Department Of Rural Development And Panchayats Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Department Of Rural Development And Panchayats Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date17 May 2024
Closing Date15 Jul 2024
Tender Amount₹ 2,30,37,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
KM 1/000-2/000

44.36

-

-

... More
KM 2/000-3/000

43.44

-

-

... More
KM 3/000-3/575

27.55

-

-

... More
Construction of Embankment with Material Obtained from Borrow Pit CBR 5 Construction of embankment using tractor with grader with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Filling with Cut Earth) KM 0/000-1/000

50.09

-

-

... More
KM 1/000-2/000

44.36

-

-

... More
KM 2/000-3/000

43.44

-

-

... More
KM 3/000-3/575

27.55

-

-

... More
Construction of sub grade and earthern shoulders with approved materials obtained from borrow pits with all lifts and leads transporting to site spreading grading to required slope and compacted to meet requirement of table 300.2 with lead upto 1000 m as per technical specification clause 303.1(Using Borrow pit Earth) KM 0/000-1/000

525.61

-

-

... More
KM 1/000-2/000

384.41

-

-

... More
KM 2/000-3/000

551.51

-

-

... More
KM 3/000-3/575

288.39

-

-

... More
GravelShoulder Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of their structures grade and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Gravel shoulder) KM 0/000-1/000

556.82

-

-

... More
KM 1/000-2/000

560.87

-

-

... More
KM 2/000-3/000

556.76

-

-

... More
KM 3/000-3/575

322.37

-

-

... More
WET MIX MACADAM Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. KM 0/000-1/000

490

-

-

... More
KM 1/000-2/000

467.39

-

-

... More
KM 2/000-3/000

472.22

-

-

... More
KM 3/000-3/575

282.7

-

-

... More
PRIMER COAT Providing and applying prime coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.85kg/sqm using mechanical means as per Technical Specification Claus 502 KM 0/000-0/100

3919.98

-

-

... More
KM 1/000-2/000

3739.13

-

-

... More
KM 2/000-3/000

3777.75

-

-

... More
KM 3/000-3/575

2261.63

-

-

... More
TACK COAT Providing and applying tack coat with Bitumen emulsion (RS-1)using emulsion distributor at the rate of 0.225 kg per sqm on the prepared granular surface treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 KM 0/000-0/100

3957.86

-

-

... More
KM 1/000-2/000

3750

-

-

... More
KM 2/000-3/000

3816

-

-

... More
KM 3/000-3/575

2268.75

-

-

... More
BITUMINOUS MACADAM Providing and laying bituminous Macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto lead of 1000m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical specification clause. 504. KM 0/000-1/000

196

-

-

... More
KM 1/000-2/000

186.96

-

-

... More
KM 2/000-3/000

188.89

-

-

... More
KM 3/000-3/575

113.08

-

-

... More
Mix Seal Surfacing with Waste Plastic Providing, laying and rolling of close-graded premix surfacing material of 25 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 KM 0/000-1/000

3957.86

-

-

... More
KM 1/000-2/000

3750

-

-

... More
KM 2/000-3/000

3816

-

-

... More
KM 3/000-3/575

2268.75

-

-

... More
Provision of Rumble strips with premix Bituminous carpet Provision of 15 nos. rumble strips covered with premix bituminous carpet, 15-20 mm high at centre, 250 mm wide placed at 1 m centre-to-centre at approved locations to control speed, marked with white strips of road marking paint. KM 0/000-1/000

5.62

-

-

... More
KM 1/000-2/000

5.62

-

-

... More
KM 2/000-3/000

5.62

-

-

... More
KM 3/000-3/575

5.62

-

-

... More
Providing and fixing Name board

1

-

-

... More
Providing and Fixing 'Logo' of PMGSY Project

3

-

-

... More
Providing and Fixing 'Citizen information Board' of PMGSY Project

1

-

-

... More
Providing and Fixing 'Maintenance information Board' of PMGSY Project

1

-

-

... More
Providing and fixing of cautionary, mandatory and informatory sign board Providing and fixing of Retro Reflectorised Cautionary, Mandatory Signs with Definition Plate made out of High Intensity Grade Prismatic Sheeting conforming to IRC-67:2010 & ASTM D 4956-09,Type IV Specification and Fixed over 1.5 mm thick Aluminium Sheet Fixed on back support Frame of 25mm x 25mm x 3mm Mild steel angle and supported on a mild steel angle iron post 75mm x 75mm x 6mm firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete 45cm x 45cm x 60cm below Ground Level etc Complete including 7 years warranty for the Retro Reflective Sheeting as per clause 6.9 of IRC 67-2010 Specification (as per MORT & Spec. No. 801) 60 Cm Equilateral triangle (Cautionary) sign Board

10

-

-

... More
60 Cm Circular (Mandatory) sign Board

14

-

-

... More
Chevron Signs 90 cm

5

-

-

... More
Reflector Metal Pracket with type 1X

36

-

-

... More
Road Marking with hot applied thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface KM 0/000-3/045

715

-

-

... More
Kilometre stone Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 (ii) Ordinary Kilometer Stone (Precast)

4

-

-

... More
(iii) 200 m stone (precast)

14

-

-

... More
(iv) Guard Stone (precast)

25

-

-

... More
Construction of 1.50m RCC slab culvert @Ch718M. Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unerviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause

6.05

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

17.87

-

-

... More
Dismantling, clearing away and carefully stacking materials useful for re use. Removal of cut stone slabs

10.5

-

-

... More
Earth work Excavation for Foundation of structures up to 3m depth as per drawing and technical specification clause 1104 including setting out constrution of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material.

90.63

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

10.36

-

-

... More
Cement concrete 1:2.5:5 mix using HBG metal for foundation including watering Centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed

10.36

-

-

... More
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

54.18

-

-

... More
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

33.39

-

-

... More
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. 20mm metal

3.36

-

-

... More
Cement concrete 1:1.5:3 using ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.

3.31

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.

0.35

-

-

... More
Providing and Fixing 20mm thick Compressible Fober Board in Expansion Joint complete as per drawing and MORD Technical Specification

15

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab

4.5

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

12

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

8.78

-

-

... More
Construction of 1.50m RCC slab culvert @Ch755M. Earth work Excavation for Foundation of structures up to 3m depth as per drawing and technical specification clause 1104 including setting out constrution of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material.

90.63

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

10.36

-

-

... More
Cement concrete 1:2.5:5 mix using HBG metal for foundation including watering Centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed

10.36

-

-

... More
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. .

54.18

-

-

... More
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

33.39

-

-

... More
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. 20mm Metal

3.36

-

-

... More
Cement concrete 1:1.5:3 using ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications

3.31

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.

0.35

-

-

... More
Providing and Fixing 20mm thick Compressible Fober Board in Expansion Joint complete as per drawing and MORD Technical Specification

15

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab

4.5

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

12

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

8.78

-

-

... More
Construction of 1.50m RCC slab culvert @Ch 1914M. Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unerviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause

6.05

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

17.87

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of un, Reinforced Cement Concrete

2.7

-

-

... More
Earth work Excavation for Foundation of structures up to 3m depth as per drawing and technical specification clause 1104 including setting out constrution of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material.

90.63

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

10.36

-

-

... More
Cement concrete 1:2.5:5 mix using HBG metal for foundation including watering Centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed

10.36

-

-

... More
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

54.18

-

-

... More
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

33.39

-

-

... More
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. 20mm Metal

3.36

-

-

... More
Cement concrete 1:1.5:3 using ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.

3.31

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.

0.35

-

-

... More
Providing and Fixing 20mm thick Compressible Fober Board in Expansion Joint complete as per drawing and MORD Technical Specification

15

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab

4.5

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

12

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

8.78

-

-

... More
Construction of 1.50m RCC slab culvert @Ch 2183M. Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unerviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause

6.05

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

17.87

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of un, Reinforced Cement Concrete

2.7

-

-

... More
Earth work Excavation for Foundation of structures up to 3m depth as per drawing and technical specification clause 1104 including setting out constrution of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material.

90.63

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

10.36

-

-

... More
Cement concrete 1:2.5:5 mix using HBG metal for foundation including watering Centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed

10.36

-

-

... More
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

54.18

-

-

... More
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

33.39

-

-

... More
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. 20mm Metal

3.36

-

-

... More
Cement concrete 1:1.5:3 using ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.

3.31

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.

0.35

-

-

... More
Providing and Fixing 20mm thick Compressible Fober Board in Expansion Joint complete as per drawing and MORD Technical Specification

15

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab

4.5

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

12

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

8.78

-

-

... More
Construction of 1.50m RCC slab culvert @Ch 2277M. Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unerviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause

6.05

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

17.87

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of un, Reinforced Cement Concrete

2.7

-

-

... More
Earth work Excavation for Foundation of structures up to 3m depth as per drawing and technical specification clause 1104 including setting out constrution of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material.

90.63

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

10.36

-

-

... More
Cement concrete 1:2.5:5 mix using HBG metal for foundation including watering Centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed

10.36

-

-

... More
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

54.18

-

-

... More
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

33.39

-

-

... More
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. 20mm Metal

3.36

-

-

... More
Cement concrete 1:1.5:3 using ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.

3.31

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.

0.35

-

-

... More
Providing and Fixing 20mm thick Compressible Fober Board in Expansion Joint complete as per drawing and MORD Technical Specification

15

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab

4.5

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

12

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

8.78

-

-

... More
Routine Maintenance after completion of Construction work (lumpsum amount for each year per Km) For 1st year maintenance

3.58

-

-

... More
For 2nd year maintenance

3.58

-

-

... More
For 3rd year maintenance

3.58

-

-

... More
For 4th year maintenance

3.58

-

-

... More
For 5th year maintenance

3.58

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.