Corporation Of Chennai Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Corporation Of Chennai Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date1 Apr 2023
Closing Date11 Apr 2023
Tender Amount₹ 1,86,000
Costs
EMD
₹ 1,900Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_CoC_298988_1Bid Award Id
ViewTender No
Z.O.X.C.No.A2/4257/02/2023Tender Authority
Corporation Of Chennai ViewPurchaser Address
-Website
http://http://www.chennaicorporation.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Carting away the surplus earth and debris to a lea...Corporation Land as directed during the execution.
4
812
203
Supplying river sand and quarry rubbish/ stone dus...ting etc. complete for foundation basement etc.
3
1834
611.58
Plain Cement concrete work 1:4:8 (1 cement, 4 Crus..., etc. complete for foundation, etc. upto basement
2
10208
5104
PROTECTIVE PLASTERING Providing protective over t...minimum thickness of 12mm with suitable admixture.
30
10197
339.9
Supplying and paving second quality colour glazed ...lour cement polishing clearing etc. complete..
33
54978
1666
Paving the flooring with first quality plain CERAM...ar shall conform to gradation as per IS 1542-1977)
9
7339
815.46
Terrace flooring with one course of pressed tiles 20cmx20cmx20mm using C.M. 1:3 etc.(ISI STD) .
3
3888
1296.14
Pointing with cement mortar 1:3 to full depth 6mm thick of tiles 20cmx20cmx20mm etc...
3
977
325.69
Supplying and fixing 55cm x 40cm colour glazed was...C.P. pillar tap and other fittings etc. complete.
1
3829
3829
Supplying and fixing in position best Indian type ...ng good all the disturbed portions etc. complete.
2
6442
3221
Supplying and fixing white glazed squatting urinal...nishing the surface neatly, curing, etc.,complete.
2
1633
816.81
Solid panel PVC door with frame Solid PVC door shu...labour charges etc. complete.as per ISI standard.
2
6650
3325
STEEL DOOR Fabricating Supply and fixing and posit...ast etc., complete with one coat red oxide primer.
4
15648
3912
Painting new iron work two coats with ready mixed ...ISI STD of superior quality and approved colour.
7
996
142.3
Supplying and fixing P.V.C. pipe 110mm dia rain wa...e plugs,etc.complete as directed during execution.
3
1192
397.53
Supplying and Jointing 25mm dia PVC pipe.including...r fixing with necessary scaffolding etc. complete.
20
3645
182.26
Supplying and Jointing 20mm dia PVC pipe.including... fixing with necessary scaffolding etc. complete..
25
4083
163.33
Supplying and fixing P.V.C. screw down tap of size 20mm dia.
5
470
94
1.0 HP Jet Pump Set
1
9012
9012
Cost of supply of 18w 4 feet LED fitting with LED tube complete set (Patty and LED tube)
5
3240
648
Wiring with 2 x 1.5 sqmm (22 / 0.3) PVC insulated ...l) (For Rooms like Bath, Toilet & Pump room etc.)
5
9045
1809
Methodology Waterproofing Work in Water Sump and Bathroom:Cementitious Pressure Grouting in Sump Floor Wall Joint :- In the Sump,Flor wall joints and Bathroom and wherever water seepage points are noticed, will be drilled to the depth of 4 inches, the drilled holes will be cleaned well by blowing out the dust and particles and PVC Nipples will be fixed by using rapid setting to serve as Nozzles foe cementitious Pressure Grouting. Prepare the cement slurry with shrinkage compensating additive "Cebex 100" and polymer "Nitobond SBR"( Fosroc Chemicals) and will be grouted by using manually operated Pressure Grouting Pump until the nipples refuse the grout. Once, the grouted material gets set inside, the PVC Nipples will be cut and the holes will be sealed by using the pluging material to the surface level. The Said work is done inclusive of material and labour.(The floor area 1 Length is 7.0 x 2 + Breath is 9.0 x 2 Height 3.4 x 2) and( the floor area 2 Length is 7.0 x 2 + Breath is 4.5 x 2 Height 3.4 x 2 ) hence 30 points to be grouted in the floor wall joint and bathroom i.e eaxh point per footsupplying and Fixing Polycarbonate Roofing Sheet
30
5250
175
The Proposed area of WaterProof coating will be cleaned well with acid wash followed by water wash by using wire brush and water jet to remove the dust, moss and other particles for better adhession of waterproof coating . In the cleaned surface,the Elastromeric Cementitious Waterproofing MEmbrance "BRUSHBOND RFX" (Fosroc Chemicals ) two part components part A & B wil be mixed as per the ratio specified and will be applied in right to angle directions (2 coats) one after the other after each coats gets duly dried. During the second coat, the seived sand will be sprinkle over the surface as a key for bonding the plastering ** The plastering has to be done by you,it is not in our scope
190
8550
45
The Said work is done inclusive of material and labour.(The floor area 1 Length is 7.0 x 2 + Breath is 9.0 x 2 Height 3.4 x 2) and( the floor area 2 Length is 7.0 x 2 + Breath is 4.5 x 2 Height 3.4 x 2 ) hence 30 points to be grouted in the floor wall joint and bathroom i.e eaxh point per foot
245
11025
45
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements