Chennai Petroleum Corporation Limited Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Chennai Petroleum Corporation Limited - CPCL Tender
Eprocure
Opening Date20 Dec 2024
Closing Date30 Dec 2024
Tender AmountRefer Documents
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_DGMMC_9784_1Tender No
1977/24-25Tender Authority
Chennai Petroleum Corporation Limited ViewPurchaser Address
-Website
http://https://www.cpcl.co.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Carbon Steel Piping Work - Above ground
-
-
-
... More
The job includes transporation of all free issue materials from owner's storage point to work site, handling at site, cutting, bevelling, fabrication, laying, welding & erection of carbon steel piping at all locations above ground level, overhead, over sleepers, piperacks, crossovers, pipe sleeves, trenches, stand posts, connecting with equipments & nozzles, providing tappings from the existing pipelines at all grades & elevations including under road culverts.
-
-
-
... More
The piping job includes all modification and replacement jobs involving pipes & all types of fittings like elbows / tees / reducers / half coupling / full coupling, etc., all types of flanges like slip on / raised face, etc., all types of inline instruments like rotameter / pressure gauges / thermowells, etc., valves, expansion joints, steam traps, orifice assemblies, strainers, vents, drains, funnels, etc., of different schedules, pressure ratings and for various temperature applications
-
-
-
... More
The piping job includes providing shoe supports, pads at support locations, reinforcement pads, etc., wherever required.
-
-
-
... More
The job includes flushing, preparing work area for executing hot work, bending to suit the contours wherever required, socket, fillet, butt welding using E 6010 / E 6013 / E 7018 electrodes / ER 70S2 filler wire as required, Post weld heat treatment (PWHT - stress relieving) after welding wherever required, DPT wherever required, hydraulic / pneumatic test as per codes, specification, drawings and draining of water & drying with compressor air after hydrotest.
-
-
-
... More
The job also includes supplying of all types of tools & tackles, lifting arrangements like chain pulley blocks, machineries, all consumables and labour to complete the job in all respects, returning back the unused materials to owner's storage point and dumping the generated scrap material to the designated area as per EIC instructions.
-
-
-
... More
The rates for the following items shall be exclusive of blinding & deblinding, radiography, stress relieving, reinforcement pad welding, removal of old piping for replacement and erection & removal of scaffolding
-
-
-
... More
The rates for the following items shall be inclusive of fabrication, laying, erection, welding, providing shoe supports, pads at support locations, flushing of the piping system, offering stagewise inspection, hydrotesting and draining / drying of the piping system.
-
-
-
... More
Carbon Steel - Above ground Piping - Socket / fillet welding Joint - Without Hydrotest
150
244
36600
... More
Carbon Steel - Above ground Piping - Butt welding Joint - Upto 8.8 mm thickness - Without hydrotest (Root E-6010 / Filling E-6013 / E-7018)
110
322
35420
... More
Alloy Steel Piping Work - Aboveground
-
-
-
... More
The job includes transporation of all free issue materials from owner's storage point to work site, handling at site, cutting, bevelling, fabrication, laying, welding & erection of alloy steel piping above ground level at all locations, overhead, over sleepers, piperacks, crossovers, pipe sleeves, trenches, stand posts, connecting with equipments & nozzles, providing tappings from the existing pipelines at all grades & elevations including under road culverts.
-
-
-
... More
The piping job includes all modification and replacement jobs involving pipes & all types of fittings like elbows / tees / reducers / half coupling / full coupling, etc., all types of flanges like slip on / raised face, etc., all types of inline instruments like rotameter / pressure gauges / thermowells, etc., valves, expansion joints, steam traps, orifice assemblies, strainers, vents, drains, funnels, etc., of different schedules, pressure ratings and for various temperature applications.
-
-
-
... More
The piping job includes providing shoe supports, pads at support locations, reinforcement pads, etc., wherever required.
-
-
-
... More
The job includes flushing, preparing work area for executing hot work, bending to suit the contours wherever required, socket, fillet, butt welding using TIG welding process for root run followed by manual arc welding process for the filling passes with relevant filler wires / electrodes as required with necessary pre-heating prior to welding, DPT wherever required, Post weld heat treatment (PWHT - stress relieving) after welding, hydraulic / pneumatic test as per codes, specification, drawings and draining of water & drying with compressor air after hydrotest.
-
-
-
... More
The job also includes supplying of all types of tools & tackles, lifting arrangements like chain pulley blocks, machineries, all consumables and labour to complete the job in all respects, returning back the unused materials to owner's storage point and dumping the generated scrap material to designated area as per EIC instructions.
-
-
-
... More
The rates for the following items shall be exclusive of blinding & deblinding, reinforcement pad welding, radiography , removal of old piping for replacement and erection & removal of scaffolding.
-
-
-
... More
The rates for the following items shall be inclusive of fabrication, laying, erection, preheating, welding,100% stress relieving of joints, providing shoe supports, pads at support locations, flushing of the piping system, offering stagewise inspection, hydrotesting and draining / drying of the piping system.WITH CPCL SUPPLY OF FREE POWER & CONTRACTOR'S WELDING MACHINE
-
-
-
... More
Alloy Steel - Above ground Piping - Socket / fillet welding Joint using alloy welding filler wire / electrode - P9 grade - without hydrotest
80
910
72800
... More
Dismantling & Removal of Piping
-
-
-
... More
The job involves removal of existing above ground, under ground, overhead insulated or uninsulated or steam traced piping including all types of fittings like elbows / tees / reducers, etc., flanges, valves, all types of instruments, supports by cold cutting / gas cutting / grinding, etc., at all locations at all grades & elevations without damaging any other portion of the existing unit, lowering down the same to ground level, transportation of the same to the designated area as per the instructions of Engineer-in-charge. The insulation materials to be removed from the pipes and transported to their respective designated locations as per EIC.
-
-
-
... More
The job also includes supplying of all types of tools & tackles, lifting arrangements like chain pulley blocks, machineries, all consumables and labour to complete the job in all respects.
-
-
-
... More
Dismantling & removal of Piping - Carbon steel / Alloy steel
350
33
11550
... More
Dismantling & Removal of Structurals / Gratings
-
-
-
... More
The job involves removal of existing above ground, overhead structurals including platforms, ladders, GI & steel gratings by unfastening / cold cutting / gas cutting / grinding, etc., from various locations at all grades & elevations without damaging any other portion of the existing unit, lowering down the same to ground level, transportation of the same to the designated area or scrap yard as per the instructions of Engineer-in-charge including weighment of the material at the appropriate place within the refinery premises, if required.
-
-
-
... More
The job also includes supplying of all types of tools & tackles, lifting arrangements like chain pulley blocks, machineries, all consumables and labour to complete the job in all respects.
-
-
-
... More
Dismantling & Removal of Structurals / Gratings
2
11095
22190
... More
Fabrication & erection of structurals:
-
-
-
... More
The job includes fabrication and erection of carbon steel structurals in position such as platforms, ladders, stairs, brackets, pipe supports, pipe shoe, using the structural materials like angles, flats, channels, beams, rounds, plates etc. at all grades & elevations.
-
-
-
... More
The job also includes transportation of the required structural materials from owner's storage point to worksite, cutting to the required size, bolting and / or welding of joints etc. as per drawings, specifications & instructions of EIC and preparing the area for hot work.
-
-
-
... More
The job also includes supplying of all types of tools & tackles, lifting arrangements like chain pulley blocks, machineries, all consumables and labour to complete the job in all respects, returning back the unused materials to owner's storage point and dumping the generated scrap material to designated area as per EIC instructions.
-
-
-
... More
Fabrication and erection of structurals upto 15 m elevation
1.5
27844
41766