The CPT has issued a formal invitation for competitive bids for the Chennai Port Trust project, for Tender For Laying Of Concrete Road For The Ioc Damaged Road Cut Portion Opposite To Dp World And Gate No.4 Towards North Quay In Ee(c)northern Division in Chennai, Tamil Nadu. The bid opening date for this tender is 29-07-2020 and the last date for bid submission is 18-08-2020. Interested bidders for Chennai Port Trust tender can download the important documents here to check the tender amount, scope of work, eligibility criteria and technical requirements.

Chennai Port Trust - CPT Tender

Works
Eprocure
Opening Date29 Jul 2020
Closing Date18 Aug 2020
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
12.Preparing the surface of kerb wall and applying two coats of Acrylic co-polimer emulsion exterior paint (Asian or equivalent) of approved colour over a coat of ACE primer exterior and to give an even shade, all as directed including all materials, labour, brushes, tools, equipments etc., complete.

60

-

-

... More
3. Providing and laying levelling course in Plain cement concrete of mix 1:4:8 (1cement :4 crushed stone sand: 3 hard granite graded stone aggregate of 40 mm nominal size) in volumetric proportion for concrete pavement and wherever required to the required levels and falls to the required finish all as per relevant specifications and as directed at site of work including mixing, transporting, placing, ramming, consolidating before laying of concrete, shuttering, curing etc., including all labour, cement and other materials, tools, equipments, plants, fuel, etc., complete

45

-

-

... More
5.Providing and laying cement concrete for RCC works of mix 1:1½:3 in volumetric proportions (1 Cement: 1½ crushed stone sand: 3 hard granite graded stone aggregate of 20 mm graded down to 12mm size) for Kerb wall and wherever necessary including providing necessary holes to drain the water from the road all as per relevant specifications, drawings and as directed at site of work including shuttering, mixing, transporting, placing, vibrating, curing including all labour, equipment, materials, tools, plants, fuel, etc., complete. Note: (Fabrication of steel will be measured and paid separately under relevant item)

7

-

-

... More
10. Supplying and laying impregnated bitumen pad of 20mm thickness and 275 mm depth (approximately) for expansion joints to the required length as specified in the drawing and as directed including making necessary holes in the pad and fixing the same in to the dowel bars as directed including all labour, materials, tools, equipment etc., complete. Note: 1.The rate shall include making necessary holes in the pad for fixing the same into the dowel bars. 2.The joint filler shall comply with IS 1838 - 1983 or its latest edition.

2.6

-

-

... More
(b) For Contraction / Longitudinal joints

307

-

-

... More
13. Loading, transporting the concrete blocks available in various size retrieved from concrete road cut portion near DP world entrance gate and anywhere at site and placing in position properly at unloading site within a lead of 2KM all as directed at site of work including all labour, tools, transport, fuel, machineries, crane, equipments, etc complete. Notes: Note: Payment will be made based on loading and unloading blocks numbers only.

45

-

-

... More
1. Earth work excavation upto 1.50 m depth in ordinary soil, sand, clay mixed with roots, boulders weighing individually less than 250 kg, debris, rubbish etc., as existing at site of work for all foundations and other such works as directed including dressing of sides, ramming of bottom all as per relevant specification, drawing and as directed at site, depositing the excavated earth within a lead of 50 M for transportation / refilling including shoring, strutting dewatering if required, including all labour, tools, tackles, equipments, fuel, etc., complete.

200

-

-

... More
2. Providing and laying of Granular Sub-Base 200mm thick by close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at Optimum Moisture Content (OMC) and compacting with vibratory roller to achieve the desired density, complete as shown in the drawing as per MoRT&H technical specifications clause 401 conforming to Grading I (Table 400-1) including all materials, labour, tools, equipment, transport, fuel etc., complete.

60

-

-

... More
7(a).Providing and fabricating the MS bars and placing in position as dowel bars for expansion joints as per details shown in the drawing and as directed including all handling, cutting, bending, all labour, materials, equipment, tools etc., complete. Dowel bar(16mm dia. MS bars) for expansion joints (one half of the rod painted with bitumen and greased to avoid bonding with concrete) including providing necessary cap / sleeve and cotton waste all as shown in drawing and as directed at site.

30

-

-

... More
8. Supplying, transporting, fabricating and placing in position of HYSD (Fe415/500) TMT steel bars as reinforcements for all RCC works wherever required including all handling, cutting, bending and tying with 1.25 mm dia black annealed steel binding wire all as per relevant specifications, drawings and as directed including all materials, labour, tools, equipments, etc., complete. Note: 1.The rate shall be inclusive of the cost of steel, binding wire and fabrication charge etc., complete. Binding wire will not be measured for payment purpose.

380

-

-

... More
9. Fixing of HYSD (Fe415/500) TMT bars as Tie bars 12mm dia @ 600mm c/c as shown in the drawing including drilling the existing concrete road portion as specified or as directed at site, fixing the tie bars in position in drill holes using anchor resin (HILTI RE 500 or equivalent ) as per manufacturer’s specification and as directed to suit the site requirement including all materials (except tie bars) labour, tools, equipment, plants, transport, fuel etc., complete. Note: Providing and fabricating the HYSD (Fe415/500) TMT bars, as tie bars for longitudinal joints will be measured and paid separately under item no.7(b).

400

-

-

... More
4.Providing and laying Plain cement concrete of mix 1:1.5:3 mix in volumetric proportion (1cement :1.5 crushed stone sand : 3 hard granite graded stone aggregate of 20 mm graded down to 12mm size ) in panels of size 2mx4.50m or any other suitable dimensions as directed as top layer of finished average thickness 300mm including providing necessary contraction / expansion joints as shown in the drawing and laid with proper slope and levels to match with the existing road level and wherever required all as per relevant specifications and as directed at site of work including shuttering, mixing, transporting, placing, vibrating with screed vibrator, curing etc., including all labour, cement and other materials, tools, equipments, plants, fuel, etc., complete. .

90

-

-

... More
14. Loading, transporting, dumping and leveling the surplus earth in the low lying areas nearest to the site of work within a lead of 2KM all as directed at site of work including all labour, tools, transport, fuel, equipments etc complete. Notes: 1).The tenderer shall maintain trip sheets in triplicate in Trust’s approved format at his own cost for the quantity of surplus earth transported. 2) Payment will be made based on the lorry cubical content. However, the final quantity will be restricted to actual excavated quantity of earth. 3). 20% voids shall be deducted for earth. .

200

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.