Directorate General Of Lighthouses And Lightships Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Directorate General Of Lighthouses And Lightships - DGLL Tender

Works
Pipes and Pipe Related Activities
Eprocure
Opening Date10 Sep 2021
Closing Date6 Oct 2021
Tender Amount₹ 1,61,83,664 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Construction of RCC compound wall and improvement works at Kodiakkarai Lighthouse
Construction of RCC compound wall and improvement works at Kodiakkarai Lighthouse
Construction of RCC compound wall and improvement works at Kodiakkarai Lighthouse
Construction of RCC compound wall and improvement works at Kodiakkarai Lighthouse
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Open timbering in case of shafts, wells, cesspits, manholes and the like including strutting and shoring complete measurements to be taken of the face area timbered):Depth exceeding 1.5 m but not exceeding 3 m. inclusive cost of supply of all materials, labours, tools and all other charges etc complete.

290

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form work for :Foundations & footings, bases. inclusive cost of supply of all materials, labours, tools and all other charges etc complete.

263

-

-

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level. inclusive cost of supply of all materials, labours, tools and all other charges etc complete.

-

-

-

... More
Cement concrete 1:3:6 (1 Cement : 3 coarse sand (zone-III) / M.sand : 6 graded stone aggregate 20 mm nominal size)of specified gradeExtra for laying concrete in or under water and/or liquid mud including cost of pumping or bailing out water and removing slush etc. complete. inclusive cost of supply of all materials, labours, tools and all other charges etc complete.

342.99

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form work for (For Under ground sump and miscellanious work ). inclusive cost of supply of all materials, labours, tools and all other charges etc complete.

-

-

-

... More
Foundations, footings, bases of columns, etc. for mass concrete

115

-

-

... More
Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc

1258

-

-

... More
Providing and laying in position specified grade 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) /M.sand: 3 graded stone aggregate 20 mm nominal size). of reinforced cement concrete, mixing water proofing material in cement concrete per 50 kg work in doses by weight of cement as per manufacturer's specification. excluding the cost of centering, shuttering, finishing and reinforcement - All work for foundation and up to Ground level. Supply of all labour, materials, tools & plants etc., complete.

-

-

-

... More
All work up to Ground level :

326

-

-

... More
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement (superstucture) 1:1.5:3 3 Gradestone 20mm(1 cement : 1.5 coarse sand (zone-III) /M.sand: 3 graded stone aggregate 20 mm nominal size).Supply of all labour, materials, tools & plants etc., complete.All work above Ground level.

171

-

-

... More
Supply and Fabrication of Thermo-Mechanically Treated bars of grade Fe-500D Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. For foundation and superstructure. Supply of all labour, materials, tools & plants etc., complete.

44400

-

-

... More
Brick work with common burnt clay modular bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand). inclusive cost of supply of all materials, labours, tools & plants and all other charges etc complete.

54

-

-

... More
Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundations and plinth in : Cement mortar 1:3 (1 cement : 3 coarse sand).inclusive cost of supply of all materials, labours, tools and all other charges etc complete.

365

-

-

... More
15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix :1:3 (1 cement: 3 fine sand/P-sand). including supply of all materials, labour, tools & plants and all other charges etc., complete.

1492

-

-

... More
Applying one coat of water thinnable cement primer of approved brand and manufacture (Asian / Berger) on wall surface : Water thinnable cement primer, inclusive cost of supply of all materials, labours, tools and all other charges etc complete.

1370

-

-

... More
Applying walls with water proofing cement paint two coats of approved brand and manufacture (Asian / Berger), including applying additional coats wherever required to achieve even shade and colour inclusive cost of supply of all materials, labours, tools and all other charges etc complete.

972

-

-

... More
Painting with synthetic enamel paint two coats of approved brand and manufacture (Asian / Berger) to give an even shade :including applying additional coats wherever required to achieve even shade and colour inclusive cost of supply of all materials, labours, tools and all other charges etc complete.

381

-

-

... More
Painting with synthetic enamel paint two coats of approved brand and manufacture (Asian / Berger) to give an even shade under a coat of zinc chromate primer :including applying additional coats wherever required to achieve even shade and colour. inclusive cost of supply of all materials, labours, tools and all other charges etc complete. ( for steel surface )

11

-

-

... More
Supplying and fixing all welded c-class G.I. Pipe main gate 3.75 m width and wicket gate 0.92 as per approved drawing complete.inclusive cost of supply of all materials, labours, tools and all other charges etc complete.

400

-

-

... More
Providing and fixing cavity 110mm wide in RCC walls with necessary weep and vent holes including use of Pvc pipes and cost of providing and fixing pvc pipe 110 mm dia with MS ties rods 10mm dia Avg 350 mm long in section at not less than 3 ties per sqm as per approved design.Inclusive cost of supply of all materials, labours, tools and all other charges etc complete.

376

-

-

... More
Filling, spreading borrowed with good quaily earth / murrum in low lying area. Including levelling, ramming, consolidation and dressing etc by maually.Inclusive cost of supply of all materials, labours, tools and all other charges etc complete.

2841

-

-

... More
Providing and laying 60mm thick faciory made cement concrete interlocking paver block of M -30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50mm thick compacted bed of coarse sand, filling the joints with line sand etc. all complete.Supply of all labour, materials, tools & plants etc., complete.

940

-

-

... More
Dismantling of MS gate without damaging the other part of the stucture. including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.inclusive cost of supply of all materials, labours, tools and all other charges etc complete.

2

-

-

... More
Demolishing R.C.C. work column pillars/ posts manually/ by mechanical means by ( core cutter up to 30cm/ 150 mm dia )including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.inclusive cost of supply of all materials, labours, tools and all other charges etc complete.

6

-

-

... More
Demolishing existing brick work compound wall manually/ by mechanical means including spreading, levelling in the low lying areas inside the Lighthouse premises/ compound as per direction of Engineer-in-charge including supply of all materials, labour, tools and plants, scaffolding, ladder etc. complete.

105

-

-

... More
Applying two coat of coal tarring/ bitumen paint on concrete surface upto plinth with approved first quality to give an even shade including thoroughly brooming the surface to remove all dirt, dust mortar drops including brushes, scaffolding, ladder supply of all materials, labour, tools & plants and all other charges etc., complete .

946.4

-

-

... More
Providing and fixing in position pre-moulded joint filler in expansion jointsas directed including brushes, scaffolding, ladder supply of all materials, labour, tools & plants and all other charges etc., complete .

19.6

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.