Chennai Port Trust Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Chennai Port Trust - CPT Tender

Works
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date15 Oct 2024
Closing Date4 Nov 2024
Tender Amount₹ 7,34,351 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
4.Dismantling and removing the existing doors/ window/ventilator (of area more than 3 sq.m ) including frame with shutters without damaging the structures nearby, including transporting and handing over the same to departmental stores / RSD yard within a lead of 3km all as specified and as directed at site of work including all labour, tools, equipments, transport, fuel etc., complete.

1

332

332

... More
5. Dismantling and removing the existing damaged Plain Cement Concrete in rich mix wherever required without damaging the nearby structures to the required level, size and shape and making good the disturbed portions if any, and depositing the debris within a lead of 50m for disposal all as per relevant specification and as directed at site including all labour, tools, tackles, equipment, fuel, transport, etc. complete.

8.5

2200

18700

... More
6.Dismantling and removing the existing Asbestos cement corrugated sheet roofing and cladding etc., wherever required without damaging near by structures including collecting and stacking the ACC sheets within a lead of 50m and handing over the retrieved serviceable materials such as Asbestos cement corrugated sheets, J/ L bolts, nuts etc., to Departmental store within a lead of 2Kms all as specified and as directed at site of work including all labour, tools, tackles, equipments, scaffolding, transport, fuel, safety ladder, safety belts, safety helmets, safety nets etc., complete.

42

69

2935.8

... More
7. Earth work excavation by mechanical / manual means in ordinary soil, sand, clay mixed with roots, boulders weighing individually less than 250 Kg, debris, rubbish etc., as existing at site of work up to 1.5m depth for foundations and where ever required all as directed at site, including dressing of sides ramming of bottom all as per relevant specification and as directed at site including depositing the excavated earth within a lead of 50 m for transportation including shoring, strutting if required, including all labour, tools, tackles, equipments, fuel etc., complete.

9

314

2830.5

... More
8. Supplying and filling with crushed stone sand for bedding to a required depth in basement and whereever required including ramming, watering consolidation all as per relevant specification and as directed at site including all labour, materials, tools, equipments, fuel etc., complete

3

2387

7161

... More
9.Providing and laying plain cement concrete of mix 1:4:8 (1 Cement: 4 crushed stone sand : 8 hard granite graded stone aggregate of 40 mm nominal size) in volumetric proportions for levelling course in foundations and wherever required all as per relevant specification and as directed at site including mixing, transporting, vibrating, placing, ramming, consolidating, curing, shuttering, dewatering if any etc., including all materials, cement, labour, tools, plants, equipments, etc., complete

3

6934

20802

... More
10. Providing Brick work with common burnt clay (non modular) bricks of class designation 7.5 in cement mortar 1:4 ( 1 Cement : 4 crushed stone sand) for foundation and wherever required all as as per relevant specication and as directed at site including all materials, cement, labour, curing, tools, scaffolding, equipments, transport, fuel ,etc., complete

4.5

7543

33943.5

... More
11. Providing and laying Reinforced Cement Concrete of mix 1:1.5:3 (1 Cement: 1.5 crushed stone sand : 3 hard granite graded stone aggregate of 20 mm nominal size) in volumetric proportions for Plinth beam, all as per relevant specifications and as directed including shuttering, mixing, transporting, placing, vibrating, curing etc.,including all materials, labour, strutting, tools, plants, equipments, machinery, fuel, etc., complete. Note: Steel reinforcement will be measured and paid for separately under relevant item.

1.5

11949

17923.5

... More
12. Providing Brick work with common burnt clay (non modular) bricks of class designation 7.5 in cement mortar 1:5 ( 1 Cement : 5 crushed stone sand) for super structure and wherever required all as as per relevant specication and as directed at site including all materials, cement, labour, curing, tools, scaffolding , equipments, transport, fuel etc., complete.

17

8129

138193

... More
13. Chipping the existing damaged wall / floor plastering and wherever required without damaging the nearby structures and deposting within a lead of 50m for disposal all as specified and as directed at site of work including all labour, tools, equipments, transport, fuel etc., complete.

50

49

2470

... More
14.Preparing the surfaces of brick walls and plastering in CM 1:4, (1 cement : 4 C.S. sand) 12 mm thick to the required finish wherever required , curing all as per relevant specifications and as directed at site including all materials, cement, labour, tools, equipment, scaffolding, fuel etc., complete.

185

396

73260

... More
15) Providing double scaffolding arrangement at required areas to carry out plastering and other works by using Steel pipes of required diameter, including providing necessary tie members, bracings etc.,all-round and platforms at various level with adequate strength including removing the scaffolding with platform after completion of works all as per relevant specification and all as directed at site including all labour, materials, tools, equipment, coir, transport, fuel, etc., complete. Note:1. 75% of the Payment only may be released, after erecting of scaffolding in all respects. 2.The balance 25% of payment will be released after completion of plastering and other works and removal of scaffolding.

150

312

46875

... More
16..Providing and laying Reinforced cement concrete of mix 1:1.5:3 (1 cement : 1.5 crushed stone.sand : 3 hard granite graded stone aggregate of 20 mm nominal size) in volumetric proportions for R.C.C platform concrete all as per relevant specifications and as directed at site of work including scaffolding, shuttering, centering, mixing, transporting, placing, vibrating, curing, including all labour, materials, Cement, equipments, tools, plants, fuel, etc., complete. Note: Supplying and fabrication of steel reinforcement will be measured and paid separately under the relevant item.

1

16067

16067

... More
17.Preparing the surfaces of RCC members and plastering in CM 1:3, (1 cement : 3 C.S. sand) 12 mm thick to the required finish wherever required , curing all as per relevant specifications and as directed at site including all materials, cement, labour, tools, equipment, scaffolding, fuel etc., complete.

20

410

8210

... More
18). Providing and fixing in position First Class country wood (SAL/ PADAUK )wrought main frames of finished size 95mm x 58mm for doors with necessary M.S. hold fasts(40x5mm) 400mm (overall length) long / clamps fixed suitably to the masonry / concrete including cutting pockets and grouting with P.C.C.1:3:6 ( 1 Cement : 3 Crushed stone sand : 6 graded down stone aggregate of 20mm down size) etc,. and applying two coats of oil type wood preservatives of approved brand and manufacture all as directed at site of work including all labour,materials, tools, equipments, etc., complete.

0.07

162395

11367.65

... More
19). Providing and fixing in position First Class country wood (SAL/ PADAUK )wrought main frames of finished size 95mm x 58mm for windows with necessary M.S. hold fasts(40x5mm) 400mm (overall length) long / clamps fixed suitably to the masonry / concrete including cutting pockets and grouting with P.C.C.1:3:6 ( 1 Cement : 3 Crushed stone sand : 6 graded down stone aggregate of 20mm down size) etc,. and applying two coats of oil type wood preservatives of approved brand and manufacture all as directed at site of work including all labour,materials, tools, equipments, etc., complete.

0.05

152140

7607

... More
20). Providing and fixing second class teak wood 35mm thick panelled shutters frame for doors and fixing with butt hinges of required size with necessary screws, including panelling 16mm tk with single leaves / double leaves all complete as per direction of Engineer-in-charge / as per chennai port civil engineering manual and drawing (amended )including all labour, materials, tools, equipments, etc., complete. Note:- Butt hinges with necessary screws shall be paid separately.

3.2

7347

23510.4

... More
21). Providing and fixing second class teak wood 35mm thick panelled shutters frame for windows and fixing with butt hinges of required size with necessary screws, including panelling 16mm tk with single leaves / double leaves all complete as per direction of Engineer-in-charge / as per chennai port civil engineering manual and drawing (amended )including all labour, materials, tools, equipments, etc., complete. Note:- Butt hinges with necessary screws shall be paid separately.

1.6

7347

11755.2

... More
22. Supplying , fabricating and fixing M.S Grills for windows / openings or as directed at site using suitable MS Flats of size 25x6mm using as verticles, horizontals and diagonal members including neccessary M.S. fittings, scaffolding all as directed at site of work, including all materials (including cement) , labour, tools, transport , fuel , etc., complete.

50

218

10900

... More
23.Providing plain cement concrete of mix 1:1.5:3, in volumetric proportions (1 cement: 1.5 c.s sand: 3 hard granite graded stone aggregate of 20 mm nominal size) for flooring concrete all as per relevant specifications, all as directed at site of work including shuttering, mixing, transporting, placing, curing,all other materials, labour, tools, equipments, etc., complete.,

1.2

11684

14020.8

... More
24.Preparing the surfaces of flooring and plastering in CM 1:3, (1 cement : 3 C.S. sand) 20mm thick to the required finish wherever required , curing all as per relevant specifications and as directed at site including all materials, cement, labour, tools, equipment, scaffolding, fuel etc., complete.

22

557

12254

... More
25.Supplying and fixing of Non Asbestos cement corrugated roofing sheets of 6mm thick with natural grey colour conforming to IS 14871-2000, Type A,Catogory C, Class 7 for roofing over purlins / rafters andfixing in position with GI L / J hook, bolt & nuts of 8mm dia (galvanisedcoating of 70 to 80 Microns) with GI plain & EPDM washers etc., including mitering corners and lapping at sides and ends of sheets to suit purlin/ rafter etc., including inserting the sheet in the wall to required depth wherever required without damaging the existing structure all as per relevant specification and to match with the existing site conditions and all as directed atsite of work all labour, materials, tools, tackles, equipments, scaffolding, transport, fuel, safety ladder, safety belts, safety helmets, safety nets etc.,complete. Note: (i) The length of GI J/L hook shall be such that hooks are bent to cover the depth of the purlins as directed at site. (i)The top of J/L bolt and nuts shall be sealed with weather proof silicane sealent(Black). iii)The roof sheets shall be lapped without any leakage.

80

507

40560

... More
26. Providing and fixing of M.S. structural steel sections for Hand rails of required size and shapes to suit the site conditions including one coat of primer all as directed at site of work and including welding plants, welding rods, cutting etc.,all labour, materials. tools, equipments, transport, fuel etc. complete.

120

173

20784

... More
27. Providing and fixing M.S.angles for purlins and rafters of required size and shapes to suit the site conditions including one coat of primer all as directed at site of work and including welding plants, welding rods, cutting etc.,all labour, materials. tools, equipments, transport, fuel etc. complete.

300

156

46980

... More
28.Drilling of holes in the concrete/ wall surface of size 20mm dia and 300 mm deep at 300mm c/c for fixing 16mm dia high yield strength deformed (HYSD Fe 415/Fe500 grade) TMT bars as anchor rod (Shear key) including making good the disturbed portion if any as specified or as directed at site including supplying and mixing anchor resin HILTI RE 500 for fixing anchor rod using suitable method all as per relevent specifications and all as directed, including all materials , labour, tools, equipments, transport,fuel,etc., complete. ( Note: Payment will be made for Anchor rods seperatly)

12

133

1604.4

... More
29.Supplying, fabricating and placing in position HYSD (Fe 415/500 grade) TMT steel bars as reinforcement for all RCC works wherever required, including handling, cutting, bending and tying with 1.25mm dia black annealed steel binding wire including placing, all as per relevant specification, drawings and as directed, including all materials, labour, tools, equipment, transport, fuel, etc., complete. Note:1.The rate shall be inclusive of cost of reinforcement steel, binding wire and fabrication charges etc., complete. Binding wire will not be measured for payment purpose. 2.The contractor will be allowed to use Fe500 Grade TMT steel bar without claiming any extra cost.

250

98

24575

... More
30. Preparing the surface of Exterior and interior walls and applying Two coats of Acrylic co-polymer emulsion with over a one coat of primer (Asian/Berger or equivalent) on old/ new walls wherever necessary all as directed at site of work including all labour, materials, tools, scaffolding, equipments, etc., complete.

185

182

33836.5

... More
31. Removing the existing pealed off surfaces of white / colour wash etc., including preparing the wall surfaces to receive new finish to give an even shade all as directed at site of work including all labour, scaffolding, materials, tools, equipments, wire brushes, sand paper etc. complete

125

17

2237.5

... More
32. Preparing the surfaces of existing Steel members and applying with two coats of synthetic enamel paint (Asian / Berger / Dulux or equivalent) of approved colour to give an even shade and finish all as directed at site of work including all labour, materials, tools, tackles, equipments, brushes, scaffolding etc., complete. NOTE:1. Necessary painting co-efficient shall be allowed as per Ch.P.A. engineering manual. 2.The above quantity is inclusive of painting co-efficient

4

155

623.2

... More
33. Preparing the surfaces of existing wooden members and applying with two coats of synthetic enamel paint (Asian / Berger / Dulux or equivalent) of approved colour to give an even shade and finish all as directed at site of work including all labour, materials, tools, tackles, equipments, brushes, scaffolding etc., complete. NOTE:1. Necessary painting co-efficient shall be allowed as per Ch.P.A. engineering manual. 2.The above quantity is inclusive of painting co-efficient

50

94

4745

... More
34. Preparing the surfaces of new wooden members and applying with two or more coats over an under coat of suitable primer shade of synthetic enamel paint (Asian / Berger / Dulux or equivalent) of approved colour to give an even shade and finish all as directed at site of work including all labour, materials, tools, tackles, equipments, brushes, scaffolding etc., complete. NOTE:1. Necessary painting co-efficient shall be allowed as per Ch.P.A. engineering manual. 2.The above quantity is inclusive of painting co-efficient

11.5

210

2415

... More
35. Preparing the surfaces of new steel members and applying with two or more coats over an under coat of suitable primer shade of synthetic enamel paint (Asian / Berger / Dulux or equivalent) of approved colour to give an even shade and finish all as directed at site of work including all labour, materials, tools, tackles, equipments, brushes, scaffolding etc., complete. NOTE:1. Necessary painting co-efficient shall be allowed as per Ch.P.A. engineering manual. 2.The above quantity is inclusive of painting co-efficient

2

144

288.2

... More
36. Providing and fixing Anodized aluminium fittings to the door etc., with necessary screws all as directed at site including all materials, labour, tools, screws, equipments etc., complete. 36. a). Door stopper with rubber bush

2

255

511

... More
36. b). Butt hinges - 150mm long

16

151

2430.4

... More
36. c). Tower bolt 150mm size

12

82

993.6

... More
36. d). Handle, 100mm long

4

58

233.4

... More
36. e). Aldrop - 200x12mm size

2

257

515

... More
36.f). Hookes and eyes 50mm

8

57

462.4

... More
37. Re-filling with available excavated earth (excluding boulders, rubbish, debris etc.,) in sides of foundation and wherever required in layers not exceeding 200mm in depth all as per relevant specification and as directed at site including consolidating the deposited earth in layer by ramming and watering including all labour,tools, equipments, etc., complete.

3

278

835.5

... More
38. a)Loading, transporting, dumping and levelling the Surplus Earth in the low lying areas outside the port premises within a lead of 5 Kms all as per relevant specifications and as directed at site including all labour, transport, tools, equipments, fuel, etc., complete. Note: 1. The tenderer shall maintain trip sheets in triplicate in Port’s approved format at his own cost for the quantity of earth transported. 2. Payment will be based on the lorry cubical contents after deduction of 20% for voids. However, the final quantity will be restricted to actual earth work quantity.

7

298

2086

... More
38.b) Loading, transporting, dumping and levelling the debris in the low lying areas outside the port premises within a lead of 5 Kms all as per relevant specifications and as directed at site including all labour, transport, tools, equipments, fuel, etc., complete. Note: 1. The tenderer shall maintain trip sheets in triplicate in Trust's approved format at his own cost. 2.Payment will be based on the lorry cubical content. No deduction of voids for debris will be made.However, the final quantity will be restricted to actual quantity of cutting and removal items for debris.

40

238

9540



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.