Corporation Of Chennai Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Corporation Of Chennai Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date29 Aug 2022
Closing Date1 Sep 2022
Tender Amount₹ 13,47,900
Costs
EMD
₹ 13,500Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
El.d.c.no Centre/4389/2022removal And Re Erection Of 23 Nos 6/7 Mt Lamp Post And Supply And Laying Of 2009 Mt 2/31/2 Sqmm Cable At The Places Of Storm Water Drain Construction Work In Various Places Of Dn 102,105,106 In Zone 8
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_CoC_249146_1Bid Award Id
ViewTender No
El.D.C NO .CENTRE/4389/2022Tender Authority
Corporation Of Chennai ViewPurchaser Address
-Website
http://http://www.chennaicorporation.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
HDPE PIPE OF SIZE 50 MM O.D X 38MM I.D ( ORANGE(OR)BLUE COLOUR )
1565
-
-
Cost of supply of Double wall corregated duct 120/103.5mm - Orange or Blue colour ( to be used instead of HUME PIPE)
123
-
-
Labour for laying of cable through HDPE pipe ( 50 mm OD ) in plain cement concrete road including braking of cement concrete road & Filling of plain cement concrete mix of 1:1.5:3 ( with 12 mm jelly ) INCLUDING CARTING OF CABLE & HDPE PIPE (Trench size 100MM width X 150MM depth)
1429
-
-
Cost of Cutting of road, excavation of earth, laying of Road cross pipe, drawal of cable through Road cross pipe including carting of cable and Road cross Pipe and refilling of excavated earth and rammed properly.(cutting of Road, across the Road by Machine)
123
-
-
Cost of Fixing of 2 core SMC fuse box on the street lamp post
57
-
-
Cost of Removal and refixing of 6/7 street lamp posts by removal of Brackets, Luminaries etc, excavation of pit, Breaking of pedestal and foundation, Lifting and removal of street lamp post, closing of pit by excavated earth and rammed properly. Then re – erection of street lamp post in other location by excavation of earth, erection of street lamp post in the excavated pit, fixing of brackets, and FITTINGS, formation of foundation and construction of pedestal including supply and utilization of cement, jelly and Crushed stone sand ( M-Sand) required for the masonry work, FIXING of in & Out cable, Termination of cables in the fuse box as per our departmental specification, with out joint for in and out system ( 2c x 25 sq mm cable)
23
-
-
Cost of Termination of In & Out cables in the Fuse Box with supply of suitable lugs. (The crimping tool required for the Termination of cables shall be contractor responsibility) (For 2 core cable).
57
-
-
Cost of Fixing of IN & OUT cables on the lamp post by clamping up to the Fuse Box with supply of clamps including painting of clamps and drawal of cable through Down pipes.
23
-
-
Cost of construction of new pedestal including supply of required cement, jelly, Crushed stone sand ( M-Sand) etc. for the masonry work as per our departmental specification. (For 2/3/6/7 mtr. street lamp post).
57
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements