Chennai Petroleum Corporation Limited Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Chennai Petroleum Corporation Limited - CPCL Tender

Pipes and Pipe Related Activities
Eprocure
Opening Date28 Dec 2020
Closing Date19 Jan 2021
Tender AmountRefer Documents 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supply, Erection & Dismantling of Steel Scaffolding - For Pipe line dismantling, erection etc., The scaffolding materials can be taken back by the contractor after completion of the job.

-

-

-

... More
Job involves erection of scaffolding at the required locations using 1-1/2 inch dia steel tubular pipes with suitable clamping arrangement, providing wooden planks / steel gratings at the required locations firmly tied on to the scaffolding pipes, removal of the wooden planks / steel gratings & scaffolding materials on completion of the job.

-

-

-

... More
The job also includes supplying of all types of tools & tackles, lifting arrangements like chain pulley blocks, steel scaffolding materials, clamps & wooden planks / steel gratings, all consumables and labour to complete the job in all respects. Scaffolding shall be adequately safe for welding and inspection activities.

-

-

-

... More
Supply, Erection & dismantling - Upto 10 mtr height of scaffolding (External)

7200

-

335

... More
Supply, Erection & dismantling - Above 10 mtrs upto 20mts height of scaffolding (External)

4800

-

412

... More
NOTE:

-

-

-

... More
(1) For measurement, the scaffolding height shall be measured from the erected base level upto the top plank reference or the top horizontal poles.

-

-

-

... More
Dismantling & Removal of Structurals / Gratings (All Elevation)

-

-

-

... More
The job involves removal of existing above ground, overhead structurals including platforms, ladders, GI & steel gratings by unfastening / cold cutting / gas cutting / grinding, etc., from various locations at all grades & elevations without damaging any other portion of the existing unit, lowering down the same to ground level, segragation / sizing of scraps as per the instruction of EIC, transportation of the same to the designated area or scrap yard as per the instructions of Engineer-in-charge including weighment of the material at the specified place within the refinery premises.

-

-

-

... More
The job also includes supplying of all types of tools & tackles, lifting arrangements like chain pulley blocks, machineries, all consumables and labour to complete the job in all respects.

-

-

-

... More
Dismantling & Removal of Structurals / Gratings

5

-

40000

... More
NOTE:

-

-

-

... More
(1) Weighment procedure stipulated by CPCL is required to be followed for shifting the removed materials to scrap yard.

-

-

-

... More
Fabrication & erection of structurals (All Elevation)

-

-

-

... More
The job includes fabrication and erection of carbon steel structurals in position such as platforms, ladders, stairs, brackets, pipe supports, pipe shoe, using the structural materials like angles, flats, channels, beams, rounds, plates etc. at all grades & elevations.

-

-

-

... More
The job also includes transportation of the required structural materials from owner's storage point to worksite, cutting to the required size, bolting and / or welding of joints etc. as per drawings, specifications & instructions of EIC and preparing the area for hot work.

-

-

-

... More
The job also includes supplying of all types of tools & tackles, lifting arrangements like chain pulley blocks, machineries, equipments like crane , tractor & trailer , all consumables and labour to co mplete the job in all respects, returning back the unused materials to owner's storage point and dumping the generated scrap material to designated area as per EIC instructions.

-

-

-

... More
Fabrication and erection of structurals

5

-

60000

... More
NOTE:

-

-

-

... More
(1) For erection and dismantling of scaffolding wherever required, rates shall be paid separately as per available SOR.

-

-

-

... More
Erection and welding of gratings for platforms, Staircase & Ladder Gratings (All Elevation)

-

-

-

... More
The job includes erection & welding of gratings in position under the support structure in columns, vessels, tanks, staircase, platforms, step ladders, etc., at all grades & elevations with necessary corrections at work site on the supplied grating to fit to the site requirements.

-

-

-

... More
The job also includes transportation of the required grating materials from owners' storage point to worksite, cutting to the required size, bolting and / or welding of joints etc. as per drawings, specifications & instructions of EIC and preparing the area for hot work.

-

-

-

... More
The job also includes supplying of all types of tools & tackles, lifting arrangements like chain pulley blocks, machineries, all consumables and labour to complete the job in all respects, returning ba ck the unused materials to owner's storage point and dumping the generated scrap material to designated area as per EIC instructions.

-

-

-

... More
Erection and welding of Gratings

5

-

50000

... More
SOCKET WELDING - (All thickness and All Elevation)

-

-

-

... More
Carbon Steel Piping - Socket / Fillet welding Joints

500

-

900

... More
Carbon Steel - Flare Header Piping Work:

-

-

-

... More
The job includes transporation of all free issue materials from owner's storage point to work site, handling at site, cutting / cold cutting and removal of old piping, bevelling, fabrication, laying new piping, welding & erection of carbon steel piping at all locations above the ground level, overhead sleepers, existing flare trestles, pipe-racks, cross-overs, pipe-sleeves, trenches, stand posts, connecting with equipments & nozzles, providing tappings from the existing pipelines at all grades & elevations as per the requirement and instructions of EIC.

-

-

-

... More
The piping job includes all modification and replacement jobs involving pipes & all types of fittings like elbows / tees / reducers / half coupling / full coupling, etc., all types of flanges like slip on / raised face, etc., all types of inline instruments like rotameter / pressure gauges / thermowells, etc., valves, expansion joints, steam traps, orifice assemblies, strainers, vents, drains, funnels, etc., of different schedules, pressure ratings and for various temperature applications. The scope of wok and rate includes blinding and deblinding of flare header for positive isolation and preparation of flare header for hot work, removal & re-fixing of flanged valve required for piping replacement / installation jobs, assisting manufacturing for steaming / steam flushing of the flare header (The steam flushing will be done by CPCL and the contractor shall assist Manufacturing for providing steam inside the header wherever required as per the Operation's requirement).

-

-

-

... More
This job includes disposal of sediments / Pyrophoric Iron materials from existing pipe (all line content of existing pipes: The job involves removal of existing flare header pipe line contents (sediments and pyrophoric iron materials) and the same shall be collected and disposed to the designated place as directed by Engineer in charge immediately after cold cutting of pipe segments. Sufficient nos. of empty barrels / drums shall be supplied by contractor.

-

-

-

... More
The piping job includes providing shoe supports, pads at support locations, reinforcement pads, etc., wherever required.

-

-

-

... More
The job includes flushing, preparing work area for executing hot work, bending to suit the contours wherever required, socket, fillet, butt welding using E 6010 / E 6013 / E 7018 electrodes as required, DPT wherever required, hydraulic / pneumatic test as per codes, specification, drawings and draining of water & drying with compressor air after hydrotest.

-

-

-

... More
The job also includes supplying of all types of tools & tackles, lifting arrangements like chain pulley blocks, machineries including cold cutting machines (pipe cutting machines) – Power hacksaw having intrinsically safe motor or pneumatic operated power hacksaw with proper cooling arrangement, equipment like suitable crane, tractor with trailer, winches for lifting, all consumables and labour to complete the job in all respects, returning back the unused materials to owner's storage point and dumping the generated scrap material to the designated area as per EIC instructions. Scraps shall be disposed after segregation and sizing as required by Scrap Yard personnel. The cold cutting of pipes only permittted due to safety reasons.

-

-

-

... More
Cold Cutting of existing pipes of sizes 28", 40" and 48’’ in-situ at various locations at higher elevation using pnumatic operated / equivalent cold cutting machine. During cold cutting operation, the machines should not generate heat and should not produce sparks resulting any fire while cutting. Cold cutting machines should be of light in weight with low setting time and capable of cutting at faster rate to complete more number of cuts per day. The cold cutting machines shall be pneumatically operated or equivalent cold cutting machines with the capabilities to meet the above requirements. ALL PIPE CUTS FOR DISMANTLING OF THE EXISTING FLARE HEADER SHALL BE OF COLD CUTS ONLY FOR SAFETY REQUIREMENT.

-

-

-

... More
The job involves pneumatic testing of pipelines to the specified test pressure (2.5 KSC) at all elevations by providing necessary hose connections from the source of air supply to the work location for preparing the test, flushing, filling up air on the piping circuit, pressurize to the required pneumatic pressure with necessary compressors and offer for inspection including access & assistance to CPCL Inspection team during the checking, draining & drying of the piping circuit. The job also includes supplying of all types of tools & tackles, suitable testing equipments, mobile diesel driven compressors, pressure regulators, pressure gauges, machineries, all consumables (including diesel) and labour to complete the job in all respects.

-

-

-

... More
The job involves removal of existing above ground overhead piping including all types of fittings like elbows / tees / reducers, etc., flanges, valves, all types of instruments, supports by cold cutting at all locations at all grades & elevations without damaging any other portion of the existing unit, lowering down the same to ground level ,transportation of the same to the designated area as per the instructions of Engineer-in-charge. The entire length of flare header is an uninsulated piping. The job also includes supplying of all types of tools & tackles, lifting arrangements like chain pulley blocks, equipments like crane, tractor & trailer, all consumables and labour to complete the job in all respects. The rate includes providing arrangements for steam flushing and assisting steam flushing of piping with Operations. Steam will be provided by CPCL at free cost at one or multi locations and neceesary further distribution shall be done by the contractor at their cost.

-

-

-

... More
The rate inclueds any temporary structural erection and dismantling after completion of the job (the replacement of the flare header), required for pipe line erection jobs. The mobilisation of temporary structural is under contractor's scope and same can be taken back by the contractor after completion of the job i.e. repalcement of flare header jobs.

-

-

-

... More
The rates for the following items shall be exclusive of pad plate welding, radiography, stress relieving, erection & dismantling of scaffolding and painting works, which can be claimed as per respective SOR.

-

-

-

... More
The rates shall be inclusive of area preparation for hot work, blinding and deblinding, new line fabrication, laying, erection, welding, flushing of piping system, offering stagewise inspection

-

-

-

... More
The rates for the following items shall be inclusive of pipeline fabrication, laying, erection, welding, providing shoe supports at support locations, flushing of the piping system, offering stage wise inspection, flushing of piping before pneumatic testing, pneumatic testing of piping systems and draining / drying of the piping system.

-

-

-

... More
Replacement of portion of CS 48”Sch.XS, 40"Sch.XS & 28"Sch.XS/Std., Flare headers at different locations (North of CT-3 & West of CT-3/5 (or) any other locations as instructed by EIC). 48" dia. minimum 60M, 40" dia. minimum 120M & 28" dia. minimum 72M; Pipe Material : Material: A672 Gr.B60 Cl.22 (200 BHN Max), including blinding & deblinding jobs, and pneumatic testing of replaced portion at 2.5 Ksc. Old line shall be cold cut using hydraulic / pneumatic cold cutting machines (under contractor's scope) only during dismantling of piping nd shall be transfered to the designated place as decided by EIC. All rates are inclusive, no separate SOR for old pipe cutting & dismantling and removal.

-

-

-

... More
DISMANTLING AND REMOVAL OF OLD PIPING & ITS DISPOSAL, FABRICATION, ERECTION AND BUTT WELDING OF NEW PIPING & TESTING AT ALL ELEVATIONS (THE ELEVATION OF EXISTING PIPING BUTT WELDING PIPING AT ALL ELEVATIONS UPTO 20 METRES FROM GROUND LEVEL - USING ER70S-2 (filler wire for root pass) & E7018 (for filler pass).

-

-

-

... More
WITH CONTRACTOR'S POWER & CONTRACTOR'S WELDING MACHINES.

-

-

-

... More
BUTT WELDING - (All thickness and All Elevation)

-

-

-

... More
Carbon Steel Piping - Butt welding Joints for all piping works

4500

-

2950

... More
Reinforcement pad Fabrication, welding including pneumatic testing of pad plates at all elevations upto 20 Meters from ground level. RF pad pneumatic test pressure : 1.05 Ksc. (or) as decided by EIC.

-

-

-

... More
Pad plate welding for 28" pipe

12

-

48000

... More
Pad plate welding for 40" pipe

20

-

65000

... More
Pad plate welding for 48" pipe

10

-

74000

... More
NOTE: (1) Thickness of piping for measurement shall be based on the relevant ANSI or equivalent standards. (2) The rates for socket & fillet welding in piping shall remain same for all thickness and elevations as per SOR. (3) Rate for weld joints of vents & drains shall be paid on actual measurement using the applicable SOR. (4) For radiography of weld joints, rates shall be as per the SOR. (5) There is no separate payment for welded valves. (6) Civil work for crane parking : The scope of work and rate includes M. sand / gravel filling at the side of the road, compacting so as to park the crane for clear access to reach the pipe. Supply of M-sand / gravel shall be under contractor's scope. All tools and tackles, equipment and machineries shall be supplied by contractor.

-

-

-

... More
(1) Thickness of piping for measurement shall be based on the relevant ANSI or equivalent standards.

-

-

-

... More
(2) The rates for socket & fillet welding in piping shall remain same for all thickness and elevations as per SOR.

-

-

-

... More
(3) Rate for weld joints of vents & drains shall be paid on actual measurement using the applicable SOR.

-

-

-

... More
(4) For radiography of weld joints, rates shall be as per the SOR.

-

-

-

... More
(5) There is no separate payment for welded valves.

-

-

-

... More
(6) Civil work for crane parking : The scope of work and rate includes sand / gravel filling at the side of the road, compacting so as to park the crane for clear access to reach the pipe. Supply of sand / gravel shall be under contractor's scope. All tools and tackles, equipment and machineries shall be supplied by contractor.

-

-

-

... More
Patch plate welding - Carbon steel

-

-

-

... More
The job includes collection & transportation of required materials from owner's storage point, marking to the required size, cutting, bending to the desired curvature wherever required, edge preparation, fit up & fillet welding on all four sides using E 6013 electrodes, flushing the finished weld surface by grinding and offering DPT or any other testing as per Inspection at all grades & elevations.

-

-

-

... More
The job also includes supplying of all types of tools & tackles, lifting arrangements like chain pulley blocks, machineries, all consumables and labour to complete the job in all respects, transportation of unused materials to owner's storage point and dumping the generated scrap material to designated area as per EIC instructions.

-

-

-

... More
Patch plate welding - Carbon steel - Upto 10 mm thickness using E 6013 electrodes. (Unit "M" represents "Running Metre")

100

-

8190

... More
Stress Relieving

-

-

-

... More
The job involves Post weld heat treatment (PWHT) / Stress relieving of carbon steel / alloy steel metal surfaces, weld seams or HAZ, etc., shop fabricated or site fabricated or existing piping / static equipment at all grades & elevation.

-

-

-

... More
The job also includes cleaning the adjoining surfaces, welding of required thermocouples, insulating the portion using super fine glass wool / asbestos tape, heating the metal surface using a induction heating equipment as per the requirement, ensuring uniform temperature attainment at all points, recording the temperatures by means of thermocouples / pyrometer / automatic temperature recorders suitably calibrated, removal of insulation, providing assitance for hardness testing, submitting recorded charts for approval, removal & dressing of thermocouple leads, etc., as per the instructions of EIC.

-

-

-

... More
The job also includes supplying of all types of tools & tackles, machineries, all consumables, labour & supervision to complete the job in all respects including transportation of all the required materials to the work site.

-

-

-

... More
Stress Relieving - Pipe weld joints

3800

-

460

... More
NOTE: (1) For pipe weld joints, nominal diameter of the pipe shall be taken for measurement. (2) Re-stress relieving arised due to improper heating / cooling or anyother fault on account of contractor shall be borne by the contactor at his own cost.

-

-

-

... More
(1) For pipe weld joints, nominal diameter of the pipe shall be taken for measurement.

-

-

-

... More
(2) Re-stress relieving arised due to improper heating / cooling or anyother fault on account of contractor shall be borne by the contactor at his own cost.

-

-

-

... More
Radiography

-

-

-

... More
The job includes performing radiography examination of welds on piping & all type of equipments as per relevant ASME / ASTM standards & as per CPCL specification CPCL-INSP-RAD-01 at all grades & elevations with film width not less than 4 inches.

-

-

-

... More
The job also includes supplying of radiation source camera, other machineries required, all consumables required for filming & developing, transportation of camera, etc., area preparation before starting the job, labour, supervision to complete the job in all respects including preparation of developing chemicals, developing the films & submission of films for inspection review.

-

-

-

... More
Pipe weld joints

2500

-

425

... More
NOTE: (1) For pipe weld joints, nominal diameter of the pipe shall be taken for measurement. (2) Retaking radiography due to poor density or lack of clarity or poor developing or any other fault on account of contractor shall be borne by the contactor at his own cost.

-

-

-

... More
(1) For pipe weld joints, nominal diameter of the pipe shall be taken for measurement.

-

-

-

... More
(2) Retaking radiography due to poor density or lack of clarity or poor developing or any other fault on account of contractor shall be borne by the contactor at his own cost.

-

-

-

... More
PAINTING WORKS :

-

-

-

... More
Surface Preparation works

-

-

-

... More
Surface preparation works : By Grit Blast cleaning to SSPC-SP-10/Sa 2-1/2.

1200

-

320

... More
Surface preparation works : By Hand tool cleaning to SSPC-SP-2 / St 2.

100

-

150

... More
CPCL Painting System - XXV for Flare (Hydrocarbon and Acid gas pipelines (Application : Airless spray, roller or brush) - painting of Flare header near CT-03/05 area or any other location as per EIC shall be done within the shutdown period with the approval of CPCL Fire and Safety Department and Operations.

-

-

-

... More
Primer : One Coat of Surface Moisture Tolerant Aluminium filled Phenalkamine / Polyamine Epoxy Mastic paint to a Minimum DFT 150 microns per coat after mordant wash with high pressure water cleaning. Paint shall have 80% volume of solids.

1200

-

350

... More
Inter : One Coat of Moisture Tolerant Phenalkamine / Polyamine Epoxy paint, Minimum DFT 150 microns per coat. Paint shall have 80% volume of solids.

1200

-

350

... More
Finish : One Coat of 2-Pack Aliphatic Polyeurethene Finish Paint, Min. DFT of 50 microns per coat.

1200

-

275

... More
CPCL Painting System-X for stair ways / handrails, platforms, ladders and all other structural etc., as instructed by Engineer-In-Charge (Application brush / conventional spray).

-

-

-

... More
Primer : One Coat of Self Priming Epoxy Paint, Min DFT 100 microns / coat

250

-

330

... More
Inter : One coat of Polyamide cured HB Epoxy MIO Paint, Min. DFT of 75 microns / coat

250

-

350

... More
Finish : Two Coats of Acrylic Polyeurethene Finish Paint, Min. DFT of 35 microns / coat

250

-

275

... More
GENERAL NOTES :

-

-

-

... More
The contractor shall use his own transport for shifting material from / to - ware house & work site and for shifting the scrap to scrap yard or designated place.

-

-

-

... More
PIPING&STRUCTURAL JOB_REF-3 S/D (PART-B)

-

-

-

... More
PART - B : PIPING & STRUCTURAL JOBS DURING REFINERY-III M&I SHUTDOWN 2020-21 IN OFFSITE AREA AT CPCL-MANALI REFINERY, CHENNAI-600068.

-

-

-

... More
SUPPLY OF POWER IS UNDER CONTRACTOR'S SCOPE. ALL HOT WORKS INCLUDING WELDING WORKS SHALL BE DONE WITH CONTRACTOR'S POWER BY MOBILISING REQUIRED NUMBER OF POWER GENERATORS AND WELDING MACHINES WITH SUPPLY OF DIESEL, LABOURERS AND OTHER CONSUMABLES ETC.

-

-

-

... More
Erection & Dismantling of Steel Scaffolding:

-

-

-

... More
Job involves erection of scaffolding at the required locations using 1-1/2 inch dia steel tubular pipes with suitable clamping arrangement, providing wooden planks / steel gratings at the required locations firmly tied on to the scaffolding pipes, removal of the wooden planks / steel gratings & scaffolding materials on completion of the job.

-

-

-

... More
The job also includes supplying of all types of tools & tackles, lifting arrangements like chain pulley blocks, steel scaffolding materials, clamps & wooden planks / steel gratings, all consumables and labour to complete the job in all respects. Scaffolding shall be adequately safe for welding and inspection activities.

-

-

-

... More
Erection & Dismantling - Upto 10 mtr height of scaffolding (External)

600

-

231

... More
NOTE:

-

-

-

... More
(1) For measurement, the scaffolding height shall be measured from the erected base level upto the top plank reference or the top horizontal poles.

-

-

-

... More
Carbon Steel Piping Work - (Above ground / Under ground / Culvert Crossing Piping)

-

-

-

... More
The job includes transporation of all free issue materials from owner's storage point to work site, handling at site, cutting, bevelling, fabrication, cold cutting and removal of old piping, laying new piping, welding & erection of carbon steel piping at all locations above and below the ground levels as per the requirement, overhead, over sleepers, piperacks, crossovers, pipe sleeves, trenches, stand posts, connecting with equipments & nozzles, providing tappings from the existing pipelines at all grades & elevations including under road culverts.

-

-

-

... More
The piping job includes all modification and replacement jobs involving pipes & all types of fittings like elbows / tees / reducers / half coupling / full coupling, etc., all types of flanges like slip on / raised face, etc., all types of inline instruments like rotameter / pressure gauges / thermowells, etc., valves, expansion joints, steam traps, orifice assemblies, strainers, vents, drains, funnels, etc., of different schedules, pressure ratings and for various temperature applications.

-

-

-

... More
The piping job includes providing shoe supports, pads at support locations, reinforcement pads, etc., wherever required.

-

-

-

... More
The job includes flushing, preparing work area for executing hot work, bending to suit the contours wherever required, socket, fillet, butt welding using E 6010 / E 6013 / E 7018 electrodes as required, DPT wherever required, hydraulic / pneumatic test as per codes, specification, drawings and draining of water & drying with compressor air after hydrotest.

-

-

-

... More
The job also includes supplying of all types of tools & tackles, lifting arrangements like chain pulley blocks, all required machineries and equipments including cold cutting machines (pipe cutting machines) – Power hacksaw having intrinsically safe motor or pneumatic operated power hacksaw with proper cooling arrangement, all consumables and labour to complete the job in all respects, returning back the unused materials to owner's storage point and dumping the generated scrap material to the designated area as per EIC instructions. The cold cutting of pipes only permittted due to safety reasons.

-

-

-

... More
The job also include erection and dismantling of scaffolding wherever required. Supply of required scaffolding materials is under contractor's scope.

-

-

-

... More
The rates for the following items shall be exclusive of blinding & deblinding, wrapping coating, radiography, stress relieving, reinforcement pad welding, removal of old piping for replacement, Flushing of old piping, Pneumatic / Hydro testing of whole piping.

-

-

-

... More
The rates shall be inclusive of area preparation for hot work, flushing of new piping, cold cutting of existing piping, new piping fabrication, laying, erection, welding, providing shoe supports, providing pads at support locations, offering stagewise inspection and draining / drying of the piping system after hydrotesting.

-

-

-

... More
WITH CONTRACTOR'S POWER & CONTRACTOR'S WELDING MACHINES.

-

-

-

... More
SOCKET WELDING - (All thickness and All Elevation)

-

-

-

... More
Carbon Steel Piping - Socket / Fillet welding Joints

600

-

550.2

... More
BUTT WELDING - (All thickness and All Elevation)

-

-

-

... More
Carbon Steel Piping - Butt welding Joints for all piping works

4000

-

992.3

... More
NOTE:

-

-

-

... More
(1) For reinforcement pad welding, the rates shall be paid separately.

-

-

-

... More
(2) Fabrication & welding of pads at support locations and shoe supports are included in SOR. This welding shall not be accounted for measurement purposes.

-

-

-

... More
(3) For blinding & deblinding wherever involved, rates shall be paid separately as per available SOR.

-

-

-

... More
(4) In case of replacement of existing piping, rates for removal of old pipelines shall be paid separately.

-

-

-

... More
(5) Hydrotesting and old line flushing will be paid seperately.

-

-

-

... More
(6) For steam tracing piping work & sleeve piping welding in under ground piping work where hydraulic testing of pipings are not required and in that case 90% of the applicable SOR shall only be paid.

-

-

-

... More
(7) Hydraulic testing shall be done only once for testing sleeve pipes before wrapping & coating.

-

-

-

... More
(8) Wrapping & coating of pipelines are not included in SOR and the same shall be paid seperately.

-

-

-

... More
(9) For erection and dismantling of scaffolding wherever required, rates shall be paid separately as per available SOR.

-

-

-

... More
Carbon Steel Piping specials like Mitre cut bend, Reducers (All thickness and All Elevation)

-

-

-

... More
The job includes transporation of all free issue materials from owner's storage point to work site, handling at site, cutting, bevelling, fabrication & welding of carbon steel piping specials (of any thickness) like 4 element - 3 weld type 90° mitre cut bend, 3 element - 2 weld type 45° mitre cut bend / reducers, etc., at all locations above ground level, overhead, over sleepers, piperacks, crossovers, pipe sleeves, trenches, stand posts, connecting with equipments & nozzles at all grades & elevations including under road culverts of different schedules, pressure ratings and for various temperature applications.

-

-

-

... More
The job includes flushing, preparing work area for executing hot work, bending to suit the contours wherever required, welding using E 6010 / E 6013 / E 7018 electrodes as required, DPT wherever required, hydraulic / pneumatic test as per codes, specification, drawings and draining of water & drying with compressor air after hydrotest.

-

-

-

... More
The job also includes supplying of all types of tools & tackles, lifting arrangements like chain pulley blocks, machineries, all consumables and labour to complete the job in all respects, returning back the unused materials to owner's storage point and dumping the generated scrap material to designated area as per EIC instructions.

-

-

-

... More
The rates for the following items shall be exclusive of radiography.

-

-

-

... More
The rates for the following items shall be inclusive of fabrication, welding, offering stagewise inspection.

-

-

-

... More
Mitre Bends - Butt weld Joint

250

-

997.5

... More
Mitre Reducers - Butt weld Joint (Unit "M" represents "Running Metre")

25

-

7140

... More
NOTE:

-

-

-

... More
(1) Radiography of weld joints is not included in SOR and the same shall be paid seperately.

-

-

-

... More
Dismantling & Removal of Piping

-

-

-

... More
The job involves removal of existing above ground, under ground, overhead insulated or uninsulated or steam traced piping including all types of fittings like elbows / tees / reducers, etc., flanges, all types of instruments, supports by cold cutting using power hacksaw at all locations at all grades & elevations without damaging any other portion of the existing unit, lowering down the same to ground level, transportation of the same to the designated area as per the instructions of Engineer-in-charge. Removal insulation from the pipes before dismantling is under contractor's scope without any additional cost. Removed Valves shall be shifted to designated locations as per EIC without any additional cost. Segragation / sizing of scraps for scrap dispoal shall be under contractor's scope.

-

-

-

... More
The job also includes supplying of all types of tools & tackles, lifting arrangements like chain pulley blocks, machineries, all consumables and labour to complete the job in all respects.

-

-

-

... More
Dismantling & removal of Piping - Carbon steel / Alloy steel /stainless steel (by cold cutting only using Power Hacksaw / pneumatic hackwaw with power / compressed air sources). (Unit "IM" represents "Inch Metre").

12500

-

120.8

... More
NOTE:

-

-

-

... More
(1) For erection and dismantling of scaffolding wherever required, rates shall be paid separately as per available SOR.

-

-

-

... More
(2) Cold cutting of old piping shall only be permitted due to safety reasons.

-

-

-

... More
(3) The job also includes supplying of all types of tools & tackles, all consumables, equipments such as mobile air compressor with fuel and operator for pneumatic hacksaw operation, power generator for power hacksaw operation, crane, tractor and trailer etc., and skilled labour to complete the job in all respects and dumping the generated scrap material to designated area as per EIC instructions.

-

-

-

... More
Dismantling & Removal of Structurals / Gratings (All Elevation)

-

-

-

... More
The job involves removal of existing above ground, overhead structurals including platforms, ladders, GI & steel gratings by unfastening / cold cutting / gas cutting / grinding, etc., from various locations at all grades & elevations without damaging any other portion of the existing unit, lowering down the same to ground level, segragation / sizing of scraps as per the instruction of EIC, transportation of the same to the designated area or scrap yard as per the instructions of Engineer-in-charge including weighment of the material at the specified place within the refinery premises.

-

-

-

... More
The job also includes supplying of all types of tools & tackles, lifting arrangements like chain pulley blocks, machineries, all consumables and labour to complete the job in all respects.

-

-

-

... More
Dismantling & Removal of Structurals / Gratings

2

-

18742.5

... More
NOTE:

-

-

-

... More
(1) Weighment procedure stipulated by CPCL is required to be followed for shifting the removed materials to scrap yard. Segragation / sizing of scraps shall be as per the requirement of scrap yard personnel.

-

-

-

... More
(2) For erection and dismantling of scaffolding wherever required, rates shall be paid separately as per available SOR.

-

-

-

... More
Fabrication & erection of structurals (All Elevation)

-

-

-

... More
The job includes fabrication and erection of carbon steel structurals in position such as platforms, ladders, stairs, brackets, pipe supports, pipe shoe, using the structural materials like angles, flats, channels, beams, rounds, plates etc. at all grades & elevations.

-

-

-

... More
The job also includes transportation of the required structural materials from owner's storage point to worksite, cutting to the required size, bolting and / or welding of joints etc. as per drawings, specifications & instructions of EIC and preparing the area for hot work.

-

-

-

... More
The job also includes supplying of all types of tools & tackles, lifting arrangements like chain pulley blocks, machineries, all consumables and labour to complete the job in all respects, returning back the unused materials to owner's storage point and dumping the generated scrap material to designated area as per EIC instructions.

-

-

-

... More
Fabrication and erection of structurals

5

-

55912.5

... More
NOTE:

-

-

-

... More
(1) For erection and dismantling of scaffolding wherever required, rates shall be paid separately as per available SOR.

-

-

-

... More
Erection and welding of gratings for platforms, Staircase & Ladder Gratings (All elevation)

-

-

-

... More
The job includes erection & welding of gratings in position under the support structure in columns, vessels, tanks, staircase, platforms, step ladders, etc., at all grades & elevations with necessary corrections at work site on the supplied grating to fit to the site requirements.

-

-

-

... More
The job also includes transportation of the required grating materials from owners' storage point to worksite, cutting to the required size, bolting and / or welding of joints etc. as per drawings, specifications & instructions of EIC and preparing the area for hot work.

-

-

-

... More
The job also includes supplying of all types of tools & tackles, lifting arrangements like chain pulley blocks, machineries, all consumables and labour to complete the job in all respects, returning back the unused materials to owner's storage point and dumping the generated scrap material to designated area as per EIC instructions.

-

-

-

... More
Erection and welding of Gratings

2

-

22312.5

... More
NOTE:

-

-

-

... More
(1) For erection and dismantling of scaffolding wherever required, rates shall be paid separately as per available SOR.

-

-

-

... More
Wrapping & Coating

-

-

-

... More
Supply and application of Coating & Wrapping by "Hot Means"

250

-

1522.5

... More
Culvert Slabs removal & Refixing.

-

-

-

... More
Scope includes chipping of the Tar / cement concrete to facilitate removal of all slabs from the culvert. Payment will be made based on the number of slabs removed and refixed. Rate is inclusive of any chipping activity done,removing and refixing the slabs.

-

-

-

... More
Chipping, Removal and refixing the Slabs in Culverts with Contractor's Crane and labour.

500

-

1134

... More
Cleaning of Culvert as per Scope of Work (Unit "EA" represent per culvert)

15

-

21945

... More
BLINDING AND DE-BLINDING

-

-

-

... More
The job includes collection & transportation of required quantity of materials like blinds, gaskets, fasteners, etc., from owner's storage point, loosening & tightening of studs (cold / gas cutting / grinding if required), wedge opening, cleaning of flanges, insertions / removal of blind, overhauling of fasteners using oil, replacing the defective studs / nuts to ensure zero leak of joints including hot bolting.

-

-

-

... More
The job also includes supplying of all types of tools & tackles, lifting arrangements like chain pulley blocks, machineries, all consumables and labour to complete the job in all respects, transporta tion of unused materials to owner's storage point and dumping the generated scrap material to designated area as per EIC instructions.

-

-

-

... More
Blinding and deblinding (All ratings)

-

-

-

... More
Blinding & Deblinding - Size Upto 1-1/2 inch dia.

10

-

546

... More
Blinding & Deblinding - Size 2 inch dia. to 5 inch dia.

100

-

1071

... More
Blinding & Deblinding - Size 6 inch dia. to 10 inch dia.

100

-

2257.5

... More
Blinding & Deblinding - Size 12 inch dia. to 16 inch dia.

20

-

4011

... More
Blinding & Deblinding - Size 18 inch dia. to 24 inch dia.

5

-

5764.5

... More
Blinding & Deblinding - Size 26 inch dia. to 32 inch dia.

5

-

7192.5

... More
Blinding & Deblinding - Size 34 inch dia. to 40 inch dia.

5

-

8946

... More
NOTE:

-

-

-

... More
(1) Nominal diameter of the pipes shall be taken for all measurements.

-

-

-

... More
(2) In case of either one of the activity like Blinding or de-blinding arise, 50% of the applicable rate shall be paid for the single activity.

-

-

-

... More
REMOVAL / INSTALLATION / REFIXING OF FLANGED VALVES

-

-

-

... More
Removal of Flanged valves

-

-

-

... More
The job includes removal of flanged valves at all grades & elevations by de-bolting / cold cutting / gas cutting / grinding and transportation of the valve to the maintenance valve shop or any other designated place inside the refinery premises for repair / disposal.

-

-

-

... More
The job also includes supplying of all types of tools & tackles, lifting arrangements like chain pulley blocks, dumping the generated scrap material to the designated area, all consumables and labour to complete the job in all respects.

-

-

-

... More
Valve (All ratings)

-

-

-

... More
Removal of valves - Size 2 inch dia. to 3 inch dia.

10

-

892.5

... More
Removal of valves - Size 4 inch dia. to 6 inch dia.

15

-

1491

... More
Removal of valves - Size 8 inch dia. to 10 inch dia.

5

-

2362.5

... More
Removal of valves - Size 12 inch dia. to 14 inch dia.

2

-

3591

... More
NOTE:

-

-

-

... More
The job includes transportation of valves, gaskets, fasteners, etc., from the owner's storage point or valve maintenance shop, cleaning, checking, tightening the gland, greasing & freeing up etc., serv icing of all the fasteners using oil, replacing with new fasteners wherever required, hydrotesting the valve if required, at the specified pressure at valve maintenance shop, installation of flanged valve at all heights & grades using proper gaskets & studs.

-

-

-

... More
The job also includes supplying of all types of tools & tackles, lifting arrangements like chain pulley blocks, dumping the generated scrap material to the designated area, all consumables and labour to complete the job in all respects.

-

-

-

... More
Installation of Flanged valves

-

-

-

... More
Valve (All ratings)

-

-

-

... More
Installation of valves - Size 2 inch dia. to 3 inch dia.

10

-

861

... More
Installation of valves - Size 4 inch dia. to 6 inch dia.

15

-

1701

... More
Installation of valves - Size 8 inch dia. to 10 inch dia.

5

-

2814

... More
Installation of valves - Size 12 inch dia. to 14 inch dia.

2

-

3549

... More
PLATE WELDING

-

-

-

... More
Fillet welding - Carbon Steel for RF pads (All elevation)

-

-

-

... More
The job includes flushing, preparing work area for executing hot work, grinding, fillet welding on plate surfaces using E 6013 electrodes at all grades & elevations.

-

-

-

... More
The job also includes supplying of all types of tools & tackles, machineries, all consumables and labour to complete the job in all respects as per EIC instructions and inspection as per requirement.

-

-

-

... More
Fillet welding - Carbon Steel - Upto 8 m

50

-

2257.5

... More
Patch plate welding - Carbon steel

-

-

-

... More
The job includes collection & transportation of required materials from owner's storage point, marking to the required size, cutting, bending to the desired curvature wherever required, edge preparation, fit up & fillet welding on all four sides using E 6013 electrodes, flushing the finished weld surface by grinding and offering DPT or any other testing as per Inspection at all grades & elevations.

-

-

-

... More
The job also includes supplying of all types of tools & tackles, lifting arrangements like chain pulley blocks, machineries, all consumables and labour to complete the job in all respects, transportat ion of unused materials to owner's storage point and dumping the generated scrap material to designated area as per EIC instructions.

-

-

-

... More
Patch plate welding - Carbon steel - Upto 10 mm thickness using E 6013 electrodes. (Unit "M" represents "Running Metre")

50

-

3202.5

... More
PIPELINES HYDROTESTING

-

-

-

... More
The job involves hydrotesting of pipelines to the specified test pressure at all elevations by providing necessary hose connections from the source of water supply to the work location for preparing the test, flushing, filling up water on the piping circuit, vent entrapped air, pressurize to the required hydro test pressure with necessary test pumps, and offer for inspection including access & assistance to CPCL Inspection team during the checking, draining & drying of the piping circuit.

-

-

-

... More
The job also includes supplying of all types of tools & tackles, suitable test pumps (power operated), pressure gauges, machineries, all consumables and labour to complete the job in all respects.

-

-

-

... More
Upto 2" dia (Unit "M" represents "Running Metre")

5000

-

29.4

... More
2.5" dia - 6" dia (Unit "M" represents "Running Metre")

25000

-

35.7

... More
8" dia & 10" dia (Unit "M" represents "Running Metre")

20000

-

42

... More
12" dia and above (Unit "M" represents "Running Metre")

15000

-

49.4

... More
NOTE:

-

-

-

... More
(1) For blinding & deblinding wherever involved, rates shall be paid separately as per applicable SOR.

-

-

-

... More
Water flushing , air blowing with supply of FW hoses, steam hoses, water hoses etc.

-

-

-

... More
Rates are inclusive of labour and supply of tools and tackles for Water flushing and air blowing of various hydrocarbon and other pipe lines as directed by EIC, Contractor shall supply Fire water hoses, steam hoses, water hoses etc.along with chicago couplings and similar fittings required to connect the hoses for successful completion of the work. Any required valves, pipes etc for this work will be provided by CPCL free of cost.

-

-

-

... More
2" dia - 6" dia (Unit "M" represents "Running Metre")

50000

-

28.4

... More
8" dia - 12" dia (Unit "M" represents "Running Metre")

40000

-

39.9

... More
14" dia - 24" dia (Unit "M" represents "Running Metre")

15000

-

50.4

... More
Hot Bending of Pipelines - Carbon Steel

-

-

-

... More
The job includes transporation of all free issue materials from owner's storage point to work site, handling at site, cutting, fabrication, laying, bending to the suitable contour as per drawings / as per site requirements, erection of piping separately or as a tracing to the main pipeline or as a coil at all locations above ground level, overhead, over sleepers, piperacks, crossovers, pipe sleeves, trenches, stand posts, connecting with equipments & nozzles at all grades & elevations including under road culverts.

-

-

-

... More
The job also includes supplying of all types of tools & tackles, machineries, all consumables including gas and labour to complete the job in all respects, returning back the unused materials to owner's storage point and dumping the generated scrap material to designated area as per EIC instructions.

-

-

-

... More
Hot bending of Pipe upto 90 Degree - Carbon Steel / Alloy Steel - Upto Sch.160 Pipe thick.

-

-

-

... More
Hot bending of 1/2 inch dia. Pipe upto 90 degree - Carbon Steel / Alloy Steel - Upto Sch.160 Pipe thick.

50

-

231

... More
Hot bending of 3/4 inch dia. Pipe upto 90 degree - Carbon Steel / Alloy Steel - Upto Sch 160 Pipe thick.

25

-

252

... More
Hot bending of Pipe Beyond 90 Degree & upto 180 Degree - Carbon Steel / Alloy Steel - Upto Sch.160 Pipe thick.

-

-

-

... More
Hot bending of 1/2 inch dia. Pipe Beyond 90 degrees & upto 180 Degrees - Carbon Steel / Alloy Steel - Upto Sch 160 Pipe thick.

25

-

294

... More
Hot bending of 3/4 inch dia. Pipe Beyond 90 degrees & upto 180 Degrees - Carbon Steel / Alloy Steel - Upto Sch 160 Pipe thick.

15

-

315

... More
Radiography

-

-

-

... More
The job includes performing radiography examination of welds on piping & all type of equipments as per relevant ASME / ASTM standards & as per CPCL specification CPCL-INSP-RAD-01 at all grades & elevations with film width not less than 4 inches.

-

-

-

... More
The job also includes supplying of radiation source camera, other machineries required, all consumables required for filming & developing, transportation of camera, etc., area preparation before starting the job, labour, supervision to complete the job in all respects including preparation of developing chemicals, developing the films & submission of films for inspection review.

-

-

-

... More
Pipe weld joints

2000

-

399

... More
NOTE:

-

-

-

... More
(1) For pipe weld joints, nominal diameter of the pipe shall be taken for measurement.

-

-

-

... More
(2) Retaking radiography due to poor density or lack of clarity or poor developing or any other fault on account of contractor shall be borne by the contactor at his own cost.

-

-

-

... More
Stress Relieving

-

-

-

... More
The job involves Post weld heat treatment (PWHT) / Stress relieving of carbon steel / alloy steel metal surfaces, weld seams or HAZ, etc., shop fabricated or site fabricated or existing piping / static equipment at all grades & elevation.

-

-

-

... More
The job also includes cleaning the adjoining surfaces, welding of required thermocouples, insulating the portion using super fine glass wool / asbestos tape, heating the metal surface using a induction heating equipment as per the requirement, ensuring uniform temperature attainment at all points, recording the temperatures by means of thermocouples / pyrometer / automatic temperature recorders suitably calibrated, removal of insulation, providing assitance for hardness testing, submitting recorded charts for approval, removal & dressing of thermocouple leads, etc., as per the instructions of EIC.

-

-

-

... More
The job also includes supplying of all types of tools & tackles, machineries, all consumables, labour & supervision to complete the job in all respects including transportation of all the required materials to the work site.

-

-

-

... More
Stress Relieving - Pipe weld joints

1100

-

309.8

... More
Supply of Air compressors on hire basis with operators for pipe line air flushing / blowing jobs.

-

-

-

... More
Supply of Plant air compressors (diesel driven), minimum 300 CFM, with operator on hire basis. Hiring duration minimum 30 days.(Compressors should be capable of providing adequate volume of air to enable flushing of pipe lines during shutdown within shortest duration possible. Pressure requirements generally vary from 7 kg/sq cm to 10 Kg/sq cms) Supply of Diesel & lube oil and other consumables will be under contractor's scope. This Air compressors should be available on round the clock basis. All the spares, operator cost etc., shall be under contractor's scope. Minimum number of compressors is 3 Nos.

-

-

-

... More
Running charges per shift per compressor (8 Hrs per shift). Each represent rate per shift per compressor.

180

-

5512.5

... More
Idle charges per shift per compressor (8 Hrs per shift) Each represent rate per shift per compressor.

200

-

2625

... More
PAINTING WORKS

-

-

-

... More
CPCL Painting System-X for Culvert & other pipings and structurals (Application brush / conventional spray).

-

-

-

... More
By Hand tool cleaning to SSPC-SP-2 / St 2

600

-

47.3

... More
Primer : One Coat of Self Priming Epoxy Paint, Min DFT 100 microns / coat

600

-

228.9

... More
Inter : One coat of Polyamide cured HB Epoxy MIO Paint, Min. DFT of 75 microns / coat

600

-

197.4

... More
Finish : Two Coats of Acrylic Polyeurethene Finish Paint, Min. DFT of 35 microns / coat

600

-

270.9

... More
Heat Resistant Aluminium Paint(DFT-20 micron per coat) (upto 250deg C) (Application by Brush) as per CPCL Painting System-I.

250

-

102.9

... More
GENERAL NOTES :

-

-

-

... More
The contractor shall use his own transport for shifting material from / to - ware house & work site and for shifting the scrap to scrap yard or designated place.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.