Chennai Metropolitan Water Supply And Sewerage Board Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Chennai Metropolitan Water Supply And Sewerage Board - CMWSSB Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date23 Feb 2024
Closing DateCancelled
Tender AmountRefer Documents
Costs
EMD
₹ 90,800Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CMWSS_429436_1Tender No
CNT/SEW/CRRT/103B/2023-24Tender Authority
Chennai Metropolitan Water Supply And Sewerage Board ViewPurchaser Address
-Website
http://https://chennaimetrowater.tn.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
at 5.5 m deep
200
-
-
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly for plain cement concrete works including laying in layers of not more than 15cm thick including ramming curing, etc., complete for End concrete.
6.3
-
-
Construction of RCC machineholes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,sinking well kerb below 2m from G.L.or by open excavation for various depth as per site condition with M30 mix for side wall, raft and roof slab,including cost of steel reinforcement ,including bailing and pumping out water, formwork, plugging the bottom with PCC 1:3:6 using 40mm hard broken granite jelly, laying plain cement concrete 1:3:6 using 12mm to 20mm hard broken granite jelly for fixing frame, fixing FRC machine holes cover and frame, providing CI steps, ,benching and channelling including refilling the trenches with excavated earth and disposal of earth etc. Including testing the machine holes with water for 48hours to check water tightness and rectifying the defects if any complete for the following size of machineholes.
-
-
-
1500mm dia Circular machine holes for Sewers (500mm dia & above)
-
-
-
at 5.5m deep
7
-
-
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites
200
-
-
Hire charge for Cutting Cement Concrete Road using tractor compressor
-
-
-
CC -CS (2.4 m2/hr)
150
-
-
Cutting CI Pipes
-
-
-
700 mm
9
-
-
Dewatering using 10HP to 70HP diesel engine pumpset including Hire charges, cost of Diesel, Engine oil, pump operator, labour charges, conveyance of pumpset and fuel to site and back, loading, unloading and any other incidental charges etc., complete.
-
-
-
Hire charges for Diesel Pump set for 10 HP
3600
-
-
Hire charges for Diesel Pump set for 20 HP
600
-
-
Conveyance of excavated earth from the narrow street (width less than 3.75m) to stock yard at nearest place (up to a lead of 5.00Km) including Head load charges from 10 meters to 100 meters and conveyance charges.
1980
-
-
Re-Conveyance of earth from the stock yard to the narrow street (width less than 3.75m) for refilling the trenches after laying the pipe line (up to a lead of 5.00Km) including Head load charges from 10 meters to 100 meters and conveyance charges.
1980
-
-
Where the Site has already been surveyed and maps available in UTM Zone44 coordinate system with TBM available on ground or coordinates of other assets available on Ground.
-
-
-
The Contractor must obtain the existing Static GCP points from CMWSSB which should be considered as the control point with known coordinates X, Y and Z. Survey consultant to ensure the closing error is within permissible limits (Sol Standards) while transferring the levels from the existing Static GCP points and the same to be presented as a report. The same process shall be adopted for random verification of positional accuracy of points established using the PBMs as base. As built survey for every sewage and water pipeline and other assets must be done using DGPS based RTK method by transferring the coordinates from the nearest Static GCP of CMWSSB. Where there are signal interruptions for the RTK method, Total Station can be used. The coordinates from the static GCP shall be transferred to the Total Station by RTK method and the co-ordinates of the assets can then be captured by Total Station.
1
-
-
All the features, attributes of all the assets, utilities captured shall be Geo referenced as per standard Coordinate reference system (WGS 84 UTM Zone 44N). The final base map with assets and utilities shall be fumished in (shp) format. The geo referenced assets and utilities along with the attributes (as specified by the GIS Wing. CMWSSB) shall be converted into proper geo database (FGDB/PGDB) with the attributes. One set Hard and Soft Copy of all the CMWSSB assets and utility has to be prepared category wise network wise in A0 Print for verification in a print scale of 1:1000 in A0 plot, with standard legends in international and NUIS standards and should be legible and three sets of final Hard Copy in A0 print a) For the Underground/Surface Assets along the roads for the distance ranging from: 2km
-
-
-
Sub Total (excluding GST)
1
-
-
GST @ 18%
1
-
-