Directorate Of Town Panchayats Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Directorate Of Town Panchayats Tender
Civil And Construction
Road Construction
Eprocure
Opening Date26 Oct 2024
Closing Date7 Nov 2024
Tender Amount₹ 1,14,00,000
Costs
EMD
₹ 1,14,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Erode Zone Erode District Vellottamparappu Town Panchayat Nabard (ridf-xxx) 2024-2025
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_DTP_497071_1Tender No
14/2024Tender Authority
Directorate Of Town Panchayats ViewPurchaser Address
-Website
http://https://www.tn.gov.in/dtp/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Below 1.00 mt Height ( Without strutting )
672
-
-
... More
Above 1.00 mt Height ( Without strutting )
321
-
-
... More
Vibrated Cement concrete of 1:2:4 mix (one part of cement, two parrt of M.sand ,and four part of coarse aggregate using hard granite stone jelly of 20mm gauge for sidewall concrete works excluding shuttering , including dewatering wherever necessary including the cost of all materials and labour charges for mixing concrete and curing etc. complete as per TNDSS NO 24
313
-
-
... More
Supply and Fixing of 90 MM Dia PVC 4 ksc Pipe including cost, conveyance of all to site and all labour for curing charges etc., complete as per standard specification.
36
-
-
... More
Finishing the top of drain vent Portion with granolethic finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete
28
-
-
... More
Supply and fabrication and placing in position of TMT steel roads to required size and length as directed by the departmental officers including cost of binding wire, cutting, bending and tying with proper position etc., including cost and conveyance of all materials to site and all labour charges etc., complete Complying with Standard Specification as per TNDSS No.97 V,VI (S6) VII (S6) VII-3,
1400
-
-
... More
Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone Sand (M- Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers -
14
-
-
... More
Picking the Existing B.T Surface up to 50mm depth as directed by the depatmental opfficers and collecting the picked up salvaged metal and stacking the same for reuse and depositing the debris excluding cost of materials including all labour charges for picking and all other tools and plants employedfor the work and including all other incidential charges etc complete as per standard specifications., MORTH 111, 112
1500
-
-
... More
Collection and Spreading of well gravel including cost and conveyance of all materials from approved quarries as noted in lead chart to the road side including loading, unloading and stacking the well gravel at road side to departmental gauge for pre-measurement including labour charges for laying spreading leveling to camper etc., complete as per as per MORTH Specifications.401 and 1015
290
-
-
... More
Providing and Laying Wet Mix Mecadam Using 0.396m3 of 45-22.40mm Graded metal, 0.528m3 of 22.40-2.36 mm graded metal and 0.396m 3 2.36 and below size graded metal premixing with water to a densemass on a prepared subgrade / base to temple in uniform 15cm Consolidated thickness and consolidation with Vibratory roller of 8 to 10 tonne capacity in stages to proper grade and camber rolling with protecting edges, etc completing with MORTH specification Clause 406.
675
-
-
... More
Providing and laying Prime Coat over WBM/ WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 502 of MORTH Rev-5
4500
-
-
... More
Providing and laying Tack Coat over Existing BT surface using 2.5 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5
4500
-
-
... More
Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24 cum of 26.50-13.20mm, 0..25cum of 13.20-2.36mm and 0.23cum of 2.36mm & below and with 53.20 Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site,heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to work site, spreading themix to uniform thickness of 50mm with paver to the specified grades and cross sections and compactedby Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks,Paver Finisher / 9m paver finisher, Vibratory / Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5
225
-
-
... More
Providing and laying Bituminous concrete to 30mm thick using 0.13 cum of 19.00-9.50 mm, 0.13cum of 9.50-2.36 mm and 0.26cum of 2.36mm and blow with 50.30 kgs of VG 30 /VG 40 bitumen for 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20–30 tonnes capacity, conveying the mix by tipper trucks to paver site spreading the mix to uniform thickness of 40 mm with mechanical Paver to the specified grades and cross sections and consolidated by 80 - 10 tonne vibratory/ pneumatic roller to the required density etc., including labor for attending to paver site etc., including hire charges and fuel charges for 20 – 30t CMP with bitumen boiler, tipper trucks, paver finisher,/ 9m paver finisher, vibratory/ pneumatic rollers and all other tools and plant required including fule and all other incidental charges etc., complete as per specification using CMP as for clause 507of MORTH Rev-5.
135
-
-
... More
Road Marking with Hot Applied Thermoplastic Compound with Refletiorising Glass Beads on Bituminous Surface - Providing and lying of hot applied thermoplastic compound 2.5mm thick including refectorising glass beads @250gms per sqm area, thickness of 2.5mm exclusive of surface applied glass beads as per IRC 35. The finished surface to be level uniform and free from streaks and holes, etc.,
240
-
-
... More
MAINTENANCE
-
-
-
... More
Towards the charges for routine maintenance of the road work executed under NABARD SCHEME including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost.
-
-
-
... More
Clearing and Grubbing by Light Jungle removing and disposing of all materials such as bushes, shrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness as rubbish including all other incidental charges etc., complete as per MORTH Specification 111, 112, 201.
-
-
-
... More
Upkeeping 1st year (50%)
720
-
-
... More
Upkeeping 2nd year (60%)
864
-
-
... More
Upkeeping 3rd year (60%)
864
-
-
... More
Upkeeping 4th year (60%)
864
-
-
... More
Upkeeping 5th year (60%)
864
-
-
... More
Earth Work excavating and deposting on bank with initial lead of 10m & initial lift of 2m in Hard stiff clay, Stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS20A for making up the berms. as per clause 111, 112, 201, 202, 301 to 305 & 900 of MORTH Vth Revision [Twice in a year]
-
-
-
... More
Upkeeping for 1st year (40%)
216
-
-
... More
Upkeeping for 2nd year (40%)
216
-
-
... More
Upkeeping for 3rd year (40%)
216
-
-
... More
Upkeeping for 4th year (40%)
216
-
-
... More
Upkeeping for 5th year (40%)
216
-
-
... More
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg/sqm on the prepared bituminous/ granular surface cleaned with mechanical broom as per clause 503
-
-
-
... More
4 th year 3%
135
-
-
... More
5 th year 5%
225
-
-
... More
Providing and laying Bituminous Concrete 30mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 50.30 kgs of 60/70 Grade Bulk bitumen cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5
-
-
-
... More
4 th year 3%
5
-
-
... More
5 th year 5%
7
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements