Directorate Of Town Panchayats Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Directorate Of Town Panchayats Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date26 Oct 2024
Closing Date7 Nov 2024
Tender Amount₹ 63,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Applying Tack Coat over existing Prime coating WMM surface using 2.5 Kg of Bitumen emulsion(RS-1) per 10 Sq.m including labour charges for preparing the surface removing of binder materials and other foreign matter with wire brushes and small picks & axes sweeping with brooms on soft brushes and finally dusting with old gunny bag and/or compressed air and applying the required quantity of bitumen emulsion as tack coat manually etc., Complete complying with 503 of MORTH.Rev-5 specifications.

4100

-

-

... More
Providing and laying 50 mm conslidated thick Dense Bituminuous macadam using 0.24 cum of 26.50-13.20 mm,0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm and below and with 53.20kg of VG30(60/70Bulk ) Bitumen premixing 10 sqm including cost and conveyance of all materials to CMP site,heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 tons capacity,conveying the mix by tipper trucks to work site,spreading the mix uniform thickness of 50mm with paver to the specified grade and cross sections and compaction by vibratory/ pneumatic roller to the required density etc., including labour for accending to pavor at sites etc., including hire charges and fuel charges for 20-30T CMP with bitumen Boiler,tipper trucks, paver finisher/9 m paver finisher,vibratory/ pneumatic rollers and all other tools and plant required including to all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5.

205

-

-

... More
Providing and laying Bituminous Concrete 30mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 50.30 Kgs of VG30 (60/70Bulk ) Bitumen and for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5

123

-

-

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm. thick including reflectorising glass beads @ 250 gms. per sqm. area, thickness of 2.5 mm. is exclusive of surface applied glass beads as per IRC: 35. The finished surface to be level, uniform and free from streaks and holes etc. complete. (as per MORT & H specification No.803). (CE(H) Chennai Memo No.4848/BOE/138/2011-1/ dated:06.01.12)

205

-

-

... More
Providing and laying Well Gravel for 150 mm thick in layers of finished thickness of 75 mm thick each including cost and conveyance of Gravel from approved quarry to working site and stacking them to departmental gauge for pre measurement including labourcharges for sperading watering including all leads for water and consolidation by power roller rolling including hire and fuel charges for all tools and plants employed and all other incidental charges etc, complete complying as per clause 301&305 of MORTH specification.

154

-

-

... More
MAINTENANCE

-

-

-

... More
Towards the charges for routine maintenance of the road work executed under NABARD SCHEME including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works

-

-

-

... More
Clearing and Grubbing by light Jungle removing and disposing of all materials such as bushes, shrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness as rubbish including all other incidental charges etc., complete as per MO

-

-

-

... More
Upkeeping 1st Year (50%)

615

-

-

... More
Upkeeping 2st Year (60%)

738

-

-

... More
Upkeeping 3st Year (60%)

738

-

-

... More
Upkeeping 4st Year (60%)

738

-

-

... More
Upkeeping 5st Year (60%)

738

-

-

... More
Earth work excavting and deposting on bank with initial lead of 10m & initial lift of 2m in Hard sriff clay, Stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with samll size bouders SS20A for making up the berms. as

-

-

-

... More
Upkeeping for 1st Year (40%)

49.2

-

-

... More
Upkeeping for 2st Year (40%)

49.2

-

-

... More
Upkeeping for 3st Year (40%)

49.2

-

-

... More
Upkeeping for 4st Year (40%)

49.2

-

-

... More
Upkeeping for 5st Year (40%)

49.2

-

-

... More
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributo at the rate of 0.20 kg/sqm on the prepared bituminous/ granular surface cleaned with mcchanical broom as per clause 503

-

-

-

... More
4 th year 3%

123

-

-

... More
5 th year 5%

205

-

-

... More
Providing and laying bituminous concreete 30 mm Consolidated thick using 0.13 cum of 19.00 - 9.50 mm 0.17 cum of 9.50-2.36 mm and 0.26 cum of 2.36 mm & below with 50.30 kgs of 60/70 Grade Bulk aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40 mm with mcchanical rollers to the required density etc., including labour for loading bitumen into bitumen tank and metal to feeder unit. labour for attending ot paver site etc., including hire chares nad fuel charges for 20-30 ton CMP With bitumen boiler tipper, trucks, paver Finisher/9M. Vibrator rollers and all other tools and plants required. including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5

-

-

-

... More
4 th year 3%

3.69

-

-

... More
5 th year 5%

3.69

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.