Chennai Petroleum Corporation Limited Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Chennai Petroleum Corporation Limited - CPCL Tender

Civil And Construction
Eprocure
Opening Date17 Aug 2018
Closing Date18 Sep 2018
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Medium coarse sand filling: Providing and filling coarse sand of quality in floor, foundation etc. in layer of 15 cm thickness including, watering, ramming, consolidating etc. complete.

600

-

-

... More
Providing and laying 50mm thick premix carpet surfacing in 2 (two) layers, each layer with 3 cum of stone chippings 10mm nominal size per 100 sqm and bitumen emulsion (medium setting minimum 65% bitumen contents) complying with IS : 8887-1995 using 96 kg per cum of chippings for tank pad surface including consolidation by hand roller etc. complete. The scope includes removal and disposal of old premix / anticorrosive layers as per the instruction of EIC.

50

-

-

... More
Providing and laying 50mm compacted thickness, anticorrosive layer under tank bottom. Providing and laying 50 / 75mm thick anticorrosive layer sand pad cushion under steel storage tanks consisting of screened dry coarse sand mixed with VG-10 (80/100) grade bitumen conforming to IS:73 (8 to 10% by volume) including making in drum, heating in line, grade & levels, tamping, dressing to the required slopes to form hard mass of specified compacted thickness, etc. as shown on drawings & as per specification all complete as directed by the Engineer-inChrage. Scope also includes preparation and consolidation of sub grade with earth rammer / hand roller after filling the deteriorated portions / undulations of tank pad with available good earth / sand collected within the tank farm, dressing to required slopes / camber and including making good the undulations, removing / cutting the existing damaged premix carpet surface of tank pads etc. and disposal of unserviceable materials lead up to 2 km etc. complete. The scope includes removal and disposal of old premix / anticorrosive layers as per the instruction of EIC.

200

-

-

... More
Crushed stone filling: Supplying stacking of hand broken 63 - 45mm size stone aggregate spreading in uniform thickness, including preparation of sub base, clearing debris and disposal within the refinery premises etc., complete as directed by the Engineer-in-charge for all leads and lifts (payment will be made after deducting voids at 7.5%).

40

-

-

... More
Exposing the annular plate projection outside the tank, which has been covered with asphalt mix layer, for carrying out annular plate periphery Inspection

1

-

-

... More
Blinding & de-blinding for 150# & 300#. Job includes collecting all necessary materials from stores to site. Contractor has to provide all necessary tools and tackles

-

-

-

... More
upto 1 1/2" inch

3

-

-

... More
2" to 4"

5

-

-

... More
6" to 10"

5

-

-

... More
12" to 16"

5

-

-

... More
18" to 24"

5

-

-

... More
Note for blinding & deblinding : 1) Nominal diameter of the flanges shall be taken for all measurements

-

-

-

... More
Note for blinding & deblinding: 2) In case of either one of the activity like blinding or deblinding arise, 50% of the applicable rate shall be paid for the single activity.

-

-

-

... More
Residual oil Handling

-

-

-

... More
Fabrication/Erection of temporary piping as per scope of work for pumping out the sludge /product or piping for supplying water for tank hydrotest. The pipes shall be taken from scrap yard and returned back after completion of works. New pipes, if required, will be issued at the discretion of EIC for this work. Radiography and hydrotest not required for this piping works.

1000

-

-

... More
Removal of residual oil / sludge from the tank using suitable pneumatic pump / any other suitable pump / compressors / hoses etc., and transferring to near by tanks or or manual removal of oil / sludge and transporting to any other area as shown by EIC within the refinery premises of maximum radial distance of 3 kms by deploying gulley sucker / tankers, including manual and thorough cleaning to make the tank inside fir for carrying out all hot work jobs. Note: For the activilty of Oil pumping alone the applicable rate is 70% of this SOR unit rate shall only be paid from the composite single rate of oil pumping cum manual removal of sluge and transporting to the site as identified by EIC.

1300

-

-

... More
Gasket replacement jobs. Job includes collecting all necessary materials from stores to site. Contractor has to provide all necessary tools and tackles. For replacing gaskets in all connected valves / flanges etc., (undisturbed flange connections only). The following rates are not applicable for gasket replacements in new valve, sprikler, foam pourer replacement jobs etc.,

-

-

-

... More
Gasket Replacement Upto 1.5"

10

-

-

... More
Gasket Replacement 2" to 4"

15

-

-

... More
Gasket Replacement 6" to 10"

10

-

-

... More
Gasket Replacement 12" to 16"

10

-

-

... More
Removal and Refixng of PV Valves

-

-

-

... More
Removal of all PV valves / block valves (size between 2" and 10") from tank, transporting to and fro to Valve Section and refixing the same after servicing. Servicing will be done by CPCL.

15

-

-

... More
Commercial Cleaning of plates (roof underside, shell upto 2M elevation,bottom plates) as per scope of work.

-

-

-

... More
By Mechanical cleaning

200

-

-

... More
By Commercial Grit blasting (Roof top for LFET testing of roof, if requried as per Inspection & roof underside to be done before applying specaiality coating on bottom plate, if required as per Inspection)

3500

-

-

... More
By Powertool cleaning

200

-

-

... More
Cleaning of welds as per scope of work

-

-

-

... More
Buffing

150

-

-

... More
Buffing with Diesel chalk test

150

-

-

... More
Buffing with Vacuum box test

250

-

-

... More
Patch welding : The job includes preparing the work area for hot work ,grinding,fillet welding on plate surfaces using E 6013 / E 7018 electrodes at all grades and elevations, bending to the desired curvatures wherever required and pnuematic testing / other testing as recommended by CPCL Inspection for patch welding etc. The jobs includes supplying of all types of tools & tackles , machineries all consumables and labour to complete the job in all respects as per EIC instructions. as per scope of work. The thickness of patch weldings are up to 8mm. This item (patch welding) is appilicable for patch welding in all locations and all elevation of the tank - shell / roof / bottom plate etc.,

1500

-

-

... More
Weld repairs and reinforcement as per scope of work

500

-

-

... More
Bottom plate replacement as per scope of work (Using 8MM Plate)

-

-

-

... More
Cutting and dismantling of existing bottom plate and transporting to designated scrapyard, Preparing fabrication drawing, fabrication including underside (soil side) painting of bottom plates, shell window opening and closing after completion of bottom plate replacement jobs, erection of bottom plates, welding and testing as per the direction of Inspection. For payment, theoritical weight given in the fabrication drawing will be considered. Since there is no anticipated double deck replacement the exising bottom plate shall be replaced after providing proper support to the exising double deck roof. (replacement of bottom plate with double deck roof in tact in position safely without any damage to the existing double deck roof). In case of any demage, the same shall be recified by the contractor to its original condition without any additional cost.

220

-

-

... More
Annular plate replacement as per scope of work (Using 14MM Plate)

-

-

-

... More
Cutting and dismantling of existing annular plate and transporting to desginated scrapyard, Preparing of fabrication drawing, fabrication including underside (soil side) painting of annular plates, erection of annular plates, welding and testing as per the direction of Inspection. For payment, theoritical weight given in the fabrication drawing will be considered. Since there is no anticipated double deck replacement the exising annular plate shall be replaced after providing proper support to the exising double deck roof. (replacement of annular plate with double deck roof in tact in position safely without any damage to the existing double deck roof). In case of any demage, the same shall be recified by the contractor to its original condition without any additional cost.

45

-

-

... More
Shell plate replacement / New Shell course addition jobs / Shell course partial replacement jobs as per scope of work in all location and elevation - all thickness

-

-

-

... More
Cutting, dismantling, shifting out of dyke, weighing and transporting to scrap yard / designated place as directed by EIC.

30

-

-

... More
Providing construction drawings, fabrication/ modification, erection, welding and satisfying all inspection requirments as directed by EIC.

30

-

-

... More
Repair works on Roof Appurtenances

-

-

-

... More
Roof rolling ladder complete servicing including supply and replacement of required brass flats, rollers, wheels, pins and brazing of rolling ladder wheel, ladder stariway GI rungs etc. and the torn off rolling ladder top rungs and the connecting flats shall be replaced with suitable modification. Only structural material will be supplied by CPCL.

1

-

-

... More
Weld repair of pontoon compmartment plates using E 7018 electrode (inside pontoon) as directed by EIC - Applicable only if complete roof replacement is not done

300

-

-

... More
Replacement of Roof Sleeves (includes replcement of reinforcement pads) - Applicable only if complete roof replacement is not done i.e. repair works in existing roof only

20

-

-

... More
Replacement of Roof legs - Applicable only if complete roof replacement is not done i.e. repair works in existing roof only

20

-

-

... More
Double deck roof - All roof pontoons water fill testing - the testing shall be done for individual pontoon only. Hence required number of testings shall be done to conver the entire roof as per the requirement of Inspection

1

-

-

... More
Supply and fixing of nitrile rubber gaskets as per existing samples for pontoons / double deck roof manholes

60

-

-

... More
Supply and fixing of nitrile rubber gaskets as per existing samples for breather vents

100

-

-

... More
Supply and fixing of 25mm neoprene gaskets as per existing samples for gauge well (1M x 1M)

1

-

-

... More
Supply and fixing of 4" nitrile rubber gaskets as per existing samples for roof leg sleeves

160

-

-

... More
Supply and fixing of cottor pin assembly or stud bolt assmbly as per the existing samples for roof leg supports

160

-

-

... More
Replacement of gauge well pipes.

-

-

-

... More
Cutting, dismantling, shifting out of dyke, weighing and transporting to scrap yard. Fabrication, erection and welding of gauge well and still well pipes.

200

-

-

... More
Structural works as per scope of work

-

-

-

... More
Cutting, dismantling, shifting out of dyke, weighing and transporting to scrap yard / designated place as directed by EIC.

15

-

-

... More
Providing contruction drawing, Fabrication, erection, welding and satisfying all inspection requirments as directed by EIC.

20

-

-

... More
Earthing point repairs as per scope of work

-

-

-

... More
Supply and fixing of the earthing cable with copper wire between roof to rolling ladder and rolling ladder to gaugewell platform with 50mm square copper flexible, pvc insulated, both ends crimped with lugs. All the earthing shall be as per existing IS earthing standards.

50

-

-

... More
Earthing flat repair works as per Scope of work

250

-

-

... More
Repairs/replacement of mechanical level indicator as per scope of work (Rate includes supply & installation of mechnaical level indicator wires, pulleys, Float, Scale & counterweight)

1

-

-

... More
Dismantling and refixing of existing roof drain systems ( 3 Nos) Size (6" / 8")

-

-

-

... More
Dismantling of exisitng 3 Nos. of roof drain system and refixing after completion of bottom plate replacement and hydrotesting of Roof drain systems (Swivel joints to be tested individually as well as with system) which includes erection / replacement of non-return valves as directed by EIC.

1

-

-

... More
Partial / Full replacement of roof drain (SOR excludes hydrotest, since that is already accomodated in the previous SOR)

1000

-

-

... More
Removal & Refixing of primary seals as per scope of work

-

-

-

... More
Removal of primary seals

220

-

-

... More
Refixing of primary seals

220

-

-

... More
Removal & Refixing of secondary seals as per scope of work

-

-

-

... More
Removal of secondary seals

220

-

-

... More
Refixing of secondary seals

220

-

-

... More
Removal and Refixing of Rim Seal after completion of Maintenance Job

1

-

-

... More
(1) Removal and Refixing of Rim seal includes, Dismantling of Vessel, connected pipe, hose, fasteners and other parts, Preserving the Dismantlings, Refxing the Rim Seal in order.

-

-

-

... More
Foam pourer works as per scope of work

-

-

-

... More
Complete replacement of foam pourer lines (total system) as directed by EIC. Job includes fabrication, erection and hydro testing of piping along with necessary supports (for supports rate can be claimed using Structural Fabrication and Erection SOR). Scope includes removal of foam makers and fixing back of all foam makers. Scope also includes radiography and hydrotesting of foam pourer system.

1500

-

-

... More
Supply of 100 mesh of SS 304 material for the foam pourer system

15

-

-

... More
Fire water sprinkler works as per scope of work

-

-

-

... More
Complete replacement of FW sprinkler system with supports (for supports rate can be claimed using Structural Fabrication and Erection SOR). Job includes fabrication, erection and hydro testing of fire water piping along with necessary supports. This rate includes bending of pipes to the required curvature. Scope includes fixing of sprinkler nozzles, radiography and hydrotesting of Fire water sprinkler lines.

2000

-

-

... More
Piping work as per scope of work

-

-

-

... More
Fabrication and erection of process piping with supports inside the tank including hydrotest and meet other standard inspection requirements.

100

-

-

... More
Fabrication and erection of process piping with supports outside the tank within dyke area including hydrotest and meet other standard inspection requirements.

250

-

-

... More
Dismantling of old pipes inside / outside tank and disposing them off to designated place as directed by EIC.

500

-

-

... More
Fabrication, Erection and welding of temporary piping inside and outside the dyke for transportation water from outside source for tank hydrotesting. Hydrotest not required for this line. Old pipes and salvaged pipes to be used as directed by EIC.

1000

-

-

... More
Clean the shell nozzles & pad welds and carryout pneumatic testing as per scope of work.

400

-

-

... More
Scaffolding Erection and Dismantling using Contractor Own Material, Tank Calibration etc.,

-

-

-

... More
Scaffolding (box type scaffolding), Tank Hydrotesting, Initial measurements and Calibration as per scope of work.

1

-

-

... More
Manual Cleaning with wire brush of shell / bottom plates after hydrotesting

4000

-

-

... More
For providing nozzles size from 2" to 12" on the shell / roof with RF pad as per API 650 / 653 with necessary inspection. Measurement will be based on size of the nozzle only and erection and welding of RF pad will not be considered in the measurement for payment - The item rate is Inch dia based on nominal pipe size.

100

-

-

... More
For providing nozzles size above 12" on the shell / roof with RF pad as per API 650 / 653 with necessary inspection. Measurement will be based on size of the nozzle only and erection and welding of RF pad will not be considered in the measurement for payment - The item rate is Inch dia based on nominal pipe size.

50

-

-

... More
Tank bottom sump provision / reloation : Fabrication, erection rolling, welding testing etc of MS stripping suction/water draw off sump as per scope of work

1

-

-

... More
Barricading: Installation and dismantling of barricading for isolating the tank taken for maintenance from live tanks based on the instruction of EIC (Optional based on its requirement only) as per the CPCL Standard barricading drawing. Mobilization of all materials required for barricading is in contractor's scope - which includes all new or old pipe, structurals and GI barricading sheets, fasteners etc., CPCL will provide required Civil foundations only for installing barricading structure at free of cost. The contractor shall take back all barricading materials after completion of tank repair works. The contract shall install strucutrally strong barricading following all safety norms and should get CPCL clearance after installation.

500

-

-

... More
Painting as per scope of work

-

-

-

... More
Surface preparation works

-

-

-

... More
By Grit blast cleaning to SSPC-SP-10/Sa 2.5 (Location: Roof exterior surface, shell top course - interior surface 2.0 meters including curb angle & foam defector plate inside, gauge well, combined still well, pontoon exterior surface etc).

5000

-

-

... More
By Power Tool cleaning to SSPC-SP-3/ St 3 (Location:Exterior surface of shell bottom 150mm height and annular plate projection and in other areas if required)

325

-

-

... More
By Hand tool cleaning to SSPC-SP-2/ St 2 (Location: Shell exterior surface, foam deflector plates outside, rolling ladders, shell stairway, structurals, platforms, fire fighting systems, pontoon internals etc.)

16500

-

-

... More
Supply and Application of primer/ Inter/ Finish Paints

-

-

-

... More
Shell exterior surface to be painted as per CPCL painting system XIII without primer .(Application: Conventional brush / spray)

-

-

-

... More
Finish: Two coats of Aluminium Paint IS 2339 DFT of 15 microns / coat

3500

-

-

... More
Bottom deck top surface. Top deck under side (Pontoon interior surface) & Pontoon internals to be painted as per CPCL painting system (Application: Brush)

-

-

-

... More
Two coats of High Build Zinc Phosphate Primer DFT of 35 microns/coat

12000

-

-

... More
Wind girders, roof rolling ladders,shell stairway (excluding the ladder GI rungs), structural / platforms, fire fighting systems and all connected piping of tank within the dyke as per the CPCL painting system - System X (Application by brush)

-

-

-

... More
Primer : one coat of self priming epoxy paint, DFT: 100 microns/coat

1000

-

-

... More
Intermediate: One coat of Polyamide Cured HB Epoxy MIO paint DFT of 75 microns/coat

1000

-

-

... More
Finish :Two coats of Acrylic Polyurethene paint of DFT 35 microns/coat

1000

-

-

... More
Top deck exterior surface, Shell top course interior surface 2.0M including curb angle & foam deflector plate as per CPCL painting system XII (Application by airless spray)

-

-

-

... More
Primer:One coat of Inorganic Zinc silicate DFT of 75 microns/coat

5000

-

-

... More
Inter:One coat of Polyamide Cured HB Epoxy MIO paint DFT of 75 microns/coat

5000

-

-

... More
Finish:Two coats of Acrylic Polyurethane Paint DFT 35 microns/coat

5000

-

-

... More
Exterior surface of shell bottom -150 mm ht & annular plate projection as per CPCL painting system XI (Application by Brush)

-

-

-

... More
Primer:One coat of Epoxy Zinc Phosphate DFT of 30 microns/coat

45

-

-

... More
Inter:One coat of Polyamide Cured HB Epoxy MIO paint DFT of 75 microns/coat

45

-

-

... More
Finish: Two coats of High Build Coal Tar Epoxy paint 100 microns/coat

45

-

-

... More
Tank inside area preparation for uninterrupted hot work: Grass cutting, area cleaning, removal of debris, stagnated oil, if any, by engaging a crew of not less than ten unskilled helpers with one supervisor in 8 hours shift to comply with CPCL safety norms as per scope of work and for maintaining the area oil / sludge / grass free so as to execute the hot works uninterruptedly. The dyke inside area has to be maintained always spic and span, and safe to carry out hot work. This optional SOR shall be operated based on the instruction of EIC only. Separate manpower deplolyment details has to be certified by EIC for operating this item. - Item rate is Lumpsum per Month (i.e, UNIT "EACH" REFERS LUMPSUM PER MONTH).

5

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.