Chennai Port Trust Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Chennai Port Trust - CPT Tender
Civil And Construction
Consultancy Services
Civil And Architectural Services
Eprocure
Opening Date3 Jan 2025
Closing Date28 Jan 2025
Tender Amount₹ 1,70,87,905
Costs
EMD
₹ 3,42,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_ChPT_842672_1Tender No
SS2/780/2024/MTender Authority
Chennai Port Trust ViewPurchaser Address
-Website
http://https://www.chennaiport.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
HULL CLEANING: Upto water line (1.7 M) - Total 147 Sq.M approx. Above water line ( 1.3M)- Total - 71.6 Sq.M approx.
-
-
-
... More
Sea growth scrapping and cleaning work.
147
-
-
... More
Sand blasting work.
220
-
-
... More
High-pressure fresh water washing as per instruction
220
-
-
... More
PAINTING
-
-
-
... More
Painting scheme as per the recommendations of Class survey UNDER WATER AREA (Lt. Red /Dark Red)
Coats X Epoxy - 2 Coats (75 mic), TIE COAT (50 mic) – 1 Coats , ANTIFOULING (75 mic) – 2 COATS (The contractor has to submit a 5-year warranty/ Guarantee certificate from the manufacturer for the paint).
147
-
-
... More
ABOVE WATER LEVEL (Black) Epoxy Primer - 75 Mic - 2 Coats Epoxy Finish (40 mic) - 2 Coats
72
-
-
... More
Markings on the hull (Draft marks) Colour - White
2
-
-
... More
Main Deck Area (Colour - Green) Epoxy Primer – Dft.75 mic – 2 coats and Epoxy Finish – Dft.40 mic – 2 coats
132
-
-
... More
Superstructure (Colour - Orange) High build primer - Dft 75 mic – 2 coats and High build Enamel- Dft Finish: 40 mic – 2 coats
116
-
-
... More
M / Engine room compartment (Colour- White) High build primer - Dft 75 mic – 2 coats and High build Enamel- Dft Finish:40 mic – 2 coats
150
-
-
... More
Aux. / Engine room compartment (Colour- White) High build primer - Dft 75 mic – 2 coats and High build Enamel- Dft Finish:40 mic – 2 coats
100
-
-
... More
MSB compartment (Colour- White) High build primer - Dft 75 mic – 2 coats and High build Enamel- Dft Finish:40 mic – 2 coats
130
-
-
... More
Steering Gear room compartment (Colour- White) High build primer - Dft 75 mic – 2 coats and High build Enamel- Dft Finish: 40 mic – 2 coats
80
-
-
... More
Chain locker compartment (Colour- Black) Bituminous coating Average Dft-100 mic - 2 Coats (length – 0.75 m , Breadth – 1m , height – 1.4 m )
6.4
-
-
... More
Aft ballast tank (P&S) (12 mtr.sq. x 2) (Colour- Grey / white) Tar Free Epoxy paint .Dft- 170 mic - 2 Coat (length – 2.5 m, Breadth – 0.75 m, height – 1.3 m)
24
-
-
... More
Fore peak ballast tank (Colour- Grey /white) Tar Free Epoxy paint .Dft- 170 mic - 2 Coats
8
-
-
... More
Sewage tank (Color - black) HB Bituminous coating Average Dft-120mic - 1 Coats (length – 1 m, breadth – 1 m, height – 0.8 meter))
5.2
-
-
... More
Bilge holding tank Epoxy Avg dft -80 mic - 1 Coat , HB epoxy Avg DFT- 100 mic - 2 Coats (length – 0.75 m, breadth – 1 m, height – 0.8m)
4.3
-
-
... More
Fuel oil tank ( P & S ) (9 sq. mtrs.X 2 tanks) Oil Coating only. (Length – 1m, breadth -1.2 m, height-1.5m)
18
-
-
... More
Dispersant tank ( P&S) ( 8 sq.mx 2 tanks) (Length -1.5 m, Breadth- 1m, height- 1 m)
16
-
-
... More
Recovery tank ( P & S ) (25.25 mtr.sq. x 2) Oil Coating only. (Length -1.5 m, Breadth- 2.75m, height- 2 m)
50.5
-
-
... More
Hydraulic tank Oil Coating only. (length - 0.75 m,breadth - 1m, height -0 .8m)
4.3
-
-
... More
UTG GAUGING Hull and Deck plate thickness measurement. Gauging shall be conducted by the IRS-approved firm as per the IRS Surveyors requirement. The report shall be furnished to the IRS Surveyor & CHPA representative as per statutory requirements approx.5 points per square meter.
1000
-
-
... More
Hull plate renewal work When the UTG reading reveals for renewal of Hull plates, Crop and Renewal of the Hull plate. Plate as per the class Surveyor's recommendation. The Rate is inclusive of the supply of steel plate/ stiffeners/ flat bar/ angles/ channels / all sorts of steel structure requirements, labour, transport, welding, staging and clearing of scrapes etc
10
-
-
... More
DECK PLATING
-
-
-
... More
Sea chest grating to be replaced - 2 Nos
1
-
-
... More
Fabrication and renewal of Gooseneck air vents - 13 nos. Corroded sounding pipes - 2 nos.
1
-
-
... More
Engine room air blower - Motor trunk flanges to be renewed.-4 nos.
1
-
-
... More
Railing arrangement to be renewed. approx..50 mtrs.
1
-
-
... More
Complete Booby hatches (05 nos.) and main watertight door (1no) cleats / handle to be serviced.
1
-
-
... More
The vent heads of all tanks on the main deck are to be overhauled and shown to the surveyor for its self-locking floats and flaps.
13
-
-
... More
The tank sound pipes above the deck to be renewed. (length of the pipe is 0.6 meter)
6
-
-
... More
Supply of one ladder (Gangway) Aluminium / wood lightweight.
1
-
-
... More
Dent on the roof top of the Bridge to be rectified. Then the roof top flooring to be over coated with FRP
24
-
-
... More
Anode Renewal Supply and renewal of Sacrificial Anodes Type- A- 10 nos. (900 mm length), Type- B- 5 Nos. each 400 mm length) Weight of anode - 18 kg. each
270
-
-
... More
Schedule - II Rudder, Propeller, Engines, Pumps. Shafting work, Hatches, Doors, Pipes and Plates
-
-
-
... More
Rudder – 2 Nos. Rudder inspection & replace the bearing. The rudder stock is to be removed, shown D.P / M.P. test, to the class surveyor/ChPA Representative and get it certified. Rudder blade to be pressure test and water tightness.
2
-
-
... More
Hydraulic system : Hydraulic ram is to be serviced and all the hydraulic hoses ( 4 nos. of length 1.5 meter and dia.1 inch) are to be replaced. Rudder angle pointer (approx. 1 feet length and dia. 3 mm) is broken. Location - Rudder room Rudder control system to be serviced including Hydraulic Solenoid Valve
1
-
-
... More
Steering control system: Steering gear NFU system to be checked, Siemens Display unit 2nos. (both wheel house & engine room) SIMATIC HMI TOUCH 6AV2132-2DB03-0AX0 display is faulty. Hence the same to be checked and make operational.
2
-
-
... More
Propeller: 2 Nos: The Propeller is to be removed from the shaft and the profile is to be checked for any damage. Propeller key, Boss & boss locking nut is to be checked. Dynamic balancing is to be carried out as per class surveyor. Stern tube fwd. & aft cutlass bush lining is to be replaced for both the shaft. Lantern ring to be changed. The Stern tube gland is to be replaced while assembling a new gland is to be fixed. Shaft is to be cleaned and measurement is to be carried out and shown to the class surveyor.
2
-
-
... More
Watertight Doors, Hatches gasket to be replaced with EPDM materia. Hatches- 5 nos. and watertight door - 1 no.
18
-
-
... More
Anchor Windlass Overhauling: Anchor chain - 02 Nos. Anchor chain gauging lowering, ranging, washing, calibration to end change and marking, painting and shown to surveyor and fixing and Hawse pipe to be cleaned.
80
-
-
... More
Manhole Door: All tank manhole doors are to be opened and boxed back with a new Neoprene joint 5.0 mm thickness
13
-
-
... More
Main Propulsion Engine - 02 Nos
-
-
-
... More
Overhauling of Cylinder head ( 2sets). Engine should be assembled and shown for sea trial. Any defects, during sea trial should be rectified. All spares required to overhaul the top cylinder shall be borne by the contractor. All safety cut off trial to be shown during the trials. The operational test has to be shown to the satisfaction of the IRS for the survey
12
-
-
... More
Fuel Pump
2
-
-
... More
Fuel Injector
12
-
-
... More
Micro commander marine propulsion control system panel to be serviced
2
-
-
... More
The 24v Starter Motors is to be serviced
2
-
-
... More
24v DC Alternator is to be serviced.
4
-
-
... More
Engine attached heat exchanger (fresh water cooler), fresh water inlet and outlet pipe with flanges is damaged. Temporary repairs made on the pipes for operation. Same Fresh water inlet and outlet pipes to be replaced.
4
-
-
... More
Flywheel timing meter not visible on the Port and stbd main Engine. Same to be replaced.
2
-
-
... More
Fresh water cooler- 2 Nos. and Lub oil Cooler - 2 Nos. to be descaled
4
-
-
... More
Accelerator cable to be replaced
2
-
-
... More
Fuel solenoid 24v (02 Nos.) to be replaced
2
-
-
... More
Sea Water Pump
2
-
-
... More
Cladding work: Exhaust pipe lines for Main Engine (2 nos.) and Auxiliary Engine (2 nos.) penetrating to overboard to be checked. During which the cladding requires replacement and other damaged portions shall be replaced.
6
-
-
... More
Gearbox: 02 Nos: General inspection: The pressure filter is to be replaced.. Sump oil is to be replaced ( oil will be supplied by CHPA). Lub oil Pressure and temperature sensors to be replaced. The spare shall be obtained from OEM. Lub oil cooler to be cleaned.
2
-
-
... More
Generator: 65KVA
-
-
-
... More
Overhauling of top cylinder head (2 sets). Engine should be assembled and shown for sea trial. Any defects, during sea trial should be rectified. All spares required to overhaul the top cylinder shall be borne by the contractor. All safety cut off trial to be shown during the trials. The operational test has to be shown to the satisfaction of the IRS for the survey
4
-
-
... More
Lub oil cooler to be cleaned.
1
-
-
... More
12v Starter Motor is to be serviced
1
-
-
... More
12v Alternator is to be serviced
1
-
-
... More
Generator: 25KVA/20KW Overhauling of top cylinder head (2 sets). Engine should be assembled and shown for sea trial. Any defects, during sea trial should be rectified. All spares required to overhaul the top cylinder shall be borne by the contractor. All safety cut off trial to be shown during the trials. The operational test has to be shown to the satisfaction of the IRS for the survey
4
-
-
... More
Lub oil cooler to be cleaned.
1
-
-
... More
12v Starter Motor is to be serviced
1
-
-
... More
12v Alternator is to be serviced
1
-
-
... More
Sea Water Pipe lines From Sea chest, all sea water pipe lines are to be replaced. Dia. meter of the sea chest Pipe - 150 mm NB, Branch pipe line Dia. - 80mm NB, Sub - Branch - 40 mm NB
-
-
-
... More
Main Engine Port & Stbd: All seawater pipelines from sea chest, branches into the and outlet of the main engines are to be replaced. The material should MS Galvanised
50
-
-
... More
Aux.Engine (65 KVA & 25 KVA): All seawater pipelines from sea chest, branches into the and outlet of the main engines are to be replaced.
Length will be measured after removing the old pipe, required bend and flanges are to be provided. ( Port & Stbd)
20
-
-
... More
Sewage, Bilge and ballast line approx. 50 mtrs.
50
-
-
... More
Bilge & GS Pump Both pumps General servicing and Gland portion and bearings to be changed.
2
-
-
... More
Main sea line and Bilge line valves. Gate valve, 150NB, Qty: 04, 50NB, Qty: 05, 40NB, Qty: 11, 25NB, Qty: 02, Check valve:40NB, Qty: 07, SDNR valve : 50NB, Qty: 05, 40NB, Qty: 01, 25NB, Qty: 03, Hydrant valve :50NB, Qty: 03
41
-
-
... More
Sewage, fire line, hydraulic line, lube line – Globe NRV, check valves- 15 NOS. total 56Nos Overhauling of all the valves and pressure test to be done
15
-
-
... More
WINDLASS: Complete Overhauling of windlass unit including motor and gearbox. renewal of brakes, lining, and grease points are to be made operational and shown to the Class for their performance.
1
-
-
... More
JIB CRANE
-
-
-
... More
The hydraulic ram has to be overhauled with a new seal, and all the line hydraulic hose with adopter has to be replaced. Hydraulic control block to be replaced.
1
-
-
... More
Hydraulic pipe line 12mm (SS) about 10 mtrs to be replaced with adapter Present joy sticks are sluggish, requires all joy sticks to be replaced. Protective cover in the form of wooden box or plastic to be made and fitted.
1
-
-
... More
KNUCKLE BOOM CRANE
-
-
-
... More
All hydraulic rams (5 nos.) are to be serviced, hydraulic controlling blocks to be replaced, operating levers to be replaced and all the rubber hydraulic hoses with adapter are to be replaced.
5
-
-
... More
Present joy sticks are sluggish, requires all joy sticks to be replaced. Protective cover in the form of wooden box or plastic to be made and fitted.
1
-
-
... More
Supply and fixing of fenders:
-
-
-
... More
Tyre Fenders along with GI chain and Securing arrangements
28
-
-
... More
D Fenders to be replaced along with flat bar where ever required.
50
-
-
... More
Schedule - III Electrical, Electronic, navigation equipment, Bridge console, survey items and misc.
-
-
-
... More
The main switchboard is to be carry out general service - fuses to be checked and all meters are to be calibrated. 415v - 3phase both DB section and 415 / 230v lighting system MCB to be checked. Operation of main DB to be shown as per the satisfaction of IRS/CHPA.
1
-
-
... More
Following panels have to be carry out general service
-
-
-
... More
MAIN ENGINE CONTROL PANEL (PORT & STB)
2
-
-
... More
65KVA GEN SET PANEL.
1
-
-
... More
25KVA GEN SET PANEL.
1
-
-
... More
SHORE SUPPLY PANEL
1
-
-
... More
E/R VENT FAN STARTER PANEL
2
-
-
... More
SEWAGE PUMP STARTER PANEL
1
-
-
... More
BILGE/GS/FIRE PUMP STARTER PANEL
2
-
-
... More
AUX.E/R VENT FAN STARTER PANEL
2
-
-
... More
SHORE SUPPLY BOX IN DECK
1
-
-
... More
12V TRANSFORMER BANK
1
-
-
... More
STEERING GEAR CONTROL PANEL
1
-
-
... More
BATTERY BANK
1
-
-
... More
HYDRAULIC POWER PACK
1
-
-
... More
DEBRIS CRANE STARTER PANEL
1
-
-
... More
JIB CRANE CONTROL PANEL
1
-
-
... More
LEVEL ALARM PANEL
1
-
-
... More
ANCHOR WINDLASS PANEL
1
-
-
... More
BRIDGE 230V AC LIGHTING PANEL
1
-
-
... More
BRIDGE 24V DC PANEL
1
-
-
... More
AC-DC NAVIGATI0N LIGHT PANEL
1
-
-
... More
Bridge Console
-
-
-
... More
Main Engine Propulsion control panel: Port & Stbd /each. All the gauges to be calibrated. Lub oil pressure gauge – 2 nos. Water temperature gauge – 2 nos. Lub oil temperature gauge – 2 nos Ammeter – 2 nos.
Indicator lamps Digital RPM indicators – 2 nos. Hours Meter – 2 nos.
1
-
-
... More
Magnetic compass.(PLASTIMO, OFFSHORE 135) to be calibrated.
1
-
-
... More
AIS: Class B trans receiver ( Em-trak B100) to be replaced
1
-
-
... More
GPS.( Furuono. MAKE GP-25) to be replaced
1
-
-
... More
Echo sounder (Make furuno GP-1871F) to be calibrated.
1
-
-
... More
Talk back (MAKE. Sterling) to be replaced.
1
-
-
... More
Navigational lights (Make: Rgr 3218H HELDER) All navigation lights (type approved) to be renewed with new fittings, including bulbs
7
-
-
... More
Smoke detector. (Model No-2351/EC EN54 -7,2000) to be replaced.
4
-
-
... More
Temperature Detector (Model no-5351E, EN54-5.2000) to be replaced.
2
-
-
... More
Steering Gear NFU system to be checked, Siemens Display unit 2 nos. (both wheel house & engine room) SIMATIC HMI TOUCH 6AV2132-2DB03-0AX0 display is faulty. Hence the same to be checked and make operational.
1
-
-
... More
wiper unit to be replaced.
2
-
-
... More
Class authorised service agency has to be arranged and obtain a calibration certificate for all the equipment fitted on board for radio and navigational equipment. The rate includes arranging class class-approved authorised service agency, obtaining a calibration certificate getting it approved from the class surveyor and handing over the certificate to the ChPA
1
-
-
... More
Motors overhauling: General servicing of motors of various ratings in the engine room. To check Insulation value, renewal of bearings and re-varnishing shown to the class surveyor.
-
-
-
... More
G.S Pump Motor - cap. 415 v, 3 Phase, Amp, 5.5 kw, 50 hz, rpm 1449. - 2 nos. Steering Gear motor – Cap 1.1KW - 1 nos. Hydraulic Power Pack Motor. 15 KW - 1 nos. Crane Motors – debris & aft crane. 5.5 & 7.5 KW - 2 no. Blower motor – 4 nos. 2.2 KW . sewage motor – 1 no.75KW
11
-
-
... More
Emergency battery charger SPECIFICATION.440V/24V-12V DC
1
-
-
... More
New searchlight installed properly, Halogen, Body - Aluminium, all weather proof, IP 55 rate, 220 - 240 volt, 50 hz. Range - 600 mtrs.
1
-
-
... More
Insulation mat high voltage resistant floor mat 1’ inch/ 10 mm thickness as per the survey recommendation
5
-
-
... More
Supply of portable 12 inch blower with flexible duct 30 mtrs
1
-
-
... More
Supply of submersible pump 0.5/0.75 hp
1
-
-
... More
Alternators Overhauling: 65 KVA alternator general servicing 25 KVA alternator general servicing
2
-
-
... More
As per the FFA and LSA plan all the places IMO signal sticker is to be placed
1
-
-
... More
New FRP fire hydrant box to be supplied - main deck (2 Nos.) and engine room (1 no.) Supply - new 18m length fire hose with coupling - 3 Nos. Supply new Fire hose nozzles are dual purpose type (jet/spray) with minimum dia of 12mm
3
-
-
... More
50 kg Dry powder fire extinguisher. To be serviced and pressure tested.
2
-
-
... More
Life raft KHA 15 to be serviced. Servicing and obtaining certificates from OEM. The certificate is to be shown to the class
1
-
-
... More
Making necessary Fees for inviting surveyors and certification for RSV Type–I and SRT certificate is under the scope of the contractor
1
-
-
... More
Supply and fixing of Air condition 1.5 t heavy duty with 5 years comprehensive warranty in the wheelhouse.
1
-
-
... More
Carpentry work including plumbing work on the wheelhouse restroom. (i) Closet to be changed.
(ii) Taps and hoses to replace.
(iii) Pipe lines from syntex tank to rest room to be renewed.
(iv) AC fixing support to be modified.
1
-
-
... More
Scaffolding / staging for carrying out dry dock repair
1
-
-
... More
Shore supply Electricity charges (or) Shore gen set for electricity supply
1
-
-
... More
Thrust bearing to be checked and renewed if necessary. Rudder shaft
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%