Chennai Petroleum Corporation Limited Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Chennai Petroleum Corporation Limited - CPCL Tender

Eprocure
Opening Date22 Jan 2021
Closing Date19 Feb 2021
Tender AmountRefer Documents 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Carryout Complete Catalyst replacement in 207-R-01 as per enclosed scope of work and detailed loading diagram.

160

-

-

... More
Carryout Complete Catalyst replacement in 207-R-02 as per enclosed scope of work and detailed loading diagram.

180

-

-

... More
Carryout Complete Catalyst replacement in 207-R-201 as per enclosed scope of work and detailed loading diagram.

85

-

-

... More
Mobilisation and Demobilisation charges for Equipments, Tools & Tackles for Plant -207 Reacctors Catalyst replacement.

1

-

-

... More
PART - B SOR ITEMS

-

-

-

... More
PART - B SOR ITEMS

-

-

-

... More
BLINDING AND DE-BLINDING The job includes collection & transportation of required quantity of materials like blinds, gaskets, fasteners, etc., from owner's storage point, loosening & tightening of studs (cold / gas cutting if required), wedge opening, cleaning of flanges, insertions and removal of blind & gaskets, providing new gaskets after removal of blinds, overhauling of fasteners using oil, replacing the defective studs / nuts to ensure zero leak of joints including hot bolting. The job also includes supplying of all types of tools & tackles, lifting arrangements like chain pulley blocks, machineries, all consumables and labour to complete the job in all respects, transportation of unused materials to owner's storage point and dumping the generated scrap material to designated area as per EIC instructions.

-

-

-

... More
Blinding and deblinding for 1500# & 2500# ratings:

-

-

-

... More
Blinding & Deblinding - Size Upto 1-1/2 inch dia.

50

-

-

... More
Blinding & Deblinding - Size 2 inch dia. to 5 inch dia.

50

-

-

... More
Blinding & Deblinding - Size 6 inch dia. to 10 inch dia.

25

-

-

... More
Blinding & Deblinding - Size 12 inch dia. to 16 inch dia.

20

-

-

... More
Blinding & Deblinding - Size 18 inch dia. to 24 inch dia.

5

-

-

... More
SUPPLY, ERECTION & DISMANTLING OF STEEL SCAFFOLDING- For External purpose - Insulation removal, thickness gauging, NDT jobs The job includes transportaiton of scaffolding materials in contractors scope of supply , erection of scaffolding at site covering the areas specified including providing vertical posts of pipes at inter distance of 1.5m and horizontal numbers at a inter distance of 0.5 to 0.75 meter, providing rods at corners to give sufficient strength to the structure, placing the wooden / steel planks / FRP gratings on top for making sufficient area. Dismantling scaffolding after completion of job and returning the scaffolding material to specified place including all tools, tackles, consumables, labours and contractor's supervision as directed by the Engineer-in-charge. NOTE: i) For measurement in SQM : 2( Length + Width) x height area covered by the scaffolding is to be taken. ii) Scaffolding measurement to be done by breaking the height into parts as per height slab mentioned below and adopting respective rates against mentioned height slabs.

-

-

-

... More
Supply,Scaffolding Erection & Dismantling (External)

-

-

-

... More
Up to 6m height.

500

-

-

... More
Above 6 m up to 10 m height.

500

-

-

... More
Above 10 m up to 20 m height.

500

-

-

... More
Above 20 m up to 30 m height.

500

-

-

... More
Above 30 m up to 40 m height.

500

-

-

... More
Buffing of weld Joints Job involves buffing and cleaning of total weld area of the Reactor / vessel / column etc, using power brush, thejob has to be completed in all respect to the entire satisfaction of the Engineer-in-charge ( each length of buffing will be up to width of 150 mm). Necessaty buffing tools/ machineries and consumables are in contractor's scope NOTE: (1) For weld seam buffing the width of buffing shall be 150mm (i.e) 75mm on both sides of the weld seam.

-

-

-

... More
Power tool cleaning / Buffing to SSPC - SP-2 / St3 standards - 150 mm width of Weld seams / HAZ.

200

-

-

... More
Dye Penetration test for weld joints Carryout DP test of the Critical weld joints, New / Old RTJ Gakets / RTJ Gasket seating surface areas as per CPCL Inspection advice. Performance of dye penetration test including supply of all necessary materials, penetrant, developer etc, along with all equipments, labour for carrying out the work as per specification and direction of engineer-in-charge at all elevations. Test has to be carried out in all metallurgy the test has to carry out on all schedule.

-

-

-

... More
DP test of weld joints (One Unit EA = One Inch Length)

500

-

-

... More
Hiring of Crane, Tractor Trailer, Fork lifts The contractor shall mobilise the following equipments for completion of the entrire job in all respects. The contractor shall de mobilise the equipment on completion of the job with approval from EIC. If there is any extension of days the contractor shall obtain prior approval from EIC for retaining the equipements. For the extended days the rate will be paid on pro rata basis.Entry and exist Gate passes including the operators time sheet (duly signed by CPCL in charge on daily basis ) for all the below mentioned equipments to be enclosed along with bill for processing.

-

-

-

... More
Hiring of 5 Ton Capacity Fork lift with valid operator for transportaion of New catalysts/ Adsorbent stored in drums / jumbo bags from CPCL-Manali ware hosue to Refinery-3 Plant-207 Site area & Shifting of the removed old Catalysts / Adsorbent from Plant area to the place as identified by EIC with in CPCL Permises. Necessary diesel is in contractor scope. Minimum capacity : 5 Ton No of Fork lift requried : 3 nos x 30 Days : 90 Days on round the clock basis Rate is inclusive of mobilisation and demobilisation.

90

-

-

... More
Hiring of 10 Ton 20 Feet Capacity Tractor Trailer with valid operator for transportaion of New catalysts/ Adsorbent stored in drums / jumbo bags from CPCL-Manali ware hosue to Refinery-3 Plant-205 ,206 Site area & Shifting of the removed old Catalysts / Adsorbent from Plant area to the place as identifed by EIC with in CPCL permises. Necessary Diesel is in Contractor scope. Minimum Capacity : 10 Ton, 20 Feet on round the clock basis No of Tractor / Trailer required : 3 nos x 30 Days =90 Days Rate is inclusive of mobilisation and demobilisation.

90

-

-

... More
Hiring of 5 Ton Capacity Fork lift with valid operator for transportaion of New catalysts/ Adsorbent stored in drums / jumbo bags from CPCL-Manali ware hosue to Refinery-3 Plant-207 Site area & Shifting of the removed old Catalysts / Adsorbent from Plant area to the place as identified by EIC with in CPCL Permises. Necessary diesel is in contractor scope. Minimum capacity : 5 Ton No of Fork lift requried : 3 nos x 30 Days : 90 Days on round the clock basis Rate is inclusive of mobilisation and demobilisation.

90

-

-

... More
Hiring of 200 Ton capacity Crane (for 207R-01/02) with required boom height for executing the job with valid operator for Fresh catalyst loading , removal / Refixing of top manway / elbow piece and other allied maintenance jobs for Catalyst Replacement in plant-207. Necessary diesel is in contractor scope. Minimum capacity : 200 Ton, on round the clock basis. No of Crane requried : 1no x 20 Days : 20 Days. Rate is inclusive of mobilisation and demobilisation.

20

-

-

... More
Hiring of 300 Ton capacity Crane (For 207R-201) with required boom height for executing the job with valid operator for Fresh catalyst loading , removal / Refixing of top manway / elbow piece and other allied maintenance jobs for Catalyst Replacement in plant-207. Necessary diesel is in contractor scope. Minimum capacity : 300 Ton, on round the clock basis. No of Crane requried : 1 nos x 20 Days : 20 Days. Rate is inclusive of mobilisation and demobilisation.

20

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.