Chennai Petroleum Corporation Limited Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Chennai Petroleum Corporation Limited - CPCL Tender

Civil And Construction
Civil Works Others
Eprocure
Opening Date6 Apr 2023
Closing Date27 Apr 2023
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Foundation works as per scope of work

-

-

-

... More
Supplying and filling required with any one or all types of fill materials as per design for tank pads including spreading in layers of loose thickness average, watering, ramming and compacting for repair works. existing pad materials shall be removed and disposed as directed by EIC within the lead of 7km.No extra claim will be entertained in this regard.

-

-

-

... More
The contractor scope includes Supplying and filling required with Medium coarse river sand as per design for tank pads including spreading in layers of 15cms loose thickness average, watering, ramming and compacting to obtain not less than 85% relative density as per IS 2720 part XIV for repair works.

1470

7420560

5048

... More
The contractor scope includes supplying & filling required with M-sand as per design of tank pads including spreading in layers of , foundation etc. in layer of required thickness including watering, ramming etc.

90

241290

2681

... More
The contractor scope includes Providing and laying 50mm thick premix carpet in two layers, first layer 30MM thick and second layer 20MM thick all around on slopes and sides of the tank pad under the anticorrosive layer with graded stone chips of 12MM and down size and 80/100 grade bitumen in the proportion of 64KG Bitumen per Cu.M of stone aggregate including providing tack coats of Bitumen at the rate of 1 KG/Sq.M. Heating, mixing, brushing, laying in proper slope, compacting, spreading sand over the finished surface at the rate of 0.5 Cu.M/100Sq.M etc., complete. The Contractor shall bring the materials required for the foundation repair work.

40

648960

16224

... More
The contractor scope includes Providing and laying 50MM compacted thickness, anticorrosive layer under steel storage tanks and over the 50 MM premix carpet layer / sand pad with screened dry river sand mixed with Bitumen 8 to 10% by volume including mixing in drums heating to required temperature. Dressing to the required slope, complete with tools, tackles, mixing plants etc.

250

4506500

18026

... More
Crushed stone filling Supplying & stacking of 63 - 45mm size stone aggregate spreading in uniform thickness, including preparation of sub base, clearing debris and disposal within the refinery premises etc., complete as directed by the Engineer-in-charge for all leads and lifts (payment will be made after deducting voids at 7.5%).

60

156480

2608

... More
Exposing the annular plate projection outside the tank, which has been covered with asphalt mix layer, for carrying out plate Inspection Tank dia-79M *(Applicable only if annular plate replacement is not done).

1

39396

39396

... More
Blinding and Deblinding

-

-

-

... More
Blinding & de blinding for 150# & 300#. Job includes collecting all necessary materials from stores to site. Contractor has to provide all necessary tools and tackles

-

-

-

... More
upto 1 1/2" inch

3

723

241

... More
2" to 4"

5

2405

481

... More
6" to 10"

5

6010

1202

... More
12" to 16"

5

12015

2403

... More
18" to 24"

5

15020

3004

... More
Note for sl.no.4.0: (1) Nominal diameter of the flanges shall be taken for all measurements (2) In case of either one of the activity like blinding or deblinding arise, 50% of the applicable rate shall be paid for the single activity

-

-

-

... More
Removal and Refixng of PV Valves

-

-

-

... More
Removal of all PV valves / block valves (size between 2" and 12") from tank, transporting to and fro to Valve Section and refixing the same after servicing. Servicing will be done by CPCL.

12

14424

1202

... More
Commercial Cleaning of plates (roof, shell upto 2M elevation,bottom plates) as per scope of work.

-

-

-

... More
By Mechanical cleaning

250

12000

48

... More
By Commercial Grit blasting (Roof top for LFET testing of roof,bottom plate, if requried as per Inspection & roof underside to be done , if required as per Inspection)

4900

588000

120

... More
By Powertool cleaning

250

12000

48

... More
Cleaning of welds as per scope of work

-

-

-

... More
Buffing

150

7200

48

... More
Buffing with Diesel chalk test

6420

616320

96

... More
Buffing with Vacuum box test

150

16200

108

... More
Patch Plate welding as per scope of work

-

-

-

... More
Patch welding as per scope of work. This job includes preparing the work area for hot work, bending of plates to desired curvatures wherever required, grinding, fillet welding on plate surfaces using E 6013/E 7018 electrodes at all grades and elevation. Patch plate thickness upto 8mm. The rate is applicable for patch works at all locations i.e. shell, roof, bottom plate etc. and testing as directed by EIC and Inspection. .

990

624690

631

... More
Gouging of existing plates at all elevation as per scope of work. The rate is applicable at all locations i.e. shell, roof etc. as directed by EIC and Inspection.

250

100250

401

... More
Weld repairs and reinforcement as per scope of work

710

213710

301

... More
Bottom plate & Annular plate replacement

-

-

-

... More
Bottom plate replacement as per scope of work (Using 8MM Plate)

-

-

-

... More
Bottom plate Cutting, dismantling, shifting out of dyke, , weighing and transporting to scrap yard / designated place as directed by EIC.

300

2155800

7186

... More
Providing construction drawing, preparing fabrication drawing, fabrication including underside (soil side) painting of bottom plates, Opening & closing of Shell window after completion of bottom plate replacement jobs, erection of bottom plates, welding and testing as per the direction of Inspection. For payment, theoritical weight given in the new fabrication drawing will be considered.

310

7457980

24058

... More
Annular plate replacement as per scope of work (Using 14MM Plate)

-

-

-

... More
Annular plate cutting, dismantling, shifting out of dyke, weighing and transporting to scrap yard / designated place as directed by EIC.

50

414600

8292

... More
Preparing fabrication drawing, fabrication including underside (soil side) painting of annular plates, erection of annular plates, welding and testing as per the direction of Inspection. For payment, theoritical weight given in the new fabrication drawing will be considered.

55

1526800

27760

... More
Provision of Drip ring arrangement around the annular plate at tank outside periphery to prevent the entry & accumulation of water below the annular plate as per the enclosed sketch and procedure. Painting of drip ring arrangement as per System-XI as advised by Inspection shall be done.

1

115307

115307

... More
Shell plate replacement / New Shell course addition jobs / Shell course partial replacement jobs as per scope of work in all location and elevation - all thickness

-

-

-

... More
Cutting, dismantling, shifting out of dyke, weighing and transporting to scrap yard / designated place as directed by EIC. .

40

240360

6009

... More
Providing construction drawings, fabrication/ modification, erection, welding and satisfying all inspection requirments as directed by EIC

40

576840

14421

... More
Repair works on Roof Appurtenances

-

-

-

... More
Roof rolling ladder complete servicing including supply and replacement of required brass flats, rollers, wheels, pins and brazing of rolling ladder wheel, ladder stariway GI rungs etc. and the torn off rolling ladder top rungs and the connecting flats shall be replaced with suitable modification. Only structural material will be supplied by CPCL.

1

60086

60086

... More
Weld repair of pontoon compmartment plates using E 7018 electrode (inside pontoon) as directed by EIC - Applicable only if complete roof replacement is not done

110

31790

289

... More
Replacement of Roof Sleeves (includes replcement of reinforcement pads) - Applicable only if complete roof replacement is not done i.e. repair works in existing roof only

10

9610

961

... More
Replacement of Roof legs - Applicable only if complete roof replacement is not done i.e. repair works in existing roof only

20

19220

961

... More
Double deck roof - All roof pontoons water fill testing - the testing shall be done for individual pontoon only. Hence required number of testings shall be done to cover the entire roof as per the requirement of Inspection

1

144207

144207

... More
Supply and fixing of nitrile rubber gaskets as per existing samples for pontoons / double deck roof manholes

110

33110

301

... More
Supply and fixing of nitrile rubber gaskets as per existing samples for breather vents

50

6000

120

... More
Supply and fixing of 25mm neoprene gaskets as per existing samples for gauge well (1M x 1M)

1

6009

6009

... More
Supply and fixing of 4" nitrile rubber gaskets as per existing samples for roof leg sleeves

190

79990

421

... More
Supply and fixing of cottor pin assembly or stud bolt assmbly as per the existing samples for roof leg supports

150

63150

421

... More
Structural works as per scope of work

-

-

-

... More
Cutting, dismantling, shifting out of dyke, weighing and transporting to scrap yard / designated place as directed by EIC.

17.5

105157

6009

... More
Providing contsruction drawing, Fabrication, erection, welding and satisfying all inspection requirments as directed by EIC.

17.5

334390

19108

... More
Earthing point repairs as per scope of work

-

-

-

... More
Supply and fixing of the earthing cable with copper wire between roof to rolling ladder, rolling ladder to gaugewell platform, shell to earth grid, interconnection between the earth pits with 50mm square copper flexible, pvc insulated, both ends crimped with lugs. All the earthing shall be as per existing IS earthing standards.

50

24050

481

... More
Earthing flat repair works as per Scope of work

50

6000

120

... More
Repairs/replacement of mechanical level indicator as per scope of work (Rate includes supply & installation of mechnaical level indicator wires, pulleys, Float, Scale & counterweight)

1

48069

48069

... More
Removal and refixing of the side entry mixer with motors and gear boxes after servicing by CPCL as per scope of work

3

54078

18026

... More
Dismantling and refixing of existing roof drain systems (3 Nos) Size (6" / 8")

-

-

-

... More
Dismantling of exisitng 3 Nos. of roof drain system and refixing after completion of bottom plate replacement and hydrotesting of Roof drain systems (Swivel joints to be tested individually as well as with system) which includes erection / replacement of non-return valves as directed by EIC.

1

120173

120173

... More
Partial / Full replacement of roof drain (SOR excludes hydrotest, since that is already accomodated in the previous SOR)

1100

595100

541

... More
Rim Seal, Primary Seal and Secondary Seal

-

-

-

... More
Refixing of primary seals as per scope of work

-

-

-

... More
Removal of primary seals

250

49750

199

... More
Refixing of primary seals

250

75250

301

... More
Refixing of secondary seals as per scope of work

-

-

-

... More
Removal of secondary seals

250

37500

150

... More
Refixing of secondary seals

250

60250

241

... More
Removal and Refixing of Rim Seal

-

-

-

... More
Removal and Refixing of Rim Seal after completion of Maintenance Job

1

70457

70457

... More
Note for sl.no.18.3: (1) Removal and Refixing of Rim seal includes, Dismantling of Vessel, connected pipe, hose, fasteners and other parts, Preserving the Dismantlings, Refixing the Rim Seal in order.

-

-

-

... More
Foam pourer works as per scope of work

-

-

-

... More
Dechoking & Hydrotesting of the all / entire foam pourer systems at 19 kg/sq cms. Scope includes removal of foam makers with blinding of all nozzles for hydrotesing and fixing back of all foam makers.

1

54078

54078

... More
Replace or repair (partial or complete foam lines) as directed by EIC. Job includes fabrication, erection and hydro testing of piping along with necessary supports (for supports rate can be claimed using Structural Fabrication and Erection SOR).

1230

665430

541

... More
Supply of 100 mesh of SS 304 material for the foam pourer system.

10

12020

1202

... More
Fire water sprinkler works as per scope of work

-

-

-

... More
Dechoking & Hydrotesting of the entire FW sprinkler system as directed by EIC (includes removal of sprinkler nozzles and plugging before hydrotesting and refixing of sprinklers after hydrotesting).

1

52842

52842

... More
Partial or complete replacement of FW sprinkler system with supports (for supports rate can be claimed using Structural Fabrication and Erection SOR). Job includes fabrication, erection and hydro testing of fire water piping along with necessary supports. This rate includes bending of pipes to the required curvature.

2740

1646740

601

... More
Piping work as per scope of work

-

-

-

... More
Fabrication and erection of process piping with supports inside the tank including hydrotest and meet other standard inspection requirements.

250

105250

421

... More
Fabrication and erection of process piping with supports outside the tank within dyke area including hydrotest and meet other standard inspection requirements.

500

210500

421

... More
Dismantling of old pipes inside / outside tank and disposing them off to designated place as directed by EIC.

2500

150000

60

... More
Fabrication, Erection and welding of temporary piping inside and outside the dyke for transportation water from outside source for tank hydrotesting. Hydrotest not required for this line. Old pipes and salvaged pipes to be used as directed by EIC.

1000

108000

108

... More
Clean the shell nozzles & pad welds and carryout pneumatic testing as per scope of work.

380

40280

106

... More
Manual Cleaning with wire brush of shell / bottom plates after hydrotesting

5940

83160

14

... More
For providing nozzles size from 2" to 12" (including 12") on the shell / roof with RF pad as per API 650 / 653 with necessary inspection. Measurement will be based on size of the nozzle only and erection and welding of RF pad will not be considered in the measurement for payment - The item rate is Inch dia based on nominal pipe size.

64

53824

841

... More
For providing nozzles size above 12" upto 24" (including 24") on the shell / roof with RF pad as per API 650 / 653 with necessary inspection. Measurement will be based on size of the nozzle only and erection and welding of RF pad will not be considered in the measurement for payment - The item rate is Inch dia based on nominal pipe size.

36

37584

1044

... More
For providing nozzles size above 24" upto 30" (including 30") on the shell / roof with RF pad as per API 650 / 653 with necessary inspection. Measurement will be based on size of the nozzle only and erection and welding of RF pad will not be considered in the measurement for payment - The item rate is Inch dia based on nominal pipe size.

30

39180

1306

... More
For providing nozzles size above 30" upto 42" on the shell / roof with RF pad as per API 650 / 653 with necessary inspection (Including erection of valve) . Measurement will be based on size of the nozzle only and erection and welding of RF pad will not be considered in the measurement for payment - The item rate is Inch dia based on nominal pipe size.

42

76818

1829

... More
Tank bottom sump provision / relocation : Fabrication, erection rolling, welding testing including excavation and backfilling, underside painting and anticorrosive layer packing etc of MS stripping suction/water draw off sump as per scope of work.

1

24035

24035

... More
Scaffolding Erection and Dismantling using Contractor Own Material

-

-

-

... More
Scaffolding (box type scaffolding), Tank Hydrotesting, Initial measurements and Calibration as per scope of work.

1

1201725

1201725

... More
Still Gauge well pipes

-

-

-

... More
Cutting, dismantling, shifting out of dyke, weighing and transporting to scrap yard . Fabrication, erection, & welding of gauge well & still well pipes

340

163540

481

... More
Provision of combined still well pipes (24") as per scope of work, for accomadate two radar gauge (8"), gauge hatch cover & temp element Scope includes fabrication,dismantling, erection of pipes as well as supply of Aluminium gaskets, brass rollers, machining activities, related transporting activities, rubber / neoprene gaskets etc as directed by EIC. This still well assembly can be checked at Site / in Drawing before quoting (previously installed in crude tanks)

1

78816

78816

... More
Painting as per scope of work

-

-

-

... More
Surface preparation works

-

-

-

... More
By Grit blast cleaning to SSPC-SP-10/Sa 2.5 (Location: Roof exterior surface, shell top course - interior surface 1.5 metres, roof leg top-2 metres and including curb angle & foam defector plate inside, gauge well, combined still well, pontoon exterior surface, tank bottom plate/annular plate product side & shell bottom 1.5M height including roof drain system etc and in other areas if required).

5940

1300860

219

... More
By Power Tool cleaning to SSPC-SP-3/ St 3 (Location:Exterior surface of shell bottom 150mm height and annular plate projection and in other areas if required)

50

2400

48

... More
By Hand tool cleaning to SSPC-SP-2/ St 2 (Location: Shell exterior surface, roof drain sump, foam deflector plates outside, rolling ladders, shell stairway, structurals, platforms, bottom plate undersiderside, fire fighting systems, pontoon internals, double deck inside including all structurals, etc. and in other areas if required)

10190

448360

44

... More
Supply and Application of primer/ Inter/ Finish Paints

-

-

-

... More
Shell exterior surface to be painted as per CPCL painting system XIII without primer .(Application: Conventional brush / airless spray)

-

-

-

... More
Finish: Two coats of Aluminium Paint IS 2339 DFT of 15 microns / coat

3930

412650

105

... More
Pontoon interior surface & Pontoon internals,Wind girders, roof rolling ladders,shell stairway (excluding the ladder GI rungs), structural / platforms, fire fighting systems and all connected piping of tank within the dyke and in other areas if required to be painted as per CPCL painting system (Application: Brush)

-

-

-

... More
Two coats of High Build Zinc Phosphate Primer DFT of 35 microns/coat

5070

532350

105

... More
Wind girders, roof rolling ladders,shell stairway (excluding the ladder GI rungs), structural / platforms, fire fighting systems and all connected piping of tank within the dyke and in other areas if required as per the CPCL painting system - (Application by brush/airless spray)

-

-

-

... More
Primer : one coat of self priming epoxy paint, DFT: 100 microns/coat

200

17400

87

... More
Intermediate: One coat of Polyamide Cured HB Epoxy MIO paint DFT of 75 microns/coat

200

15600

78

... More
Finish :Two coats of Acrylic Polyurethene paint of DFT 35 microns/coat

200

35000

175

... More
Finish:Two coats of First Quality synthetic enamel paint, DFT 25 Micron per coat

2630

481290

183

... More
Top deck exterior surface, Shell top course interior surface 1.5M including curb angle, roof leg top 2 metres & foam deflector plate and in other areas if required as per CPCL painting system XII (Application by airless spray)

-

-

-

... More
Primer:One coat of Inorganic Zinc silicate DFT of 75 microns/coat

6040

954320

158

... More
Inter:One coat of Polyamide Cured HB Epoxy MIO paint DFT of 75 microns/coat

6040

471120

78

... More
Finish:Two coats of Acrylic Polyurethane Paint DFT 35 microns/coat

6040

1057000

175

... More
Exterior surface of shell bottom -150 mm ht & annular plate projection, roof drain sump and in other areas if required as per CPCL painting system XI (Application by Brush/airless spray)

-

-

-

... More
Primer:One coat of Epoxy Zinc Phosphate DFT of 30 microns/coat

50

3900

78

... More
Inter:One coat of Polyamide Cured HB Epoxy MIO paint DFT of 75 microns/coat

50

3900

78

... More
Finish: Two coats of High Build Coal Tar Epoxy paint 100 microns/coat

50

7900

158

... More
Painting of water stagnant area of floating roof tank deck plate (roof drain sump surrounding) to avoid corrosion

-

-

-

... More
Two coats of Polysulphide modified epoxy paint DFT of 500 Micron/coat (Application by Airless spray).

770

924000

1200

... More
Tank inside & dyke area preparation for uninterrupted hot work: Grass cutting, area cleaning, removal of debris, stagnated oil/sludge ,oil cleaning inside dyke to get hot work permit if any, by engaging a crew of unskilled helpers in 8 hours shift to comply with CPCL safety norms as per scope of work and for maintaining the area oil / sludge / grass free so as to execute the hot works uninterruptedly. The dyke inside area has to be maintained always clean, and safe to carry out hot work. This optional SOR shall be operated based on the instruction of EIC only. Separate manpower deplolyment details has to be certified by EIC for operating this item. - Item rate is per unskilled personnel for 8 hrs shift. Manpower to be deployed as instructed by EIC.

600

533400

889

... More
Barricading as per scope of work and attached drawing-1902 Rev. 0

-

-

-

... More
Providing Civil foundation for barricading including earth work excavation upto 1.5M depth, supply and filling of fine aggregrate of M-sand, centering, shuttering, strutting, providing reinforcement of FE500 bar, providing and laying PCC & Cement concrete, supplying and grouting of foundation bolts, supplying and fixing of anchor fasterner of approve quality to complete the foundation work in all respect as per drawing No-1902 Rev. 0. EA Referes rate for one foundation block- Common raft + two pedestal.

24

775080

32295

... More
Installation and dismantling of barricading for isolation the tank taken for maintenance from live tanks based on the instruction of EIC(Optional based on its requirement only) as per the CPCL standard barricading Drawing. Mobilization of all material required for barricading is in contractors scope -which includes all new or old pipes, structural and GI barricading sheets, fasteners etc. The contracor shall take back all the barricading materials after completion of tank repair works. The contractor shall install structurally strong barricading following all saftey norms and should get CPCL clearance after installation.

1540

2467080

1602



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.