Chennai Port Trust Tender
... More
The CPT has issued a formal invitation for competitive bids for the Chennai Port Trust project, for Tender For Providing Strom Water Drain And Cable Chase At Coastal Road Chainage From 330m To 1140m In Ee(c)cd-i At Chennai Port in Chennai, Tamil Nadu, with an estimated contract value of Rs. 2,91,56,639. The bid opening date for this tender is 14-07-2023 and the last date for bid submission is 03-08-2023. Interested bidders for Chennai Port Trust tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Chennai Port Trust - CPT Tender
Opening Date14 Jul 2023
Closing Date3 Aug 2023
Tender Amount₹ 2,91,56,639
Costs
EMD
₹ 5,83,200Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_ChPT_761903_1Bid Award Id
ViewTender No
T/WMA3/ 49 /2023/ETender Authority
Chennai Port Trust ViewPurchaser Address
-Website
http://https://www.chennaiport.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
16. Preparing the Exposed inner side wall surfaces of Drain cum cable chase providing plastering in cement mortar 1:3 (1 cement :3 C.S.sand (M.sand)) 12 mm thick to the required finish, curing all as per relevant specification and as directed including cost of all materials, labour, tools, equipments, etc., complete.
3650
1250125
342.5
... More
17. Preparing the surfaces of new steel members and painting with two coats of synthetic enamel paint ) (Asian or other equivalent approved brands) of approved quality over the one coat of zinc chromate metal primer, all as directed including cost of all materials, labour, scaffoldings, brushes, tools, equipments, etc., complete. NOTE: 1. Necessary painting co-efficient shall be allowed as per ChPA. engineering manual. 2. The above quantity is inclusive of painting co-efficient.
165
26515
160.7
... More
19. Loading, transporting, dumping and leveling the Debris etc., in the low lying areas with a lead of 3 Kms from the Port premises all as per relevant specifications and as directed including cost of all labour, transport, tools, equipments, fuel, etc., complete. NOTE: Payment will be based on the item No 1,2,3 & 4 quantity
50
9730
194.6
... More
8.Providing and laying Cement Concrete of mix 1:1.5:3 (1 Cement: 1.5 C.S.sand (M.sand) : 3 hard granite graded stone aggregate of 20 mm nominal size) in volumetric proportions for RCC works, Bottom slab of drain cum Cable chase, Side walls, In-situ slab etc, all as per relevant specifications, drawings and as directed including mixing, transporting, shuttering, placing, vibrating, curing etc.,including cost of all materials, labour, strutting, tools, plants, equipments, machinery, fuel, etc., complete.
Note: Steel reinforcement will be measured and paid for separately under relevant item. a. Base slab of drain cum cable chase
308
2755984
8948
... More
4.Dismantling the existing Lean mix concrete in the road portion, etc., as existing at site of work and wherever required to the extent as directed without damaging the nearby structures including collecting and depositing the dismantled debris with in a lead of 50m for disposal all as directed at site of work including cost of all labour, tools, equipment, etc., complete
3
3978
1326
... More
12.Providing and laying of Non pressure NP-4 Class (Heavy Duty) RCC pipes with collars / spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1cement : 2 CS sand (M sand)) 450mm dia in trenches to the correct alignment and gradient, including testing of joints, strutting all as per relevant specifications and drawings all as directed including cost of all materials, labour, tools, plants, equipments, transport, fuel, etc., complete.
Note: Earth work, Refilling with excavated earth and PCC for levelling course concrete will be paid for separately under relevant item.
8
12680
1585
... More
18. Loading, transporting, dumping and leveling the Surplus earth in the low lying areas with a lead of 3 Kms from the Port premises all as per relevant specifications and as directed including cost of all labour, transport, tools, equipments, fuel, etc., complete. NOTE: Payment will be based on the Earth work excavation Post level and Pre level of Earth work excavation in item No 5 and deduct refilling quantity as item no 14.
1875
456562
243.5
... More
10. Casting and placing RCC Precast cover slabs for Drain cum cable chase, manhole and wherever required in mix 1:1.5:3 ( 1 cement : 1.5 C.S.sand (M.sand) : 3 hard granite graded stone aggregate of 20mm nominal size) in volumetric proportions to the required size, all as per relevant specifications, drawings and as directed including shuttering / necessary formwork, mixing, transporting, placing, compacting, curing, finishing the exposed concrete surface with neat cement punning at 2.2 kg/Sq.m as directed, including lifting, handling, transporting and placing the precast slabs over the drain walls in correct position and alignment, providing necessary lifting holes including cost of all materials, labour, tools, plants, equipments, fuel, etc., complete.
Note : Steel reinforcement will be measured and paid separately under relevant item
73
1060617
14529
... More
15. Preparing the bottom surfaces of Drain cum cable chase providing plastering in cement mortar 1:3 (1 cement :3 C.S.sand (M.sand)) 20mm thick to the required finish, curing all as per relevant specification andas directed including cost of all materials, labour, tools, equipments, etc., complete
975
460687
472.5
... More
8.b. Side wall for Drain cum cable chase
632
5655136
8948
... More
5. Earth work excavation by mechanical means (Hydrualic excavator)/manual means in ordinary soil, sand, clay mixed with roots, boulders weighing individually less than 250 Kg, debris, rubbish etc., as existing at site of work for foundation of Drain, Cable chase, etc., to a required depth including dressing of sides, ramming of bottom all as per relevant specification, drawings and as directed, including depositing the excavated earth within a lead of 50m for refilling / transportation including shoring, strutting, if any, including cost of all labour, tools, tackles, equipments, plants, fuel etc., complete.
1985
609395
307
... More
9. Providing centering and shuttering including strutting, propping, etc., and removal of shuttering, all as per relevant specifications & drawings and as directed including necessary transporting, placing, etc., including cost of all materials, labour, tools, plants, equipments, fuel, etc., complete. a. Drain / Cable chase bottom slab
650
214175
329.5
... More
c. In situ Cover slab for drain cum cable chase
73
837091
11467
... More
11. Supplying, Fabricating and fixing M.S.Angle for Cable Chase and Drain, by using MS flat of size 50 x 8mm - 600 mm long to be welded with ISA 65 x 65 x 8mm - 500 mm long all as per relevant specifications drawings and as directed, including cost of all materials, labour, tools, equipment, transport, fuel, etc., complete
7795
1169250
150
... More
6. Providing and laying Plain Cement Concrete of mix 1:4:8 (1 Cement: 4 C.S.sand (M.sand) : 8 hard granite graded stone aggregate of 40 mm nominal size) in volumetric proportions for levelling course for foundations of Drain, Cable chase, etc., and wherever required as per relevant specification, drawing and as directed including mixing, transporting, placing, ramming, consolidating, shuttering, if any, curing etc., including cost of all materials, labour, form work, tools, plants, equipments, fuel, etc., complete.
160
1082720
6767
... More
14. Refilling with available excavated earth excluding boulders, debris etc., in the sides of drain side wall, Cable chase. etc., as per relevant specifications and as directed including consolidating the deposited earth in layers by watering and ramming, including cost of all labour, tools, equipment, etc., complete.
110
29920
272
... More
3.Dismantling the existing Rich mix concrete in the road portion, etc., as existing at site of work and wherever required to the extent as directed without damaging the nearby structures including collecting and depositing the dismantled debris with in a lead of 50m for disposal all as directed at site of work including cost of all labour, tools, equipment, etc., complete
3
6444
2148
... More
9.b. Drain / Cable chase side wall
5510
3950670
717
... More
13. Supplying, transporting and placing in position of PVC pipe (4Kg/sq.cm) 250 mm length in the drain concrete for spout pipe, all as per relevant specification and as directed including cost of all materials, labour, tools, equipments, etc., complete.
205
37187
181.4
... More
2.Dismantling the existing Asphalt concrete road without damaging the adjoining / nearby structures including collecting and depositing the debris within a lead of 50m for retransportation, all as per relevent specification and as directed including cost of all labour, tools, tackles,equipment, plants, fuel, transport, etc., complete
40
50480
1262
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements