Directorate Of Town Panchayats Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Directorate Of Town Panchayats Tender
Electrical and Electronics
Eprocure
Opening Date5 Dec 2024
Closing Date12 Dec 2024
Tender Amount₹ 5,41,715.62 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 13,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
15th Fc - Tied Grant 2024-2025- I Installment
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_DTP_507767_1Bid Award Id
ViewTender No
110-2024Tender Authority
Directorate Of Town Panchayats ViewPurchaser Address
-Website
http://https://www.tn.gov.in/dtp/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Earth work excavation for foundation in all soils and sub-soil to full depth as may be directed except in hard rock requiring blastering including shoring, timbering,strutting and balling out water wherever necessary and refilling the sides of foundation with excavated earth in 15cm. Layers, well rammed and compacted and depositing the surplus earth in places shown by the departmental officers with initial leads and lifts etc. including leveling the site complete complying with standard specifications and as directed.
718
-
-
... More
Supplying and fixing in pisition of the following HDPE, PVC and G.I specials best approved quality conforming to ISS and providing leak proof joint with PVC adhesive etc., complete complying with standard specification. 63mm HDPE Pipe
1994
-
-
... More
Air Valve - CI SINGLE 25mm
6
-
-
... More
Towards Labour charges for refilling excavated earth for foundation sides and basement including all labour and all other charges etc., complete as per standard specification
718
-
-
... More
Lowering PVC rigid/ HDPE pipes and specials to trench and laying to proper grade and alignment jointing with PVC couplers with cement paste and testing to the required pressure including conveyance of water for filling during testing etc.,Complete
1994
-
-
... More
Jointing HDPE Pipes and Specials by butt fusion welding / electro fusion welding joints using fusion equipment as per ISO 21307-2011 and as per IS 7634 (part-2) : 2012 including cost of hire charges for butt fusion equipment power supply arrangements etc., complete as per directed by TWAD Board Officers.
20
-
-
... More
Labour charges for the erection of submersible pumpset in borewell/openwell including fixing and jointing submersible cable withproper clamps upto the starter to required depth and also fixing of riser pipes to the required depth valves erection clamps, pressure gauges upto the exterior wall of pump room and erection of panel board consisting of TPICN switches starter, voltmeter, Ammeter, three pilot (indicating) lamps capacitor single phasing preventor, water level guard and laying and jointing the cables and twin earthing as per IE rules etc., complete and testing the pumpset and trail run for 10 days.
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements