Directorate Of Archaeology Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Directorate Of Archaeology Tender

Works
Civil And Construction
Eprocure
Opening Date24 May 2018
Closing Date22 Jun 2018
Tender Amount₹ 72,83,667 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Summary

Comprehensive conservation works to the Protected Monument Padmanabhapuram Palace, Thuckalai, 2018-19 , Structural Repairs and restorations of Paalpura Malika and Clock Tower

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Hire and labour charges for covering the dismantled roof with tarpaulin / silpaulin tying with coir rope to protect from bad weather and to prevent the damages of roof timber works etc.

549.65

-

107.49

... More
Supplying and providing well matured teak wood wrought and framed work for roof members such as wall plates, rafters etc, including cutting and joining by traditional method with all existing ornamental works etc., complete using wooden nails and necessary cuttings, beedings, grooves and carvings works etc., complete.

8

-

279984.45

... More
Labour charges for providing departmental wooden roof members which already removed without cutting and shaping including petty repairs.

16

-

20422.41

... More
Labour charges for fixing wooden roof members in place of damaged ones and already removed from position such as rafters, ridge, wall plate, collar, collar pin, flooring joist etc. after cutting, shaping and fixing the same in position etc. complete.

8

-

36191.94

... More
Supplying 50 x 25 mm teak wooden reeper including cost, conveyance etc complete but excluding fixing charges.

2.47

-

186969.23

... More
Reepering with departmental reeper of size 50 x 25 mm and wire nails 50 mm long for Mangalore pattern roofing tile including cost of nails and labour charges etc complete.

549.65

-

77.33

... More
Applying vegetative oil(Cashew nut shell oil and other herbal ingredients) on the exposed wooden surface of all wooden roof members, reepers, first time for rafters wall plate, collars, collar pins, ridges, hips and valleys, rafters etc. including all cost of materials and labour charges for dusting and cleaning the surface etc. complete.

1649

-

260.17

... More
Supplying pressed clay tile (Mangalore tile) of 20 mm nominal thickness and of standard size and approved pattern.

3518

-

16.66

... More
Supplying pressed clay Ridge tile (Mangalore tile) of 20 mm nominal thickness and as per approved pattern.

243

-

22.14

... More
Cleaning old pressed clay M.P. roof tile, hip and ridge tiles by removing water weeds, fungus etc using wire brush and lime water etc.

4317

-

4

... More
Roofing with departmental MP roofing tiles including extra labour for old protected monuments with raised up mughappu, false ceiling, obstructions, additional works in valleying areas etc. complete.

549.65

-

140.71

... More
Roofing with departmental hip and ridge tiles including extra labour for old protected monuments with raised up mughappu, false ceiling, obstructions, additional works in valleying areas etc. complete.

90

-

202.65

... More
Providing lime mortar bordering to tiled roof about 65cm2 in section using lime mortar 1:2 (1 lime : 2 river sand) and finishing with red oxide including all labour charges and material cost etc. complete.

200

-

145.48

... More
Finishing the flooring with approved terracotta tiles of size 230 mm x230 mm x 20 mm thick of approved quality laid in lime mortar 1:2, 12 mm thick mixed with water proofing compound conforming to Indian standards, the joints pointed neatly to full depth of tiles with the same mortar mixed with water proof compound, pigments etc., complete complying with standard specifications.

272.22

-

1143.82

... More
Lime plastering with lime mortar 1:2, 12 mm thick prepared with herbal extract such as jaggery water, kadukka water, egg fluid etc., in traditional proportion, after washing the surface with clean water and applying a coat of herbal water to receive the mortar to surface and then applying 1st coat and trowelled smooth the after one week rectifying the hair cracks where ever seen with treated water and mortar, then applying 2nd coat of herbal water and finally applying cebbara coat (mughal polish), including ornamental cornice and ballestrails for building parapet wall and places wherever necessary as directed by departmental officers at site. a. Plastering the base with Lime mortar (12 mm thick).

1087.3

-

388.26

... More
b. Thin coat of secondary plastering with hand grinded Lime mortar (Cebbara coat) (3mm thick).

1087.3

-

547.88

... More
c. Colour matching and finishing.

1087.3

-

857.3

... More
Repairing of clock including replacing of damaged spare parts and labour charges etc complete.

1

-

100000

... More
Fixing warning boards, signs etc in the protected monument of approved design, materials etc as directed by departmental officers at site.

1

-

300000

... More
Comprehensive documentation of the structure in graphics, photo and video before, while and after completion of the work.

1

-

30000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.