing the unsuitable earth/material.

-

-

-

... More
Contractor shall take all necessary steps to ensure that the temporary soil retention system (touching piles, diaphragm wall or any other shoring system) is not damaged or disturbed during the excavation activity. In case any damages occurred, the Contractor shall make good such damages during the progress of the work at his own cost.

-

-

-

... More
The final approved founding strata shall be left absolutely clean by removing loose, slushy soil, murrum and weathered rocks with necessary tools & tackles, cleaning the surface by wire brush and carting away the debris, dewatering to keep site dry at all times till laying and curing of PCC etc. are all complete to the approval of Project Manager.

-

-

-

... More
The rate of excavation are inclusive of providing and maintaining in good condition, barricadding all along excavated pits with minimum 75 mm dia bullies of 2 m height with signes of DANGER on it.

-

-

-

... More
REINFORCED CEMENT CONCRETE

-

-

-

... More
The items mentioned in the Price Schedule / BOQ are applicable to any part, any structural / civil component to be constructed under this scope and contract and the same are not limited to buildings only.

-

-

-

... More
No additional payment shall be made for extra cement usage in the design mix for concrete from batching plant at site.

-

-

-

... More
All concrete shall be machine mixed and machine vibrated.

-

-

-

... More
All concrete shall be controlled Mix Concrete.

-

-

-

... More
The rates shall be inclusive of everything necessary required for delayed pour.

-

-

-

... More
For shuttering, all props shall be adjustable steel props

-

-

-

... More
STRUCTURAL STEEL WORKS

-

-

-

... More
Contractor shall carryout Die penetration Tests on 10% of total fabricated structural steel to ensure weld quality.

-

-

-

... More
DEMOLITION AND DISMANTLING WORKS

-

-

-

... More
Demolished materials shall be segregated based on their type and shall be used within the site for various purposes such as filling in landscape mounds, backfilling, reusing steel reinforcement for non structural works such as curbing etc. Rest of the segregated debris shall be sold for backfilling/ any other reuse offsite. Contractor shall produce the challans of the debris sold out offsite.

-

-

-

... More
While carying out demolition / dismantling works and disposing off the debris, special due care shall be taken towards safety. The owner and the consultants shall be indemnified from all liabilities.

-

-

-

... More
MASONRY

-

-

-

... More
Rates quoted for all items shall include the cost of the following :

-

-

-

... More
a) All scaffolding, ladders, platforms, staging and plant required in the execution of work to any height and depth

-

-

-

... More
b) Hacking and Roughening of concrete or other surface in contact with masonry for bond.

-

-

-

... More
c) Raking cut joints to 12mm depth for plastering and pointing

-

-

-

... More
d) Levelling up and preparing top of masonry for Damp proof course

-

-

-

... More
e) Hold fasts, bolts and such other inserts as directed by the Project manager

-

-

-

... More
f) Keeping the masonry work well wetted for two weeks or as directed by the Project manager

-

-

-

... More
g) Work at all heights, levels, depths, unless otherwise specified

-

-

-

... More
h) Providing through bond stones at every 1.0 m apart in each coarse in stone masonry

-

-

-

... More
i) Curved, straight and inclined masonry works

-

-

-

... More
j) Soaking of bricks in water for minimum period of 60 minutes so that the entire brick is soaked in water

-

-

-

... More
k) Cost of all materials, transport to site and labour

-

-

-

... More
l) An pipe fittings and specials, spouts, hold fasts and other fixtures which are required to be built into the walls shall be embedded, as specified, in their correct position as the work proceeds unless otherwise directed by the Project Manager.

-

-

-

... More
m) Building in ends of beams, joists, slabs, lintels, sills, trusses etc..,

-

-

-

... More
n) Stones used for UCR masonry shall be granite trap and/or basalt unless otherwise specified

-

-

-

... More
o) Provision to be made for cut-outs (Openings for sanitary, electrical, fire fighting or any other services) and after completion of the services work, all the cut-outs and openings to be made good, matching the surroundings

-

-

-

... More
p) Solid / Hollow block shall conform to IS : 2185.

-

-

-

... More
PLASTER AND FINISHING

-

-

-

... More
The Plaster shall be of sufficient thickness to fill up all undulations in the surfaces of masonry and to provide a true surface for wall/ceiling plaster. Special care shall be taken to soak the walls before applying the plaster and finishing the surface of plaster to ensure uniform texture and free from air cracks. Before starting the work sufficient Number of button marks shall be done to plumb and level to achieve uniform finish.

-

-

-

... More
All External Windows shall be finished to slope outwards and not less than 1 in 48. The exterior shall be finished as per sample approved, by wooden float but the interior shall be as per sample finished smooth.

-

-

-

... More
The contractor shall make good all the grooves, pockets, etc. after the scaffolding is removed.

-

-

-

... More
The rate for all types of plaster given below should be inclusive of the following items

-

-

-

... More
a) Forming of drip mould/ bands, grooves of sizes as required etc,.wherever grooves are to be provided horizontally/ vertically for in accordance with the drawings.

-

-

-

... More
b) Cost of All material and labour

-

-

-

... More
c) Hacking concrete surfaces to be plastered or rendered

-

-

-

... More
d) Preparation of surfaces by raking out joints, wetting the surface etc.,

-

-

-

... More
e) Work at all heights, levels and situations.

-

-

-

... More
f) Washing floors, cleaning glass and leaving premises clean and tidy after the plastering is done. Disposing off the debris outside the site

-

-

-

... More
g) Curing of the plaster works.

-

-

-

... More
h) Providing necessary scaffolding, ladder, platform for any height and depth and removing the same after the work is completed.

-

-

-

... More
i) Neat finishing of junctions of plaster and skirting

-

-

-

... More
j) Screening and washing approved fine aggregates

-

-

-

... More
PAINTING / FINISHING

-

-

-

... More
Paint shall be applied as per the specification and to Manufacturer’s specification and instructions.

-

-

-

... More
The quoted rate shall include curing, protecting the painted surface and adjacent work, and thoroughly cleaning of the premises.

-

-

-

... More
Paint shall be ready mixed and of premium quality of the approved brand and manufacturer. The paint shall generally conform to the chemical composition and other characteristics laid down in the relevant Indian standard specification. It is desired that materials of one manufacturer only shall be used as far as possible and paint of one shade be obtained from the same manufacturing batch. All paints shall be subjected to analysis from random samples taken at site from the painter’s bucket, if so desired. Any materials found not conforming to the relevant specification shall have to be removed by the Contractor from the site at no extra cost.

-

-

-

... More
All primer coats shall be compatible to the material of the surface to be finished as well as to the finishing coats to be applied.

-

-

-

... More
All coats shall be thoroughly dry before being sand papered or before the succeeding coat is applied. Coats of painting as specified are intended to cover surfaces perfectly. In case the surface is not covered properly by applying the specified number of coats, further coats shall be applied by the Contractor when so directed by the Project Manager at no extra cost.

-

-

-

... More
Painting shall be done by skilled labourers in a workman like manner. All materials shall be evenly applied so as to be free from sags, runs, crawls, or other defects. All coats shall be of proper consistency and shall be well brushed out, so that no brush marks are visible, except varnish and enamels which shall be uniformly flowed on. The brushes shall be clean and in good condition before application of paint.

-

-

-

... More
Net surface area of the painting/ finishing works shall be measured for the payment. No any painting coefficient shall be applicable for any type of paint.

-

-

-

... More
The rate to include the following:

-

-

-

... More
a) All surface preparation, suitable number of base coats required, primers and suitable finishing to the complete satisfaction of the Engineer in Charge.

-

-

-

... More
b) Scaffolding and all leads and lifts

-

-

-

... More
c) Proper curing in between the two subsequent coats

-

-

-

... More
d) Touch ups to the paint after the scaffolding is removed

-

-

-

... More
e) Minimum Guarantee of TEN Years for all external paints on requisite stamp paper

-

-

-

... More
f) Any splash or spray of paint shall be removed immediately after painting work. All doors and windows or any other area which is not to be painted shall be protected by suitable tape with paper. All this material shall be removed disposed without damaging the painted surface.

-

-

-

... More
LANDSCAPING

-

-

-

... More
Unless otherwise specifically mentioned in the items, the Contractor shall carryout following works at no extra cost to the Employer.

-

-

-

... More
The Contractor will supply and install 3.0 metres high barricades for safeguarding landscape development area and works, as indicated in the drawing. He may also install the barricades in the landscape development area according to his own understanding if he feels that any part of the landscape area is bound to be damaged for any reason, after taking prior permission from the Employer/ Employer’s Representative.

-

-

-

... More
The Contractor will supply, install and maintain at his own cost, the watering system for the landscape, which will take care of the requirement for particular plants, save water and does not waste water, including any requirements specified by the Landscape Architect appointed by contractor. He will give full details of the layout, size of the pipe with watering attachment hose details. All equipment must conform to international standards and / or Indian Standards if available. The design of the irrigation system has to be approved by Employer/ Employer’s representative.

-

-

-

... More
All equipment required for development shall be made available by Contractor, and its maintenance shall be his responsibility. This includes Tagara, Phawdas, Hose Pipes, Ground Roller, Manual and/or Electric lawn Mowers, Sprinklers, etc.

-

-

-

... More
Contractor will ensure that all plants remain free of diseases, pests, etc during development and maintenance periods. The contractor shall, without any additional charge renew any dead or defective plant material and shall fully maintain including watering, de- weeding etc. of the whole landscape as mentioned above.

-

-

-

... More
The Contractor shall maintain Nursery at his own cost at designated locations as shown in the drawing or at a suitable location within the plot as directed by Employer/ Employer's Representative. The Nursery will be fenced with gates for protection from cattle. The area of Nursery will be approximately 5000sqm. The item would include construction and maintenance of Green Houses if required.

-

-

-

... More
Contractor shall follow pre construction and during construction soil erosion control measures as per the NBC Part 10, section 1, Chapter 4 – Protection of Landscape during Construction.

-

-

-

... More
The contractor in co-ordination with the Employer as applicable shall ensure conservation and storage of top soil: Topsoil shall be stripped to a depth of 200 mm from areas proposed to be occupied by buildings, roads, paved areas and external services. It shall be stockpiled to a height of 400 mm in designated areas and shall be re-applied to site during plantation of the proposed vegetation. Topsoil shall be separated from sub-soil debris and stones larger than 50 mm diameter. The stored topsoil may be used as finished grade for planting areas. It is the landscape contractor’s responsibility to conserve top soil that is not disturbed by the civil contractor.

-

-

-

... More
The Contractor shall:

-

-

-

... More
I. Furnish the source of top soil to Employer/ Employer’s Representative. II. Study the soil report provided with the tender document, providing soil details such as pH, alkalinity, total soluble salts, porosity, sodium content and organic matter. Ref. Soil Test Report III. Use the restored soil at site for landscape purpose, manure mixture, Neemcake, weedicide shall be added if required. IV. Not consider any external soil source unless the existing soil conserved from site is lacking in quality and/or quantity.

-

-

-

... More
Soil Analysis for Top Soil fertility determination

-

-

-

... More
To determine the fertility of top soil for conservation, soil investigation shall be carried out by an NABL accredited laboratory. Adequate number of test samples of soil from a depth of 10-200mm below ground level shall be collected from at least 5 representative locations from site, preserved and transported (as per standard procedures specified by the laboratory) carefully to the laboratory for carrying out necessary tests. All relevant Indian Standards for sampling and conducting laboratory tests shall be followed. This soil samples shall be analyzed to determine soil type, texture, total organic content, pH, extractable nutrients such as nitrogen, phosphorus, potassium, salinity, cation exchange capacity, % base saturation and extractable heavy metals. The soil analysis report from the laboratory shall also include a statement on the fertility and suitability of the soil for plant growth based on the analysis, in addition to the test results.

-

-

-

... More
Top Soil conservation

-

-

-

... More
Top soil shall be removed for conservation to a depth of 200 mm (not more than 400 mm) and shall be separated from subsoil debris and stones larger than 50 mm diameter. It shall be stockpiled to a height of 400 mm in designated areas. The stockpiled topsoil shall be protected from erosion during storage by installing earthern berms/solid walls, temporary seeding (using native grass), covering with mulch or plastic, etc. The topsoil shall be protected with sand bags/solid walled enclosures (2 feet high) on all sides for containment. Appropriate drainage channels shall be dug around the storage area to prevent flooding of the top soil storage area. The top soil shall be reapplied to site during plantation of the proposed vegetation as finished grade for planting areas. Seeding will take place immediately after respreading topsoil and decompacting, unless timing is inappropriate (for e.g., not in mid-summer).

-

-

-

... More
The contractor to identify erosion prone areas on site and protect them from construction activities throughout the construction period. Prevent / mitigate the disturbances caused to site due to construction activity.

-

-

-

... More
The contractor shall execute a sedimentation and erosion control plan that conforms to the best management practices highlighted in the National Building Codes of India (NBC) Part 10, section 1, Chapter 4 – Protection of Landscape during Construction. This standard describes two types of measures that can be used to control sedimentation and erosion. Stabilization measures include temporary seeding, permanent seeding and mulching. Structural control measures include earth dikes, silt fence, sediment trap, and sediment basin. All of these measures are intended to stabilize the soil to prevent erosion.

-

-

-

... More
The erosion and sedimentation control plan must be approved by Employer/ Employer’s Representative and the erosion sedimentation control plan must be maintained throughout the execution period.

-

-

-

... More
The contractor shall execute measures of protection and preservation of existing landscape on site during entire construction time.

-

-

-

... More
Design, execute and maintain a temporary storm water management layout for the duration of construction activity. The storm water management layout should conform to National Building Codes of India (NBC) Part 10, section 1, chapter 4 – Protection of Landscape during Construction.

-

-

-

... More
Contractor should take measures to prevent entry of any soluble/ insoluble construction waste to enter the water table/ water ways/ ravines on site.

-

-

-

... More
1.0) ARCHITECTURAL WORKS

-

-

-

... More
1.1) PLASTER WORKS

-

-

-

... More
1.1.1) External Wall Plaster

-

-

-

... More
18 mm cement plaster in two coats under layer 12 mm thick cement plaster 1:5 (1 cement : 5 coarse sand) and a top layer 6 mm thick cement plaster 1:3 (1 cement : 3 coarse sand) finished rough with sponge.

8853

-

-

... More
1.1.2) Extra for plastering exterior walls of height more than 10 m from ground level for every additional height of 3 m or part thereof.

-

-

-

... More
1.1.2.1) from 10 to 13.0m

596

-

-

... More
1.1.2.2) from 13.0 to16.0m

596

-

-

... More
1.1.2.3) from 16.0 to 19.00

596

-

-

... More
1.1.2.4) from 19.00 to 22.00

468

-

-

... More
1.1.3) Forming groove of uniform size from 10 to 15mm x 6 mm (one even size) in plastered surface as per approved pattern using wooden battens, nailed to the under layer including removal of wooden/ PVC battens, repairs to the edges of plaster panel and finishing the groove complete as per specifications and direction of the Engineer.

2900

-

-

... More
1.1.4) Internal Wall Plaster

-

-

-

... More
1.1.4.1) 12 mm cement plaster of mix 1:6 (1 cement : 6 coarse sand)

6375

-

-

... More
1.1.5) Cement Putty

-

-

-

... More
Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete.

6375

-

-

... More
1.1.6) Providing and applying 12 mm thick (average) premixed formulated one coat gypsum lightweight plaster having additives and light weight aggregates as vermiculite/ perlite respectively conforming to IS: 2547 (Part - 1 & II) 1976, applied on hacked / uneven background such as bare brick/ block/ RCC work on walls & ceiling at all floors and locations, finished in smooth line and level etc. complete

6375

-

-

... More
1.1.7.1) 6 mm cement plaster of 1:3 of Mix 1:3( 1 Cement:3 fine sand)

2671

-

-

... More
1.1.8) Providing & Fixing chicken wire mesh / wired fabric (12.5mm x 24 SWG) in strips of 200 mm widths or as required over junctions between concrete & brick / block masonry at all heights and locations prior to plastering including drilling, nailing etc complete as directed by Engineer In Charge.

2790

-

-

... More
1.1.9) Extra for providing and mixing water proofing material in cement plaster work in proportion recommended by the manufacturers

304

-

-

... More
1.1.10) Extra for plastering on circular work not exceeding 6 m in radius

-

-

-

... More
1.1.10.1) In two coats

133.33

-

-

... More
1.2) FLOORING, SKIRTING AND DADO WORKS

-

-

-

... More
1.2.1) Kota Flooring

-

-

-

... More
Kota stone slab flooring over 20 mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab, including rubbing and polishing complete with base of cementmortar 1 : 4 (1 cement : 4 coarse sand) : 25mm thick

2243

-

-

... More
1.2.2) Kota stone Tread Risers

-

-

-

... More
Kota stone slabs 20 mm thick in risers of steps, skirting, dado and pillars laid on 12 mm (average) thick cement mortar 1:3 (1 cement: 3 coarse sand) and jointed with grey cement slurry mixed with pigment to match the shade of the slabs, including rubbing and polishing, making machine cut groves as per drawing needs, making neccesory cutouts for railing including pre finished nosing in treads of steps of Kota stone complete.

101.5

-

-

... More
1.2.3) Marble Stone Flooring

-

-

-

... More
Marble stone flooring with 18 mm thick marble stone, as per sample of marble approved by Engineer-in-charge, over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with grey cement slurry, including rubbing and polishing complete with :

-

-

-

... More
Udaipur green marble

-

-

-

... More
1.2.4) Granite Stone Flooring

-

-

-

... More
Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing , curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. Polished Granite stone slab jet Black, Cherry Red, Elite Brown, Cat Eye or equivalent

359

-

-

... More
1.2.5) Granite Stone Tread Risers

-

-

-

... More
Providing and laying Polished Granite stone flooring in risers of steps, skirting, dado and pillars with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing , curing and polishing , making machine cut groves as per drawing needs, making neccesory cutouts for railing including prefinished nosing in treads of steps & using single length up to 2.00 metre.etc. all complete as specified and as directed by the Engineer-in-Charge. Polished Granite stone slab jet Black, Cherry Red, Elite Brown, Cat Eye or equivalent

45

-

-

... More
1.2.6) Granite stone Wall Cladding

-

-

-

... More
Stone tile (polished) work for wall lining over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and cement slurry @ 3.3 kg/sqm including pointing in white cement complete. 8mm thick Granite of any colour and shade

21.5

-

-

... More
1.2.8) Ceramic Tile Dado

-

-

-

... More
Providing and fixing Ist quality ceramic glazed wall tiles conforming to IS: 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer-in-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per sqm, including pointing in white cement mixed with pigment of matching shade complete.

1003

-

-

... More
1.2.11) Grnaite Kitchen/ Basin Platfomrs

-

-

-

... More
Providing and fixing 18 mm thick gang saw cut, mirror polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills , facias and similar locations of required size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 (1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels.

-

-

-

... More
Area of slab over 0.50 sqm

20

-

-

... More
1.2.12) Granite Facia/drops

-

-

-

... More
Extra for fixing marble /granite stone, over and above corresponding basic item, in facia and drops of width upto 150 mm with epoxy resin based adhesive, including cleaning etc. complete.

60

-

-

... More
1.2.13) Extra For cutout for Sink

-

-

-

... More
Extra for providing opening of required size & shape for wash basin/ kitchen sink in kitchen platform, vanity counter and similar location in marble/ Granite/stone work, including necessary holes for pillar taps etc. including moulding, rubbing and polishing of cut edges etc. complete.

37

-

-

... More
1.3) PAINTING WORKS

-

-

-

... More
1.3.1) OBD

-

-

-

... More
Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :

-

-

-

... More
New work (two or more coats) over and including water tinnable priming coat with cement primer

754

-

-

... More
1.3.2) Premium Acrylic Emulsion Paint

-

-

-

... More
Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 grams/ litre of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour.

-

-

-

... More
Two coats

5164

-

-

... More
1.3.3) Synthetic Enamel Paint ( Low VOC)

-

-

-

... More
Painting with synthetic enamel paint, having VOC (Volatile Organic Compound) content less than 150 grams/ litre, of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour.

-

-

-

... More
Two coats

30

-

-

... More
1.3.4) WeatherProof Exterior Paint

-

-

-

... More
Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade :

-

-

-

... More
New work (Two or more coats applied @ 1.43 ltr/ 10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm)

8234

-

-

... More
1.3.5) Textured Paint

-

-

-

... More
Finishing walls with textured exterior paint of required shade :

-

-

-

... More
New work (Two or more coats applied @ 3.28 ltr/10 sqm) over and including priming coat of exterior primer applied @ 2.20kg/ 10 sqm

30

-

-

... More
1.3.6) Cement Paint

-

-

-

... More
Finishing walls with water proofing cement paint of required shade :

-

-

-

... More
New work (Two or more coats applied @ 3.84 kg/10 sqm)

30

-

-

... More
1.3.7) Epoxy Paint

-

-

-

... More
Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer’s specifications including appropriate priming coat, preparation of surface, etc. complete.

-

-

-

... More
On steel work

110

-

-

... More
1.3.8) Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound) content.

-

-

-

... More
1.3.8.1) With water thinnable cement primer on wall surface having VOC content less than 50 grams/litre

12384

-

-

... More
1.3.8.2) With ready mixed pink or grey primer on wood work (hard and soft wood) having VOC content less than 50 grams/ litre

20

-

-

... More
1.3.9) melamine polish on wood work ( one or more coat)

20

-

-

... More
1.4.5) Providing , fabricating ,assembling,& fixing in position aluminium partitions

-

-

-

... More
1.4.5.1) Alu. Framing for Partitions

-

-

-

... More
Providing and fixing aluminium work for doors, windows, ventilators and partitions with extruded built up standard tubular sections/ appropriate Z sections and other sections of approved make conforming to IS: 733 and IS: 1285, fixing with dash fasteners of required dia and size, including necessary filling up the gaps at junctions, i.e. at top, bottom and sides with required EPDM rubber/ neoprene gasket etc. Aluminium sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, Aluminium snap beading for glazing / paneling, C.P. brass / stainless steel screws, all complete as per architectural drawings and the directions of Engineer-in- charge. (Glazing, paneling and dash fasteners to be paid for separately), Polyester powder coated aluminium (minimum thickness of polyester powder coating 50 micron)

-

-

-

... More
1.4.5.2) Alu. Framing for Doors

-

-

-

... More
For shutters of doors, including providing and fixing hinges/ pivots and making provision for fixing of fittings wherever required including the cost of EPDM rubber / neoprene gasket required (Fittings shall be paid for separately). Polyester powder coated aluminium (minimum thickness of polyester powder coating 50 micron)

200

-

-

... More
1.4.5.3) Glazing in partition & Doors

-

-

-

... More
Providing and fixing glazing in aluminium door, window, ventilator shutters and partitions etc. with EPDM rubber / neoprene gasket etc. complete as per the architectural drawings and the directions of engineer-in-charge. (Cost of aluminium snap beading shall be paid in basic item).

163

-

-

... More
1.4.5.4) Prelaminated Particle Board

-

-

-

... More
Providing and fixing 12 mm thick prelaminated particle board flat pressed three layer or graded wood particle board conforming to IS: 12823 Grade l Type ll, in panelling bottom fixed in aluminum doors, windows shutters and partition frames with C.P. brass / stainless steel screws etc. complete as per architectural drawings and directions of engineer-in-charge.- Pre-laminated particle board with decorative lamination on both sides

62

-

-

... More
1.4.5.5) Hydraulic Floor Spring for Doors

-

-

-

... More
Providing and fixing double action hydraulic floor spring of approved brand and manufacture conforming to IS : 6315, having brand logo embossed on the body / plate with double spring mechanism and door weight upto 125 kg, for doors, including cost of cutting floors, embedding in floors as required and making good the same matching to the existing floor finishing and cover plates with brass pivot and single piece M.S. sheet outer box with slide plate etc. complete as per the direction of Engineer-in-charge: stainless steel cover plate minimum 1.25 mm thickness

5

-

-

... More
1.4.6) Modular toilet Partitions: Providing & fixing in position 12mm thick High Pressure laminated Toilet cubicles of Size 1100mm(w)X1500mm(L)x 2100mm(Ht),door size 610mm(w)X1925mm( Ht) with SS legs including all necessary hardware's of SS304 & SS door nob, SS privacy thumb, SS Coat Hook, Door Stopper.Make merino titan box up series or equivalent

35

-

-

... More
1.5) DOORS, WINDOWS, GLAZING, CLADDING, FAÇADE ETC.

-

-

-

... More
1.5.1) Wood Work For Frames

-

-

-

... More
Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length ( hold fast lugs or dash fastener shall be paid for separately).

-

-

-

... More
Second class teak wood

0.67

-

-

... More
1.5.2) Dash Fasterners t door frames

-

-

-

... More
Providing and fixing carbon steel galvanised ( minimum coating 5 micron) dash fastener of 10 mm dia double threaded 6.8 grade (yield strength 480 N/mm2), counter sunk head, comprising of 10 m dia polyamide PA 6 grade sleeve, including drilling of hole in frame , concrete/ masonry, etc. as per direction of Engineer-in-charge.

-

-

-

... More
10X120mm

12

-

-

... More
1.5.3) Pressed steel door frames

-

-

-

... More
Providing and fixing pressed steel door frames conforming to IS: 4351, manufactured from commercial mild steel sheet of 1.60 mm thickness, including hinges, jamb, lock jamb, bead and if required angle threshold of mild steel angle of section 50x25 mm, or base ties of 1.60 mm, pressed mild steel welded or rigidly fixed together by mechanical means, 2.5 mm thick with mortar guards, lock strike-plate and shock absorbers as specified and applying a coat of approved steel primer after pre-treatment of the surface as directed by Engineer-in-charge:Profile B Fixing with adjustable lugs with split end tail to each jamb

700

-

-

... More
1.5.4) Flush Doors

-

-

-

... More
1.5.4.1) Providing and fixing ISI marked flush door shutters conforming to IS : 2202 (Part I) non-decorative type, core of block board construction with frame of 1st class hard wood and well matched commercial 3 ply veneering with vertical grains or cross bands and face veneers on both faces of shutters

-

-

-

... More
1.5.4.2) 35 mm thick including ISI marked Stainless Steel butt hinges with necessary screws & finishing as per Engineer in charge

429

-

-

... More
1.5.4.3) Extra for Providing and fixing flush doors with decorative veneering instead of non decorative ISI marked flush door shutters conforming to IS: 2202 (Part I) ON One side only

429

-

-

... More
1.5.4.4) Extra for providing lipping with 2nd class teak wood battens 25 mm minimum depth on all edges of flush door shutters (over all area of door shutter to be measured).

429

-

-

... More
1.5.4.5) Extra for providing vision panel not exceeding 0.1 sqm in all type of flush doors (cost of glass excluded) (overall area of door shutter to be measured):

-

-

-

... More
1.5.4.5.1) Reactangular or Square

67

-

-

... More
1.5.5) Providing and fixing pre-polished Granite Stone work for wall lining 200mm -300mmwide, on 12mm thk cement mortar 1:3 (1 cement : 3 fine sand), inclusive of all mitred joinery inclusive of all necessary joinery in Araldite and cement paste etc. All exposed surfaces and edges to be chamfered and mirror polished with 6mm wide groove to be made in wall at the junction of stone and finished surface of wall including scaffolding, curing etc. complete as directed by Engineer In Charge. Polished Granite stone slab shall be Jet Black, Cherry Red, Elite Brown, Cat Eye or approved equivalent

23

-

-

... More
1.5.6) FRP doors frames

-

-

-

... More
Providing and fixing Fiber Glass Reinforced plastic (FRP) Door Frames of cross-section 90 mm x 45 mm having single rebate of 32 mm x 15 mm to receive shutter of 30 mm thickness .The laminate shall be moulded with fire resistant grade unsaturated polyester resin and chopped mat. Door frame laminate shall be 2 mm thick and shall be filled with suitable wooden block in all the three legs. The frame shall be covered with fiber glass from all sides. M.S. stay shall be provided at the bottom to steady the frame.

123

-

-

... More
1.5.7) FRP doors shutters

-

-

-

... More
30 mm thick Fiberglass Reinforced Plastic (F.R.P.) flush door shutter in different plain and wood finish made with fire retardant grade unsaturated polyester resin, moulded to 3 mm thick FRP laminate all around, with suitable wooden blocks inside at required places for fixing of fittings and polyurethane foam (PUF)/ Polystyrene foam to be used as filler material throughout the hollow panel, casted monolithically with testing parameters of F.R.P. laminate conforming to table - 3 of IS: 14856, complete as per direction of Engineer-in-charge.

50

-

-

... More
1.5.11) Aluminum Doors Windows Ventilators

-

-

-

... More
Providing and fixing aluminium work for doors, windows, ventilators and partitions with extruded built up standard tubular sections/ appropriate Z sections and other sections of approved make conforming to IS: 733 and IS: 1285, fixing with dash fasteners of required dia and size, including necessary filling up the gaps at junctions, i.e. at top, bottom and sides with required EPDM rubber/ neoprene gasket etc. Aluminium sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, Aluminium snap beading for glazing / paneling, C.P. brass / stainless steel screws, all complete as per architectural drawings and the directions of Engineer-in- charge. (Glazing, paneling and dash fasteners to be paid for separately) , Polyester powder coated aluminium (minimum thickness of polyester powder coating 50 micron)

-

-

-

... More
doors , windows,ventilators main frame

1388

-

-

... More
1.5.12) For shutters of doors, windows & ventilators including providing and fixing hinges/ pivots and making provision for fixing of fittings wherever required including the cost of EPDM rubber / neoprene gasket required (Fittings shall be paid for separately)

-

-

-

... More
doors windows shutter frames

1073

-

-

... More
1.5.13) Providing and fixing glazing in aluminium door, window, ventilator shutters and partitions etc. with EPDM rubber / neoprene gasket etc. complete as per the architectural drawings and the directions of engineer-in- charge. (Cost of aluminium snap beading shall be paid in basic item):

-

-

-

... More
1.5.13.1) With float glass panes of 5.0 mm thickness

445

-

-

... More
1.5.13.2) With float glass panes of 8 mm thickness

36

-

-

... More
1.5.13.3) With Frosted glass panes of 4 mm thickness

20

-

-

... More
1.5.14) Prelaminated Particle Board

-

-

-

... More
1.5.14.1) Providing and fixing 12 mm thick prelaminated particle board flat pressed three layer or graded wood particle board conforming to IS: 12823 Grade l Type ll, in panelling for bottom panel of 0.9m, fixed in aluminum doors, windows shutters and partition frames with C.P. brass / stainless steel screws etc. complete as per architectural drawings and directions of engineer-in- charge.- Pre-laminated particle board with decorative lamination on both sides

44

-

-

... More
1.5.15) Filling the gap in between aluminium frame & adjacent RCC/ Brick/ Stone work by providing weather silicon sealant over backer rod of approved quality as per architectural drawings and direction of Engineer-in- charge complete. Upto 5mm depth and 5mm width

691

-

-

... More
1.5.16) Structural Glazing

-

-

-

... More
1.5.16.1) Providing and supplying aluminium extruded tubular and other aluminium sections as per the architectural drawings and approved shop drawings , the aluminium quality as per grade 6063 T5 or T6 as per BS 1474,including super durable powder coating of 60-80 microns conforming to AAMA 2604 of required colour and shade as approved by the Engineer-in-Charge. ( The item includes cost of material such as cleats, sleeves, screws etc. necessary for fabrication of extruded aluminium frame work. Nothing extra shall be paid on this account).

756

-

-

... More
1.5.16.2) Designing, fabricating, testing, protection, installing and fixing in position semi (grid) unitized system of structural glazing (with open joints) for linear as well as curvilinear portions of the building for all heights and all levels, including: (a) Structural analysis & design and preparation of shop drawings for the specified design loads conforming to IS 875 part III (the system must passed the proof test at 1.5 times design wind pressure without any failure), including functional design of the aluminum sections for fixing glazing panels of various thicknesses, aluminium cleats, sleeves and splice plates etc. gaskets, screws, toggles, nuts, bolts, clamps etc., structural and weather silicone sealants, flashings, fire stop (barrier)-cum-smoke seals, microwave cured EPDM gaskets for water tightness, pressure equalisation & drainage and protection against fire hazard including: (b) Fabricating and supplying serrated M.S. hot dip galvanised / Aluminium alloy of 6005 T5 brackets of required sizes, sections and profiles etc. to accommodate 3 Dimentional movement for achieving perfect verticality and fixing structural glazing system rigidly to the RCC/ masonry/structural steel framework of of building structure using stainless steel anchor fasteners/ bolts, nylon seperator to prevent bimetallic contacts with nuts and washers etc. of stainless steel grade 316, of the required capacity and in required numbers.

111

-

-

... More
(c) Providing and filling, two part pump filled, structural silicone sealant and one part weather silicone sealant compatible with the structural silicone sealant of required bite size in a clean and controlled factory / work shop environment, including double sided spacer tape, setting blocks and backer rod, all of approved grade, brand and manufacture, as per the approved sealant design, within and all around the perimeter for holding glass. (d) Providing and fixing in position flashings of solid aluminium sheet 1 mm thick and of sizes, shapes and profiles, as required as per the site conditions, to seal the gap between the building structure and all its interfaces with curtain glazing to make it watertight. (e) Making provision for drainage of moisture/ water that enters the curtain glazing system to make it watertight, by incorporating principles of pressure equalization, providing suitable gutter profiles at bottom (if required), making necessary holes of required sizes and of required numbers etc. complete. This item includes cost of all inputs of designing, labour for fabricating and installation of aluminium grid, installation of glazed units, T&P, scaffolding and other incidental charges including wastages etc., enabling temporary structures and services, cranes or cradles etc. as described above and as specified.

-

-

-

... More
The item includes the cost of getting all the structural and functional design including shop drawings checked by a structural designer, dully approved by Engineer-in-charge. The item also includes the cost of all mock ups at site, cost of all samples of the individual components for testing in an approved laboratory, field tests on the assembled working structural glazing as specified, cleaning and protection till the handing over of the building for occupation. In the end, the Contractor shall provide a water tight structural glazing having all the performance characteristics etc. all complete as required, as per the Architectural drawings, as per item description, as specified, as per the approved shop drawings and as directed by the Engineer- in-Charge. Note:- 1. The cost of providing extruded aluminium frames, shadow boxes, extruded aluminium section capping for fixing in the grooves of the curtain glazing and vermin proof stainless steel wire mesh shall be paid for separately under relevant items under this sub- head. However, for the purpose of payment, only the actual area of structural glazing (including width of grooves) on the external face shall be measured in sqm. up to two decimal places. Note:-2. The following performance test are to be conducted on structural glazing system if area of structural glazing exceeds 2500 Sqm from the certified laboratories accreditated by NABL(National Accreditation Board for Testing and Calibration Laboratories), Department of Science & Technologies, India. Cost of testing is payable separately.

-

-

-

... More
The NIT approving authority will decide the necessity of testing on the basis of cost of the work, cost of the test and importance of the work. Performance Testing of Structural glazing system Tests to be conducted in the NBL Certified laboratories 1. Performance Laboratory Test for Air Leakage Test (- 50pa to - 300pa) & (+50pa to +300pa) as per ASTM E- 283-04 testing method for a range of testing limit 1 to 200 mVhr 2. Static Water Penetration Test. (50pa to 1500pa) as per ASTME- 331-09 testing method for a range up to 2000 ml. 3. Dynamic Water Penetration (50pa to 1500pa) as per AAMA 501.01- 05 testing method for a range upto 2000 ml 4. Structural Performance Deflection and deformation by static air pressure test (1.5 times desing wind pressure without any failure) as per ASTME-330- 10 testing method for a range upto 50 mm 5. Seismic Movement Test (upto 30 mm) as per AAMA 501.4-09 testing method for Qualitative test Tests to be conducted on site. 6. Onsite Test for Water Leakage for a pressure range 50 kpa to 240 kpa (35psi) upto 2000 ml

-

-

-

... More
1.5.16.3) Providing, assembling and supplying vision glass panels (IGUs) comprising of hermetically-sealed 6- 12- 6 mm insulated glass (double glazed) vision panel units of size and shape as required and specified, comprising of an outer heat strengthened float glass 6mm thick, of approved colour and shade with reflective soft coating on surface # 2 of approved colour and shade, an inner Heat strengthned clear float glass 6mm thick, spacer tube 12mm wide, dessicants, including primary seal and secondary seal (structural silicone sealant) etc. all complete for the required performances, as per the Architectural drawings, as per the approved shop drawings, as specified and as directed by the Engineer-in-Charge.

83

-

-

... More
The IGUs shall be assembled in the factory/ workshop of the glass processor. (Payment for fixing of IGU Panels in the curtain glazing is included in cost of above item No. 1.5.13.2) For payment, only the actual area of glass on face # 1 of the glass panels (excluding the areas of the grooves and weather silicone sealant) provided and fixed in position, shall be measured in sqm. (i) Coloured tinted float glass 6mm thick substrate with reflective soft coating on face # 2, + 12mm Airgap + 6mm Heat Strengthened clear Glass of approved make having properties as visible Light transmittance (VLT) of 25 to 35 %, Light reflection internal 10 to 15%, light reflection external 10 to 20 %, shading coefficient (0.25- 0.28) and U value of 3.0 to 3.3 W/m2 degree K etc. The properties of performance glass shall be decided by technical sanctioning authority as per the site requirement.

-

-

-

... More
1.5.16.4) Extra for openable side / top hung vision glass panels (IGUs) including providing and supplying at site all accessories and hardwares for the openable panels as specified and of the approved make such as heavy duty stainless steel friction hinges, min 4 -point cremone locking sets with stainless steel plates, handles, buffers etc. including necessary stainless steel screws/ fasteners, nuts, bolts, washers etc. all complete as per the Architectural drawings, as per the approved shop drawings, as specified and as directed by the Engineerin- Charge.

11

-

-

... More
1.5.16.5) Providing and supplying Spandrel Glass Panels comprising of 6 mm thick heat strengthened monolithic float glass of approved colour and shade with reflective soft coating on surface # 2 of approved colour and shade so as to match the colour and shade of the IGUs in the vision panels etc. ,all complete for the required performances as specified, as per the Architectural drawings, as per the approved shop drawings, as specified, and as directed by the Engineer- in-Charge. For payment, only the actual area of glass on face # 1 of the glass panels (but excluding the area of grooves and weather silicone sealant) provided and fixed in position, shall be measured in sqm.(Payment for fixing of Spandrel Glass Panels in the curtain glazing is included in cost of relevent Item*). (i) Coloured tinted float glass 6mm thick substrate with reflective soft coating on face # 2, having properties as visible Light transmittance (VLT) of 25 to 35%, Light reflection internal 10 to 15%, light reflection external 10 to 20%, shading coefficient (0.25- 0.28) and U value of 3.0 to 3.3 W/m2 degree K etc.The properties of performance glass shall be decided by technical sanctioning authority as per the site requirement.

17

-

-

... More
1.5.18) Door Accessories

-

-

-

... More
1.5.18.1) Providing and fixing bright finished brass 100 mm mortice latch and lock with 6 levers and a pair of lever handles of approved quality with necessary screws, etc. complete

48

-

-

... More
i) Providing and fixing bright finished brass tower bolts (barrel type) with necessary screws etc. complete :150X10mm

56

-

-

... More
1.5.18.3) Providing and fixing bright finished brass tower bolts (barrel type) with necessary screws etc. complete :250X10mm

17

-

-

... More
1.5.18.4) Providing and fixing bright finished brass handles with screws etc. complete:100 mm

408

-

-

... More
1.5.18.5) Providing and fixing bright finished brass handles with screws etc. complete:125 mm

167

-

-

... More
1.5.18.6) Providing and fixing bright finished brass hanging type floor door stopper with necessary screws, etc. complete

127

-

-

... More
1.5.18.7) Providing and fixing bright finished brass door latch with necessary screws etc. complete :250x16x5 mm

520

-

-

... More
1.5.18.8) Providing and fixing aluminium die cast body tubular type universal hydraulic door closer (having brand logo with ISI, IS : 3564, embossed on the body, door weight upto 35 kg and door width upto 700 mm), with necessary accessories and screws etc. complete

94

-

-

... More
1.5.18.9) Grab bars/ pull bars made of SS 304 for disabled toilet doors

3

-

-

... More
1.5.18.10) Providing and fixing bright finished brass double acting spring hinges with necessary brass screws etc. complete :100mm

2

-

-

... More
1.5.18.11) Providing and fixing aluminium tower bolts, ISI marked, anodised (anodic coating not less than grade AC 10 as per IS : 1868 ) transparent or dyed to required colour or shade, with necessary screws etc. complete : 200X10mm

57

-

-

... More
1.5.18.12) Providing and fixing aluminium handles, ISI marked, anodised (anodic coating not less than grade AC 10 as per IS : 1868) transparent or dyed to required colour or shade, with necessary screws etc. complete : 125mm

114

-

-

... More
1.5.18.13) Providing and fixing aluminium hanging floor door stopper, ISI marked, anodised(anodic coating not less than grade AC 10 as per IS : 1868) transparent or dyed to required colour and shade, with necessary screws etc. complete:-Single rubber stopper

4

-

-

... More
1.5.18.14) Providing and fixing bright finished brass 100 mm mortice latch and lock, ISI marked, with six levers and a pair of anodised (anodic coating not less than grade AC 10 as per IS : 1868) aluminium lever handles of approved quality with necessary screws etc. complete.

29

-

-

... More
1.5.18.15) Providing and fixing concealed latch for the sliding windows , with approved qquality ,colour as matched the powercoating colour of aluminium window sections with necessary screws etc complete as per direction of Engineer- in-charge.

53

-

-

... More
1.5.19) Air Transfer Grills to Door

-

-

-

... More
Providing and fixing powder coated (powder coating not less than 40 microns) non vision extruded aluminium "Air Transfer Grill” of required sizes to be fixed in the opening made in the laminated/ non decorative flush door shutters. The grill shall be with minimum 1.20 mm thick aluminium sections, in approved size, shade, and pattern, shape, as per the aproved drawing and as per directions of Engineer in charge. Rate shall be inclusive of cutting the door shutter as per approved grill size, providing and fixing required depth of teak wood lipping on the cutting edges of opening of flush door shutter with finishing. :- 6mm thick Compact Sheet

-

-

-

... More
1.5.19.1) 0.450X0.300

16

-

-

... More
1.5.19.2) 0.600x0.300

6

-

-

... More
1.5.20) Panic Bar

-

-

-

... More
Providing and fixing panic bar / latch (Double point) fitted with a single body, Trim Latch & Lock on back side of the Panic Latch of reputed brand and manufacture to be approved by the Engineer- in- charge, all complete

25

-

-

... More
1.5.21) Fire rated Doors

-

-

-

... More
Providing & Fixing two hour fire rated single / double leaf openable doors with fire retardant infilll paanel of "Shakti" or equivalent, of zinc coated steel frame, single rebate profile of size 100 x 57 mm with bending radius of 1.2 mm, fabricated using 1.20 mm thick galvanized steel sheet (18 gauge) and Fully flush type of 46 mm thick Single / Double leaf shutters, of Pressed Galvanized steel sheet conforming to IS 277, conforming to IS 3614 ( Part 2 ) 1992 BS467 ( Part 20 & 22 0 & ISO834, with electrostatic powder coating or polyurethane coating, including vision glass panel 300X450mmm & fire rated all fixtures and fastenings as specified like SS double ball bearing butt hinges 3nos per shutter, tower bolts 1 no, door stoppers 2 no, SS Handle 19mm Dia, 250 mm long with both side key operation (as approved by the CONSULTANT) and two aldrops per shutter, and providing Master key, Grand master key etc complete as directed by Engineer In Charge.

151

-

-

... More
1.5.22) Cement Fibre Board

-

-

-

... More
Supplying and installation of moisture resistant/fire resistant 8 mm thick Heavy duty fiber cement board (High pressure steam cured) conforming to IS 14862:2000 of category III type B as per standard sizes fixed with self- drilling / taping screws. Screws shall be of counter sunk rib head of 1.60mm to 4 mm thick of 8 to 10 gauge of length varying from 25 to 45 mm, Steel frame shall be paid separatly.

33

-

-

... More
1.5.23) GRC Jali

-

-

-

... More
Providing & Fixing Glas Reinforced Jalli works cast in custom designed moulds as per design detail including frame to hold it.

86

-

-

... More
1.5.24) Precast Cement Jali

-

-

-

... More
Providing precast cement concrete Jali 1:2:4 (1 cement : 2 coarse sand: 4 graded stone aggregate 6 mm nominal size), reinforced with 1.6 mm dia mild steel wire, including centering and shuttering, roughening cleaning, fixing and finishing in cement mortar 1:3 (1 cement: 3 fine sand) etc. complete, excluding plastering of the jambs, sills and soffits & fixing

-

-

-

... More
40 mm thick

55

-

-

... More
1.5.25) Mirror

-

-

-

... More
Providing and fixing 600x450 mm beveled edge mirror of superior glass (of approved quality) complete with 6 mm thick hard board ground fixed to wooden cleats with C.P. brass screws and washers complete.

58

-

-

... More
1.5.26) Providing , installation, testing and comissioning of Electric Motor of # Pahse of Max Safe laod carrying Capcity 2000kg. TO be installed on Rolling Shutter with necessary fitiings , accessories etc complete as per specification and direction of enginner -in -charge( inclusive of 1year Guarantee & warranty)

1

-

-

... More
1.6) METAL WORKS - RAILING, GRILLS, FABRICATION, ETC.

-

-

-

... More
1.6.1) SS Railing

-

-

-

... More
Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with with necessary accessories & stainless steel dash fasteners , stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in-charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.).

2020

-

-

... More
1.6.2) Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer.

-

-

-

... More
1.6.2.1) M.S. Tubes

167

-

-

... More
1.7) Signages towards Fire Fighting Servicess

-

-

-

... More
1.7.1) Providing and installing in position the following types of signboards made out of 3 mm thick "Opaque" PVC foam board with computer cut, PVC non reflective self adhesive vinyl painted foam board, etc. complete with fastners as per direction of Engineer In Charge.

-

-

-

... More
1.7.1.1) Floor identification signages ("GOUND FLOOR", "FIRST FLOOR" , etc) at each stair enclosure on every floor, indicating the floor nos. in words. Lettering size size shall be 75 mm with contrasting colour from background. Size shall be 150 mm x 400mm.

13

-

-

... More
1.7.1.2) Fire Exit Signage (with Hanging chain) at each stair on every floor, any change in direction and 25 m interval as per NBC 2016 indicating the direction of fire exit. Lettering size size shall be 75 mm with contrasting colour from background. Size shall be 150 mm x 400mm.

17

-

-

... More
1.7.1.3) Fire Exit Signage (without Hanging chain) at each stair on every floor, any change in direction and 25 m interval as per NBC 2016 indicating the direction of fire exit. Lettering size size shall be 75 mm with contrasting colour from background. Size shall be 150 mm x 400mm.

13

-

-

... More
1.7.1.4) Fire Extinguisher signage for all fire extinguisher locations, text letter size shall be 75 mm with contrasting colour from background. Size shall be 150 mm x 400mm.

50

-

-

... More
1.7.1.5) Fire alarm call point at each stair enclosure on every floor, text letter size shall be 75 mm with contrasting colour from background. Size shall be 150 mm x 400mm.

10

-

-

... More
1.7.1.6) Fire hose reel signage for fire shaft location, text letter size shall be 75 mm with contrasting colour from background. Size shall be 150 mm x 400mm.

12

-

-

... More
1.7.1.7) Fire evacuation plan of A3 size at 25m interval with contrasting colour from background. Size shall be 300 mm x 450mm.

13

-

-

... More
2.0) CIVIL WORKS

-

-

-

... More
2.2) EARTH WORK

-

-

-

... More
2.2.1) Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 500 m and lift upto 1.5 m, as directed by Engineer-in-charge.

-

-

-

... More
2.2.1.1) All kinds of soil

2250

-

-

... More
2.2.2) Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 500 m.

-

-

-

... More
2.2.2.1) All kinds of soil

100

-

-

... More
2.2.3) Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials.

-

-

-

... More
2.2.3.1) All kinds of soil.

1800

-

-

... More
2.2.5) Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 500 m and lift upto 1.5 m.

2150

-

-

... More
2.2.7) Providing and laying minimum 230 mm thick dry rubble (soling) packing for foundation with approved hard stone set in regular lines, hand packed, filling the interstices with small stone chips and sand, ramming, watering and compacting, etc. complete as directed by Engineer-In-Charge.

1100

-

-

... More
2.2.10) Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth upto 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m :

-

-

-

... More
2.2.10.1) All kinds of soil

-

-

-

... More
2.2.10.1.1) Pipes, cables etc. exceeding 80 mm dia. but not exceeding 300 mm dia

1582

-

-

... More
2.2.10.1.2) Pipes, cables etc. exceeding 300 mm dia but not exceeding 600 mm dia

26

-

-

... More
2.2.11) Extra for excavating trenches for pipes, cables etc. in all kinds of soil for depth exceeding 1.5 m, but not exceeding 3 m.

-

-

-

... More
2.2.11.1) All kinds of soil

-

-

-

... More
2.2.11.1.1) Pipes, cables etc. exceeding 80 mm dia. but not exceeding 300 mm dia

163

-

-

... More
2.2.11.1.2) Pipes, cables etc. exceeding 300 mm dia but not exceeding 600 mm dia

59

-

-

... More
2.2.12) Excavating trenches of required width for pipes, cables, etc, including excavation for sockets, depth upto 1.5 m, including getting out the excavated materials, returning the soil as required in layers not exceeding 20 cm in depth, including consolidating each deposited layers by ramming, watering etc., stacking serviceable material for measurements and disposal of unserviceable material as directed, within a lead of 50 m :

-

-

-

... More
2.2.12.1) Ordinary rock :

-

-

-

... More
2.2.12.1.1) Pipes, cables etc. exceeding 80 mm dia. but not exceeding 300 mm dia

30

-

-

... More
2.2.13) Extra for excavating trenches for pipes, cables, etc. in ordinary/hard rock exceeding 1.5 m in depth but not exceeding 3 m. (including dewatering)

-

-

-

... More
2.2.13.1) Ordinary rock :

-

-

-

... More
2.2.13.1.1) Pipes, cables etc. exceeding 80 mm dia. but not exceeding 300 mm dia

10

-

-

... More
2.2.17) Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth upto 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m :

-

-

-

... More
2.2.17.1) Extra for excavating trenches for pipes, cables, etc. in all kind of soil for depth exceeding 3 m in depth but not exceeding 4.5 m. (Rate is over corresponding basic item for depth upto 1.5 metre).

44

-

-

... More
2.3) PLAIN CEMENT CONCRETE WORK

-

-

-

... More
2.3.1.1) "1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size).

75

-

-

... More
2.3.1.2) 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size).

10

-

-

... More
2.3.2) Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars,posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing :

-

-

-

... More
2.3.2.1) 1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

10

-

-

... More
2.3.2.2) 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)

10

-

-

... More
2.3.4) Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement: 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) over 75mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine sand, including necessary excavation, levelling & dressing & finishing the top smooth.

100

-

-

... More
2.3.5) Providing and laying damp-proof course 50mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand(zone-III) : 4 graded stone aggregate 20mm nominal size).

68

-

-

... More
2.3.6) Providing & applying a coat of residual petroleum bitumen of grade of VG-10 of approved quality using 1.7kg per square metre on damp proof course after cleaning the surface with brushes and finally with a piece of cloth lightly soaked in kerosene oil.

59

-

-

... More
2.3.7) Providing and laying 1:5:10 mix Plum concrete with maximum size of aggregates as 40mm and plums upto 200mm size and upto 30% by volume of concrete mix, for filling in plinth, underside of foundations, etc., complete.

98

-

-

... More
2.4) REINFORCED CEMENT CONCRETE WORK

-

-

-

... More
FORMWORK

-

-

-

... More
2.4.1) Centering and shuttering including strutting, propping etc. and removal of form for all heights :

-

-

-

... More
2.4.1.1) Foundations, footings, bases of columns, etc. for mass concrete.

743.55

-

-

... More
2.4.1.2) Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.

465.24

-

-

... More
2.4.1.3) Suspended floors, roofs, landings, balconies and access platform

1018.24

-

-

... More
2.4.1.4) Lintels, beams, plinth beams, girders, bressumers and cantilevers

2133.51

-

-

... More
2.4.1.5) Columns, Pillars, Piers, Abutments, Posts and Struts

1520.41

-

-

... More
2.4.1.6) Stairs, (excluding landings) except spiral- staircases

110.92

-

-

... More
2.4.1.7) Vertical and horizontal fins individually or forming box louvers band, facias and eaves boards

34

-

-

... More
2.4.1.8) Small lintels not exceeding 1.5 m clear span, moulding as in cornices, window sills, string courses, bands, copings, bed plates, anchor blocks and the like

45

-

-

... More
2.4.1.9) Extra for additional height in centering, shuttering where ever required with adequate bracing, propping etc., including cost of de-shuttering and decentering at all levels, over a height of 3.5 m, for every additional height of 1 metre or part thereof (Plan area to be measured).

-

-

-

... More
2.4.1.9.1) Suspended floors, roofs, landing, beams and balconies (Plan area to be measured)

1700

-

-

... More
2.4.1.10) Cornices and mouldings

16

-

-

... More
2.4.1.10.1) Extra for shuttering in circular work of foundations, footings, bases of columns, etc. including machine / equipment foundations for mass concrete

20

-

-

... More
Reinforcement Note:- 1) The reinforcement consumed shall be measured as per client approved measurements. 2) The excess quantity of Steel more than allowable wastage shall be recovered from as per relavent ACC clauses

-

-

-

... More
2.4.2) Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.(Reinf.Steel will be provided free of cost - However rate quotes should include Binding cost)

31000

-

-

... More
2.4.3) Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.

-

-

-

... More
2.4.3.1) Thermo-Mechanically Treated bars HYSD Fe500D or more (Only fabrication including binding wire etc. to complete)(Reinf.Steel will be provided free of cost - However rate quotes should include Binding cost)

27458

-

-

... More
2.4.3.1 a) Thermo Thermo-Mechanically Treated bars HYSD Fe500D or more ( Supply and Fabrication) Bidders has to procure the steel at their own cost.

34521

-

-

... More
Concrete

-

-

-

... More
2.4.4) Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying , excluding the cost of cantering, shuttering finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete,improve workability without impairing strength and durability as per direction of the Engineer-in-charge. (Note :- Minimum Cement content shall be 350 kg/cum)

-

-

-

... More
2.4.4.1) All works upto plinth level

398

-

-

... More
2.4.4.2) All works above plinth level upto floor V level

422

-

-

... More
2.4.4.3) Extra for R.C.C./ B.M.C/ R.M.C. work above floor V level for each four floors or part thereof.

38

-

-

... More
2.4.5) Extra for providing richer mixes at all floor levels.

-

-

-

... More
2.4.5.1) Providing M-30 grade concrete instead of M-25 grade BMC/RMC. (Note:- Minimum Cement content shall be 360 kg/cum)

-

-

-

... More
2.4.5.1.1) All works upto plinth level

398

-

-

... More
2.4.5.1.2) All works above plinth level upto floor V level

422

-

-

... More
2.4.5.1.3) Extra for R.C.C./ B.M.C/ R.M.C. work above floor V level for each four floors or part thereof.

38

-

-

... More
Expansion Joint

-

-

-

... More
2.4.7) Providing and fixing Pre-formed joint fillers “Shalitex” or equivalent board with bitumen primer as adhesive to concrete and masonry surfaces in separation/expansion joints including 200 micron PVC sheet on top to avoid ingress of cement slurry in Shalitex board or equivalent complete as per direction of engineer in charge.

-

-

-

... More
2.4.7.1) 12 mm thick

167

-

-

... More
2.4.8) Providing and filling in position, blown bitumen in expansion joints.

2

-

-

... More
2.4.9) Providing and fixing in position 12 mm thick bitumen impregnated fibre board conforming to IS: 1838, including cost of primer, sealing compo-und GRADE A in expansion joints.

58

-

-

... More
2.4.10) Supplying, fabricating, delivering at site and fixing in position M.S. inserts as per drawing made out of rolled steel sections, plates, angles, bars, including cleaning, Grinding and removing the welding burr, scales, and preparing surface for and applying one coat of red oxide zinc chromate primer and Two coats of Synthetic Enamel paint after fabrication etc. complete as directed by Engineer In Charge.

2396

-

-

... More
2.4.11) Supplying, Fabricating and fixing in position PVC pipe sleeves of length not exceeding 450mm and confirming to IS 13592 :1990 typeB up to 150 mm and IS 4985 of 6 kg pressure 150 mm and above in concrete or in masonry at any level and location as shown on drawings including jointing, encasing, bending, threading, etc complete as directed by engineer in charge.

-

-

-

... More
2.4.11.1) Upto 75mm

52

-

-

... More
2.4.11.2) 100 mm dia

30

-

-

... More
2.4.11.3) 150 mm dia

8

-

-

... More
2.4.12) Providing and applying water swellable-bar at starter & all construction joints, of c/section 20mmX5mm, it shall have unrestrained volumetric expansion more than 200% in 30 days, Hydrostatic pressure resistance of 50 meters. It shall be fixed to the concrete using a gun grade hydrophilic adhesive / or mechanically fixed by non corrosive nailing as recommended by manufacturer complete as directed by engineer in charge.

217

-

-

... More
2.4.13) Providing and fixing in position Stainless steel Grade 304 plate-1.0 mm thick as per design for expansion joints. 200 mm wide

50

-

-

... More
2.4.13.1) Providing and fixing of expansion joint system related with floor location as per drawings and direction of Engineer-In-Charge. The joints system will be of extruded aluminum base members, self aligning / self centering arrangement and support plates etc. as per ASTM B221-02. The system shall be such that it provides floor to floor /floor to wall expansion control system for various vertical locations in load application areas that accommodates multi directional seismic movement without stress to it's components. System shall consist of metal profiles with a universal aluminum base member designed to accommodate various project conditions and finish floor treatments. The cover plate shall be designed of width and thickness required to satisfy projects movement and loading requirements and secured to base members by utilizing manufacturer’s pre-engineered self-centering arrangement that freely rotates / moves in all directions. The Self - centering arrangement shall exhibit circular sphere ends that lock and slide inside the corresponding aluminum extrusion cavity to allow freedom of movement and flexure in all directions including vertical displacement. Provision of Moisture Barrier Membrane in the Joint System to have watertight joint is mandatory requirement all as per the manufactures design and as approved by Engineer -in- Charge. (Material shall conform to ASTM 6063).

-

-

-

... More
2.4.13.1.1) Floor Joint of 100 mm gap

36

-

-

... More
2.4.13.2) Providing and fixing of expansion joint system related with wall joint (internal/ external) location as per drawings and direction of Engineer-In- Charge. The joints shall be of extruded aluminum base members, self aligning / centering arrangement and support plates as per ASTM B221- 02. The material shall be such that it provides an Expansion Joints System suitable for vertical wall to wall/ wall to corner application, both new and existing construction in office Buildings & complexes with no slipping down tendency amongst the components of the Joint System. The Joint System shall utilize light weight aluminum profiles exhibiting minimal exposed aluminum surfaces mechanically snap locking the multicellular to facilitate movement. (Material shall conform to ASTM 6063.)

-

-

-

... More
2.4.13.2.1) Wall Joint of 100 mm gap

12

-

-

... More
2.4.13.3) Providing and fixing of expansion joint system of approved make and manufacture for various roof locations as per approved drawings and direction of Engineer-In-Charge. The joints shall be of extruded aluminum base members with, self aligning and self centering arragement support plates as per ASTM B221- 02. The system shall be such that it provides water tight roof to roof /roof to corner joint cover expansion control system that is capable of accommodating multidirectional seismic movement without stress to its components. System shall consist of metal profile that incorporates a universal aluminum base member designed to accommodate various project conditions and roof treatments. The cover plate shall be designed of width and thickness required to satisfy movement and loading requirements and secured to base members by utilizing manufacturer’s pre- engineered self-centering arrangement that freely rotates / moves in all directions. The Self centering arrangement shall exhibit circular sphere ends that lock and slide inside the corresponding aluminum extrusion cavity to allow freedom of movement and flexure in all directions

-

-

-

... More
Provision of Moisture Barrier Membrane in the Joint System to have water tight joint is mandatory requirement. (Material shall confirm to ASTM 6063.)

-

-

-

... More
2.4.13.3.1) Roof Joint of 100 mm gap

43

-

-

... More
2.4.14) Designing, Detailing, Providing and installing 50 / 75mm thk SNPG-400 expansion joint system or approved equivalent for wall to wall and wall to column joints at all levels and locations designed for multi- directional movement and comprised of continuous extruded cover plate and snap-locked to base frame (Cover plate shall be fixed with continuous seal at both end of top plate) conforming to ASTM 6063 and in accordance with the drawings and manufacturers specifications including all necessary material and works etc. complete for satisfactory performance of the system as directed by Engineer-In-Charge. Note: 1) The system shall be 100% waterproof and shall be designed for underground waterpressure of 4.5m. 2) Contractor shall submit leakproof guarantee bond for waterproofing of entire expansion joint system on the on court fee stamp of Rs. 100/- or of appropriae value in the approved format for 10 years after completion and handing over the building to the owner.

24

-

-

... More
2.4.15) Providing and placing in position 100mm thick factory made machine batched & machine mixed Precast RCC Rectangular Covers on drains of footpath, trenches and chambers of various sizes,of M-25 grade cement concrete for RCC work, including cost of centering, shuttering, reinforcement of 8mm dia TMT bars of Fe 500 grade @ maximum 100mm c/c on both ways , neat cement punning on finished surface, properly encased on all edges with 1.6 mm thick , 100mm wide MS sheet duly painted over priming coat , reinforcement to be welded at edges with MS sheet and providing 2 Nos. 12 mm dia bar for hooks etc i/c cost of cartage ,all leads & lift, handling at site etc. all complete as per direction of Engineer-in- Charge.

33

-

-

... More
2.4.20) Providing & Fixing 75MM thickness of specifically extruded high performance polymer based sheet (SIL FIL of Supreme or equivalent) in expansion joint as filler board, with minimum density 28 kg / Cu. Mt & compression strength of 0.21 Kg / Sq.M, when tested as per ASTM D-3575, including using double sided adhesive of 2 MM x 25 MM x 25 MM at four places per sq.mtr to the casted surface etc complete as directed by Engineer In Charge for.

42

-

-

... More
2.4.21) Providing, supplying and mixing waterproofing compound Conplast X421 IC of Fosroc or approved equivalent conforming to IS:2645-2003 & IS:9103-1999, as per dose recommended by manufacturer etc. complete as directed by Engineer In Charge.

937

-

-

... More
2.6) WATERPROOFING WORK

-

-

-

... More
2.6.1) Providing and laying water proofing treatment in sunken portion of WCs, bathroom etc., by applying cement slurry mixed with water proofing cement compound consisting of applying : a) First layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm. This layer will be allowed to air cure for 4 hours. b) Second layer of slurry of cement @ 0.242 kg/sqm mixed with water proofing cement compound @ 0.126 kg/sqm. This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours. The rate includes preparation of surface, treatment and sealing of all joints, corners, junctions of pipes and masonry with polymer mixed slurry.

359

-

-

... More
2.6.2) Providing and laying in sunken area with broken AAC Block laid, consolidated, finished smooth, including finishing the top layer with 20 mm water proof cement mortar 1 : 4 (1 cement : 4 coarse sand) with approved water proofing compound as per manufacturer specifications etc. all complete as per directions of the Engineer-in-Charge.

175

-

-

... More
2.6.3) Providing and laying integral cement based water proofing treatment including preparation of surface as required for treatment of roofs, balconies, terraces etc consisting of following operations: a) Applying a slurry coat of neat cement using 2.75 kg/sqm of cement admixed with water proofing compound conforming to IS. 2645 and approved by Engineer-in-charge over the RCC slab including adjoining walls upto 300 mm height including cleaning the surface before treatment.

-

-

-

... More
b) Laying brick bats with mortar using broken bricks/brick bats 25 mm to 115 mm size with 50% of cement mortar 1:5 (1 cement : 5 coarse sand) admixed with water proofing compound conforming to IS : 2645 and approved by Engineer-in-charge over 20 mm thick layer of cement mortar of mix 1:5 (1 cement :5 coarse sand ) admixed with water proofing compound conforming to IS : 2645 and approved by Engineer-in-charge to required slope and treating similarly the adjoining walls upto 300 mm height including rounding of junctions of walls and slabs.

-

-

-

... More
c) After two days of proper curing applying a second coat of cement slurry using 2.75 kg/ sqm of cement admixed with water proofing compound conforming to IS : 2645 and approved by Engineer-in-charge. d) Finishing the surfaces with 20 mm thick jointless cement mortar of mix 1:4 (1 cement : 4 course sand) admixed with waterproofing compound conforming to IS :2645 and approved by Enginner in charge including laying glass fibre cloth of approved quality in top layer of plaster and finally finishing the surface with trowel with neat cement slurry and making pattern of 300 x 300 mm square and 3 mm deep.

-

-

-

... More
e) The whole terrace so finished shall be flooded with water for a minimum period of two weeks for curing and for final test. All above operations to be done in order and as directed and specified by the Engineer-in- Charge :

-

-

-

... More
2.6.3.1) With average thickness of 120 mm and minimum thickness at khurra as 65 mm.

450

-

-

... More
2.6.4) U.G. TANK / OH WATER TANKS – INTERNAL AREAS

-

-

-

... More
2.6.4.1) Providing & Applying 2 coats of CFTRI approved, waterproof coating with high performance two component pre-packed cementitious waterproofing, with a mix ratio of (liquid: Powder), parts by wt. - 1:1.4 @ 2.2 Kg/sqm to achieve DFT of 1.5mm over the wall & floor surface as per the manufacturers’ specification & drawing with the turnkey execution to be done by the manufacturer through its in house subsidiary execution company and with 10 years composite warranty against leakages, to be provided by the principal manufacturer / civil contractor. All the coats to be applied in right angle to each other. The coating shall have following properties: Tensile strength : 2.6 N/mm2 as per ASTM D 412, Elongation at break, % : 120 as per ASTM D 412, Adhesion strength : 1 N/mm2 as per ASTM D 4541, crack bridging : 2mm as per ASTM C 836, Water penetration (5 bar pressure) : 1% as per BS EN 12390, Hardness, Shore A : 60 as per ASTM D 2240, RCPT permeability : 92% as per ASTM C 1202-97, including proper surface preparation as per manufacturers' specification, cleaning work, removal of loose concrete and filling cracks with polymer modified mortar using SBR Latex, URP. All the honeycombed areas & construction joints shall be identified and injected with cement slurry admixed with expansive additive, AM @ 225gms / bag of cement.

150

-

-

... More
Making of angle fillets all around the periphery of the wall with polymer modified mortar using SBR Latex, URP, etc, complete. Protection Cum Hygiene Coat: Providing & applying 2 coats of two component, water-based epoxy resin with additive fillers, anti-algae, anti-fungal, Non- flamable, Non-toxic, hygiene cum damp-proof coating @ 4 sqm / Kg, as directed by the manufacturer with the turnkey execution to be done by the manufacturer through its in house subsidiary execution company and with 10 years composite warranty against leakages, to be provided by the principal manufacturer / civil contractor. The coating shall be Certified by CFTRI as per 21 CFR 175 – 300 of US – FDA. Mixing Ratio (Base: Hardner: Water) – 1:1:1, Specific Gravity : 1.2, Water vapour permeance : 244.48 g/m2/24 hrs, as per IS 7809/Pt 2/1977, Adhesion strength: 2.5 N/mm2 as per ASTM D 4541 : 02, as per manufacturers' specification, etc, complete as directed by engineer in charge.

-

-

-

... More
2.6.5) UG TANK EXTERNAL AREAS

-

-

-

... More
Providing and laying integral cement based treatment for water proofing on horizontal surface at all depth below ground level for under ground structures as directed by Engineer-in-Charge and consisting of : i) Ist layer of 22 mm to 25 mm thick approved and specified rough stone slab over a 25 mm thick base of cement mortar 1:3 (1 cement : 3 coarse sand) mixed with water proofing compound conforming to IS:2645 in the recommended proportion over the leveling course (leveling course to be included in this item). Joints sealed and grouted with cement slurry mixed with water proofing compound. ii) 2nd layer of 25 mm thick cement mortar 1:3 (1 cement: 3 coarse sand) mixed with water proofing compound in recommended proportions. iii) Finishing top with stone aggregate of 10 mm to 12 mm nominal size spreading @ 8 cudm/sqm thoroughly embedded in the 2nd layer.

-

-

-

... More
2.6.5.1) Using rough kota stone.

321

-

-

... More
Providing and laying integral cement based treatment for water proofing on the vertical surface by fixing specified stone slab 22 mm to 25 mm thick with cement slurry mixed with water proofing compound conforming to IS:2645 in recommended proportions with a gap of 20 mm (minimum) between stone slabs and the receiving surfaces and filling the gaps with neat cement slurry mixed with water proofing compound and finishing the exterior of stone slab with cement mortar 1:3 (1 cement : 3 coarse sand) 20 mm thick with neat cement punning mixed with water proofing compound in recommended proportion complete at all levels and as directed by Engineer-in-charge :

-

-

-

... More
2.6.5.2) Using rough kota stone.

413

-

-

... More
2.6.6) Providing and Placing in position suitable PVC water stops conforming to IS:12200 for construction/ expansion joints between two RCC members and fixed to the reinforcement with binding wire before pouring concrete etc. complete :

-

-

-

... More
2.6.6.1) Serrated with central bulb (225mm wide, 8- 11mm thick).

234

-

-

... More
2.6.7) WATERPROOF SEALING AROUND THE UTILITIES/ PIPES PASSING THROUGH RCC WALL ETC

65

-

-

... More
Supplying & sealing the pipe inserts, etc provided in the floor & walls with 1.5 mm thick two sided non-reinforced polymerized bituminous self adhesive Tape, to seal the joint between pipes/inserts and the core cuts. The Tape shall have Softening point (R&B) 60⁰C as per ASTM D 36, Elongation, (Compound) 500% as per ASTM D 412, Water absorption at 24 hrs 0.3 as per ASTM D 570, Water permeability @ 5bar : Nil as per BS EN 12390, Adhesion strength : 1.0 N/mm as per ASTM D 1000, Cold temperature flexibility -6⁰C as per UEAtc, followed by grouting the gaps around the pipe / inserts with a non shrink cementitious waterproof grout, 10M, shall conform to ASTM C 109 - 1999 18, ASTM C 1107, Grade C,all followed by sealing with Liquid Applied PU flashing of Flexi PU with reinforcing polyester mesh embedded between the two coats of Flexi PU, at the junction of the pipes and slab / wall area, including proper cleaning of the junctions and sealing the junction with PU sealant conforming to ASTM C-920-S, NS, 25 & BS EN ISO—11600: 2003 Type F & G as per manufacturers' specification, etc, complete as directed by engineer in charge.

-

-

-

... More
2.6.8.2) For external

-

-

-

... More
2.6.8.2.1) Providing and laying Box type water proofing treatment on horizontal and inclined surfaces (including below raft) of under ground structures at all depths below ground level and up to plinth level above ground level including coating with two coats of BRUSH BOND RFX of Fosroc Chemicals India Ltd or approved equivalent as per manufacturers specifications on PCC, laying 25mm thick Shahabad stone tiles with minimum 25mm thick 1:3 cement mortar bedding, filling the joints with cement mortar 1:2 and with 15mm metal, providing 15mm thick cement plaster in cement mortar 1:3, pressure grouting of all types of joints and socket pipes with cement slury, curing, successful leakproof testing etc. complete as directed by Engineer In Charge. Notes: 1) All cement mortar shall be mixed with waterproofing compound CONPLAST X 421 IC. (dosage- 130ml per bag of cement) 2) Contractor shall submit leakproof guarantee bond of waterproofing system on the on court fee stamp of Rs. 100/- or of appropriae value in the approved format for 10 years after completion and handing over the building to the owner. 3) The rate shall include costs towards all other necessary activities / works and materials not mentioned above but required for satisfactory performance of the system. complete as directed by engineer in charge.

25

-

-

... More
2.6.9) PARAPET WALL

392.25

-

-

... More
Waterproofing Treatment:- Providing & Applying 2 coats of waterproof coating with high performance two component pre-packed cementitious waterproofing coating, with a mix ratio of (liquid: Powder), parts by wt. - 1:1.4 @ 2.2 Kg/sqm to achieve DFT of 1.5mm over the wall surface as per the manufacturers’ specification & drawing with the turnkey execution to be done by the manufacturer through its in house subsidiary execution company and with 10 years composite warranty against leakages, to be provided by the principal manufacturer / civil contractor. All the coats to be applied in right angle to each other. The coating shall have following properties: Tensile strength : 2.6 N/mm2 as per ASTM D 412, Elongation at break, % : 120 as per ASTM D 412, Adhesion strength : 1 N/mm2 as per ASTM D 4541, crack bridging : 2mm as per ASTM C 836, Water penetration (5 bar pressure) : 1% as per BS EN 12390, Hardness, Shore A : 60 as per ASTM D 2240, RCPT permeability : 92% as per ASTM C 1202-97, including surface preparation as per site condition, etc, complete as directed by engineer in charge..

-

-

-

... More
Protection to Waterproof coating – Vertical Surface:

-

-

-

... More
Supplying & laying a protective plaster at vertical portion in 15 mm thickness in Sand Cement mortar (1:3) admixed with integral compound conforming to IS 2645, Pidiproof LW+ / Proofsol LWP @ 220ml per bag of cement to vertical surface including application of acrylic bond coat and sand sprinkling to create key to plaster, etc, complete.

-

-

-

... More
2.7) MISCELLANEOUS CIVIL WORK ITEMS

-

-

-

... More
2.7.1) Rebar anchoring / dowelling for following diameter of bars including scaffolding , drilling holes to required depth in existing RCC member with due care of PT Tendons, cleaning the holes embeding and fixing reinforcement rods with Fischer Chemical FISV360s / 'lockset' or equivalent compound as per manufacturer's specifications, making good surafce to the satisfaction of Engineer, etc complete, as directed by the engineer In Charge. (Reinforcing bars shall be paid in relevant Item)

-

-

-

... More
2.7.1.1) 12 mm (160mm min. embedment depth) or as per the design requirement.

183

-

-

... More
2.7.1.2) 16mm (210mm min. embedment depth) or as per the design requirement.

58

-

-

... More
2.7.1.3) 20mm (260 mm min. embedment depth) or as per the design requirement.

42

-

-

... More
2.7.1.4) 25mm (325 mm min. embedment depth) or as per the design requirement.

42

-

-

... More
2.7.2) Drilling with core cutting machine in RCC slabs, walls etc. wherever required in buildings, manholes,ducts etc. for laying pipes, and making good the same to give an even finish . The rate shall include the cost of drilling core, providing water proofing compound for sealing the joints around the pipes, nominal reinforcement wherever required, scaffolding and labour charges for working at all levels, leads and heights. (Maximum thickness of RCC members shall be 300mm) and as directed by Engineer- In-Charge.

-

-

-

... More
2.7.2.1) Upto 200mm dia

10

-

-

... More
2.7.3) Providing and fixing in position pre-moulded joint filler in expansion joints.

-

-

-

... More
2.7.4) Providing and laying 75 to 100 micron HDPE film over compacted earth/blinded soling to act as vapour barrier including cutting lapping, jointing etc. complete: Rate to include net overlapping of joints by 100mm. Sealing joints with adhesive (Only plan area to be measured for payment). complete as directed by engineer in charge.

1803

-

-

... More
2.7.5) Providing and laying PVC pipe of 100 mm dia of class 2 (working pressure 4kg/sqcm) conforming to I.S. 4985:2000 for weep holes length not more than 2m at specified locations including cutting to required length, placing with desired slopes and at various levels, creating filter media on filling side of 300mm X 300mm X 300mm in gravel & sand mixture etc complete as directed by Engineer In charge. (Make: finolex or equivalent)

3

-

-

... More
2.7.6) Providing and fixing concertina coil fencing with punched tape concertina coil 600 mm dia. 10 metre openable length (total length 90m), having 50nos. Round per 6 metre length, upto 3 m height of wall with existing angle iron 'Y' shaped placed 2.4 m or 3.00 m apart and with 9 horizontal R.B.T. reinforced barbed wire, stud tied with G.I. staples and G.I clips to retain horizontal, including necessary bolts or G.I barbed wire tied angle iron, all complete as per direction of Engineer-in-charge, with reinforced barbed tape(R.B.T)/Spring core (2.5mm thick) wire of high tensile strength of 165kg/sq.mm with tape (0.52 mm thick) and weight 43.478 gm/meter (cost of M.S. angle, C.C. blocks shall be paid separately)

980

-

-

... More
2.7.7) Providing and fixing tapered / parallel threaded couplers conforming to IS code on “Reinforcement Couplers for Mechanical Splices of Bars for Concrete Reinforcement - Specification”, to reinforcement bars including threading, enlargement at connection by forging, rotecting the prepared reinforcement bars and related operations as required to complete the works per direction of Engineer-in-Charge. (The length of the bars in which coupler is to be provided should not be less than 4 metre, no deduction for labour and binding wire saved for not providing lap length shall be made)

-

-

-

... More
2.7.7.1) Coupler for 20 mm diameter reinforcement bar

175

-

-

... More
2.7.7.2) Coupler for 25 mm diameter reinforcement bar

142

-

-

... More
2.7.7.3) Coupler for 32 mm diameter reinforcement bar

117

-

-

... More
2.7.18) Providing and laying Non Pressure NP-3 class (Medium duty) R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete

-

-

-

... More
2.7.18.1) 150 mm dia RCC pipes.

374

-

-

... More
2.7.18.2) 300 mm dia RCC pipes.

896

-

-

... More
2.7.18.3) 450 mm dia RCC pipes.

73

-

-

... More
2.7.18.4) 600 mm dia RCC pipes.

8

-

-

... More
2.7.19) Providing and constructing inspection chamber of clear inner size 1200mm x 1500mm in 230 mm thick Brick Masonry wall up to depth 1m and 340mm thick from 1 m to 2m depth in cement mortar 1:4 (Bricks shall have minimum crushing strength of 5 N/sq.mm), with 20mm thick waterproof cement plaster in cement mortar 1:3 on outer faces and 12mm thick neat waterproof cement plaster in cement mortar 1:3 on inner faces including 200 mm minimum thick foundation and 150mm thk coping at top in concrete grade M15, plastering and cement rendering chamber bottom, making connections with inlet and outlet pipes, fixing approved quality RCC manhole cover with frame complete including excavation, backfilling, providing and embeding orange coloured safety foot rest of minimum 6 mm thick plastic encapsulation as per IS : 10910, on 12 mm dia steel bar conforming to IS: 1786, at 300mm c/c, shuttering, de- shuttering, curing, scaffolding, dewatering if necessary etc. complete as per drawing and as directed by Engineer- in-Charge for depth

-

-

-

... More
2.7.19.1) Chamber depth up to 1.2 m, for M.D. (Medium duty) Covers & frames conforming to I.S. 12592 Part-I & Part-II. Note: Depth shall be measured from bottom of the chamber cover

12

-

-

... More
2.7.20) Providing and constructing inspection chamber of clear inner size 1500mm x 1500mm in 230 mm thick Brick Masonry wall up to depth 1m and 340mm thick from 1 m to 2m depth in cement mortar 1:4 (Bricks shall have minimum crushing strength of 5 N/sq.mm), with 20mm thick waterproof cement plaster in cement mortar 1:3 on outer faces and 12mm thick neat waterproof cement plaster in cement mortar 1:3 on inner faces including 200 mm minimum thick foundation and 150mm thk coping at top in concrete grade M15, plastering and cement rendering chamber bottom, making connections with inlet and outlet pipes, fixing approved quality RCC manhole cover with frame complete including excavation, backfilling, providing and embeding orange coloured safety foot rest of minimum 6 mm thick plastic encapsulation as per IS : 10910, on 12 mm dia steel bar conforming to IS: 1786, at 300mm c/c, shuttering, de- shuttering, curing, scaffolding, dewatering if necessary etc. complete as per drawing and as directed by Engineer- in-Charge for depth

-

-

-

... More
2.7.20.1) Chamber depth more than 1m and up to 1.5 m, for M.D. (Medium duty) Covers & frames conforming to I.S. 12592 Part-I & Part-II. Note: Depth shall be measured from bottom of the chamber cover

13

-

-

... More
2.7.21) Supplying, fabricating and Erecting Chain Link fencing of G.I. mesh of size 50 x 50 mm diamond pattern of 4mm dia. GI wire and as per specifications and drawings, including providing and erecting 65 x 65 x 8 angle posts @ 2.4m C/C with cross support at every 8th pole and at corners, MS Angle 35mm x 35mm x 3mm thick at top and bottom of chain link with necessary U hooks, nuts and bolts, washers, total height of fencing @ 2.5m above ground including embedding the angle post in cement concrete block of size 0.45m x 0.45m x 0.6m of grade M15 (20mm downgraded), with necessary excavation, cleaning and preparing surface, applying one coat of red oxide zinc chromate primer and two coats of Synthetic Enamel paint after fabrication and touchup paint after erection if required of approved manufacture, brand, colour, shade etc. complete as directed by Engineer In Charge.

36

-

-

... More
2.7.22) Providing, detailing, and fabricating as per specifications, transporting to site and erecting MS Swing type gate fabricated using MS Hollow pipe sections and GI Chain link fabric of size 50 x 50mm (diamond pattern with 4mm dia. of GI wire) including fixing bolts, nuts, washers, cleats, stiffeners, gussets and all necessary operations such as but not limited to straightening, bending, cutting, drilling, grinding, machining if specified, welding etc. complete including cleaning, Grinding and removing the welding burr and preparing surface and applying one coat of red oxide zinc chromate primer and one coat of Epoxy paint after fabrication and second coat of Epoxy paint after erection, with approved colour, shade and brand etc. including touching up with primer and paint etc. complete as directed by Engineer In Charge.

1327

-

-

... More
2.7.23) Providing and spreading ballast using 80mm size stone metal for thickness of 100mm all complete as directed by Engineer In Charge.

16

-

-

... More
2.7.24) Painting with black anti-corrosive bitumastic paint of approved brand and manufacture to give an even shade :

-

-

-

... More
2.7.24.1) Two or more coats on new work

11

-

-

... More
2.7.25) Providing, hoisting and fixing up to floor five level precast reinforced cement concrete perforated / non perforated covers with lifting hooks not exceeding 1.5m clear span up to floor five level, including the cost of required centering, shuttering but , excluding the cost of reinforcement, with M40 grade concrete.

0.3

-

-

... More
2.7.26) FILTER MEDIA : Providing and filling following materials in layers for for filter media or where directed including lifting, loading, unloading, transporting, etc. complete as directed by Engineer In charge.

-

-

-

... More
2.7.26.1) Coarse sand

4

-

-

... More
2.7.26.2) Gravel 5 mm to 10 mm

4

-

-

... More
2.7.26.3) Boulder 50 mm to 200 mm

4

-

-

... More
2.8) BLOCK WORK

-

-

-

... More
2.8.1) Providing and laying autoclaved aerated cement blocks masonry with 100 mm thick AAC blocks in super structure above plinth level up to floor V level in cement mortar 1:4 (1 cement : 4 coarse sand ). The rate includes providing and placing in position 2 Nos 6 mm dia M.S. bars at every third course of masonry work.

17

-

-

... More
2.8.1A) Providing and laying autoclaved aerated cement blocks Masonry of thickness 100mm with AAC blocks in proper line and level in superstructure above plinth level up to floor V level, in polymer adhesive as recommended by block manufactures or from saint gobain weber or leticrete make, including all scaffolding, staging, curing, all lifts, all labour, hire and fuel charges for all tools and plants employed etc. complete to the satisfaction of the Engineer-in-charge and as directed. Rate shall include providing Concrete Binders in proportion 1:2:4 (1 cement : 2 Coarse sand : 4 Aggregates), 75mm thick reinforced with 2 nos. of 8 mm dia Fe 500 bars, RCC binders to be at every 1 metre interval from floor level. The rate to be inclusive of cost of reinforcement and formwork, cover blocks for reinforcement and all other incidental charges etc., all complete and as directed. The rate shall also include closing the gap between the masonry and RCC beam / slab finished to required slope as directed by the Engineer-in-charge. Note:- The width of the joints shall not exceed 10mm.

28

-

-

... More
2.8.2) Extra for brick work / AAC block masonry / Tile brick masonry in superstructure above floor V level, for each four floors or part thereof by mechanical means.

89

-

-

... More
2.8.3) Providing and laying autoclaved aerated cement blocks masonry with 150mm/200mm/230mm/300 mm thick AAC blocks in super structure above plinth level up to floor V level with RCC band at sill level and lintel level with approved block laying polymer modified adhesive mortar all complete as per direction of Engineerin- Charge. (The payment of RCC band and reinforcement shall be made for seperately).

84

-

-

... More
2.8.3A) Providing and laying autoclaved aerated cement blocks Masonry of thickness 150mm/200mm/230mm/300 mm with AAC blocks in proper line and level in superstructure above plinth level up to floor V level, in polymer adhesive as recommended by block manufactures or from saint gobain weber or leticrete make, including all scaffolding, staging, curing, all lifts, all labour, hire and fuel charges for all tools and plants employed etc. complete to the satisfaction of the Engineer-in-charge and as directed. Rate shall include providing Concrete Binders in proportion 1:2:4 (1 cement : 2 Coarse sand : 4 Aggregates), 75mm thick reinforced with 2 nos. of 8 mm dia Fe 500 bars, RCC binders to be at every 1 metre interval from floor level. The rate to be inclusive of cost of reinforcement and formwork, cover blocks for reinforcement and all other incidental charges etc., all complete and as directed. The rate shall also include closing the gap between the masonry and RCC beam / slab finished to required slope as directed by the Engineer-in-charge. Note:- The width of the joints shall not exceed 10mm.

813

-

-

... More
2.8.4) Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:

-

-

-

... More
2.8.4.1) Cement mortar 1:4 (1 cement : 4 coarse sand)

46

-

-

... More
2.8.5) Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level in all shapes and sizes in :

-

-

-

... More
2.8.5.1) Cement mortar 1:4 (1 cement : 4 coarse sand)

83

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.