Chennai Metropolitan Water Supply And Sewerage Board Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Chennai Metropolitan Water Supply And Sewerage Board - CMWSSB Tender

Works
Civil And Construction
Eprocure
Opening Date7 Sep 2024
Closing Soon4 Dec 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Package I Replacement Of Various Sizes Of Damaged Swp/ Psc, Enlargement/ Improvement/ Extension Of Sewage Pumping Main And Strengthening Of Existing Collection System In Various Sewage Pumping Stations Commanding Areas In Area I,iii,iv, V Under Va

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
450mm D/Soc CI 90 deg Bend

2

-

-

... More
450mm D/Soc CI 45 deg Bend

2

-

-

... More
450mm D/Soc CI 22.5 deg Bend

1

-

-

... More
Supply, delivery at site, conveying and fixing of CI valves of following sizes conforming to relevent IS Code including loading, unloading, transportation charges and stacking etc complete as per specifications.

-

-

-

... More
300 mm sluice valve

1

-

-

... More
100mm Double Air valve

1

-

-

... More
100mm Sluice valve

1

-

-

... More
Supply, delivery, conveying and fixing following cast iron specials as mentioned below conforming to IS: 1538:1993 including loading, unloading and stacking at the site etc as directed by the engineer at site, and including earthwork excavation, refilling with excavated soil, watering and ramming to consolidation and disposal of surplus earth etc complete.

-

-

-

... More
CI Specials for 450mm Sluice valve

-

-

-

... More
450 mm F/Spi Tail Piece

1

-

-

... More
450 mm F/Soc Tail Piece

1

-

-

... More
450 mm collars

1

-

-

... More
450 to 350 mm Taper

2

-

-

... More
350 to 300 mm Taper

2

-

-

... More
CI Specials for 100 mm Air valve

-

-

-

... More
450 mm x 100 mm D/Soc/Fl Tee

1

-

-

... More
Construction of Sluice Valve Chamber of following sizes in second class brick work in CM 1:4 proportion with 12 mm thick outside plastering and 20mm thick inside plastering in CM 1:3 proportion, RCC cover slab in CC 1:2:4 proportion using 20 mm jelly, chamber foundation and bed block in PCC 1:3:6 proportion using 40 mm jelly including cost of reinforcement and labour charges, CI steps, etc. as per drawing including providing and fixing L.S. cover and frame of size 60cm x 60cm including necessary masonry work and plastering etc., complete..

-

-

-

... More
2.5m x 1.5m x 2.5m for 300 to 400mm dia Sluice Valve

1

-

-

... More
Construction of Air Valve Chamber of size 1.20 m x 0.90 m x 1.60 m in second class brick work in CM 1:4 proportion with 12 mm thick outside plastering and 20mm thick inside plastering in CM 1:3 proportion, RCC cover slab in CC 1:2:4 proportion using 20 mm jelly, chamber foundation and bed block in PCC 1:3:6 proportion using 40 mm jelly including cost of reinforcement and labour charges, CI steps, etc. as per drawing including providing and fixing L.S. cover and frame of size 60cm x 60cm including necessary masonry work and plastering etc., complete..

-

-

-

... More
100 mm Dia Double Air valve

1

-

-

... More
Jointing the CI specials with molten lead and yarn including caulking the joints and testing to the required pressure with water. (Including cost of Jointing materials)

-

-

-

... More
450 mm

2

-

-

... More
Cutting C.I Pipes

-

-

-

... More
450 mm dia

9

-

-

... More
Cutting Asphaltic Road

-

-

-

... More
Bus Route

560

-

-

... More
Non Bus Route

663.3

-

-

... More
Jointing the C.I. Double flanged pipes and specials with rubber insertion to the required specifications with M.S. bolts and nuts, complete and testing the pipes to the required pressure with water (including cost of jointing materials) and labour cost etc. complete

-

-

-

... More
450 mm

3

-

-

... More
100 mm

3

-

-

... More
Testing C.I pipe -450 mm dia

2100

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites

4200

-

-

... More
Cement concrete 1:2:4 using 20mm gauge hard broken stone jelly and SRC for PCC works excluding centering, shuttering, compacting, curing, finishing etc complete at 2m depth

-

-

-

... More
For thrust block

1

-

-

... More
Providing thrust blocks with Plain Cement Concrete in 1:3:6 with 40mm HBG for the CI pumping main including the cost of shuttering, compaction, curing etc. complete.

-

-

-

... More
450mm D/Soc CI 90 deg Bend

2

-

-

... More
450mm D/Soc CI 45 deg Bend

2

-

-

... More
450mm D/Soc CI 22.5 deg Bend

1

-

-

... More
The Contractor must obtain the existing Static GCP points from CMWSSB which should be considered as the control point with known coordinates X, Y and Z. Survey consultant to ensure the closing error is within permissible limits (Sol Standards) while transferring the levels from the existing Static GCP points and the same to be presented as a report. The same process shall be adopted for random verification of positional accuracy of points established using the PBMs as base. As built survey for every sewage and water pipeline and other assets must be done using DGPS based RTK method by transferring the coordinates from the nearest Static GCP of CMWSSB. Where there are signal interruptions for the RTK method, Total Station can be used. The coordinates from the static GCP shall be transferred to the Total Station by RTK method and the co-ordinates of the assets can then be captured by Total Station. All the features, attributes of all the assets, utilities captured shall be Geo referenced as per standard Coordinate reference system (WGS 84 UTM Zone 44N).

1

-

-

... More
Bill No. 2 : Replacement of Existing 600 mm Dia PSC pumping main with 600 mm Dia CI pumping main from (Berachah Prayer house) Manickavel street to Basin Road in Area I

-

-

-

... More
Supply, delivery and laying 600mm diameter cast iron soc/spi pipes of (Class-A) conforming to IS: 1536:2001 in standard lengths with EDPM rubber gaskets including labour charges for loading, unloading and stacking at the site etc., including earthwork excavation for trenches in hard stiff clay, blackcotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil depositing the earth on banks with initial lead of 10m and initial lift of 2m conveying to the site of work, lowering into the trenches, and aligning, jointing, refilling the trenches with excavated soil, watering and ramming to consolidation, disposal of surplus earth,including material and labour cost of rubber gasket for jointing etc., complete for laying the pipes at an average depth of 1.5 m.

1660

-

-

... More
Supplying, conveying and laying / fixing specials like Tee, Bends and Tapers confirming to relevent IS codes including earthwork excavation as per schedule No.1.1 at any depth and as directed at site.

-

-

-

... More
600mm D/Soc CI 90 deg Bend

2

-

-

... More
600mm D/Soc CI 45 deg Bend

2

-

-

... More
600mm D/Soc CI 22.5 deg Bend

2

-

-

... More
Supply, delivery at site, conveying and fixing of CI valves of following sizes conforming to relevent IS Code including loading, unloading, transportation charges and stacking etc complete as per specifications.

-

-

-

... More
400 mm DN Sluice valve

1

-

-

... More
150mm Double Air valve

1

-

-

... More
150mm Sluice valve

1

-

-

... More
Supply, delivery, conveying and fixing following cast iron specials as mentioned below conforming to IS: 1538:1993 including loading, unloading and stacking at the site etc as directed by the engineer at site, and including earthwork excavation, refilling with excavated soil, watering and ramming to consolidation and disposal of surplus earth etc complete.

-

-

-

... More
CI Specials for 600mm Sluice valve

-

-

-

... More
600 mm F/Spi Tail Piece

1

-

-

... More
600 mm F/Soc Tail Piece

1

-

-

... More
600 mm collars

4

-

-

... More
Tapper 600 to 400 mm

2

-

-

... More
CI Specials for 150 mm Air valve

-

-

-

... More
600 mm x 150 mm D/Soc/Fl Tee

1

-

-

... More
Construction of Sluice Valve Chamber of following sizes in second class brick work in CM 1:4 proportion with 12 mm thick outside plastering and 20mm thick inside plastering in CM 1:3 proportion, RCC cover slab in CC 1:2:4 proportion using 20 mm jelly, chamber foundation and bed block in PCC 1:3:6 proportion using 40 mm jelly including cost of reinforcement and labour charges, CI steps, etc. as per drawing including providing and fixing L.S. cover and frame of size 60cm x 60cm including necessary masonry work and plastering etc., complete..

-

-

-

... More
2.5 m x 2 m x 3m for 600 mm Dia Sluice valve

1

-

-

... More
Construction of Air Valve Chamber of size 1.20 m x 0.90 m x 1.60 m in second class brick work in CM 1:4 proportion with 12 mm thick outside plastering and 20mm thick inside plastering in CM 1:3 proportion, RCC cover slab in CC 1:2:4 proportion using 20 mm jelly, chamber foundation and bed block in PCC 1:3:6 proportion using 40 mm jelly including cost of reinforcement and labour charges, CI steps, etc. as per drawing including providing and fixing L.S. cover and frame of size 60cm x 60cm including necessary masonry work and plastering etc., complete..

-

-

-

... More
150 mm Dia Double Air valve

1

-

-

... More
Jointing the CI specials with molten lead and yarn including caulking the joints and testing to the required pressure with water. (Including cost of Jointing materials)

-

-

-

... More
600 mm

2

-

-

... More
Cutting C.I Pipes

-

-

-

... More
600 mm dia

10

-

-

... More
Jointing the C.I. Double flanged pipes and specials with rubber insertion to the required specifications with M.S. bolts and nuts, complete and testing the pipes to the required pressure with water (including cost of jointing materials) and labour cost etc. complete

-

-

-

... More
600 mm

3

-

-

... More
150 mm

3

-

-

... More
Testing C.I pipe -600 mm dia

1660

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites

3320

-

-

... More
Cement concrete 1:2:4 using 20mm gauge hard broken stone jelly and SRC for PCC works excluding centering, shuttering, compacting, curing, finishing etc complete at 2m depth

-

-

-

... More
For thrust block

2

-

-

... More
Providing thrust blocks with Plain Cement Concrete in 1:3:6 with 40mm HBG for the CI pumping main including the cost of shuttering, compaction, curing etc. complete.

-

-

-

... More
600mm D/Soc CI 90 deg Bend

2

-

-

... More
600mm D/Soc CI 45 deg Bend

2

-

-

... More
600mm D/Soc CI 22.5 deg Bend

2

-

-

... More
The Contractor must obtain the existing Static GCP points from CMWSSB which should be considered as the control point with known coordinates X, Y and Z. Survey consultant to ensure the closing error is within permissible limits (Sol Standards) while transferring the levels from the existing Static GCP points and the same to be presented as a report. The same process shall be adopted for random verification of positional accuracy of points established using the PBMs as base. As built survey for every sewage and water pipeline and other assets must be done using DGPS based RTK method by transferring the coordinates from the nearest Static GCP of CMWSSB. Where there are signal interruptions for the RTK method, Total Station can be used. The coordinates from the static GCP shall be transferred to the Total Station by RTK method and the co-ordinates of the assets can then be captured by Total Station. All the features, attributes of all the assets, utilities captured shall be Geo referenced as per standard Coordinate reference system (WGS 84 UTM Zone 44N).

1

-

-

... More
Bill No. 3: Enlargement ewer main / Improvements to existing sewer system, Pumping main, Sewage Pumping station and its allied works for collector Nagar in Depot 31, Aea III

-

-

-

... More
Bill No. 3A: Enlargement / Improvement to the existing collection system at Collector Nagar and Britania nagar (Rajiv Gandhi nagar) in Depot 31, Area-III

-

-

-

... More
Hiring and running charges for JCB

50

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation including timbering the trenches for depths 2.5m and above, pumping out subsoil water etc., complete.

-

-

-

... More
250 mm dia

-

-

-

... More
at 1.0 m average depth

540

-

-

... More
at 1.50m average depth.

1218

-

-

... More
300 mm dia

-

-

-

... More
at 2.00m average depth.

237

-

-

... More
at 2.50m average depth.

90

-

-

... More
at 3.00m average depth.

25

-

-

... More
at 3.5m average depth.

142

-

-

... More
at 4.00m average depth.

154

-

-

... More
400mm dia

-

-

-

... More
at 3.50m average depth.

25

-

-

... More
at 4.00m average depth.

25

-

-

... More
Supplying, Laying,jointing CI socket spigot pipes (LA Class) with rubber gasket joint (including cost & making of Rubber gasket), testing including earth work excavation in all kind of soil , including carting of pipes from any of the board's stores to the site of work , lowering into trenches and aligning, refilling the trenches with excavated soil, watering and ramming to consolidation, disposal of surplus earth etc., complete (Timbering included for Depths 2.50m,3.0m,3.5m,..........upto 5.5m)

-

-

-

... More
300 mm dia

-

-

-

... More
at 4.50m average depth.

60

-

-

... More
400mm dia

-

-

-

... More
at 5.00m average depth.

30

-

-

... More
at 5.50m average depth.

40

-

-

... More
Providing CC1:3:6 using Crushed stone sand (Msand) and 12 to 20mm gauge hard broken stone jelly forplain cement concrete works including laying,compacting, curing, etc., complete.

64

-

-

... More
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe for DWC PE pipes including ramming, consolidation etc., complete

245.6

-

-

... More
Construction of Machineholes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3,12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame,providing C.I. steps, machinehole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each machinehole (As per the type design drawing for machinehole).(Including backfilling of trenches and disposal of surplus earth )

-

-

-

... More
1m depth

23

-

-

... More
1.5m depth

49

-

-

... More
2m depth

6

-

-

... More
Transfering House service connection- roviding House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete

500

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites

5172

-

-

... More
Dewatering using 10 HP diesel engine pumpset including Hire charges, cost of Diesel Engine oil, pump operator, labour charges, conveyance of pumpset and fuel to site and back,loading, unloading and any other incidental charges etc., complete.

600

-

-

... More
Temporary bypassing of sewer including Plugging the mouth of pipe/s inside sewer manhole using suitable plugging system and installation of bypass arrangement for bypassing the sewage flow, including, but not limited, to pumps, pipes, connections, couplin

15

-

-

... More
Forming water bound mecadam to a thickness of 100mm using 1 Cu.m. of 40mm IRC size HBG metal with 0.33cum.of gravel (which will passes through 10mm sieve size) fine for blindage for an area of 10 m2 including spreading metal and gravel fine and packing to camber,consolidation by power roller and including watering and keeping the surface moist for 15 days etc., complete - For temporary road restoration

2586

-

-

... More
As built survey for every sewage and water pipeline and other assets must be done using DGPS based RTK method by transferring the coordinates from the nearest Static GCP of CMWSSB. Where there are signal interruptions for the RTK method, Total Station can be used. The coordinates from the static GCP shall be transferred to the Total Station by RTK method and the co- ordinates of the assets can then be captured by Total Station. All the features, attributes of all the assets, utilities captured shall be Geo referenced as per standard Coordinate reference system (WGS 84 UTM Zone 44N). The final base map with assets and utilities shall be furnished in (.shp) format. The geo referenced assets and utilities along with the attributes (as specified by the GIS Wing, CMWSSB) shall be converted into proper geo database (FGDB / PGDB) with the attributes. One set Hard and Soft Copy of all the CMWSSB assets and utility has to be prepared category wise network wise in A0 Print for verification in a print scale of 1:1000 in A0 plot, with standard legends in international and NUIS standards and should be legible and three sets of final Hard Copy in A0 print.

-

-

-

... More
For the Underground / Surface Assets along the roads 2km

2.59

-

-

... More
Disposal of surplus earth

141

-

-

... More
Salvage valve for CI Pipe @2% of cost of pipe (in Negative)

-

-

-

... More
i) 250mm

7.66

-

-

... More
ii) 300mm

2.24

-

-

... More
Bill No. 3B: Replacement of existing 200mm dia pumping main to 300mm dia DI sewage pumping main from Rajiv Gandhi Nagar RSPS to ThangalKari SPS with the allied Electromechanical works

-

-

-

... More
Hiring and running charges for JCB

81

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites

4900

-

-

... More
Supplying, delivery, Laying and jointing of CI socket spigot pipes (A Class) including rubber gasket joint, earth work excavation for trenches in hard stiff clay,black cotton, hard red earth,shales,murrum gravel, Stoney earth and earth mixed with small size boulders depositing the earth on banks with initial lead of 10m and initial lift of 2m, lowering in to the trenches, aligning including cost & making of Rubber gasket, refilling the trenches with excavated earth, watering, ramming and disposal of surplus earth etc; complete at 1.5m depth to invert. a. 300mm dia

2450

-

-

... More
Cutting CI Pipes (Labour only)

-

-

-

... More
300mm dia

15

-

-

... More
Supplying, Conveying and fixing of D/soc CI specials

-

-

-

... More
300 mm CI D/S 900 Bend

15

-

-

... More
300 mm CI D/S 450 Bend

2

-

-

... More
300 mm CI D/S 22.50 Bend

2

-

-

... More
300 mm CI Collars

30

-

-

... More
Supplying, Conveying and fixing valves with cap/wheel, tail pieces including fixing the surface boxes/valves, covers.

-

-

-

... More
80mm Air Valve

1

-

-

... More
100mm CI Sluice valve

1

-

-

... More
300mm CI Sluice valve

1

-

-

... More
Supplying, Conveying and fixing of flanged CI specials incuding labour for jointing

-

-

-

... More
300 x300x 100 CI A/F Tee

1

-

-

... More
100 x 80 CI A/f Tapper

1

-

-

... More
300mm CI D/F Pipe-0.5m lg

2

-

-

... More
300mm CI D/F Pipe-1.0m lg

1

-

-

... More
300 mm CI D/F 90 deg Bend

2

-

-

... More
300 mm CI D/F Bellmouth

1

-

-

... More
100 mm CI D/F duckfoot 90 deg Bend

1

-

-

... More
Testing of C.I pipes with hydraulic testing equipment by filling with water and testing to recommended pressure in convenient stetches and attending the bursts if any occurred during the test, excluding the cost of pipes, including other incidental and operational charges, etc complete for 300mm dia.

2450

-

-

... More
Hire Charges for Diesel pumpset 10 hp including cost of fuel and machinest for running the machine per hour of running

80

-

-

... More
Providing thrust blocks with Plain Cement Concrete in 1:3:6 with 40mm BG jelly for the DI pumping main including the cost of shuttering, compaction, curing etc. complete.

-

-

-

... More
300mm CI D/S 90 degree Bend

17

-

-

... More
300mm CI D/S 45 degree Bend

2

-

-

... More
300 mm CI D/S 22.50 Bend

6

-

-

... More
Construction of chamber for 300mm to 400mm dia.sluice valve including providing and fixing FRC cover and frame of size 60 x 60cm for size 1.35 x 1.35 x 1.95 m

-

-

-

... More
300mm dia Sluice valve

1

-

-

... More
300mm dia EMF

1

-

-

... More
Construction of 80mm Double Air Valve chamber for 100mm to 350mm dia.pipeline including providing and fixing FRC cover and frame of size 60 x 60cm for size 1.2 x 0.9 x 1.8 m

1

-

-

... More
Forming water bound mecadam to a thickness of 100mm using 1 Cu.m. of 40mm IRC size HBG metal with 0.33cum.of gravel (which will passes through 10mm sieve size) fine for blindage for an area of 10 m2 including spreading metal and gravel fine and packing to camber,consolidation by power roller and including watering and keeping the surface moist for 15 days etc., complete - For temporary road restoration

2450

-

-

... More
The Contractor must obtain the existing Static GCP points from CMWSSB which should be considered as the control point with known coordinates X, Y and Z. Survey consultant to ensure the closing error is within permissible limits (SoI Standards) while transferring the levels from the existing Static GCP points and the same to be presented as a report. The same process shall be adopted for random verification of positional accuracy of points established using the PBMs as base. As built survey for every sewage and water pipeline and other assets must be done using DGPS based RTK method by transferring the coordinates from the nearest Static GCP of CMWSSB. Where there are signal interruptions for the RTK method, Total Station can be used. The coordinates from the static GCP shall be transferred to the Total Station by RTK method and the co- ordinates of the assets can then be captured by Total Station. All the features, attributes of all the assets, utilities captured shall be Geo referenced as per standard Coordinate reference system (WGS 84 UTM Zone 44N). The final base map with assets and utilities

-

-

-

... More
For the Underground / Surface Assets along the roads for the distance ranging from: 2 to 5 km

-

-

-

... More
For Pumping Main

2.45

-

-

... More
For the Point Underground / Surface Assets along the roads

70

-

-

... More
Bill No. 3C - Enhancement of Pumping Capacity by Supply, delivery ,erection and commissioning of non clog sewage submersible pumpset with discharge 250 m3/hr and 20m head along with allied civil and electrical works at Rajiv Gandhi Nagar Sewage Pumping Station in Area III

-

-

-

... More
Supply, delivery, erection, testing and commissioning of submersible sewage non-clog pumps, vertical spindle type pump , wear resistance with submersible motor for the various duty conditions. Pump shall be capable of handling min 100 mm solid size with sewage specific gravity of up to 1.05. Pump shall be of robust construction, Liquid passages shall be finished smooth and designed as to allow free passage to solids. Pump Impeller should be of Non-clog semi open type , single vane / multi vane preferably contra bloc or vortex impeller design. Double mechanical seal with silicon carbide faces should be provided to protect the motor from ingress of sewage along the shaft. The critical speed of the rotor shall be at least 30% above the operating speed. Pumps should have double bearings between the pump & motor. The bearings life shall be minimum 100,000 hrs of operation with greased for life. Pump should be provided with automatic coupling device including pedestal, duck foot bend, stainless steel guide pipe or related accessories of suitable size to facilitate lifting and lowering into guide rails for easy maintenance.

-

-

-

... More
Pump shall be provided with a stainless steel lifting chain conforming to BS 970 Gr 304. Pump speed shall be of 9600 rpm for high duty pumps and 960/1450 rpm for low duty pumpsets. Casing and impeller should be of CI Gr. FG 260:IS210 more preferably with hardened impeller.Shaft should be of stainless steel AISI 410. All the fasteners and bolts shall be of AISI 410.The submersible motor shall be operated with 3ph, 415 V(+or– 10%), 50Hz(+or-5 %) dry induction type. Motor shall be capable of giving rated output without reduction in the expected life span when operated continuously. The rotating assembly shall be dynamically balanced as per standards. The starting current of the motor shall not exceed 200% of rated full load current for Star / Delta or ATS starting under any circumstances .The motor shall be suitable for full voltage star delta / ATS starting. The locked rotor current of the motor shall not exceed 600% of full load current unless otherwise specified. Motor shall be designed to withstand 120% of rated speed for two minutes without any mechanical damage, in either direction of rotation.

-

-

-

... More
The motor vibration shall be within the limit specified in applicable standards. Motor should be of IE2, explosion proof compatible for VFD operation together with star-Delta /ATS starter, protection against increase in stator winding temperature (15 deg Celsius), bearing temperature, leakage in the stator housing and terminal box shall be provided and to be suitably interlocked with the control panel for tripping the pump in case of increase in temperature beyond set limit. Insulation class shall be of “Class H” and degree of protection shall be of IP 68 as per IS4691. Motor shall be suitable for continuous operation in fully submerged or partially submerged condition.The pumpset shall be supplied with power cable of PVC insulated and PVC sheathed, copper, flexible, roundtype with required conductor size and number of cores as per starting method and of specified length for continuous use under water and air.

-

-

-

... More
The control cable of PVC insulated, PVC eathed, flexible for stator winding temperature sensor 3core x 1.5 sq.mm copper conductor and for bimetallic switches 2core x 1.5 sqmm copper conductor shall be provided. Motor shall be supplied with 10m of round submersible copper cable of suitable size. The non clog submersible pumpset shall be provided with suitable starter control panel having all protections as mentioned above. (upto 5 HP - DOL Starter, above 5 HP to 25 HP -Star Delta Panel and beyond 25 HP shall be ATS)

-

-

-

... More
Discharge - 250m3/hr Head - 20m

2

-

-

... More
Supply,delivery and fixing of 200mm dia C.I D/F PIPES AS PER IS 7181/1986 & IS 1537-2m length

1260

-

-

... More
Supply,delivery and fixing of 200mm dia CI D/F SPECIALS & S/S SPECIALS AS PER IS 1538/1986- Tapper

74

-

-

... More
Supply,delivery and fixing of 200mm dia CI D/F SPECIALS & S/S SPECIALS AS PER IS 1538/1986-Tee

136

-

-

... More
Supply,delivery and fixing of 200mm dia CI D/F SPECIALS & S/S SPECIALS AS PER IS 1538/1986- 90 degree Bend

98

-

-

... More
Supply,delivery,erection,testing and commissioning of 200 mm dia CI D/F SLUICE VALVE WITH CAP/ WHEEL AS PER IS 14846/2000 PN 1 WITH ISI MARKING

2

-

-

... More
Supply,delivery erection,testing and commissioning of of 200mm dia C.I. D/F REFLUX VALVE AS PER I.S. 5312/ PART I/ 84 WITH BYE-PASS ARRANGEMENTS (PN-1) WITH ISI MARKING

2

-

-

... More
Supply, delivery, erection, testing and commiossioning of floor mounted 200 Amps M.V.panel with aluminium bus bars and consisting of required quantities of the following accessories with necessary interconnections between busbars, switches and trunking box, measuring instruments such as voltmeters,ammeters with selector switches, energy meter,phase indicating lamps, etc., complete with incidental civil works and comprising of following and as per specifications

1

-

-

... More
Supply, delivery, erection, testing and commissioning of mixed DI-Electric capacitor with TNEB Test certificate with accessories conforming to IS 2834

20

-

-

... More
Supply, delivery and laying LT cables 3.5core 1.1KV grade armoured aluminium conductor cross linked poly ethylene insulated PVC sheathed cables conforming to IS 7098(Part I) /1988 with IS marking 3.50x50sq.mm

50

-

-

... More
Supply and fixing of cable gland and termination with aluminium cable by 3½ core 50 sq.mm PVC UG cable and with earth connection

6

-

-

... More
Jointing the 200mm C.I/D.IDouble flanged pipes and specials with rubber insertion to with IS 638(1979) and M.S.bolts and nuts of IS1364-1(2002), including cost of jointing materials such as bolt and nuts Rubber insertion and labour charges etc., complete

30

-

-

... More
Bill No. 3D : Enhancement of Pumping Capacity by Supply, delivery, erection and commissioning of non clog sewage submersible pumpset with discharge 300 m3/hr and 18m head and 82.5 KVA Diesel Generator set with its allied works at Thangalkarai Sewage Pumping Station in Depot 32,Area III

-

-

-

... More
40HP SUBMERSIBLE PUMPSET

-

-

-

... More
Supply, delivery, erection, testing and commissioning of submersible sewage non-clog pumps, vertical spindle type pump , wear resistance with submersible motor for the various duty conditions. Pump shall be capable of handling min 100 mm solid size with sewage specific gravity of up to 1.05. Pump shall be of robust construction, Liquid passages shall be finished smooth and designed as to allow free passage to solids. Pump Impeller should be of Non-clog semi open type , single vane / multi vane preferably contra bloc or vortex impeller design. Double mechanical seal with silicon carbide faces should be provided to protect the motor from ingress of sewage along the shaft. The critical speed of the rotor shall be at least 30% above the operating speed. Pumps should have double bearings between the pump & motor. The bearings life shall be minimum 100,000 hrs of operation with greased for life. Pump should be provided with automatic coupling device including pedestal, duck foot bend, stainless steel guide pipe or related accessories of suitable size to facilitate lifting and lowering into guide rails for easy maintenance.

-

-

-

... More
Pump shall be provided with a stainless steel lifting chain conforming to BS 970 Gr 304. Pump speed shall be of 9600 rpm for high duty pumps and 960/1450 rpm for low duty pumpsets. Casing and impeller should be of CI Gr. FG 260:IS210 more preferably with hardened impeller.Shaft should be of stainless steel AISI 410. All the fasteners and bolts shall be of AISI 410.The submersible motor shall be operated with 3ph, 415 V(+or– 10%), 50Hz(+or-5 %) dry induction type. Motor shall be capable of giving rated output without reduction in the expected life span when operated continuously. The rotating assembly shall be dynamically balanced as per standards. The starting current of the motor shall not exceed 200% of rated full load current for Star / Delta or ATS starting under any circumstances .The motor shall be suitable for full voltage star delta / ATS starting. The locked rotor current of the motor shall not exceed 600% of full load current unless otherwise specified. Motor shall be designed to withstand 120% of rated speed for two minutes without any mechanical damage, in either direction of rotation.

-

-

-

... More
The motor vibration shall be within the limit specified in applicable standards . Motor should be of IE2, explosion proof compatible for VFD operation together with star-Delta /ATS starter, protection against increase in stator winding temperature (15 deg Celsius), bearing temperature, leakage in the stator housing and terminal box shall be provided and to be suitably interlocked with the control panel for tripping the pump in case of increase in temperature beyond set limit. Insulation class shall be of “Class H” and degree of protection shall be of IP 68 as per IS4691. Motor shall be suitable for continuous operation in fully submerged or partially submerged condition.The pumpset shall be supplied with power cable of PVC insulated and PVC sheathed, copper, flexible, roundtype with required conductor size and number of cores as per starting method and of specified length for continuous use under water and air.

-

-

-

... More
The control cable of PVC insulated, PVC sheathed, flexible for stator winding temperature sensor 3core x 1.5 sq.mm copper conductor and for bimetallic switches 2core x 1.5 sqmm copper conductor shall be provided. Motor shall be supplied with 10m of round submersible copper cable of suitable size. The non clog submersible pumpset shall be provided with suitable starter control panel having all protections as mentioned above. (upto 5 HP - DOL Starter, above 5 HP to 25 HP -Star Delta Panel and beyond 25 HP shall be ATS)

-

-

-

... More
Discharge - 300m3/hr Head - 18m

1

-

-

... More
Supply,delivery and fixing of 200mm dia C.I D/F PIPES AS PER IS 7181/1986 & IS 1537-2m length

700

-

-

... More
Supply,delivery and fixing of 200mm dia CI D/F SPECIALS & S/S SPECIALS AS PER IS 1538/1986- Tapper

37

-

-

... More
Supply,delivery and fixing of 200mm dia CI D/F SPECIALS & S/S SPECIALS AS PER IS 1538/1986-Tee

68

-

-

... More
Supply,delivery and fixing of 200mm dia CI D/F SPECIALS & S/S SPECIALS AS PER IS 1538/1986- 90 degree Bend

49

-

-

... More
Supply,delivery,erection,testing and commissioning of 200 mm dia CI D/F SLUICE VALVE WITH CAP/ WHEEL AS PER IS 14846/2000 PN 1 WITH ISI MARKING

1

-

-

... More
Supply,delivery erection,testing and commissioning of of 200mm dia C.I. D/F REFLUX VALVE AS PER I.S. 5312/ PART I/ 84 WITH BYE-PASS ARRANGEMENTS (PN-1) WITH ISI MARKING

1

-

-

... More
Supply,delivery and fixing of MOULDED CASE CIRCUIT BREAKER (MCCB) WITH THERMO MAGNETIC RELEASE including erection charges

-

-

-

... More
125A 3 Pole MCCB (Pump)

1

-

-

... More
63A 3 Pole MCCB (Capacitor)

1

-

-

... More
Supply, delivery and laying LT cables 3.5core 1.1KV grade armoured aluminium conductor cross linked poly ethylene insulated PVC sheathed cables conforming to IS 7098(Part I) /1988 with IS marking 3.50x95sq.mm

25

-

-

... More
Supply and fixing of cable gland and termination with aluminium cable by 3½ core 95 sq.mm PVC UG cable and with earth connection

3

-

-

... More
Supply, delivery, erection, testing and commissioning of mixed DI-Electric capacitor with TNEB Test certificate with accessories conforming to IS 2834

15

-

-

... More
Jointing the 200mm C.I/D.IDouble flanged pipes and specials with rubber insertion to with IS 638(1979) and M.S.bolts and nuts of IS1364-1 (2002), including cost of jointing materials such as bolt and nuts Rubber insertion and labour charges etc., complete

15

-

-

... More
Supplying of 82.5KVA DG set

-

-

-

... More
Supply, delivery, erection, testing and commissioning o of 82.5KVA capacity diesel generator set, phase-3, 50Hz, 415V, consisting of diesel engine capable of delievering continuos brake horse power with standard fittings, water- cooled radiator,acuostic enclosure to restrict the noise level as per TNPCB norms, residential silencer with exhaust pipe arrangements, suitable alternator (brushless), self-excited, self-regulated, suitable for continuos operation. standard control panel consisting of ammeter with CT's and selector switch , voltmeter with selector switch MCCB, energy meter, earth fault relay,indicating lamps, fuses, and required 1.1 KVA grade PVC armoured aluminium cable from alternator to alternator control panel, 12/24V battery, battery leads, battery charger etc. coupling with guard,fuel tank (8 hours capacity) common rigid MS channel base frame,antivibration mounting pads etc complete.

1

-

-

... More
Providing foundation of DG set

-

-

-

... More
Excavation in hard stiff clay, stiff black cotton, hard red earth, shales muram, gravel stoney earth and earth mixed with small size boulders as per SS 20B with initial lead of 10m and lift of 2.0 m.

9.5

-

-

... More
Supply and filling sand for foundation and basement including watering conslidating ramming etc., complete.

7.75

-

-

... More
Cement concrete 1:4:8 using 40mm gauge hard broken stone jelly for plain cement concrete works including laying in layers of not more than 15cm thick including ramming, curing,etc., complete.

2.38

-

-

... More
Stock brick work with II class bricks in cement mortar 1:5 for 23 cm thick wall including curing etc., complete.

3.29

-

-

... More
Plastering with cement mortar 1:4 for 20mm thick including ciuring etc., complete.

10.8

-

-

... More
Supplying and fabricating and laying in position MS round or RTS rode for RCC works including cost of reinforcement , binding wire, cuttingbending ,cranking and typing in position with binding wire assembly etc.,

150

-

-

... More
Cement concrete 1:1/2:3 using 20mm gauge hard broken stone jelly for reinforcement cement concrete works excluding cost of steel, centering, shuttering and cost of steel reinforcement but including laying in position, compacting, curing, finishing, etc., complete

2.04

-

-

... More
Providing form work with centering for soffits of reinforced cement concrete slabs or plain surfaces including strutting upto 3m high

3.24

-

-

... More
Painting two coats with approved cement paint over cement plastered wall surface, ceiling and other new surfaces including cleaning preparing the surface and curing, etc.,

10.8

-

-

... More
Painting two coats with approved cement paint over one coat of cement paint over cement plastered wall surface, ceiling including cleaning preparing the surface and curing, etc.,

10.8

-

-

... More
Laying of Cable & Earthing

-

-

-

... More
Supplying and laying of 3 1/2 core 70 sq.mm LTUG cable in a trench to be excavated at a depth of 2 1/2 " putting 6" layer of sand and covering the cable with brick and sand refilling the earth to make good.

-

-

-

... More
From control panel of DG to EB Metering Board

30

-

-

... More
Supplying and fixing of cable gland and termination with Al.cable 3 1/2 core 95 sq.mm PVC insulated PVC sheathed armoured aluminium LT UG cable and with earth connection.

6

-

-

... More
Supply and installation maintenance free GI Earthing system comprising of 50mm dia and 2 mtr. long earth electrode of low carbon steel rod with 100 micron bonding and 25 kgs. of carbon based environment friendly backbill compound and suitable clamp.

4

-

-

... More
Supplying and laying of 3mm X 25mm copper earth flat, including necessary chipping and masanory work etc., complete.

45

-

-

... More
Providing MS shed for 82.5 KVA DG set with approved colour roofing sheet with necessary M.S square pipes. Including cutting, welding and civil works etc., complete as per site condition.

20.28

-

-

... More
Bill No : 3E - Enhancement of Pumping Capacity by Supply, delivery, erection and commissioning of 110HP non clog sewage submersible pumpset along with allied civil and electrical works at Kadappa Road HT Sewage Pumping Station in Area III

-

-

-

... More
Supply and delivery of submersible sewage non-clog pumps, vertical spindle type pump , wear resistance with submersible motor for the various duty conditions. Pump shall be capable of handling min 100 mm solid size with sewage specific gravity of up to 1.05. Pump shall be of robust construction, Liquid passages shall be finished smooth and designed as to allow free passage to solids. Pump Impeller should be of Non-clog semi open type , single vane / multi vane preferably contra bloc or vortex impeller design. Double mechanical seal with silicon carbide faces should be provided to protect the motor from ingress of sewage along the shaft. The critical speed of the rotor shall be at least 30% above the operating speed. Pumps should have double bearings between the pump & motor. The bearings life shall be minimum 100,000 hrs of operation with greased for life. Pump should be provided with automatic coupling device including pedestal, duck foot bend, stainless steel guide pipe or related accessories of suitable size to facilitate lifting and lowering into guide rails for easy maintenance.

-

-

-

... More
Pump shall be provided with a stainless steel lifting chain conforming to BS 970 Gr 304. Pump speed shall be of 9600 rpm for high duty pumps and 960/1450 rpm for low duty pumpsets. Casing and impeller should be of CI Gr. FG 260:IS210 more preferably with hardened impeller.Shaft should be of stainless steel AISI 410. All the fasteners and bolts shall be of AISI 410.The submersible motor shall be operated with 3ph, 415 V(+or– 10%), 50Hz(+or-5 %) dry induction type. Motor shall be capable of giving rated output without reduction in the expected life span when operated continuously. The rotating assembly shall be dynamically balanced as per standards. The starting current of the motor shall not exceed 200% of rated full load current for Star / Delta or ATS starting under any circumstances .The motor shall be suitable for full voltage star delta / ATS starting. The locked rotor current of the motor shall not exceed 600% of full load current unless otherwise specified. Motor shall be designed to withstand 120% of rated speed for two minutes without any mechanical damage, in either direction of rotation.

-

-

-

... More
The motor vibration shall be within the limit specified in applicable standards . Motor should be of IE2, explosion proof compatible for VFD operation together with star-Delta /ATS starter, protection against increase in stator winding temperature (15 deg Celsius), bearing temperature, leakage in the stator housing and terminal box shall be provided and to be suitably interlocked with the control panel for tripping the pump in case of increase in temperature beyond set limit. Insulation class shall be of “Class H” and degree of protection shall be of IP 68 as per IS 4691. Motor shall be suitable for continuous operation in fully submerged or partially submerged condition.The pumpset shall be supplied with power cable of PVC insulated and PVC sheathed, copper, flexible, roundtype with required conductor size and number of cores as per starting method and of specified length for continuous use under water and air.

-

-

-

... More
The control cable of PVC insulated, PVC sheathed, flexible for stator winding temperature sensor 3core x 1.5 sq.mm copper conductor and for bimetallic switches 2core x 1.5 sqmm copper conductor shall be provided. Motor shall be supplied with 10m of round submersible copper cable of suitable size. The non clog submersible pumpset shall be provided with suitable starter control panel having all protections as mentioned above. (upto 5 HP - DOL Starter, above 5 HP to 25 HP -Star Delta Panel and beyond 25 HP shall be ATS)

-

-

-

... More
Discharge - 560m3/hr Head - 47m

1

-

-

... More
Supply,delivery and fixing of 300mm dia C.I D/F PIPES AS PER IS 7181/1986 & IS 1537-2m length

1209

-

-

... More
Supply,delivery and fixing of 300mm dia CI D/F SPECIALS & S/S SPECIALS AS PER IS 1538/1986- Tapper

65

-

-

... More
Supply,delivery and fixing of 300mm dia CI D/F SPECIALS & S/S SPECIALS AS PER IS 1538/1986-Tee

143

-

-

... More
Supply,delivery and fixing of 300mm dia CI D/F SPECIALS & S/S SPECIALS AS PER IS 1538/1986- 90 degree Bend

100

-

-

... More
Supply,delivery,erection,testing and commissioning of 300 mm dia CI D/F SLUICE VALVE WITH CAP/ WHEEL AS PER IS 14846/2000 PN 1 WITH ISI MARKING

1

-

-

... More
Supply,delivery erection,testing and commissioning of of 300mm dia C.I. D/F REFLUX VALVE AS PER I.S. 5312/ PART I/ 84 WITH BYE-PASS ARRANGEMENTS (PN-1) WITH ISI MARKING

1

-

-

... More
Jointing the 300mm C.I/D.IDouble flanged pipes and specials with rubber insertion to with IS 638(1979) and M.S.bolts and nuts of IS1364-1 (2002), including cost of jointing materials such as bolt and nuts Rubber insertion and labour charges etc., complete

15

-

-

... More
Bill. No: 3F - Design, Manufacture, Supply, Delivery, Installation and Commissioning of Odour Control System (Activated Carbon Filter) at at various SPS in Area III

-

-

-

... More
Design, Manufacture, Supply, Delivery, Installation and Commissioning of Odour Control System (Activated Carbon Filter) at Mathur Sewage Pumping Station. Description: The counter-flow scrubbing system arrangement is designed as per VDI 3679 German guidelines for design of odour control systems. The system with airflow capacity of 800 m³/hr with suitable fresh air dilution of 12 times as per ATV M204E and NFPA 820 international standard for ventilation with at least 99.99% odour removal efficiency for effective odour (Hydrogen Sulphide gas) elimination from the source tank (Tank Discharge Pit, Collection Tank, Screen Well 1, Screen well 2 & Suction Well). The system include the pre-filter with mist eliminator, radial fan (1 duty only), activated carbon filter with carbon media, inter- connecting ductwork within the system, external ductwork from the source tank (Tank Discharge Pit, Collection Tank, Screen Well 1, Screen well 2 & Suction Well) to the pre-filter, tank covering system for the source tank (Tank Discharge Pit, Collection Tank, Screen Well 1, Screen well 2 & Suction Well), on/off type switch cabinet,

3

-

-

... More
differential pressure gauges, inlet and outlet H₂S monitors for measuring the concentration of Hydrogen Sulphide before and after treatment, manual valves for water inlet, drain outlet and sampling ports. The ACF vessel, pre-filter vessel, inter-connecting ductwork, external ductwork, tank covering systems are all made of specially weaved thermoplastic material suitable for drastic energized anti-biting and eroding against a group of air pollutants. They shall be made of chemical and UV resistant orthotropic composite material like SG-CSM-ECR mat with PSR-4503 resin grade suitable for outdoor application. The pre-filter media shall be designed to trap moisture particles effectively. The radial fan for toxic gas extraction shall be of airflow capacity 800 m³/hr and static pressure 1,500 Pa and material of construction high quality stainless steel grade (SS316). The carbon filter media shall be designed to have high H₂S adsorption capacity such as 'Grasp- Sulfone' virgin coal based pelletized catalytical impregnated water re-generable activated carbon media of suitable quantity as per manufacturer standard to maintain the necessary contain time based on VDI 3679 international guidelines for the effective removal of toxic odorous gases.

-

-

-

... More
Bill No 4: Extension of Pumping mains of Muthumariamman Koil street SPS, Thanikachalam nagar SPS, Sastri nagar road side SPS and Metha nagar SPS from Bell mouth chamber to the nearest Sewage Pumping stationsPumping stations in Area III

-

-

-

... More
Bill No. 4A : Extension of 300mm dia Thanikachalam nagar SPS CI force main from belmouth chamber at Sriraman salai (North) to Chandra Prabu Colony pumping station and its allied works in Depot-29, Area-III

-

-

-

... More
Hiring and running charges for JCB

22

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking rrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites

1320

-

-

... More
Supplying and Laying of CI socket spigot pipes (A Class) including rubber gasket joint, earth work excavation for trenches in hard stiff clay,black cotton, hard red earth,shales,murrum gravel, stoney earth and earth mixed with small size boulders depositing the earth on banks with initial lead of 10m and initial lift of 2m, lowering in to the trenches, aligning including refilling the trenches with excavated earth, watering, ramming and disposal of surplus earth etc; complete at 1.5m depth to invert. a. 300mm dia

660

-

-

... More
Cutting CI Pipes (Labour only)

-

-

-

... More
300mm dia

20

-

-

... More
Supplying, Conveying and fixing of D/soc CI specials

-

-

-

... More
300mm CI D/F Pipe-0.5m lg

2

-

-

... More
300mm CI D/F Pipe-1.0m lg

1

-

-

... More
300mm CI Sluice valve

1

-

-

... More
80mm Air Valve

1

-

-

... More
100mm CI Sluice valve

1

-

-

... More
300 x300x 100 CI A/F TEE

1

-

-

... More
100 x 80 CI A/f Tapper

1

-

-

... More
300 mm CI D/F 90 deg Bend

2

-

-

... More
300 mm CI D/F Bellmouth

1

-

-

... More
300 mm CI D/F duckfoot 90 deg Bend

1

-

-

... More
300 mm D/S CI 90 deg Bend

8

-

-

... More
300 mm D/S CI 45 deg Bend

4

-

-

... More
300 mm D/S CI Collars

4

-

-

... More
Making Rubber joints - 300mm dia

130

-

-

... More
Testing of 300 mm dia C.I pipes with hydraulic testing equipment by filling with water and testing to recommended pressure in convenient stetches and attending the bursts if any occurred during the test, excluding the cost of pipes, including other incidental and operational charges, etc complete for 300mm dia.

660

-

-

... More
Providing thrust blocks with Plain Cement Concrete in 1:3:6 with 40mm BG jelly for the DI pumping main including the cost of shuttering, compaction, curing etc. complete.

-

-

-

... More
300mm CI D/S 90 degree Bend

10

-

-

... More
300mm CI D/S 45 degree Bend

4

-

-

... More
Construction of Valve Chamber for Sluice Valve and Non Return Valve in second class brick work in CM 1:4 proportion with 12 mm thick outside plastering and 20mm thick inside plastering in CM 1:3 proportion, RCC cover slab in CC 1:2:4 proportion using 20 mm jelly, chamber foundation and bed block in PCC 1:3:6 proportion using 40 mm jelly including cost of reinforcement and labour charges, CI steps, etc. as per drawing.

-

-

-

... More
80mm Air Valve

1

-

-

... More
300mm CI Sluice valve

1

-

-

... More
Hire Charges for Diesel pumpset above 3hp up to 7.5 hp including cost of fuel and machinest for running the machine per hour of running

36

-

-

... More
Forming water bound mecadam to a thickness of 100mm using 1 Cu.m. of 40mm IRC size HBG metal with 0.33cum.of gravel (which will passes through 10mm sieve size) fine for blindage for an area of 10 m2 including spreading metal and gravel fine and packing to camber,consolidation by power roller and including watering and keeping the surface moist for 15 days etc., complete.

660

-

-

... More
Supplying , delivery and erection of various sizes of Electromagnetic Flow Meter in various sewage pumping stations in Area III

-

-

-

... More
150mm

2

-

-

... More
200mm

1

-

-

... More
250mm

2

-

-

... More
300mm

3

-

-

... More
350mm

2

-

-

... More
500mm

1

-

-

... More
Supply, delivery, erection, testing and commissioning of submersible sewage non-clog pumps, vertical spindle type pump , wear resistance with submersible motor for the various duty conditions. Pump shall be capable of handling min 100 mm solid size with sewage specific gravity of up to 1.05. Pump shall be of robust construction, Liquid passages shall be finished smooth and designed as to allow free passage to solids. Pump Impeller should be of Non-clog semi open type , single vane / multi vane preferably contra bloc or vortex impeller design. Double mechanical seal with silicon carbide faces should be provided to protect the motor from ingress of sewage along the shaft. The critical speed of the rotor shall be at least 30% above the operating speed. Pumps should have double bearings between the pump & motor. The bearings life shall be minimum 100,000 hrs of operation with greased for life. Pump should be provided with automatic coupling device including pedestal, duck foot bend, stainless steel guide pipe or related accessories of suitable size to facilitate lifting and lowering into guide rails for easy maintenance.

-

-

-

... More
Pump shall be provided with a stainless steel lifting chain conforming to BS 970 Gr 304. Pump speed shall be of 9600 rpm for high duty pumps and 960/1450 rpm for low duty pumpsets. Casing and impeller should be of CI Gr. FG 260:IS210 more preferably with hardened impeller.Shaft should be of stainless steel AISI 410. All the fasteners and bolts shall be of AISI 410.The submersible motor shall be operated with 3ph, 415 V(+or– 10%), 50Hz(+or-5 %) dry induction type. Motor shall be capable of giving rated output without reduction in the expected life span when operated continuously. The rotating assembly shall be dynamically balanced as per standards. The starting current of the motor shall not exceed 200% of rated full load current for Star / Delta or ATS starting under any circumstances .The motor shall be suitable for full voltage star delta / ATS starting. The locked rotor current of the motor shall not exceed 600% of full load current unless otherwise specified.

-

-

-

... More
Motor shall be designed to withstand 120% of rated speed for two minutes without any mechanical damage, in either direction of rotation. The motor vibration shall be within the limit specified in applicable standards . Motor should be of IE2, explosion proof compatible for VFD operation together with star-Delta /ATS starter, protection against increase in stator winding temperature (15 deg Celsius), bearing temperature, leakage in the stator housing and terminal box shall be provided and to be suitably interlocked with the control panel for tripping the pump in case of increase in temperature beyond set limit. Insulation class shall be of “Class H” and degree of protection shall be of IP 68 as per IS4691. Motor shall be suitable for continuous operation in fully submerged or partially submerged condition.The pumpset shall be supplied with power cable of PVC insulated and PVC sheathed, copper, flexible, roundtype with required conductor size and number of cores as per starting method and of specified length for continuous use under water and air.

-

-

-

... More
The control cable of PVC insulated, PVC sheathed, flexible for stator winding temperature sensor 3core x 1.5 sq.mm copper conductor and for bimetallic switches 2core x 1.5 sqmm copper conductor shall be provided. Motor shall be supplied with 10m of round submersible copper cable of suitable size. The non clogsubmersible pumpset shall be provided with suitable starter control panel having all protections as mentioned above. (upto 5 HP - DOL Starter, above 5 HP to 25 HP -Star Delta Panel and beyond 25 HP shall be ATS)

-

-

-

... More
Discharge - 250m3/hr Head - 15m

1

-

-

... More
As built survey for every sewage and water pipeline and other assets must be done using DGPS based RTK method by transferring the coordinates from the nearest Static GCP of CMWSSB. Where there are signal interruptions for the RTK method, Total Station can be used. The coordinates from the static GCP shall be transferred to the Total Station by RTK method and the co- ordinates of the assets can then be captured by Total Station. All the features, attributes of all the assets,utilities captured shall be Geo referenced as per standard Coordinate reference system (WGS 84 UTM Zone 44N). The final base map with assets and utilities shallbe furnished in (.shp) format. The geo referenced assets and utilities along with the attributes (as specified by the GIS Wing, CMWSSB) shall beconverted into proper geo database (FGDB / PGDB) with the attributes. One set Hard and Soft Copy of all theCMWSSB assets and utility has to be prepared category wise network wise in A0 Print for verification in a print scale of 1:1000 in A0 plot, with standard legends in international and NUIS standards and should be legible and three sets of final Hard Copy in A0 print.

-

-

-

... More
(a) For the Underground / Surface Assets along the roads for the distance

4.07

-

-

... More
b) For UGSS surface assets

106

-

-

... More
Bill No. 4B - Extension of 200mm dia Sastri nagar roadside SPS CI force main from belmouth chamber at Prakash Nagar Main road to Thanikachalam Nagar pumping station and its allied works in Depot-29, Area-III

-

-

-

... More
Hiring and running charges for JCB

23

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking rrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites

1340

-

-

... More
Supplying and Laying of CI socket spigot pipes (LA Class) including rubber gasket joint, earth work excavation for trenches in hard stiff clay,black cotton, hard red earth,shales,murrum gravel, stoney earth and earth mixed with small size boulders depositing the earth on banks with initial lead of 10m and initial lift of 2m, lowering in to the trenches, aligning including refilling the trenches with excavated earth, watering, ramming and disposal of surplus earth etc; complete at 1.5m depth to invert. a. 200mm dia

670

-

-

... More
Cutting CI Pipes (Labour only)

-

-

-

... More
200mm dia

20

-

-

... More
Supplying, Conveying and fixing of D/soc CI specials

-

-

-

... More
200mm CI D/F Pipe-0.5m lg

2

-

-

... More
200mm CI D/F Pipe-1.0m lg

1

-

-

... More
200mm CI Sluice valve

1

-

-

... More
80mm Air Valve

1

-

-

... More
100mm CI Sluice valve

1

-

-

... More
200 x200x 100 CI A/F TEE

1

-

-

... More
100 x 80 CI A/f Tapper

1

-

-

... More
200 mm CI D/F 900 Bend

2

-

-

... More
200 mm CI D/F Bellmouth

1

-

-

... More
200 mm CI D/F duckfoot 900 Bend

1

-

-

... More
200 mm D/S CI 900 Bend

6

-

-

... More
200 mm D/S CI 450 Bend

2

-

-

... More
200 mm D/S CI Collars

4

-

-

... More
Making Rubber joints - 200mm dia

348

-

-

... More
Testing of C.I pipes with hydraulic testing equipment by filling with water and testing to recommended pressure in convenient stetches and attending the bursts if any occurred during the test, excluding the cost of pipes, including other incidental and operational charges, etc complete for 300mm dia.

670

-

-

... More
Hire Charges for Diesel pumpset above 3hp up to 7.5 hp including cost of fuel and machinest for running the machine per hour of running

36

-

-

... More
Providing thrust blocks with Plain Cement Concrete in 1:3:6 with 40mm BG jelly for the DI pumping main including the cost of shuttering, compaction, curing etc. complete.

-

-

-

... More
200mm CI D/S 90 degree Bend

7

-

-

... More
200mm CI D/S 45 degree Bend

2

-

-

... More
Construction of Valve Chamber for Sluice Valve and Non Return Valve in second class brick work in CM 1:4 proportion with 12 mm thick outside plastering and 20mm thick inside plastering in CM 1:3 proportion, RCC cover slab in CC 1:2:4 proportion using 20 mm jelly, chamber foundation and bed block in PCC 1:3:6 proportion using 40 mm jelly including cost of reinforcement and labour charges, CI steps, etc. as per drawing.

-

-

-

... More
80mm Air Valve

1

-

-

... More
200 mm CI sluice valve

1

-

-

... More
Forming water bound mecadam to a thickness of 100mm using 1 Cu.m. of 40mm IRC size HBG metal with 0.33cum.of gravel (which will passes through 10mm sieve size) fine for blindage for an area of 10 m2 including spreading metal and gravel fine and packing to camber,consolidation by power roller and including watering and keeping the surface moist for 15 days etc., complete.

670

-

-

... More
Supply, delivery, erection, testing and commissioning of submersible centrifugal sewage non-clog pumps, vertical spindle type pump , wear resistance with submersible motor for the various duty conditions. Pump shall be capable of handling min 100 mm solid size with sewage specific gravity of up to 1.05. Pump shall be of robust construction, Liquid passages shall be finished smooth and designed as to allow free passage to solids. Pump Impeller should be of Non-clog semi open type , single vane / multi vane preferably contra bloc or vortex impeller design. Double mechanical seal with silicon carbide faces should be provided to protect the motor from ingress of sewage along the shaft. The critical speed of the rotor shall be at least 30% above the operating speed. Pumps should have double bearings between the pump & motor. The bearings life shall be minimum 100,000 hrs of operation with greased for life. Pump should be provided with automatic coupling device including pedestal, duck foot bend, stainless steel guide pipe or related accessories of suitable size to facilitate lifting and lowering into guide rails for easy maintenance. Pump shall be provided with a stainless steel lifting chain conforming to BS 970 Gr 304. Pump speed shall be of 9600 rpm for high duty pumps and 960/1450 rpm for low duty pumpsets. Casing and impeller should be of CI Gr. FG 260:IS210 more preferably with hardened impeller.Shaft should be of stainless steel AISI 410. All the fasteners and bolts shall be of AISI 410.The submersible motor shall be operated with 3ph, 415 V(+or– 10%), 50Hz(+or-5 %) dry induction type. Motor shall be capable of giving rated output without reduction in the expected life span when operated continuously. The rotating assembly shall be dynamically balanced as per standards. The starting current of the motor shall not exceed 200% of rated full load current for Star / Delta or ATS starting under any circumstances .The motor shall be suitable for full voltage star delta / ATS starting. The locked rotor current of the motor shall not exceed 600% of full load current unless otherwise specified. Motor shall be designed to withstand 120% of rated speed for two minutes without any mechanical damage, in either direction of rotation. The motor vibration shall be within the limit specified in applicable standards . Motor should be of IE2, explosion proof compatible for VFD operation together with star-Delta /ATS starter, protection against increase in stator winding temperature (15 deg Celsius), bearing temperature, leakage in the stator housing and terminal box shall be provided and to be suitably interlocked with the control panel for tripping the pump in case of increase in temperature beyond set limit. Insulation class shall be of “Class H” and degree of protection shall be of IP 68 as per IS 4691. Motor shall be suitable for continuous operation in fully submerged or partially submerged condition.The pumpset shall be supplied with power cable of PVC insulated and PVC sheathed, copper, flexible, roundtype with required conductor size and number of cores as per starting method and of specified length for continuous use under water and air. The control cable of PVC insulated, PVC sheathed, flexible for stator winding temperature sensor 3core x 1.5 sq.mm copper conductor and for bimetallic switches 2core x 1.5 sqmm copper conductor shall be provided. Motor shall be supplied with 10m of round submersible copper cable of suitable size. The non clog submersible pumpset shall be provided with suitable starter control panel having all protections as mentioned above. (upto 5 HP - DOL Starter, above 5 HP to 25 HP -Star Delta Panel and beyond 25 HP shall be ATS)

-

-

-

... More
Discharge - 72m3/hr Head - 13m

1

-

-

... More
Bill No. 4C - Laying of 300mm dia CI Sewage Pumping main from Metha Nagar Sewage Pumping Station to Bank Colony Sewage Pumping Station and its allied works in Depot 26 & 27, Area III

-

-

-

... More
Hiring and running charges for JCB

52

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking rrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites

3070

-

-

... More
Supplying and Laying of CI socket spigot pipes (A Class) including rubber gasket joint, earth work excavation for trenches in hard stiff clay,black cotton, hard red earth,shales,murrum gravel, stoney earth and earth mixed with small size boulders depositing the earth on banks with initial lead of 10m and initial lift of 2m, lowering in to the trenches, aligning including refilling the trenches with excavated earth, watering, ramming and disposal of surplus earth etc; complete at 1.5m depth to invert. a. 300mm dia

1535

-

-

... More
Cutting CI Pipes (Labour only)

-

-

-

... More
300mm dia

20

-

-

... More
Supplying, Conveying and fixing of D/soc CI specials

-

-

-

... More
300 mm CI D/S 900 Bend

7

-

-

... More
300 mm CI D/S 450 Bend

5

-

-

... More
300 mm CI D/S 22.50 Bend

2

-

-

... More
300 mm CI Collars

20

-

-

... More
Making Rubber joints - 300mm dia

348

-

-

... More
Supplying, Conveying and fixing valves with cap/wheel, tail pieces including fixing the surface boxes/valves, covers.

-

-

-

... More
80mm Air Valve

1

-

-

... More
100mm CI Sluice valve

1

-

-

... More
300mm CI Sluice valve

1

-

-

... More
Supplying, Conveying and fixing of flanged CI specials

-

-

-

... More
300 x300x 100 CI A/F Tee

1

-

-

... More
100 x 80 CI A/f Tapper

1

-

-

... More
300mm CI D/F Pipe-0.5m lg

1

-

-

... More
300mm CI D/F Pipe-1.0m lg

3

-

-

... More
300 mm CI D/F 90 deg Bend

1

-

-

... More
300 mm CI D/F Bellmouth

1

-

-

... More
100 mm CI D/F duckfoot 90 deg Bend

1

-

-

... More
Testing of C.I pipes with hydraulic testing equipment by filling with water and testing to recommended pressure in convenient stetches and attending the bursts if any occurred during the test, excluding the cost of pipes, including other incidental and operational charges, etc complete for 300mm dia.

1535

-

-

... More
Hire Charges for Diesel pumpset above 3hp up to 7.5 hp including cost of fuel and machinest for running the machine per hour of running

36

-

-

... More
Providing thrust blocks with Plain Cement Concrete in 1:3:6 with 40mm BG jelly for the DI pumping main including the cost of shuttering, compaction, curing etc. complete.

-

-

-

... More
300mm CI D/S 90 degree Bend

7

-

-

... More
300mm CI D/S 45 degree Bend

5

-

-

... More
300 mm CI D/S 22.50 Bend

2

-

-

... More
Construction of chamber for 300mm to 400mm dia.sluice valve including providing and fixing FRC cover and frame of size 60 x 60cm for size 1.35 x 1.35 x 1.95 m

2

-

-

... More
Construction of 80mm Double Air Valve chamber for 100mm to 350mm dia.pipeline including providing and fixing FRC cover and frame of size 60 x 60cm for size 1.2 x 0.9 x 1.8 m

1

-

-

... More
Forming water bound mecadam to a thickness of 100mm using 1 Cu.m. of 40mm IRC size HBG metal with 0.33cum.of gravel (which will passes through 10mm sieve size) fine for blindage for an area of 10 m2 including spreading metal and gravel fine and packing to camber,consolidation by power roller and including watering and keeping the surface moist for 15 days etc., complete.

1535

-

-

... More
Supply, delivery, erection, testing and commissioning of submersible sewage non-clog pumps, vertical spindle type pump , wear resistance with submersible motor for the various duty conditions. Pump shall be capable of handling min 100 mm solid size with sewage specific gravity of up to 1.05. Pump shall be of robust construction, Liquid passages shall be finished smooth and designed as to allow free passage to solids. Pump Impeller should be of Non-clog semi open type , single vane / multi vane preferably contra bloc or vortex impeller design. Double mechanical seal with silicon carbide faces should be provided to protect the motor from ingress of sewage along the shaft. The critical speed of the rotor shall be at least 30% above the operating speed. Pumps should have double bearings between the pump & motor. The bearings life shall be minimum 100,000 hrs of operation with greased for life. Pump should be provided with automatic coupling device including pedestal, duck foot bend, stainless steel guide pipe or related accessories of suitable size to facilitate lifting and lowering into guide rails for easy maintenance.

-

-

-

... More
Pump shall be provided with a stainless steel lifting chain conforming to BS 970 Gr 304. Pump speed shall be of 9600 rpm for high duty pumps and 960/1450 rpm for low duty pumpsets. Casing and impeller should be of CI Gr. FG 260:IS210 more preferably with hardened impeller.Shaft should be of stainless steel AISI 410. All the fasteners and bolts shall be of AISI 410.The submersible motor shall be operated with 3ph, 415 V(+or– 10%), 50Hz(+or-5 %) dry induction type. Motor shall be capable of giving rated output without reduction in the expected life span when operated continuously. The rotating assembly shall be dynamically balanced as per standards. The starting current of the motor shall not exceed 200% of rated full load current for Star / Delta or ATS starting under any circumstances .The motor shall be suitable for full voltage star delta / ATS starting. The locked rotor current of the motor shall not exceed 600% of full load current unless otherwise specified. Motor shall be designed to withstand 120% of rated speed for two minutes without any mechanical damage, in either direction of rotation. The motor vibration shall be within the limit specified in applicable standards .

-

-

-

... More
Motor should be of IE2, explosion proof compatible for VFD operation together with star-Delta /ATS starter, protection against increase in stator winding temperature (15 deg Celsius), bearing temperature, leakage in the stator housing and terminal box shall be provided and to be suitably interlocked with the control panel for tripping the pump in case of increase in temperature beyond set limit. Insulation class shall be of “Class H” and degree of protection shall be of IP 68 as per IS4691. Motor shall be suitable for continuous operation in fully submerged or partially submerged condition.The pumpset shall be supplied with power cable of PVC insulated and PVC sheathed, copper, flexible, roundtype with required conductor size and number of cores as per starting method and of specified length for continuous use under water and air.

-

-

-

... More
The control cable of PVC insulated, PVC sheathed, flexible for stator winding temperature sensor 3core x 1.5 sq.mm copper conductor and for bimetallic switches 2core x 1.5 sqmm copper conductor shall be provided. Motor shall be supplied with 10m of round submersible copper cable of suitable size. The non clogsubmersible pumpset shall be provided with suitable starter control panel having all protections as mentioned above. (upto 5 HP - DOL Starter, above 5 HP to 25 HP -Star Delta Panel and beyond 25 HP shall be ATS)

-

-

-

... More
Discharge - 110m3/hr Head - 15m

1

-

-

... More
Supply,delivery and fixing of MOULDED CASE CIRCUIT BREAKER (MCCB) WITH THERMO MAGNETIC RELEASE

-

-

-

... More
100A 3 Pole MCCB (Pump)

1

-

-

... More
63A 3 Pole MCCB (Capacitor)

1

-

-

... More
Supply, delivery and laying LT cables 3.5core 1.1KV grade armoured aluminium conductor cross linked poly ethylene insulated PVC sheathed cables conforming to IS 7098(Part I) /1988 with IS marking 3.50x35sq.mm

25

-

-

... More
Supply and fixing of cable gland and termination with aluminium cable by 3½ core 35 sq.mm PVC UG cable and with earth connection

3

-

-

... More
Supply, delivery, erection, testing and commissioning ofmixed DI-Electric capacitor with TNEB Test certificate with accessories conforming to IS 2834

5

-

-

... More
Bill No. 4D - Replacement of Damaged RCC Gravity sewer main CI Gravity Sewer main at Bank Colony Arul Nagar Link Road and Bank Colony 5th Street in Depot 27 Area III.

-

-

-

... More
Cutting asphalitc concrete road Non Bus Route

702.69

-

-

... More
Supplying and Laying, jointing with Lead/Lead wool joints (Labour only),testing of C.I. pipes including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. and carting of pipes from any of the Board’s stores to the site of work, lowering into trenches and aligning, refilling the trenches with excavated soil, dewatering, watering and ramming to consolidation, disposal of surplus earth etc., complete (Timbering included for Depths 2.50m,3.0m,3.5m,..........upto 8.5m)

-

-

-

... More
500 mm dia

-

-

-

... More
At 4 m deep to invert

23.4

-

-

... More
600 mm dia

-

-

-

... More
At 3.5 m deep to invert

127

-

-

... More
700 mm dia

-

-

-

... More
At 4 m deep to invert

82.2

-

-

... More
At 4.5 m deep to invert

136.2

-

-

... More
At 5 m deep to invert

100.8

-

-

... More
At 5.5 m deep to invert

69.7

-

-

... More
At 7m deep to invert

16.4

-

-

... More
Making Rubber Joint for Labour

-

-

-

... More
500 mm dia

5

-

-

... More
600 mm dia

25

-

-

... More
700 mm dia

74

-

-

... More
Cutting of CI Mains

-

-

-

... More
500 mm dia

3

-

-

... More
600 mm dia

16

-

-

... More
700 mm dia

20

-

-

... More
Testing of M.S./C.I./P.V.C./D.I pipes with hydraulic testing equipment by filling with water(including cost of water @ Rs.73/KL) and testing to recommended pressure in convenient stetches and attending the bursts if any occured during the test, excluding the cost of pipes, including other incidental and operational charges, etc., complete for the following diametres of pipes.

-

-

-

... More
500 mm dia

23.4

-

-

... More
600 mm dia

127

-

-

... More
700 mm dia

405.3

-

-

... More
C.C 1:3:6, using 40 mm gauge hard broken stone jelly for plain cement concrete works including laying in layers of not morethan 15cm thick including ramming curing etc. complete

35.75

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites .

1180

-

-

... More
Dewatering using 10HP to 70HP diesel engine pumpset including Hire charges, cost of Diesel, Engine oil, pump operator, labour charges, conveyance of pumpset and fuel to site and back, loading, unloading and any other incidental charges etc., complete. One Machine hole to Another Machine Hole (12.5 HP)

1680

-

-

... More
Dewatering using 10HP to 70HP diesel engine pumpset including Hire charges, cost of Diesel, Engine oil, pump operator, labour charges, conveyance of pumpset and fuel to site and back, loading, unloading and any other incidental charges etc., complete. One Machine hole to Another Machine Hole (20 HP)

8778

-

-

... More
Providind Dummies in pipes including removing dummys after commencement of work ets.,

-

-

-

... More
500 mm dia

2

-

-

... More
600 mm dia

10

-

-

... More
700 mm dia

22

-

-

... More
Bill No. 5 - Strengthening of sewer collection system in RK Nagar (North) SPS commanding Area (Depot 38 and 41), Area-IV

-

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
Non Bus Route

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 1 m deep

176.1

-

-

... More
at 1.5 m deep

2807.8

-

-

... More
at 2 m deep

1062

-

-

... More
Bus Route

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 1.5 m deep

104.6

-

-

... More
480/400mm OD/ID DWC PE or PP pipe

-

-

-

... More
at 2 m deep

45.8

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
Non Bus Route

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 2.5 m deep

663.6

-

-

... More
at 3 m deep

630.6

-

-

... More
at 3.5 m deep

735.6

-

-

... More
at 4 m deep

140.3

-

-

... More
358/300mm OD/ID DWC PE or PP pipe

-

-

-

... More
at 3.5 m deep

131.5

-

-

... More
at 4 m deep

36.7

-

-

... More
480/400mm OD/ID DWC PE or PP pipe

-

-

-

... More
at 3.5 m deep

131.1

-

-

... More
at 4 m deep

821.6

-

-

... More
at 4.5 m deep

45.6

-

-

... More
597/500mm OD/ID DWC PE or PP pipe

-

-

-

... More
at 4 m deep

726.6

-

-

... More
at 4.5 m deep

248.1

-

-

... More
715/600mm OD/ID DWC PE or PP pipe

-

-

-

... More
at 4.5 m deep

40.6

-

-

... More
Bus Route

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 2.5 m deep

86

-

-

... More
at 3 m deep

10.1

-

-

... More
at 3.5 m deep

147.9

-

-

... More
Supply, delivery of CI socket spigot pipes of LA class including rubber gaskets as per the latest revision of IS 1536, laying, jointing and testing CI pipes (LA class) including earth work excavation for trenches in hard stiff clay, black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and initial lift of 2m, lowering the pipes in to the trenches, aligning, making rubber joints, testing CI pipes, refilling the trenches with excavated soil, watering and ramming to consolidation, disposal of surplus earth including timbering the trenches for the depths of 2.5m and above, pumping out sub soil water etc., complete. (For Gravity Sewers)

-

-

-

... More
Non Bus Route

-

-

-

... More
500mm dia CI pipe

-

-

-

... More
at 5 m deep

170.9

-

-

... More
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.

-

-

-

... More
Non Bus Route

159.01

-

-

... More
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
Non Bus Route

-

-

-

... More
at 1.5m deep

122

-

-

... More
Bus Route

-

-

-

... More
at 1.5m deep

4

-

-

... More
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles including material and labour cost, Providing CI steps,fixing FRC Machine Hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast Machine Holes at the required position as directed by the engineer at site including testing the Machine Hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.

-

-

-

... More
Non Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 2.0m deep

48

-

-

... More
at 2.5m deep

31

-

-

... More
Construction of RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,sinking well kerb below 2m from G.L.or by open excavation for various depth as per site condition with M30 mix for side wall, raft and roof slab,including cost of steel reinforcement ,including bailing and pumping out water, formwork, plugging the bottom with PCC 1:3:6 using 40mm hard broken granite jelly, laying plain cement concrete 1:3:6 using 12mm to 20mm hard broken granite jelly for fixing frame, fixing FRC Machine Hole cover and frame, providing CI steps, ,benching and channelling including refilling the trenches with excavated earth and disposal of earth etc. Including testing the Machine Hole with water for 48hours to check water tightness and rectifying the defects if any complete for the following size of Machine Holes.

-

-

-

... More
Non Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 3.0m deep

29

-

-

... More
at 3.5m deep

45

-

-

... More
at 4.0m deep

45

-

-

... More
at 4.5m deep

2

-

-

... More
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)

-

-

-

... More
at 4.0m deep

26

-

-

... More
at 4.5m deep

12

-

-

... More
Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 3.5m deep

7

-

-

... More
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.

-

-

-

... More
Non Bus Route

17

-

-

... More
Bus Route

1

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.

-

-

-

... More
Non Bus Route

17137.4

-

-

... More
Bus Route

394.4

-

-

... More
Road Cutting

-

-

-

... More
Non Bus Route

-

-

-

... More
Asphalt Road

8625.58

-

-

... More
Bus Route

-

-

-

... More
State Highways/ National Highways

395.59

-

-

... More
Cutting DWC Pipes

-

-

-

... More
250mm

219

-

-

... More
300mm

6

-

-

... More
400mm

35

-

-

... More
500mm

33

-

-

... More
600mm

2

-

-

... More
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete

-

-

-

... More
Non Bus Route

-

-

-

... More
110mm dia upto a depth of 1.0m

12533

-

-

... More
160mm dia upto a depth of 1.5m

3133

-

-

... More
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.

-

-

-

... More
Non Bus Route

-

-

-

... More
Bedding

889.9

-

-

... More
Bus Route

-

-

-

... More
Bedding

39.56

-

-

... More
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).

-

-

-

... More
Non Bus Route

3805.13

-

-

... More
Bus Route

151.97

-

-

... More
Disposal of surplus earth (for DWC PE or PP pipe length)

-

-

-

... More
Non Bus Route

5654.45

-

-

... More
Bus Route

223.65

-

-

... More
Making through holes in plain or reinforced cement concrete with diamond core drilling system by using BOSCH power tools of following diameters - depth per cm

-

-

-

... More
Non Bus Route

-

-

-

... More
110mm

1791

-

-

... More
160mm

448

-

-

... More
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.

-

-

-

... More
250mm

2189

-

-

... More
300mm

57

-

-

... More
400mm

349

-

-

... More
500mm

325

-

-

... More
600mm

14

-

-

... More
Temporary bypassing of sewer including Plugging the mouth of pipe/s inside sewer manhole using suitable plugging system and installation of bypass arrangement for bypassing the sewage flow, including, but not limited, to pumps, pipes,connections, couplings,electrical accessories, support traffic diversions arrangements etc.including desilting of manholes, disposal of debris as per the instructions of Engineer-in-Charge and keeping the manhole free from seepage and removal of bypass by deplugging the mouth of pipe inside sewer manhole and removal of by pass system and making the sewer system operational including all labour,Machinery, material, taxes etc. as per the specifications and directions of the Engineer.

-

-

-

... More
Non Bus Route

-

-

-

... More
For manholes of pipes upto 1200 mm dia

390

-

-

... More
As built survey every sewage and water pipeline and other assetsmust be done using DGPS based RTK method by transferring the coordinates from the nearest static GCP of CMWSSB. Where there are signal interruption for the RTK method, Total station can be used. The coordinates from the static GCP shall be transferred to the Total Station by RTK method and the co-odinates of the assets can then be captured by Total Station. All the features, attributes of all the assets, utilities captured shall be Geo reference as per standard coordinate reference system ( WGS 84 UTM Zone 44N). The final basemap with assets and utilities shall be furnished in (.shp) format. The geo reference assets and utilities along with the attributes (as specified by the GIS Wing, CMWSSB) shall be converted into proper geo database (FGDB/PGDB) with the attributes. One set Hard and Soft copy of all the CMWSSB assets and utility has to be prepared category wise network wise in A0 print for verification in a print scale of 1:1000 in A0 plot, with standard legends in international and NUIS standards and should be legible and three sets of final hard copy in A0 print. a.For the undergrond/surface assets along the roads for the distance ranging from: (2KM) = 19000/-. in this estimate 330m length

-

-

-

... More
5 to 15 Km

8.79

-

-

... More
For the Point Underground Surface Assets along the Road

4476

-

-

... More
Hire charges for diesel pumpset for 3 HP with fuel and crew charges including transportation

3360

-

-

... More
Bill No. 6 - Strengthening of sewer collection system in Poongavanam SPS commanding Area (Depot 34), Area-IV

-

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
Non Bus Route

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 1.5 m deep

146

-

-

... More
at 2 m deep

30

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 2.5 m deep

56

-

-

... More
at 3 m deep

120

-

-

... More
at 4m deep

352

-

-

... More
at 4.5 m deep

30

-

-

... More
358/300mm OD/ID DWC PE or PP pipe

-

-

-

... More
at 4.5 m deep

60

-

-

... More
Supply, delivery & laying of CI socket spigot pipes of LA class including rubber gaskets as per the latest revision of IS 1536, laying, jointing and testing CI pipes (LA class) including earth work excavation for trenches in hard stiff clay, black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and initial lift of 2m, lowering the pipes in to the trenches, aligning, making rubber joints, testing CI pipes, refilling the trenches with excavated soil, watering and ramming to consolidation, disposal of surplus earth including timbering the trenches for the depths of 2.5m and above, pumping out sub soil water etc., complete. (For Gravity Sewers) (Location : RV Nagar 7th st -Poongavanam nagar junction )at 5 m depth

9

-

-

... More
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.

-

-

-

... More
Non Bus Route (33*0.34)

12

-

-

... More
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
Non Bus Route

-

-

-

... More
at 1 m deep

4

-

-

... More
at 1.5m deep

6

-

-

... More
at 2 m depth (existing collpased MH in poongavanam commanding area) (i)

6

-

-

... More
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles including material and labour cost, Providing CI steps,fixing FRC Machine Hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast Machine Holes at the required position as directed by the engineer at site including testing the Machine Hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.

-

-

-

... More
Non Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 2.5m deep

2

-

-

... More
Construction of RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,sinking well kerb below 2m from G.L.or by open excavation for various depth as per site condition with M30 mix for side wall, raft and roof slab,including cost of steel reinforcement ,including bailing and pumping out water, formwork, plugging the bottom with PCC 1:3:6 using 40mm hard broken granite jelly, laying plain cement concrete 1:3:6 using 12mm to 20mm hard broken granite jelly for fixing frame, fixing FRC Machine Hole cover and frame, providing CI steps, ,benching and channelling including refilling the trenches with excavated earth and disposal of earth etc. Including testing the Machine Hole with water for 48hours to check water tightness and rectifying the defects if any complete for the following size of Machine Holes.

-

-

-

... More
Non Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 3.0m deep

5

-

-

... More
at 4.0m deep

17

-

-

... More
at 4.5m deep

4

-

-

... More
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.

-

-

-

... More
Non Bus Route

2

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.

-

-

-

... More
Non Bus Route

1666

-

-

... More
Labour for Cutting road

-

-

-

... More
Non Bus Route

-

-

-

... More
Asphalt Road

773

-

-

... More
Concrete Road

60

-

-

... More
Cutting DWC Pipes

-

-

-

... More
250mm

25

-

-

... More
300mm

2

-

-

... More
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete

-

-

-

... More
Non Bus Route

-

-

-

... More
110mm dia upto a depth of 1.0m

1290

-

-

... More
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.

-

-

-

... More
Non Bus Route

-

-

-

... More
Bedding

83.4

-

-

... More
Backfill Envelope (Sidefill)

322

-

-

... More
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).

-

-

-

... More
Non Bus Route

2450

-

-

... More
Disposal of surplus earth (for DWC PE or PP pipe length)

-

-

-

... More
Non Bus Route

472

-

-

... More
Making through holes in plain or reinforced cement concrete with diamond core drilling system by using BOSCH power tools of following diameters - depth per cm

-

-

-

... More
Non Bus Route

-

-

-

... More
110mm

258

-

-

... More
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.

-

-

-

... More
250mm

254

-

-

... More
300mm

20

-

-

... More
Temporary bypassing of sewer including Plugging the mouth of pipe/s inside sewer manhole using suitable plugging system and installation of bypass arrangement for bypassing the sewage flow,including, but not limited, to pumps, pipes, connections, couplings,electrical accessories, support traffic diversions arrangements etc.including desilting of manholes, disposal of debris as per theinstructions of Engineer-in-Charge and keeping the manhole free from seepage and removal of bypass by deplugging the mouth of pipe inside sewer manhole and removal of by pass system and making the sewer system operational including all labour,Machinery, material, taxes etc. as per the specifications and directions of the Engineer.

-

-

-

... More
Non Bus Route

-

-

-

... More
For manholes of pipes upto 1200 mm dia

44

-

-

... More
Hire charges for diesel pumpset for 5HP

3360

-

-

... More
Cement concrete 1:3:6 using Crushed stone sand (Msand)and 40mm gauge hard broken stone jelly for plaincement concrete works including laying in layers of notmore than 15cm thick including ramming curing, etc.,complete (for road restoration)

116.62

-

-

... More
Dismantling of manhole including R.C.C. top slab, C.I.cover with frame including stacking of useful materialincluding bricks duly cleaned from mortar near the siteand disposal of unserviceable materials into railwaydumps within 50m lead including all excavation, refillingwatering and ramming etc. complete

-

-

-

... More
at 1 m deep

4

-

-

... More
at 1.5m deep

6

-

-

... More
at 2 m depth (existing collpased MH in poongavanam commanding area) (i)

6

-

-

... More
at 2.5 m depth

2

-

-

... More
at 3m depth

5

-

-

... More
at 4m depth

17

-

-

... More
at 4.5 m depth

4

-

-

... More
As built survey every sewage and water pipeline and other assetsmust be done using DGPS based RTK method by transferring the coordinates from the nearest static GCP of CMWSSB. Where there are signal interruption for the RTK method, Total station can be used. The coordinates from the static GCP shall be transferred to the Total Station by RTK method and the co-odinates of the assets can then be captured by Total Station. All the features, attributes of all the assets, utilities captured shall be Geo reference as per standard coordinate reference system ( WGS 84 UTM Zone 44N). The final basemap with assets and utilities shall be furnished in (.shp) format. The geo reference assets and utilities along with the attributes (as specified by the GIS Wing, CMWSSB) shall be converted into proper geo database (FGDB/PGDB) with the attributes. One set Hard and Soft copy of all the CMWSSB assets and utility has to be prepared category wise network wise in A0 print for verification in a print scale of 1:1000 in A0 plot, with standard legends in international and NUIS standards and should be legible and three sets of final hard copy in A0 print. a.For the undergrond/surface assets along the roads for the distance ranging from: (2KM) = 19000/-. in this estimate 765 m length

-

-

-

... More
2 Km

0.83

-

-

... More
For the Point Underground Surface Assets along the Road

516

-

-

... More
Bill No. 7 - Strengthening of sewer collection system in Tondiarpet A and E SPS commanding Area (Depot 39, 40, 42, 43 and 48), Area-IV

-

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
Non Bus Route

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 1.5 m deep

865

-

-

... More
at 2 m deep

152

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
Non Bus Route

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 2.5 m deep

189

-

-

... More
at 3.0 m deep

54

-

-

... More
at 3.5 m deep

105

-

-

... More
358/300mm OD/ID DWC PE or PP pipe

-

-

-

... More
at 3.5 m deep

19

-

-

... More
480/400mm OD/ID DWC PE or PP pipe

-

-

-

... More
at 3.5 m deep

90

-

-

... More
480/400mm OD/ID DWC PE or PP pipe

-

-

-

... More
at 3.5 m deep

238

-

-

... More
Supply, delivery of CI socket spigot pipes of LA class including rubber gaskets as per the latest revision of IS 1536, laying, jointing and testing CI pipes (LA class) including earth work excavation for trenches in hard stiff clay, black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and initial lift of 2m, lowering the pipes in to the trenches, aligning, making rubber joints, testing CI pipes, refilling the trenches with excavated soil, watering and ramming to consolidation, disposal of surplus earth including timbering the trenches for the depths of 2.5m and above, pumping out sub soil water etc., complete. (For Gravity Sewers)

-

-

-

... More
Non Bus Route

-

-

-

... More
900mm dia CI pipe

-

-

-

... More
at 5.5 m deep

53

-

-

... More
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.

-

-

-

... More
Non Bus Route

33

-

-

... More
Bus Route

6

-

-

... More
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
Non Bus Route

-

-

-

... More
at 1.5m deep

40

-

-

... More
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles including material and labour cost, Providing CI steps,fixing FRC Machine Hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast Machine Holes at the required position as directed by the engineer at site including testing the Machine Hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.

-

-

-

... More
Non Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 2.0m deep

7

-

-

... More
at 2.5m deep

8

-

-

... More
Construction of RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,sinking well kerb below 2m from G.L.or by open excavation for various depth as per site condition with M30 mix for side wall, raft and roof slab,including cost of steel reinforcement ,including bailing and pumping out water, formwork, plugging the bottom with PCC 1:3:6 using 40mm hard broken granite jelly, laying plain cement concrete 1:3:6 using 12mm to 20mm hard broken granite jelly for fixing frame, fixing FRC Machine Hole cover and frame, providing CI steps, ,benching and channelling including refilling the trenches with excavated earth and disposal of earth etc. Including testing the Machine Hole with water for 48hours to check water tightness and rectifying the defects if any complete for the following size of Machine Holes.

-

-

-

... More
Non Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 3.0m deep

3

-

-

... More
at 3.5m deep

20

-

-

... More
at 5.5m deep

3

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 3.5m deep

9

-

-

... More
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.

-

-

-

... More
Non Bus Route

4

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.

-

-

-

... More
Non Bus Route

3048

-

-

... More
Bus Route

238

-

-

... More
Road Cutting

-

-

-

... More
Non Bus Route

-

-

-

... More
Asphalt Road

1443

-

-

... More
Bus Route

-

-

-

... More
Asphalt Road

297

-

-

... More
Cutting DWC Pipes

-

-

-

... More
250mm

51

-

-

... More
300mm

2

-

-

... More
400mm

99

-

-

... More
Cutting CI Pipes

-

-

-

... More
900mm dia CI pipe

3

-

-

... More
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete

-

-

-

... More
Non Bus Route

-

-

-

... More
110mm dia upto a depth of 1.0m

2722

-

-

... More
160mm dia upto a depth of 1.5m

680

-

-

... More
Bus Route

-

-

-

... More
110mm dia upto a depth of 1.0m

302

-

-

... More
160mm dia upto a depth of 1.5m

76

-

-

... More
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.

-

-

-

... More
Non Bus Route

-

-

-

... More
Bedding

144

-

-

... More
Bus Route

-

-

-

... More
Bedding

30

-

-

... More
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).

-

-

-

... More
Non Bus Route

2684

-

-

... More
Bus Route

856

-

-

... More
Disposal of surplus earth (for DWC PE or PP pipe length)

-

-

-

... More
Non Bus Route

879

-

-

... More
Bus Route

217

-

-

... More
Making through holes in plain or reinforced cement concrete with diamond core drilling system by using BOSCH power tools of following diameters - depth per cm

-

-

-

... More
Non Bus Route

-

-

-

... More
110mm

389

-

-

... More
160mm

98

-

-

... More
Bus Route

-

-

-

... More
110mm

44

-

-

... More
160mm

11

-

-

... More
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.

-

-

-

... More
250mm

455

-

-

... More
300mm

7

-

-

... More
400mm

30

-

-

... More
Temporary bypassing of sewer including Plugging the mouth of pipe/s inside sewer manhole using suitable plugging system and installation of bypass arrangement for bypassing the sewage flow,including, but not limited, to pumps, pipes,connections, couplings,electrical accessories, support traffic diversions arrangements etc.including desilting of manholes, disposal of debris as per the instructions of Engineer-in-Charge and keeping the manhole free from seepage and removal of bypass by deplugging the mouth of pipe inside sewer manhole and removal of by pass system and making the sewer system operational including all labour,Machinery, material, taxes etc. as per the specifications and directions of the Engineer.

-

-

-

... More
Non Bus Route

-

-

-

... More
For manholes of pipes upto 1200 mm dia

81

-

-

... More
Bus Route

-

-

-

... More
For manholes of pipes upto 1200 mm dia

9

-

-

... More
Dismantling of machinehole including R.C.C. top slab, C.I.cover with frame including stacking of useful material including bricks duly cleaned from mortar near the site and disposal of unserviceable materials into railway dumps within 50m lead including all excavation, refilling watering and ramming etc. complete

-

-

-

... More
Non Bus Route

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
at 1.5m deep

40

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 2.0m deep

7

-

-

... More
at 2.5m deep

8

-

-

... More
at 3.0m deep

3

-

-

... More
at 3.5m deep

20

-

-

... More
at 5.5m deep

3

-

-

... More
Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 3.5m deep

9

-

-

... More
As built survey every sewage and water pipeline and other assetsmust be done using DGPS based RTK method by transferring the coordinates from the nearest static GCP of CMWSSB. Where there are signal interruption for the RTK method, Total station can be used. The coordinates from the static GCP shall be transferred to the Total Station by RTK method and the co-odinates of the assets can then be captured by Total Station. All the features, attributes of all the assets, utilities captured shall be Geo reference as per standard coordinate reference system ( WGS 84 UTM Zone 44N). The final basemap with assets and utilities shall be furnished in (.shp) format. The geo reference assets and utilities along with the attributes (as specified by the GIS Wing, CMWSSB) shall be converted into proper geo database (FGDB/PGDB) with the attributes. One set Hard and Soft copy of all the CMWSSB assets and utility has to be prepared category wise network wise in A0 print for verification in a print scale of 1:1000 in A0 plot, with standard legends in international and NUIS standards and should be legible and three sets of final hard copy in A0 print. a.For the undergrond/surface assets along the roads for the distance ranging from: (2KM)

-

-

-

... More
2 Km

1.77

-

-

... More
For the Point Underground Surface Assets along the Road

1084

-

-

... More
Hire charges for diesel pumpset for 5HP with fuel and crew charges including transportation

2490

-

-

... More
Bill No. 8 - Strengthening of sewer collection system in Tondiarpet A and E SPS commanding Area ( Depot 39, 40, 42, 43 and 48), Area IV

-

-

-

... More
Bill No. 8A - Strengthening of Sewer Collection System in Melpatadai SPS commanding Area (Depot 44), Area-IV

-

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
Non Bus Route

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 1.5 m deep

3046

-

-

... More
at 2 m deep

1245

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
Non Bus Route

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 2.5 m deep

421.51

-

-

... More
at 3 m deep

708.96

-

-

... More
at 3.5 m deep

409.92

-

-

... More
at 4m deep

60.89

-

-

... More
358/300mm OD/ID DWC PE or PP pipe

-

-

-

... More
at 3.5m deep

66

-

-

... More
480/400mm OD/ID DWC PE or PP pipe

-

-

-

... More
at 2.5m deep

145.59

-

-

... More
at 3 m deep

136.05

-

-

... More
at 3.5 m deep

879

-

-

... More
Bus Route

-

-

-

... More
at 4 m deep

219.27

-

-

... More
at 4.5 m deep

124.06

-

-

... More
Supply, delivery of CI socket spigot pipes of LA class including rubber gaskets as per the latest revision of IS 1536, laying, jointing and testing CI pipes (LA class) including earth work excavation for trenches in hard stiff clay, black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and initial lift of 2m, lowering the pipes in to the trenches, aligning, making rubber joints, testing CI pipes, refilling the trenches with excavated soil, watering and ramming to consolidation, disposal of surplus earth including timbering the trenches for the depths of 2.5m and above, pumping out sub soil water etc., complete. (For Gravity Sewers)

-

-

-

... More
Non Bus Route

-

-

-

... More
at 4.5 m deep (500mm)

54

-

-

... More
at 5 m deep (600mm)

26

-

-

... More
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.

-

-

-

... More
Non Bus Route

-

-

-

... More
250mm dia

310.15

-

-

... More
300mm dia

6.36

-

-

... More
400mm dia

28.26

-

-

... More
500 mm

2.12

-

-

... More
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole

-

-

-

... More
1.05mx0.9m

-

-

-

... More
Non Bus Route

-

-

-

... More
at 1.5m deep

162

-

-

... More
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles including material and labour cost, Providing CI steps,fixing FRC Machine Hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast Machine Holes at the required position as directed by the engineer at site including testing the Machine Hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.

-

-

-

... More
Non Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 2.0m deep

112

-

-

... More
at 2.5m deep

69

-

-

... More
Construction of RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,sinking well kerb below 2m from G.L.or by open excavation for various depth as per site condition with M30 mix for side wall, raft and roof slab,including cost of steel reinforcement ,including bailing and pumping out water, formwork, plugging the bottom with PCC 1:3:6 using 40mm hard broken granite jelly, laying plain cement concrete 1:3:6 using 12mm to 20mm hard broken granite jelly for fixing frame, fixing FRC Machine Hole cover and frame, providing CI steps, ,benching and channelling including refilling the trenches with excavated earth and disposal of earth etc. Including testing the Machine Hole with water for 48hours to check water tightness and rectifying the defects if any complete for the following size of Machine Holes.

-

-

-

... More
Non Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 3m deep

85

-

-

... More
at 3.5 deep

40

-

-

... More
at 4m deep

13

-

-

... More
at 4.5m deep

7

-

-

... More
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)

-

-

-

... More
4.5m deep

3

-

-

... More
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.

-

-

-

... More
Non Bus Route

15

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.

14706

-

-

... More
Road Cutting

-

-

-

... More
Non Bus Route

-

-

-

... More
Asphalt Road

6250.05

-

-

... More
Cutting DWC Pipes

-

-

-

... More
250mm

130

-

-

... More
300mm

2

-

-

... More
400mm

26

-

-

... More
500mm

6

-

-

... More
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete

-

-

-

... More
Non Bus Route

-

-

-

... More
110mm dia upto a depth of 1.0m

16498

-

-

... More
160mm dia upto a depth of 1.5m

4124

-

-

... More
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.

-

-

-

... More
Non Bus Route

-

-

-

... More
Bedding

967.6

-

-

... More
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).

-

-

-

... More
Non Bus Route

9675.98

-

-

... More
Disposal of surplus earth (for DWC PE or PP pipe length)

-

-

-

... More
Non Bus Route

219.27

-

-

... More
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.

-

-

-

... More
250mm

390

-

-

... More
300mm

21.86

-

-

... More
400mm

10

-

-

... More
Temporary bypassing of sewer including Plugging the mouth of pipe/s inside sewer manhole using suitable plugging system and installation of bypass arrangement for bypassing the sewage flow, including, but not limited, to pumps, pipes, connections, couplings, electrical accessories, support traffic diversions arrangements etc. including desilting of manholes, disposal of debris as per the instructions of Engineer-in-Charge and keeping the manhole free from seepage and removal of bypass by deplugging the mouth of pipe inside sewer manhole and removal of by pass system and making the sewer system operational including all labour, Machinery, material, taxes etc. as per the specifications and directions of the Engineer.

-

-

-

... More
Non Bus Route

-

-

-

... More
For manholes of pipes upto 1200 mm dia

468

-

-

... More
Dismantling of manhole including R.C.C. top slab, C.I. cover with frame including stacking of useful material including bricks duly cleaned from mortar near the site and disposal of unserviceable materials into railway dumps within 50m lead including all excavation, refilling watering and ramming etc. complete

-

-

-

... More
Non Bus Route

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 2.5m deep

20

-

-

... More
at 3.0m deep

25

-

-

... More
at 3.5m deep

14

-

-

... More
at 4.0m deep

5

-

-

... More
at 4.5m deep

3

-

-

... More
As built survey every sewage and water pipeline and other assetsmust be done using DGPS based RTK method by transferring the coordinates from the nearest static GCP of CMWSSB. Where there are signal interruption for the RTK method, Total station can be used. The coordinates from the static GCP shall be transferred to the Total Station by RTK method and the co-odinates of the assets can then be captured by Total Station. All the features, attributes of all the assets, utilities captured shall be Geo reference as per standard coordinate reference system ( WGS 84 UTM Zone 44N). The final basemap with assets and utilities shall be furnished in (.shp) format. The geo reference assets and utilities along with the attributes (as specified by the GIS Wing, CMWSSB) shall be converted into proper geo database (FGDB/PGDB) with the attributes. One set Hard and Soft copy of all the CMWSSB assets and utility has to be prepared category wise network wise in A0 print for verification in a print scale of 1:1000 in A0 plot, with standard legends in international and NUIS standards and should be legible and three sets of final hard copy in A0 print. a.For the undergrond/surface assets along the roads for the distance ranging from: (2KM) = 19000/-. in this estimate 330m length

-

-

-

... More
5Km-15Km

7.58

-

-

... More
For the Point Underground Surface Assets along the Road

5892

-

-

... More
Hire charges for diesel pumpset for 5 HP with fuel and crew charges including transportation

1400

-

-

... More
Bill No. 8B -Strengthening of sewer collection system in Vyasarpadi lake area SPS commanding Area (Depot 45), Area-IV

-

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
Non Bus Route

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 1.5 m deep

2650

-

-

... More
at 2 m deep

1520

-

-

... More
at 2.5m deep

860

-

-

... More
at 3.0m deep

515

-

-

... More
at 3.5m deep

110

-

-

... More
at 4.0m deep

90

-

-

... More
Bus Route

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 1.5 m deep

110

-

-

... More
at 2 m deep

130

-

-

... More
at 2.5m deep

260

-

-

... More
at 3.0m deep

510

-

-

... More
at 3.5m deep

560

-

-

... More
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.

-

-

-

... More
Non Bus Route

28.08

-

-

... More
Bus Route

14.4

-

-

... More
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
Non Bus Route

-

-

-

... More
at 1.5m deep

50

-

-

... More
Bus Route

-

-

-

... More
at 1.5m deep

10

-

-

... More
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles including material and labour cost, Providing CI steps,fixing FRC Machine Hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast Machine Holes at the required position as directed by the engineer at site including testing the Machine Hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.

-

-

-

... More
Non Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 2.0m deep

18

-

-

... More
at 2.5m deep

10

-

-

... More
Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 2.0m deep

10

-

-

... More
at 2.5m deep

10

-

-

... More
Construction of RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,sinking well kerb below 2m from G.L.or by open excavation for various depth as per site condition with M30 mix for side wall, raft and roof slab,including cost of steel reinforcement ,including bailing and pumping out water, formwork, plugging the bottom with PCC 1:3:6 using 40mm hard broken granite jelly, laying plain cement concrete 1:3:6 using 12mm to 20mm hard broken granite jelly for fixing frame, fixing FRC Machine Hole cover and frame, providing CI steps, ,benching and channelling including refilling the trenches with excavated earth and disposal of earth etc. Including testing the Machine Hole with water for 48hours to check water tightness and rectifying the defects if any complete for the following size of Machine Holes.

-

-

-

... More
Non Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 3.0m deep

5

-

-

... More
Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 3.0m deep

10

-

-

... More
at 3.5m deep

5

-

-

... More
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.

-

-

-

... More
Non Bus Route

30

-

-

... More
Bus Route

10

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.

-

-

-

... More
Non Bus Route

12130

-

-

... More
Bus Route

2500

-

-

... More
Road Cutting

-

-

-

... More
Non Bus Route

-

-

-

... More
Asphait Road

731.7

-

-

... More
Concret Road

360

-

-

... More
Bus Route

-

-

-

... More
Asphait Road

135

-

-

... More
NH/SH

90

-

-

... More
Extra cost for Road Cutting(if thickness of Bitumen15cm)

-

-

-

... More
Non Bus Route

-

-

-

... More
Asphait Road

1091.7

-

-

... More
Bus Route

-

-

-

... More
Asphait Road

135

-

-

... More
NH/SH

-

-

-

... More
Cutting DWC Pipes

-

-

-

... More
250mm

242

-

-

... More
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete

-

-

-

... More
Non Bus Route

-

-

-

... More
110mm dia upto a depth of 1.0m

2400

-

-

... More
160mm dia upto a depth of 1.5m

600

-

-

... More
Bus Route

-

-

-

... More
110mm dia upto a depth of 1.0m

1000

-

-

... More
160mm dia upto a depth of 1.5m

300

-

-

... More
Inspection Chamber : Construction of inspection chambers of following sizes with earth work excavation for foundation, 23cm thick concrete bed using 40mm brick jelly concrete in C.M. 1:4:10 for foundation, brick work in C.M. 1:6 for chamber, plastering with C.M. 1:3,12mm thick, benching, channelling, supplying and fixing 60x60cm medium weight L.S. cover and frame, etc., complete for

-

-

-

... More
Non Bus Route

-

-

-

... More
60 x 60 x 105cm

600

-

-

... More
60 x 60 x 150cm

150

-

-

... More
Bus Route

-

-

-

... More
60 x 60 x 105cm

250

-

-

... More
60 x 60 x 150cm

75

-

-

... More
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.

-

-

-

... More
Non Bus Route

-

-

-

... More
Bedding

1822.32

-

-

... More
Backfill Envelope (Sidefill)

361.08

-

-

... More
Bus Route

-

-

-

... More
Bedding

432

-

-

... More
Backfill Envelope (Sidefill)

198

-

-

... More
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).

-

-

-

... More
Non Bus Route

7278

-

-

... More
Bus Route

1500

-

-

... More
Disposal of surplus earth (for DWC PE or PP pipe length)

-

-

-

... More
Non Bus Route

2183.4

-

-

... More
Bus Route

450

-

-

... More
Making through holes in plain or reinforced cement concrete with diamond core drilling system by using BOSCH power tools of following diameters - depth per cm

-

-

-

... More
Non Bus Route

-

-

-

... More
110mm

600

-

-

... More
160mm

150

-

-

... More
Bus Route

-

-

-

... More
110mm

250

-

-

... More
160mm

75

-

-

... More
Providing form work with centering for soffits of reinforced cement concrete slabs or plain surfaces including shuttering for

-

-

-

... More
For end concrete

70.8

-

-

... More
Supply, delivery, erection of sheet piles and fixing in position using timbering for trenches of average depths of 1.5m to 2.0m, including hire charges of sheet piles, dismantling the shoring after completion of work, etc., complete.

-

-

-

... More
Non Bus Route

-

-

-

... More
250mm

-

-

-

... More
For 3.0m deep

4

-

-

... More
For 3.5m deep

3

-

-

... More
Bus Route

-

-

-

... More
250mm

-

-

-

... More
For 3.0m deep

4

-

-

... More
For 3.5m deep

3

-

-

... More
Temporary bypassing of sewer including Plugging the mouth of pipe/s inside sewer manhole using suitable plugging system and installation of bypass arrangement for bypassing the sewage flow, including, but not limited, to pumps, pipes, connections, couplings, electrical accessories, support traffic diversions arrangements etc. including desilting of manholes, disposal of debris as per the instructions of Engineer-in-Charge and keeping the manhole free from seepage and removal of bypass by deplugging the mouth of pipe inside sewer manhole and removal of by pass system and making the sewer system operational including all labour, Machinery, material, taxes etc. as per the specifications and directions of the Engineer.

-

-

-

... More
Non Bus Route

-

-

-

... More
For manholes of pipes upto 1200 mm dia

202

-

-

... More
Bus Route

-

-

-

... More
For manholes of pipes upto 1200 mm dia

42

-

-

... More
As built survey every sewage and water pipeline and other assetsmust be done using DGPS based RTK method by transferring the coordinates from the nearest static GCP of CMWSSB. Where there are signal interruption for the RTK method, Total station can be used. The coordinates from the static GCP shall be transferred to the Total Station by RTK method and the co-odinates of the assets can then be captured by Total Station. All the features, attributes of all the assets, utilities captured shall be Geo reference as per standard coordinate reference system ( WGS 84 UTM Zone 44N). The final basemap with assets and utilities shall be furnished in (.shp) format. The geo reference assets and utilities along with the attributes (as specified by the GIS Wing, CMWSSB) shall be converted into proper geo database (FGDB/PGDB) with the attributes. One set Hard and Soft copy of all the CMWSSB assets and utility has to be prepared category wise network wise in A0 print for verification in a print scale of 1:1000 in A0 plot, with standard legends in international and NUIS standards and should be legible and three sets of final hard copy in A0 print. a.For the undergrond/surface assets along the roads for the distance ranging from: (2KM) = 19000/-. in this estimate 330m length

-

-

-

... More
2-5 km

7.32

-

-

... More
For the Point Underground Surface Assets along the Road

3353

-

-

... More
Hire charges for diesel pumpset for 5 HP with fuel and crew charges including transportation

2048

-

-

... More
Bill No. 8C - Strengthening of sewer collection system in Vyasarpadi SPS and Damodaran Nagar Roadside SPS commanding Area (Depot 46), Area-IV

-

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
Non Bus Route

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 1 m deep

1212

-

-

... More
at 1.5 m deep

1488

-

-

... More
at 2 m deep

300

-

-

... More
at 2.5m deep

300

-

-

... More
at 3.0m deep

300

-

-

... More
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.

-

-

-

... More
Non Bus Route

58.32

-

-

... More
Bus Route

15.12

-

-

... More
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
Non Bus Route

-

-

-

... More
at 1.5m deep

50

-

-

... More
Bus Route

-

-

-

... More
at 1.5m deep

6

-

-

... More
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles including material and labour cost, Providing CI steps,fixing FRC Machine Hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast Machine Holes at the required position as directed by the engineer at site including testing the Machine Hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.

-

-

-

... More
Non Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 2.0m deep

10

-

-

... More
at 2.5m deep

10

-

-

... More
Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 2.0m deep

14

-

-

... More
Construction of RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,sinking well kerb below 2m from G.L.or by open excavation for various depth as per site condition with M30 mix for side wall, raft and roof slab,including cost of steel reinforcement ,including bailing and pumping out water, formwork, plugging the bottom with PCC 1:3:6 using 40mm hard broken granite jelly, laying plain cement concrete 1:3:6 using 12mm to 20mm hard broken granite jelly for fixing frame, fixing FRC Machine Hole cover and frame, providing CI steps, ,benching and channelling including refilling the trenches with excavated earth and disposal of earth etc. Including testing the Machine Hole with water for 48hours to check water tightness and rectifying the defects if any complete for the following size of Machine Holes.

-

-

-

... More
Non Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 3.0m deep

10

-

-

... More
Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 3.5m deep

5

-

-

... More
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.

-

-

-

... More
Non Bus Route

15

-

-

... More
Bus Route

10

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.

-

-

-

... More
Non Bus Route

7200

-

-

... More
Bus Route

1200

-

-

... More
Road Cutting

-

-

-

... More
Non Bus Route

-

-

-

... More
Asphait Road

731.7

-

-

... More
Concret Road

360

-

-

... More
Bus Route

-

-

-

... More
NH/SH

90

-

-

... More
Extra cost for Road Cutting(if thickness of Bitumen15cm)

-

-

-

... More
Non Bus Route

-

-

-

... More
Asphait Road

648

-

-

... More
Bus Route

-

-

-

... More
NH/SH

108

-

-

... More
Cutting DWC Pipes

-

-

-

... More
250mm

18

-

-

... More
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete

-

-

-

... More
Non Bus Route

-

-

-

... More
110mm dia upto a depth of 1.0m

1400

-

-

... More
160mm dia upto a depth of 1.5m

400

-

-

... More
Bus Route

-

-

-

... More
110mm dia upto a depth of 1.0m

600

-

-

... More
160mm dia upto a depth of 1.5m

200

-

-

... More
Inspection Chamber : Construction of inspection chambers of following sizes with earth work excavation for foundation, 23cm thick concrete bed using 40mm brick jelly concrete in C.M. 1:4:10 for foundation, brick work in C.M. 1:6 for chamber, plastering with C.M. 1:3,12mm thick, benching, channelling, supplying and fixing 60x60cm medium weight L.S. cover and frame, etc., complete for

-

-

-

... More
Non Bus Route

-

-

-

... More
60 x 60 x 105cm

350

-

-

... More
60 x 60 x 150cm

100

-

-

... More
Bus Route

-

-

-

... More
60 x 60 x 105cm

150

-

-

... More
60 x 60 x 150cm

50

-

-

... More
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.

-

-

-

... More
Non Bus Route

-

-

-

... More
Bedding

936

-

-

... More
Backfill Envelope (Sidefill)

360

-

-

... More
Bus Route

-

-

-

... More
Bedding

144

-

-

... More
Backfill Envelope (Sidefill)

72

-

-

... More
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).

-

-

-

... More
Non Bus Route

4320

-

-

... More
Bus Route

720

-

-

... More
Disposal of surplus earth (for DWC PE or PP pipe length)

-

-

-

... More
Non Bus Route

1296

-

-

... More
Bus Route

216

-

-

... More
Making through holes in plain or reinforced cement concrete with diamond core drilling system by using BOSCH power tools of following diameters - depth per cm

-

-

-

... More
Non Bus Route

-

-

-

... More
110mm

350

-

-

... More
160mm

100

-

-

... More
Bus Route

-

-

-

... More
110mm

150

-

-

... More
160mm

50

-

-

... More
Providing form work with centering for soffits of reinforced cement concrete slabs or plain surfaces including shuttering for

-

-

-

... More
For end concrete

60

-

-

... More
Supply, delivery, erection of sheet piles and fixing in position using timbering for trenches of average depths of 1.5m to 2.0m, including hire charges of sheet piles, dismantling the shoring after completion of work, etc., complete.

-

-

-

... More
Non Bus Route

-

-

-

... More
250mm

-

-

-

... More
For 3.0m deep

4

-

-

... More
Bus Route

-

-

-

... More
250mm

-

-

-

... More
For 3.0m deep

4

-

-

... More
Temporary bypassing of sewer including Plugging the mouth of pipe/s inside sewer manhole using suitable plugging system and installation of bypass arrangement for bypassing the sewage flow, including, but not limited, to pumps, pipes, connections, couplings, electrical accessories, support traffic diversions arrangements etc. including desilting of manholes, disposal of debris as per the instructions of Engineer-in-Charge and keeping the manhole free from seepage and removal of bypass by deplugging the mouth of pipe inside sewer manhole and removal of by pass system and making the sewer system operational including all labour, Machinery, material, taxes etc. as per the specifications and directions of the Engineer.

-

-

-

... More
Non Bus Route

-

-

-

... More
For manholes of pipes upto 1200 mm dia

120

-

-

... More
Bus Route

-

-

-

... More
For manholes of pipes upto 1200 mm dia

20

-

-

... More
Hire charges for diesel pumpset for 5 HP with fuel and crew charges including transportation

1680

-

-

... More
As built survey every sewage and water pipeline and other assetsmust be done using DGPS based RTK method by transferring the coordinates from the nearest static GCP of CMWSSB. Where there are signal interruption for the RTK method, Total station can be used. The coordinates from the static GCP shall be transferred to the Total Station by RTK method and the co-odinates of the assets can then be captured by Total Station. All the features, attributes of all the assets, utilities captured shall be Geo reference as per standard coordinate reference system ( WGS 84 UTM Zone 44N). The final basemap with assets and utilities shall be furnished in (.shp) format. The geo reference assets and utilities along with the attributes (as specified by the GIS Wing, CMWSSB) shall be converted into proper geo database (FGDB/PGDB) with the attributes. One set Hard and Soft copy of all the CMWSSB assets and utility has to be prepared category wise network wise in A0 print for verification in a print scale of 1:1000 in A0 plot, with standard legends in international and NUIS standards and should be legible and three sets of final hard copy in A0 print. a.For the undergrond/surface assets along the roads for the distance ranging from: (2KM) = 19000/-. in this estimate 330m length

-

-

-

... More
2 to 5 km

4.2

-

-

... More
For the Point Underground Surface Assets along the Road

2055

-

-

... More
Bill No. 9 : Strengthening of sewer collection system in Vyasarpadi lake area SPS and Damodaran nagar, Roadside SPS commanding area (Depot 44, 45 and 46), Area IV

-

-

-

... More
Bill No. 9A Strengthening of sewer collection system in RK Nagar (South) SPS commanding Area (Depot 41 and 47), Area-IV

-

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
Non Bus Route

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 1.5 m deep

20.2

-

-

... More
at 2 m deep

79.5

-

-

... More
Bus Route

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 2 m deep

140.6

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
Non Bus Route

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 2.5 m deep

191.2

-

-

... More
at 3 m deep

68.1

-

-

... More
at 3.5 m deep

325.7

-

-

... More
at 4 m deep

244.3

-

-

... More
at 4.5 m deep

87

-

-

... More
358/300mm OD/ID DWC PE or PP pipe

-

-

-

... More
at 3 m deep

53.7

-

-

... More
597/500mm OD/ID DWC PE or PP pipe

-

-

-

... More
at 3.5 m deep

30.2

-

-

... More
at 4 m deep

15.3

-

-

... More
at 4.5 m deep

25.7

-

-

... More
Bus Route

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 2.5 m deep

83.7

-

-

... More
at 3 m deep

297.5

-

-

... More
at 3.5 m deep

234.4

-

-

... More
480/400mm OD/ID DWC PE or PP pipe

-

-

-

... More
at 3 m deep

113.7

-

-

... More
at 3.5 m deep

14.7

-

-

... More
597/500mm OD/ID DWC PE or PP pipe

-

-

-

... More
at 3.5 m deep

28.7

-

-

... More
Supply, delivery of CI socket spigot pipes of LA class including rubber gaskets as per the latest revision of IS 1536, laying, jointing and testing CI pipes (LA class) including earth work excavation for trenches in hard stiff clay, black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and initial lift of 2m, lowering the pipes in to the trenches, aligning, making rubber joints, testing CI pipes, refilling the trenches with excavated soil, watering and ramming to consolidation, disposal of surplus earth including timbering the trenches for the depths of 2.5m and above, pumping out sub soil water etc., complete. (For Gravity Sewers)

-

-

-

... More
Non Bus Route

-

-

-

... More
250mm dia CI pipe

-

-

-

... More
at 5 m deep

61.6

-

-

... More
300mm dia CI pipe

-

-

-

... More
at 5 m deep

78.9

-

-

... More
400mm dia CI pipe

-

-

-

... More
at 5 m deep

83.3

-

-

... More
at 5.5 m deep

47

-

-

... More
500mm dia CI pipe

-

-

-

... More
at 4.5 m deep

67.7

-

-

... More
at 5 m deep

98

-

-

... More
600mm dia CI pipe

-

-

-

... More
at 5 m deep

20.2

-

-

... More
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.

-

-

-

... More
Non Bus Route

33.87

-

-

... More
Bus Route

14.89

-

-

... More
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
Non Bus Route

-

-

-

... More
at 1.5m deep

5

-

-

... More
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles including material and labour cost, Providing CI steps,fixing FRC Machine Hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast Machine Holes at the required position as directed by the engineer at site including testing the Machine Hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.

-

-

-

... More
Non Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 2.0m deep

3

-

-

... More
at 2.5m deep

7

-

-

... More
Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 2.0m deep

7

-

-

... More
at 2.5m deep

3

-

-

... More
Construction of RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,sinking well kerb below 2m from G.L.or by open excavation for various depth as per site condition with M30 mix for side wall, raft and roof slab,including cost of steel reinforcement ,including bailing and pumping out water, formwork, plugging the bottom with PCC 1:3:6 using 40mm hard broken granite jelly, laying plain cement concrete 1:3:6 using 12mm to 20mm hard broken granite jelly for fixing frame, fixing FRC Machine Hole cover and frame, providing CI steps, ,benching and channelling including refilling the trenches with excavated earth and disposal of earth etc. Including testing the Machine Hole with water for 48hours to check water tightness and rectifying the defects if any complete for the following size of Machine Holes.

-

-

-

... More
Non Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 3.0m deep

12

-

-

... More
at 3.5m deep

13

-

-

... More
at 4.0m deep

12

-

-

... More
at 4.5m deep

4

-

-

... More
at 5m deep

9

-

-

... More
at 5.5m deep

3

-

-

... More
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)

-

-

-

... More
at 3.5m deep

3

-

-

... More
at 4.0m deep

3

-

-

... More
at 4.5m deep

7

-

-

... More
at 5m deep

9

-

-

... More
Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 3.0m deep

18

-

-

... More
at 3.5m deep

16

-

-

... More
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)

-

-

-

... More
at 3.5m deep

1

-

-

... More
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.

-

-

-

... More
Non Bus Route

3

-

-

... More
Bus Route

2

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.

-

-

-

... More
Non Bus Route

3195.2

-

-

... More
Bus Route

1826.6

-

-

... More
Road Cutting

-

-

-

... More
Non Bus Route

-

-

-

... More
Asphalt Road

2013

-

-

... More
Concrete Road

637.65

-

-

... More
Bus Route

-

-

-

... More
Asphalt Road

914.3

-

-

... More
Cutting DWC Pipes

-

-

-

... More
250mm

59

-

-

... More
300mm

2

-

-

... More
400mm

4

-

-

... More
500mm

3

-

-

... More
Cutting CI Pipes

-

-

-

... More
250mm dia CI pipe

2

-

-

... More
300mm dia CI pipe

3

-

-

... More
400mm dia CI pipe

4

-

-

... More
500mm dia CI pipe

6

-

-

... More
600mm dia CI pipe

1

-

-

... More
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete

-

-

-

... More
Non Bus Route

-

-

-

... More
110mm dia upto a depth of 1.0m

1742

-

-

... More
160mm dia upto a depth of 1.5m

436

-

-

... More
Bus Route

-

-

-

... More
110mm dia upto a depth of 1.0m

53

-

-

... More
160mm dia upto a depth of 1.5m

13

-

-

... More
Inspection Chamber : Construction of inspection chambers of following sizes with earth work excavation for foundation, 23cm thick concrete bed using 40mm brick jelly concrete in C.M. 1:4:10 for foundation, brick work in C.M. 1:6 for chamber, plastering with C.M. 1:3,12mm thick, benching, channelling, supplying and fixing 60x60cm medium weight L.S. cover and frame, etc., complete for

-

-

-

... More
Non Bus Route

-

-

-

... More
60 x 60 x 105cm

159

-

-

... More
60 x 60 x 150cm

40

-

-

... More
Bus Route

-

-

-

... More
60 x 60 x 105cm

5

-

-

... More
60 x 60 x 150cm

1

-

-

... More
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.

-

-

-

... More
Non Bus Route

-

-

-

... More
Bedding

191.54

-

-

... More
Backfill Envelope (Sidefill)

820.8

-

-

... More
Bus Route

-

-

-

... More
Bedding

99.32

-

-

... More
Backfill Envelope (Sidefill)

401.71

-

-

... More
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).

-

-

-

... More
Non Bus Route

3742.61

-

-

... More
Bus Route

2529.15

-

-

... More
Disposal of surplus earth (for DWC PE or PP pipe length)

-

-

-

... More
Non Bus Route

727.72

-

-

... More
Bus Route

583.98

-

-

... More
Making through holes in plain or reinforced cement concrete with diamond core drilling system by using BOSCH power tools of following diameters - depth per cm

-

-

-

... More
Non Bus Route

-

-

-

... More
110mm

159

-

-

... More
160mm

40

-

-

... More
Bus Route

-

-

-

... More
160mm

1

-

-

... More
Providing form work with centering for soffits of reinforced cement concrete slabs or plain surfaces including shuttering for

-

-

-

... More
For end concrete

587.6

-

-

... More
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.

-

-

-

... More
250mm

255

-

-

... More
300mm

9

-

-

... More
400mm

21

-

-

... More
500mm

17

-

-

... More
Supply, delivery, erection of sheet piles and fixing in position using timbering for trenches of average depths of 1.5m to 2.0m, including hire charges of sheet piles, dismantling the shoring after completion of work, etc., complete.

-

-

-

... More
Non Bus Route

-

-

-

... More
250mm

-

-

-

... More
For 1.5m deep

20.2

-

-

... More
For 2.0m deep

79.5

-

-

... More
Bus Route

-

-

-

... More
250mm

-

-

-

... More
For 2.0m deep

140.6

-

-

... More
Temporary bypassing of sewer including Plugging the mouth of pipe/s inside sewer manhole using suitable plugging system and installation of bypass arrangement for bypassing the sewage flow, including, but not limited, to pumps, pipes, connections, couplings, electrical accessories, support traffic diversions arrangements etc. including desilting of manholes, disposal of debris as per the instructions of Engineer-in-Charge and keeping the manhole free from seepage and removal of bypass by deplugging the mouth of pipe inside sewer manhole and removal of by pass system and making the sewer system operational including all labour, Machinery, material, taxes etc. as per the specifications and directions of the Engineer.

-

-

-

... More
Non Bus Route

-

-

-

... More
For manholes of pipes upto 1200 mm dia

26

-

-

... More
Bus Route

-

-

-

... More
For manholes of pipes upto 1200 mm dia

13

-

-

... More
Dismantling of manhole including R.C.C. top slab, C.I. cover with frame including stacking of useful material including bricks duly cleaned from mortar near the site and disposal of unserviceable materials into railway dumps within 50m lead including all excavation, refilling watering and ramming etc. complete

-

-

-

... More
Non Bus Route

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
at 1.5m deep

2

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 2.0m deep

2

-

-

... More
at 2.5m deep

7

-

-

... More
at 3.0m deep

12

-

-

... More
at 3.5m deep

12

-

-

... More
at 4.0m deep

11

-

-

... More
at 4.5m deep

4

-

-

... More
at 5m deep

8

-

-

... More
at 5.5m deep

2

-

-

... More
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)

-

-

-

... More
at 3.5m deep

1

-

-

... More
at 4.0m deep

1

-

-

... More
at 4.5m deep

4

-

-

... More
at 5m deep

6

-

-

... More
Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 2.0m deep

7

-

-

... More
at 2.5m deep

3

-

-

... More
at 3.0m deep

13

-

-

... More
at 3.5m deep

6

-

-

... More
Road Cutting

-

-

-

... More
Non Bus Route

-

-

-

... More
Asphalt Road

3340

-

-

... More
Concrete Road

882.59

-

-

... More
Bus Route

-

-

-

... More
Asphalt Road

983.58

-

-

... More
State Highways/ National Highways

235.17

-

-

... More
Supplying and filling Crushed stone sand (M-sand) for foundations and basement including watering consolidating ramming, etc., complete for Permanent plugging of Machinehole

-

-

-

... More
Bus Route

-

-

-

... More
Precast circular RCC Machine Holes

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 2.0m deep

9.05

-

-

... More
at 2.5m deep

5.65

-

-

... More
Cast-Insitu RCC Machine Holes

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 3.0m deep

10.18

-

-

... More
at 3.5m deep

3.96

-

-

... More
Non Bus Route

-

-

-

... More
Precast circular RCC Machine Holes

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 2.0m deep

4.52

-

-

... More
at 2.5m deep

2.83

-

-

... More
Cast-Insitu RCC Machine Holes

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 3.0m deep

10.18

-

-

... More
at 4.0m deep

9.05

-

-

... More
at 5m deep

16.96

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete For Connection of existing conduit with replaced conduit in case of Parallel laying

-

-

-

... More
Non Bus Route

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 2 m deep

10

-

-

... More
Bus Route

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 2 m deep

20

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete For Connection of existing conduit with replaced conduit in case of Parallel laying

-

-

-

... More
Non Bus Route

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 2.5 m deep

5

-

-

... More
at 3 m deep

5

-

-

... More
at 4 m deep

5

-

-

... More
at 4.5 m deep

5

-

-

... More
358/300mm OD/ID DWC PE or PP pipe

-

-

-

... More
at 3 m deep

10

-

-

... More
Bus Route

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 2.5 m deep

10

-

-

... More
at 3 m deep

10

-

-

... More
480/400mm OD/ID DWC PE or PP pipe

-

-

-

... More
at 3 m deep

10

-

-

... More
Supply, delivery of CI socket spigot pipes of LA class including rubber gaskets as per the latest revision of IS 1536, laying, jointing and testing CI pipes (LA class) including earth work excavation for trenches in hard stiff clay, black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and initial lift of 2m, lowering the pipes in to the trenches, aligning, making rubber joints, testing CI pipes, refilling the trenches with excavated soil, watering and ramming to consolidation, disposal of surplus earth including timbering the trenches for the depths of 2.5m and above, pumping out sub soil water etc., complete. (For Gravity Sewers)

-

-

-

... More
Non Bus Route

-

-

-

... More
300mm dia CI pipe

-

-

-

... More
at 5 m deep

10

-

-

... More
400mm dia CI pipe

-

-

-

... More
at 5 m deep

5

-

-

... More
600mm dia CI pipe

-

-

-

... More
at 5 m deep

5

-

-

... More
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete For Parallel line Connection

-

-

-

... More
Non Bus Route

-

-

-

... More
110mm dia upto a depth of 1.0m

634

-

-

... More
160mm dia upto a depth of 1.5m

158

-

-

... More
Bus Route

-

-

-

... More
110mm dia upto a depth of 1.0m

907

-

-

... More
160mm dia upto a depth of 1.5m

227

-

-

... More
Hire charges for diesel pumpset for 5 HP for dewatering the sub-soil water and others

2160

-

-

... More
As built survey every sewage and water pipeline and other assets must be done using DGPS based RTK method by transferring the coordinates from the nearest static GCP of CMWSSB. Where there are signal interruption for the RTK method, Total station can be used. The coordinates from the static GCP shall be transferred to the Total Station by RTK method and the co-odinates of the assets can then be captured by Total Station. All the features, attributes of all the assets, utilities captured shall be Geo reference as per standard coordinate reference system ( WGS 84 UTM Zone 44N). The final basemap with assets and utilities shall be furnished in (.shp) format. The geo reference assets and utilities along with the attributes (as specified by the GIS Wing, CMWSSB) shall be converted into proper geo database (FGDB/PGDB) with the attributes. One set Hard and Soft copy of all the CMWSSB assets and utility has to be prepared category wise network wise in A0 print for verification in a print scale of 1:1000 in A0 plot, with standard legends in international and NUIS standards and should be legible and three sets of final hard copy in A0 print. a.For the undergrond/surface assets along the roads for the distance ranging from: (2KM) = 19000/-. in this estimate 330m length

-

-

-

... More
2 to 5 km

4.7

-

-

... More
For the Point Underground Surface Assets along the Road

396

-

-

... More
Bill No. 9B Strengthening of sewer collection system in New Sastri SPS commanding Area (Depot 47), Area-IV

-

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
Non Bus Route

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 1.5 m deep

70.1

-

-

... More
at 2 m deep

152.6

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
Non Bus Route

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 2.5 m deep

110.8

-

-

... More
at 3 m deep

29.8

-

-

... More
at 3.5 m deep

14.2

-

-

... More
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.

-

-

-

... More
Non Bus Route

6.46

-

-

... More
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
Non Bus Route

-

-

-

... More
at 1.5m deep

7

-

-

... More
Construction of RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,sinking well kerb below 2m from G.L.or by open excavation for various depth as per site condition with M30 mix for side wall, raft and roof slab,including cost of steel reinforcement ,including bailing and pumping out water, formwork, plugging the bottom with PCC 1:3:6 using 40mm hard broken granite jelly, laying plain cement concrete 1:3:6 using 12mm to 20mm hard broken granite jelly for fixing frame, fixing FRC Machine Hole cover and frame, providing CI steps, ,benching and channelling including refilling the trenches with excavated earth and disposal of earth etc. Including testing the Machine Hole with water for 48hours to check water tightness and rectifying the defects if any complete for the following size of Machine Holes.

-

-

-

... More
Non Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 3.0m deep

8

-

-

... More
at 3.5m deep

1

-

-

... More
Construction of RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,sinking well kerb below 2m from G.L.or by open excavation for various depth as per site condition with M30 mix for side wall, raft and roof slab,including cost of steel reinforcement ,including bailing and pumping out water, formwork, plugging the bottom with PCC 1:3:6 using 40mm hard broken granite jelly, laying plain cement concrete 1:3:6 using 12mm to 20mm hard broken granite jelly for fixing frame, fixing FRC Machine Hole cover and frame, providing CI steps, ,benching and channelling including refilling the trenches with excavated earth and disposal of earth etc. Including testing the Machine Hole with water for 48hours to check water tightness and rectifying the defects if any complete for the following size of Machine Holes.

-

-

-

... More
Non Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 3.0m deep

5

-

-

... More
at 3.5m deep

5

-

-

... More
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.

-

-

-

... More
Non Bus Route

1

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.

-

-

-

... More
Non Bus Route

755

-

-

... More
Road Cutting

-

-

-

... More
Non Bus Route

-

-

-

... More
Asphalt Road

338.15

-

-

... More
Concrete Road

92.19

-

-

... More
Cutting DWC Pipes

-

-

-

... More
250mm

13

-

-

... More
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete

-

-

-

... More
Non Bus Route

-

-

-

... More
110mm dia upto a depth of 1.0m

192

-

-

... More
160mm dia upto a depth of 1.5m

48

-

-

... More
Inspection Chamber : Construction of inspection chambers of following sizes with earth work excavation for foundation, 23cm thick concrete bed using 40mm brick jelly concrete in C.M. 1:4:10 for foundation, brick work in C.M. 1:6 for chamber, plastering with C.M. 1:3,12mm thick, benching, channelling, supplying and fixing 60x60cm medium weight L.S. cover and frame, etc., complete for

-

-

-

... More
Non Bus Route

-

-

-

... More
60 x 60 x 105cm

48

-

-

... More
60 x 60 x 150cm

12

-

-

... More
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.

-

-

-

... More
Non Bus Route

-

-

-

... More
Bedding

34.84

-

-

... More
Backfill Envelope (Sidefill)

129.25

-

-

... More
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).

-

-

-

... More
Non Bus Route

658.01

-

-

... More
Disposal of surplus earth (for DWC PE or PP pipe length)

-

-

-

... More
Non Bus Route

189.9

-

-

... More
Making through holes in plain or reinforced cement concrete with diamond core drilling system by using BOSCH power tools of following diameters - depth per cm

-

-

-

... More
Non Bus Route

-

-

-

... More
110mm

48

-

-

... More
160mm

12

-

-

... More
Providing form work with centering for soffits of reinforced cement concrete slabs or plain surfaces including shuttering for

-

-

-

... More
For end concrete

77.9

-

-

... More
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.

-

-

-

... More
250mm

26

-

-

... More
Supply, delivery, erection of sheet piles and fixing in position using timbering for trenches of average depths of 1.5m to 2.0m, including hire charges of sheet piles, dismantling the shoring after completion of work, etc., complete.

-

-

-

... More
Non Bus Route

-

-

-

... More
250mm

-

-

-

... More
For 1.5m deep

70.1

-

-

... More
For 2.0m deep

152.6

-

-

... More
Temporary bypassing of sewer including Plugging the mouth of pipe/s inside sewer manhole using suitable plugging system and installation of bypass arrangement for bypassing the sewage flow,including, but not limited, to pumps, pipes, connections, couplings, electrical accessories, support traffic diversions arrangements etc. including desilting of manholes, disposal of debris as per the instructions of Engineer-in-Charge and keeping the manhole free from seepage and removal of bypass by deplugging the mouth of pipe inside sewer manhole and removal of by pass system and making the sewer system operational including all labour, Machinery, material, taxes etc. as per the specifications and directions of the Engineer.

-

-

-

... More
Non Bus Route

-

-

-

... More
For manholes of pipes upto 1200 mm dia

6

-

-

... More
Dismantling of manhole including R.C.C. top slab, C.I. cover with frame including stacking of useful material including bricks duly cleaned from mortar near the site and disposal of unserviceable materials into railway dumps within 50m lead including all excavation, refilling watering and ramming etc. complete

-

-

-

... More
Non Bus Route

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
at 1.5m deep

4

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 2.0m deep

10

-

-

... More
at 2.5m deep

1

-

-

... More
at 3.0m deep

2

-

-

... More
at 3.5m deep

2

-

-

... More
Road Restoration

-

-

-

... More
Non Bus Route

-

-

-

... More
Asphalt Road

682.35

-

-

... More
Concrete Road

170.59

-

-

... More
Supplying and filling Crushed stone sand (M-sand) for foundations and basement including watering consolidating ramming, etc., complete for Permanent plugging of Machinehole

-

-

-

... More
Bus Route

-

-

-

... More
Precast circular RCC Machine Holes

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 2.0m deep

2.26

-

-

... More
Cast-Insitu RCC Machine Holes

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 3.5m deep

3.96

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete For Connection of existing conduit with replaced conduit in case of Parallel laying

-

-

-

... More
Non Bus Route

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 2 m deep

5

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete For Connection of existing conduit with replaced conduit in case of Parallel laying

-

-

-

... More
Non Bus Route

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 3.5 m deep

5

-

-

... More
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete For Parallel line Connection

-

-

-

... More
Non Bus Route

-

-

-

... More
110mm dia upto a depth of 1.0m

192

-

-

... More
160mm dia upto a depth of 1.5m

48

-

-

... More
As built survey every sewage and water pipeline and other assetsmust be done using DGPS based RTK method by transferring the coordinates from the nearest static GCP of CMWSSB. Where there are signal interruption for the RTK method, Total station can be used. The coordinates from the static GCP shall be transferred to the Total Station by RTK method and the co-odinates of the assets can then be captured by Total Station. All the features, attributes of all the assets, utilities captured shall be Geo reference as per standard coordinate reference system ( WGS 84 UTM Zone 44N). The final basemap with assets and utilities shall be furnished in (.shp) format. The geo reference assets and utilities along with the attributes (as specified by the GIS Wing, CMWSSB) shall be converted into proper geo database (FGDB/PGDB) with the attributes. One set Hard and Soft copy of all the CMWSSB assets and utility has to be prepared category wise network wise in A0 print for verification in a print scale of 1:1000 in A0 plot, with standard legends in international and NUIS standards and should be legible and three sets of final hard copy in A0 print. a.For the undergrond/surface assets along the roads for the distance ranging from: (2KM) = 19000/-. in this estimate 330m length

-

-

-

... More
2 Km

0.62

-

-

... More
For the Point Underground Surface Assets along the Road

120

-

-

... More
Bill No. 9C Strengthening of sewer collection system in RK Nagar (North) SPS commanding Area (Depot 38 and 41), Area-IV

-

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
Non Bus Route

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 1.5 m deep

1338

-

-

... More
at 2 m deep

273.2

-

-

... More
Bus Route

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 1.5 m deep

34.4

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
Non Bus Route

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 2.5 m deep

64.8

-

-

... More
at 3.5 m deep

560.4

-

-

... More
at 4 m deep

59.1

-

-

... More
358/300mm OD/ID DWC PE or PP pipe

-

-

-

... More
at 3.5 m deep

117.8

-

-

... More
at 4 m deep

57

-

-

... More
480/400mm OD/ID DWC PE or PP pipe

-

-

-

... More
at 4 m deep

193.5

-

-

... More
Bus Route

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 2.5 m deep

22.7

-

-

... More
at 3 m deep

82.2

-

-

... More
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.

-

-

-

... More
Non Bus Route

43.21

-

-

... More
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
Non Bus Route

-

-

-

... More
at 1.5m deep

55

-

-

... More
Bus Route

-

-

-

... More
at 1.5m deep

15

-

-

... More
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles including material and labour cost, Providing CI steps,fixing FRC Machine Hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast Machine Holes at the required position as directed by the engineer at site including testing the Machine Hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.

-

-

-

... More
Non Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 2.0m deep

11

-

-

... More
at 2.5m deep

4

-

-

... More
Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 2.5m deep

1

-

-

... More
Construction of RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,sinking well kerb below 2m from G.L.or by open excavation for various depth as per site condition with M30 mix for side wall, raft and roof slab,including cost of steel reinforcement ,including bailing and pumping out water, formwork, plugging the bottom with PCC 1:3:6 using 40mm hard broken granite jelly, laying plain cement concrete 1:3:6 using 12mm to 20mm hard broken granite jelly for fixing frame, fixing FRC Machine Hole cover and frame, providing CI steps, ,benching and channelling including refilling the trenches with excavated earth and disposal of earth etc. Including testing the Machine Hole with water for 48hours to check water tightness and rectifying the defects if any complete for the following size of Machine Holes.

-

-

-

... More
Non Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 3.5m deep

36

-

-

... More
at 4.0m deep

18

-

-

... More
Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 3.0m deep

9

-

-

... More
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.

-

-

-

... More
Non Bus Route

5

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.

-

-

-

... More
Non Bus Route

5327.6

-

-

... More
Bus Route

139.3

-

-

... More
Road Cutting

-

-

-

... More
Non Bus Route

-

-

-

... More
Asphalt Road

2484.59

-

-

... More
Bus Route

-

-

-

... More
State Highways/ National Highways

142.91

-

-

... More
Cutting DWC Pipes

-

-

-

... More
250mm

82

-

-

... More
300mm

6

-

-

... More
400mm

7

-

-

... More
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete

-

-

-

... More
Non Bus Route

-

-

-

... More
110mm dia upto a depth of 1.0m

3830

-

-

... More
160mm dia upto a depth of 1.5m

958

-

-

... More
Bus Route

-

-

-

... More
110mm dia upto a depth of 1.0m

235

-

-

... More
160mm dia upto a depth of 1.5m

59

-

-

... More
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.

-

-

-

... More
Non Bus Route

-

-

-

... More
Bedding

248.46

-

-

... More
Bus Route

-

-

-

... More
Bedding

14.29

-

-

... More
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).

-

-

-

... More
Non Bus Route

953.55

-

-

... More
Bus Route

54.07

-

-

... More
Disposal of surplus earth (for DWC PE or PP pipe length)

-

-

-

... More
Non Bus Route

1411.51

-

-

... More
Bus Route

77.89

-

-

... More
Making through holes in plain or reinforced cement concrete with diamond core drilling system by using BOSCH power tools of following diameters - depth per cm

-

-

-

... More
Non Bus Route

-

-

-

... More
110mm

548

-

-

... More
160mm

137

-

-

... More
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.

-

-

-

... More
250mm

812

-

-

... More
300mm

59

-

-

... More
400mm

65

-

-

... More
Temporary bypassing of sewer including Plugging the mouth of pipe/s inside sewer manhole using suitable plugging system and installation of bypass arrangement for bypassing the sewage flow, including, but not limited, to pumps, pipes,connections, couplings,electrical accessories, support traffic diversions arrangements etc.including desilting of manholes, disposal of debris as per the instructions of Engineer-in-Charge and keeping the manhole free from seepage and removal of bypass by deplugging the mouth of pipe inside sewer manhole and removal of by pass system and making the sewer system operational including all labour,Machinery, material, taxes etc. as per the specifications and directions of the Engineer.

-

-

-

... More
Non Bus Route

-

-

-

... More
For manholes of pipes upto 1200 mm dia

114

-

-

... More
Bus Route

-

-

-

... More
For manholes of pipes upto 1200 mm dia

7

-

-

... More
As built survey every sewage and water pipeline and other assetsmust be done using DGPS based RTK method by transferring the coordinates from the nearest static GCP of CMWSSB. Where there are signal interruption for the RTK method, Total station can be used. The coordinates from the static GCP shall be transferred to the Total Station by RTK method and the co-odinates of the assets can then be captured by Total Station. All the features, attributes of all the assets, utilities captured shall be Geo reference as per standard coordinate reference system ( WGS 84 UTM Zone 44N). The final basemap with assets and utilities shall be furnished in (.shp) format. The geo reference assets and utilities along with the attributes (as specified by the GIS Wing, CMWSSB) shall be converted into proper geo database (FGDB/PGDB) with the attributes. One set Hard and Soft copy of all the CMWSSB assets and utility has to be prepared category wise network wise in A0 print for verification in a print scale of 1:1000 in A0 plot, with standard legends in international and NUIS standards and should be legible and three sets of final hard copy in A0 print. a.For the undergrond/surface assets along the roads for the distance ranging from: (2KM) = 19000/-. in this estimate 330m length

-

-

-

... More
5 to 15 Km

2.8

-

-

... More
For the Point Underground Surface Assets along the Road

1368

-

-

... More
Hire charges for diesel pumpset for 3 HP with fuel and crew charges including transportation

720

-

-

... More
Bill No. 9D Strengthening of sewer collection system in Tondiarpet A SPS commanding Area (Depot 42 and 48), Area-IV

-

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
Non Bus Route

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 1 m deep

50.21

-

-

... More
at 1.5 m deep

1668.72

-

-

... More
at 2 m deep

505.43

-

-

... More
Bus Route

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 2 m deep

61.45

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
Non Bus Route

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 2.5 m deep

594.2

-

-

... More
at 3 m deep

206.77

-

-

... More
at 3.5 m deep

49.9

-

-

... More
358/300mm OD/ID DWC PE or PP pipe

-

-

-

... More
at 3.5 m deep

50.8

-

-

... More
480/400mm OD/ID DWC PE or PP pipe

-

-

-

... More
at 3.5 m deep

141.39

-

-

... More
at 4 m deep

167.3

-

-

... More
at 4.5 m deep

50.88

-

-

... More
597/500mm OD/ID DWC PE or PP pipe

-

-

-

... More
at 3.5 m deep

24.12

-

-

... More
at 4 m deep

71.11

-

-

... More
at 4.5 m deep

98.93

-

-

... More
Bus Route

-

-

-

... More
480/400mm OD/ID DWC PE or PP pipe

-

-

-

... More
at 3.5 m deep

85.46

-

-

... More
Supply, delivery of CI socket spigot pipes of LA class including rubber gaskets as per the latest revision of IS 1536, laying, jointing and testing CI pipes (LA class) including earth work excavation for trenches in hard stiff clay, black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and initial lift of 2m, lowering the pipes in to the trenches, aligning, making rubber joints, testing CI pipes, refilling the trenches with excavated soil, watering and ramming to consolidation, disposal of surplus earth including timbering the trenches for the depths of 2.5m and above, pumping out sub soil water etc., complete. (For Gravity Sewers)

-

-

-

... More
Non Bus Route

-

-

-

... More
500mm dia CI pipe

-

-

-

... More
at 5 m deep

59.07

-

-

... More
700mm dia CI pipe

-

-

-

... More
at 5 m deep

13.15

-

-

... More
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.

-

-

-

... More
Non Bus Route

71.06

-

-

... More
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
Non Bus Route

-

-

-

... More
at 1.0m deep

9

-

-

... More
at 1.5m deep

81

-

-

... More
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles including material and labour cost, Providing CI steps,fixing FRC Machine Hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast Machine Holes at the required position as directed by the engineer at site including testing the Machine Hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.

-

-

-

... More
Non Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 2.0m deep

23

-

-

... More
at 2.5m deep

27

-

-

... More
Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 2.0m deep

3

-

-

... More
Construction of RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,sinking well kerb below 2m from G.L.or by open excavation for various depth as per site condition with M30 mix for side wall, raft and roof slab,including cost of steel reinforcement ,including bailing and pumping out water, formwork, plugging the bottom with PCC 1:3:6 using 40mm hard broken granite jelly, laying plain cement concrete 1:3:6 using 12mm to 20mm hard broken granite jelly for fixing frame, fixing FRC Machine Hole cover and frame, providing CI steps, ,benching and channelling including refilling the trenches with excavated earth and disposal of earth etc. Including testing the Machine Hole with water for 48hours to check water tightness and rectifying the defects if any complete for the following size of Machine Holes.

-

-

-

... More
Non Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 3.0m deep

9

-

-

... More
at 3.5m deep

14

-

-

... More
at 4.0m deep

8

-

-

... More
at 4.5m deep

4

-

-

... More
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)

-

-

-

... More
at 3.5m deep

2

-

-

... More
at 4.0m deep

3

-

-

... More
at 4.5m deep

5

-

-

... More
at 5m deep

3

-

-

... More
Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 3.5m deep

4

-

-

... More
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.

-

-

-

... More
Non Bus Route

8

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.

-

-

-

... More
Non Bus Route

7503.96

-

-

... More
Bus Route

146.91

-

-

... More
Road Cutting

-

-

-

... More
Non Bus Route

-

-

-

... More
Asphalt Road

3529.55

-

-

... More
Bus Route

-

-

-

... More
State Highways/ National Highways

142.91

-

-

... More
Cutting DWC Pipes

-

-

-

... More
250mm

105

-

-

... More
300mm

2

-

-

... More
400mm

15

-

-

... More
500mm

7

-

-

... More
Cutting CI Pipes

-

-

-

... More
700mm dia CI pipe

2

-

-

... More
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete

-

-

-

... More
Non Bus Route

-

-

-

... More
110mm dia upto a depth of 1.0m

5846

-

-

... More
160mm dia upto a depth of 1.5m

1462

-

-

... More
Bus Route

-

-

-

... More
110mm dia upto a depth of 1.0m

235

-

-

... More
160mm dia upto a depth of 1.5m

59

-

-

... More
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.

-

-

-

... More
Non Bus Route

-

-

-

... More
Bedding

364.49

-

-

... More
Bus Route

-

-

-

... More
Bedding

15.6

-

-

... More
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).

-

-

-

... More
Non Bus Route

1481.42

-

-

... More
Bus Route

69.51

-

-

... More
Disposal of surplus earth (for DWC PE or PP pipe length)

-

-

-

... More
Non Bus Route

2202.03

-

-

... More
Bus Route

104.77

-

-

... More
Making through holes in plain or reinforced cement concrete with diamond core drilling system by using BOSCH power tools of following diameters - depth per cm

-

-

-

... More
Non Bus Route

-

-

-

... More
110mm

836

-

-

... More
160mm

209

-

-

... More
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.

-

-

-

... More
250mm

1046

-

-

... More
300mm

17

-

-

... More
400mm

149

-

-

... More
500mm

85

-

-

... More
600mm

5

-

-

... More
Temporary bypassing of sewer including Plugging the mouth of pipe/s inside sewer manhole using suitable plugging system and installation of bypass arrangement for bypassing the sewage flow, including, but not limited, to pumps, pipes,connections, couplings,electrical accessories, support traffic diversions arrangements etc.including desilting of manholes, disposal of debris as per the instructions of Engineer-in-Charge and keeping the manhole free from seepage and removal of bypass by deplugging the mouth of pipe inside sewer manhole and removal of by pass system and making the sewer system operational including all labour,Machinery, material, taxes etc. as per the specifications and directions of the Engineer.

-

-

-

... More
Non Bus Route

-

-

-

... More
For manholes of pipes upto 1200 mm dia

174

-

-

... More
Bus Route

-

-

-

... More
For manholes of pipes upto 1200 mm dia

7

-

-

... More
As built survey every sewage and water pipeline and other assetsmust be done using DGPS based RTK method by transferring the coordinates from the nearest static GCP of CMWSSB. Where there are signal interruption for the RTK method, Total station can be used. The coordinates from the static GCP shall be transferred to the Total Station by RTK method and the co-odinates of the assets can then be captured by Total Station. All the features, attributes of all the assets, utilities captured shall be Geo reference as per standard coordinate reference system ( WGS 84 UTM Zone 44N). The final basemap with assets and utilities shall be furnished in (.shp) format. The geo reference assets and utilities along with the attributes (as specified by the GIS Wing, CMWSSB) shall be converted into proper geo database (FGDB/PGDB) with the attributes. One set Hard and Soft copy of all the CMWSSB assets and utility has to be prepared category wise network wise in A0 print for verification in a print scale of 1:1000 in A0 plot, with standard legends in international and NUIS standards and should be legible and three sets of final hard copy in A0 print. a.For the undergrond/surface assets along the roads for the distance ranging from: (2KM) = 19000/-. in this estimate 330m length

-

-

-

... More
5 to 15 Km

3.83

-

-

... More
For the Point Underground Surface Assets along the Road

2088

-

-

... More
Hire charges for diesel pumpset for 3 HP with fuel and crew charges including transportation

2688

-

-

... More
Bill No. 9E Strengthening of sewer collection system in Bharathi Nagar SPS commanding Area (Depot 47), Area-IV

-

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
Non Bus Route

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 1 m deep

126.2

-

-

... More
at 1.5 m deep

597.2

-

-

... More
at 2 m deep

76.6

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
Non Bus Route

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 2.5 m deep

134.2

-

-

... More
at 3 m deep

99.9

-

-

... More
at 3.5 m deep

92.1

-

-

... More
480/400mm OD/ID DWC PE or PP pipe

-

-

-

... More
at 2.5 m deep

67.8

-

-

... More
at 3 m deep

230.9

-

-

... More
at 3.5 m deep

58.9

-

-

... More
at 4 m deep

16.9

-

-

... More
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.

-

-

-

... More
Non Bus Route

29.22

-

-

... More
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
Non Bus Route

-

-

-

... More
at 1.0m deep

22

-

-

... More
at 1.5m deep

38

-

-

... More
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles including material and labour cost, Providing CI steps,fixing FRC Machine Hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast Machine Holes at the required position as directed by the engineer at site including testing the Machine Hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.

-

-

-

... More
Non Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 2.0m deep

4

-

-

... More
at 2.5m deep

7

-

-

... More
Construction of RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,sinking well kerb below 2m from G.L.or by open excavation for various depth as per site condition with M30 mix for side wall, raft and roof slab,including cost of steel reinforcement ,including bailing and pumping out water, formwork, plugging the bottom with PCC 1:3:6 using 40mm hard broken granite jelly, laying plain cement concrete 1:3:6 using 12mm to 20mm hard broken granite jelly for fixing frame, fixing FRC Machine Hole cover and frame, providing CI steps, ,benching and channelling including refilling the trenches with excavated earth and disposal of earth etc. Including testing the Machine Hole with water for 48hours to check water tightness and rectifying the defects if any complete for the following size of Machine Holes.

-

-

-

... More
Non Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 3.0m deep

17

-

-

... More
at 3.5m deep

10

-

-

... More
at 4.0m deep

2

-

-

... More
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.

-

-

-

... More
Non Bus Route

3

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.

-

-

-

... More
Non Bus Route

3001.4

-

-

... More
Road Cutting

-

-

-

... More
Non Bus Route

-

-

-

... More
Asphalt Road

1185.44

-

-

... More
Concrete Road

102.27

-

-

... More
Cutting DWC Pipes

-

-

-

... More
250mm

38

-

-

... More
400mm

12

-

-

... More
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete

-

-

-

... More
Non Bus Route

-

-

-

... More
110mm dia upto a depth of 1.0m

106

-

-

... More
160mm dia upto a depth of 1.5m

26

-

-

... More
Inspection Chamber : Construction of inspection chambers of following sizes with earth work excavation for foundation, 23cm thick concrete bed using 40mm brick jelly concrete in C.M. 1:4:10 for foundation, brick work in C.M. 1:6 for chamber, plastering with C.M. 1:3,12mm thick, benching, channelling, supplying and fixing 60x60cm medium weight L.S. cover and frame, etc., complete for

-

-

-

... More
Non Bus Route

-

-

-

... More
60 x 60 x 105cm

10

-

-

... More
60 x 60 x 150cm

3

-

-

... More
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.

-

-

-

... More
Non Bus Route

-

-

-

... More
Bedding

146.69

-

-

... More
Backfill Envelope (Sidefill)

594.65

-

-

... More
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).

-

-

-

... More
Non Bus Route

2591.22

-

-

... More
Disposal of surplus earth (for DWC PE or PP pipe length)

-

-

-

... More
Non Bus Route

886.09

-

-

... More
Making through holes in plain or reinforced cement concrete with diamond core drilling system by using BOSCH power tools of following diameters - depth per cm

-

-

-

... More
Non Bus Route

-

-

-

... More
110mm

10

-

-

... More
160mm

3

-

-

... More
Providing form work with centering for soffits of reinforced cement concrete slabs or plain surfaces including shuttering for

-

-

-

... More
For end concrete

407.26

-

-

... More
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.

-

-

-

... More
250mm

54

-

-

... More
400mm

62

-

-

... More
Supply, delivery, erection of sheet piles and fixing in position using timbering for trenches of average depths of 1.5m to 2.0m, including hire charges of sheet piles, dismantling the shoring after completion of work, etc., complete.

-

-

-

... More
Non Bus Route

-

-

-

... More
250mm

-

-

-

... More
For 1.5m deep

597.2

-

-

... More
For 2.0m deep

76.6

-

-

... More
Temporary bypassing of sewer including Plugging the mouth of pipe/s inside sewer manhole using suitable plugging system and installation of bypass arrangement for bypassing the sewage flow, including, but not limited, to pumps, pipes, connections, couplings, electrical accessories, support traffic diversions arrangements etc. including desilting of manholes, disposal of debris as per the instructions of Engineer-in-Charge and keeping the manhole free from seepage and removal of bypass by deplugging the mouth of pipe inside sewer manhole and removal of by pass system and making the sewer system operational including all labour, Machinery, material, taxes etc. as per the specifications and directions of the Engineer.

-

-

-

... More
Non Bus Route

-

-

-

... More
For manholes of pipes upto 1200 mm dia

23

-

-

... More
Dismantling of manhole including R.C.C. top slab, C.I. cover with frame including stacking of useful material including bricks duly cleaned from mortar near the site and disposal of unserviceable materials into railway dumps within 50m lead including all excavation, refilling watering and ramming etc. complete

-

-

-

... More
Non Bus Route

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
at 1.0m deep

6

-

-

... More
at 1.5m deep

25

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 2.0m deep

4

-

-

... More
at 2.5m deep

5

-

-

... More
at 3.0m deep

17

-

-

... More
at 3.5m deep

10

-

-

... More
at 4.0m deep

2

-

-

... More
Road cutting

-

-

-

... More
Non Bus Route

-

-

-

... More
Asphalt Road

1632.7

-

-

... More
Concrete Road

370.58

-

-

... More
Supplying and filling Crushed stone sand (M-sand) for foundations and basement including watering consolidating ramming, etc., complete for Permanent plugging of Machinehole

-

-

-

... More
Non Bus Route

-

-

-

... More
Brick Machine holes

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
Cast-Insitu RCC Machine Holes

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 3.0m deep

13.57

-

-

... More
at 3.5m deep

15.83

-

-

... More
at 4.0m deep

9.05

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete For Connection of existing conduit with replaced conduit in case of Parallel laying

-

-

-

... More
Non Bus Route

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 2.5 m deep

5

-

-

... More
at 3 m deep

5

-

-

... More
at 3.5 m deep

5

-

-

... More
480/400mm OD/ID DWC PE or PP pipe

-

-

-

... More
at 3 m deep

10

-

-

... More
at 3.5 m deep

20

-

-

... More
at 4 m deep

5

-

-

... More
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete For Parallel line Connection

-

-

-

... More
Non Bus Route

-

-

-

... More
110mm dia upto a depth of 1.0m

461

-

-

... More
160mm dia upto a depth of 1.5m

115

-

-

... More
Hire charges for diesel pumpset for 5 HP for dewatering the sub-soil water and others

2160

-

-

... More
As built survey every sewage and water pipeline and other assetsmust be done using DGPS based RTK method by transferring the coordinates from the nearest static GCP of CMWSSB. Where there are signal interruption for the RTK method, Total station can be used. The coordinates from the static GCP shall be transferred to the Total Station by RTK method and the co-odinates of the assets can then be captured by Total Station. All the features, attributes of all the assets, utilities captured shall be Geo reference as per standard coordinate reference system ( WGS 84 UTM Zone 44N). The final basemap with assets and utilities shall be furnished in (.shp) format. The geo reference assets and utilities along with the attributes (as specified by the GIS Wing, CMWSSB) shall be converted into proper geo database (FGDB/PGDB) with the attributes. One set Hard and Soft copy of all the CMWSSB assets and utility has to be prepared category wise network wise in A0 print for verification in a print scale of 1:1000 in A0 plot, with standard legends in international and NUIS standards and should be legible and three sets of final hard copy in A0 print. a.For the undergrond/surface assets along the roads for the distance ranging from: (2KM) = 19000/-. in this estimate 330m length

-

-

-

... More
2 to 5 km

2.1

-

-

... More
For the Point Underground Surface Assets along the Road

288

-

-

... More
Bill No. 10 Strengthening of sewer collection system in CB Road SPS commanding Area (Depot 47 and 53), Area IV and Area V

-

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
Non Bus Route

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 1.5 m deep

1640.8

-

-

... More
at 2 m deep

527.9

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
Non Bus Route

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 2.5 m deep

111

-

-

... More
at 3 m deep

65.2

-

-

... More
at 3.5 m deep

41.4

-

-

... More
480/400mm OD/ID DWC PE or PP pipe

-

-

-

... More
at 4.5 m deep

57.1

-

-

... More
597/500mm OD/ID DWC PE or PP pipe

-

-

-

... More
at 4 m deep

22.9

-

-

... More
480/400mm OD/ID DWC PE or PP pipe

-

-

-

... More
at 4 m deep

44.9

-

-

... More
597/500mm OD/ID DWC PE or PP pipe

-

-

-

... More
at 4 m deep

136

-

-

... More
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.

-

-

-

... More
Non Bus Route

42.98

-

-

... More
Bus Route

5.28

-

-

... More
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
Non Bus Route

-

-

-

... More
at 1.5m deep

79

-

-

... More
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles including material and labour cost, Providing CI steps,fixing FRC Machine Hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast Machine Holes at the required position as directed by the engineer at site including testing the Machine Hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.

-

-

-

... More
Non Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 2.0m deep

28

-

-

... More
at 2.5m deep

7

-

-

... More
Construction of RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,sinking well kerb below 2m from G.L.or by open excavation for various depth as per site condition with M30 mix for side wall, raft and roof slab,including cost of steel reinforcement ,including bailing and pumping out water, formwork, plugging the bottom with PCC 1:3:6 using 40mm hard broken granite jelly, laying plain cement concrete 1:3:6 using 12mm to 20mm hard broken granite jelly for fixing frame, fixing FRC Machine Hole cover and frame, providing CI steps, ,benching and channelling including refilling the trenches with excavated earth and disposal of earth etc. Including testing the Machine Hole with water for 48hours to check water tightness and rectifying the defects if any complete for the following size of Machine Holes.

-

-

-

... More
Non Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 3.0m deep

2

-

-

... More
at 3.5m deep

3

-

-

... More
at 4.0m deep

1

-

-

... More
at 4.5m deep

1

-

-

... More
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)

-

-

-

... More
at 4.0m deep

2

-

-

... More
Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 4.0m deep

2

-

-

... More
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)

-

-

-

... More
at 4.0m deep

6

-

-

... More
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.

-

-

-

... More
Non Bus Route

5

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.

-

-

-

... More
Non Bus Route

4932.6

-

-

... More
Bus Route

361.8

-

-

... More
Road Cutting

-

-

-

... More
Non Bus Route

-

-

-

... More
Asphalt Road

1704.24

-

-

... More
Concrete Road

167.91

-

-

... More
Bus Route

-

-

-

... More
Asphalt Road

297.2

-

-

... More
State Highways/ National Highways

52.03

-

-

... More
Cutting DWC Pipes

-

-

-

... More
250mm

80

-

-

... More
400mm

3

-

-

... More
500mm

6

-

-

... More
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete

-

-

-

... More
Non Bus Route

-

-

-

... More
110mm dia upto a depth of 1.0m

317

-

-

... More
160mm dia upto a depth of 1.5m

79

-

-

... More
Bus Route

-

-

-

... More
110mm dia upto a depth of 1.0m

158

-

-

... More
160mm dia upto a depth of 1.5m

40

-

-

... More
Inspection Chamber : Construction of inspection chambers of following sizes with earth work excavation for foundation, 23cm thick concrete bed using 40mm brick jelly concrete in C.M. 1:4:10 for foundation, brick work in C.M. 1:6 for chamber, plastering with C.M. 1:3,12mm thick, benching, channelling, supplying and fixing 60x60cm medium weight L.S. cover and frame, etc., complete for

-

-

-

... More
Non Bus Route

-

-

-

... More
60 x 60 x 105cm

29

-

-

... More
60 x 60 x 150cm

8

-

-

... More
Bus Route

-

-

-

... More
60 x 60 x 105cm

14

-

-

... More
60 x 60 x 150cm

4

-

-

... More
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.

-

-

-

... More
Non Bus Route

-

-

-

... More
Bedding

208.58

-

-

... More
Backfill Envelope (Sidefill)

772.95

-

-

... More
Bus Route

-

-

-

... More
Bedding

26.01

-

-

... More
Backfill Envelope (Sidefill)

141.55

-

-

... More
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).

-

-

-

... More
Non Bus Route

2889.08

-

-

... More
Bus Route

818.24

-

-

... More
Disposal of surplus earth (for DWC PE or PP pipe length)

-

-

-

... More
Non Bus Route

1161.37

-

-

... More
Bus Route

213.76

-

-

... More
Making through holes in plain or reinforced cement concrete with diamond core drilling system by using BOSCH power tools of following diameters - depth per cm

-

-

-

... More
Non Bus Route

-

-

-

... More
110mm

29

-

-

... More
160mm

8

-

-

... More
Bus Route

-

-

-

... More
110mm

14

-

-

... More
160mm

4

-

-

... More
Providing form work with centering for soffits of reinforced cement concrete slabs or plain surfaces including shuttering for

-

-

-

... More
For end concrete

624.78

-

-

... More
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.

-

-

-

... More
250mm

36

-

-

... More
400mm

17

-

-

... More
500mm

26

-

-

... More
Supply, delivery, erection of sheet piles and fixing in position using timbering for trenches of average depths of 1.5m to 2.0m, including hire charges of sheet piles, dismantling the shoring after completion of work, etc., complete.

-

-

-

... More
Non Bus Route

-

-

-

... More
250mm

-

-

-

... More
For 1.5m deep

1640.8

-

-

... More
For 2.0m deep

527.9

-

-

... More
Temporary bypassing of sewer including Plugging the mouth of pipe/s inside sewer manhole using suitable plugging system and installation of bypass arrangement for bypassing the sewage flow, including, but not limited, to pumps, pipes, connections, couplings, electrical accessories, support traffic diversions arrangements etc. including desilting of manholes, disposal of debris as per the instructions of Engineer-in-Charge and keeping the manhole free from seepage and removal of bypass by deplugging the mouth of pipe inside sewer manhole and removal of by pass system and making the sewer system operational including all labour, Machinery, material, taxes etc. as per the specifications and directions of the Engineer.

-

-

-

... More
Non Bus Route

-

-

-

... More
For manholes of pipes upto 1200 mm dia

41

-

-

... More
Bus Route

-

-

-

... More
For manholes of pipes upto 1200 mm dia

3

-

-

... More
Dismantling of manhole including R.C.C. top slab, C.I. cover with frame including stacking of useful material including bricks duly cleaned from mortar near the site and disposal of unserviceable materials into railway dumps within 50m lead including all excavation, refilling watering and ramming etc. complete

-

-

-

... More
Non Bus Route

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
at 1.5m deep

78

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 2.0m deep

25

-

-

... More
at 2.5m deep

6

-

-

... More
at 3.0m deep

2

-

-

... More
at 3.5m deep

3

-

-

... More
at 4.0m deep

1

-

-

... More
at 4.5m deep

1

-

-

... More
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)

-

-

-

... More
at 4.0m deep

2

-

-

... More
Bus Route

-

-

-

... More
at 4.0m deep

1

-

-

... More
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)

-

-

-

... More
at 4.0m deep

2

-

-

... More
Road cutting

-

-

-

... More
Non Bus Route

-

-

-

... More
Asphalt Road

2269.13

-

-

... More
Concrete Road

567.28

-

-

... More
Bus Route

-

-

-

... More
Asphalt Road

365.74

-

-

... More
State Highways/ National Highways

59.26

-

-

... More
Supplying and filling Crushed stone sand (M-sand) for foundations and basement including watering consolidating ramming, etc., complete for Permanent plugging of Machinehole

-

-

-

... More
Non Bus Route

-

-

-

... More
Brick Machine holes

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
at 1.5m deep

9.92

-

-

... More
Precast circular RCC Machine Holes

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 2.0m deep

20.36

-

-

... More
at 2.5m deep

2.83

-

-

... More
Cast-Insitu RCC Machine Holes

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 3.0m deep

3.39

-

-

... More
at 3.5m deep

3.96

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete For Connection of existing conduit with replaced conduit in case of Parallel laying

-

-

-

... More
Non Bus Route

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 1.5 m deep

35

-

-

... More
at 2 m deep

45

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete For Connection of existing conduit with replaced conduit in case of Parallel laying

-

-

-

... More
Non Bus Route

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 2.5 m deep

10

-

-

... More
at 3.5 m deep

5

-

-

... More
597/500mm OD/ID DWC PE or PP pipe

-

-

-

... More
at 4 m deep

5

-

-

... More
597/500mm OD/ID DWC PE or PP pipe

-

-

-

... More
at 4 m deep

10

-

-

... More
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete For Parallel line Connection

-

-

-

... More
Non Bus Route

-

-

-

... More
110mm dia upto a depth of 1.0m

1267

-

-

... More
160mm dia upto a depth of 1.5m

317

-

-

... More
Bus Route

-

-

-

... More
110mm dia upto a depth of 1.0m

202

-

-

... More
160mm dia upto a depth of 1.5m

50

-

-

... More
Hire charges for diesel pumpset for 5 HP for dewatering the sub-soil water and others

2160

-

-

... More
As built survey every sewage and water pipeline and other assets must be done using DGPS based RTK method by transferring the coordinates from the nearest static GCP of CMWSSB. Where there are signal interruption for the RTK method, Total station can be used. The coordinates from the static GCP shall be transferred to the Total Station by RTK method and the co-odinates of the assets can then be captured by Total Station. All the features, attributes of all the assets, utilities captured shall be Geo reference as per standard coordinate reference system ( WGS 84 UTM Zone 44N). The final basemap with assets and utilities shall be furnished in (.shp) format. The geo reference assets and utilities along with the attributes (as specified by the GIS Wing, CMWSSB) shall be converted into proper geo database (FGDB/PGDB) with the attributes. One set Hard and Soft copy of all the CMWSSB assets and utility has to be prepared category wise network wise in A0 print for verification in a print scale of 1:1000 in A0 plot, with standard legends in international and NUIS standards and should be legible and three sets of final hard copy in A0 print. a.For the undergrond/surface assets along the roads for the distance ranging from: (2KM) = 19000/-. in this estimate 330m length

-

-

-

... More
2 to 5 km

3.24

-

-

... More
For the Point Underground Surface Assets along the Road

108

-

-

... More
Bill No. 11 Strengthening of sewer collection system in DBK chetty street SPS commanding Area (Depot 48 and 52), Area IV and Area V

-

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
Non Bus Route

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 1 m deep

232

-

-

... More
at 1.5 m deep

1470

-

-

... More
at 2 m deep

303

-

-

... More
Bus Route

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 1.5 m deep

64

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
Non Bus Route

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 2.5 m deep

36

-

-

... More
358/300mm OD/ID DWC PE or PP pipe

-

-

-

... More
at 3.5 m deep

27

-

-

... More
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.

-

-

-

... More
Non Bus Route(250mm)

37.06

-

-

... More
Bus Route(250mm)

1.02

-

-

... More
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
Non Bus Route

-

-

-

... More
at 1.0m deep

11

-

-

... More
at 1.5m deep

79

-

-

... More
Bus Route

-

-

-

... More
at 1.5m deep

3

-

-

... More
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles including material and labour cost, Providing CI steps,fixing FRC Machine Hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast Machine Holes at the required position as directed by the engineer at site including testing the Machine Hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.

-

-

-

... More
Non Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 2.0m deep

14

-

-

... More
at 2.5m deep

1

-

-

... More
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)

-

-

-

... More
at 2.0m deep

2

-

-

... More
at 2.5m deep

2

-

-

... More
Construction of RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,sinking well kerb below 2m from G.L.or by open excavation for various depth as per site condition with M30 mix for side wall, raft and roof slab,including cost of steel reinforcement ,including bailing and pumping out water, formwork, plugging the bottom with PCC 1:3:6 using 40mm hard broken granite jelly, laying plain cement concrete 1:3:6 using 12mm to 20mm hard broken granite jelly for fixing frame, fixing FRC Machine Hole cover and frame, providing CI steps, ,benching and channelling including refilling the trenches with excavated earth and disposal of earth etc. Including testing the Machine Hole with water for 48hours to check water tightness and rectifying the defects if any complete for the following size of Machine Holes.

-

-

-

... More
Non Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 3.5m deep

1

-

-

... More
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.

-

-

-

... More
Non Bus Route

1

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.

-

-

-

... More
Non Bus Route

4136

-

-

... More
Bus Route

128

-

-

... More
Road Cutting

-

-

-

... More
Non Bus Route

-

-

-

... More
Asphalt Road

1830.44

-

-

... More
Concrete Road

137.28

-

-

... More
Bus Route

-

-

-

... More
Asphalt Road

153.15

-

-

... More
State Highways/ National Highways

38.29

-

-

... More
Cutting DWC Pipes

-

-

-

... More
250mm

67

-

-

... More
300mm

3

-

-

... More
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete

-

-

-

... More
Non Bus Route

-

-

-

... More
110mm dia upto a depth of 1.0m

5703

-

-

... More
160mm dia upto a depth of 1.5m

1425

-

-

... More
Bus Route

-

-

-

... More
110mm dia upto a depth of 1.0m

158

-

-

... More
160mm dia upto a depth of 1.5m

40

-

-

... More
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.

-

-

-

... More
Non Bus Route

-

-

-

... More
Bedding

167.33

-

-

... More
Backfill Envelope (Sidefill)

765.16

-

-

... More
Bus Route

-

-

-

... More
Bedding

5.12

-

-

... More
Backfill Envelope (Sidefill)

23.68

-

-

... More
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).

-

-

-

... More
Non Bus Route

1901.1

-

-

... More
Bus Route

54.27

-

-

... More
Disposal of surplus earth (for DWC PE or PP pipe length)

-

-

-

... More
Non Bus Route

903.58

-

-

... More
Bus Route

27.65

-

-

... More
Making through holes in plain or reinforced cement concrete with diamond core drilling system by using BOSCH power tools of following diameters - depth per cm

-

-

-

... More
Non Bus Route

-

-

-

... More
110mm

519

-

-

... More
160mm

130

-

-

... More
Bus Route

-

-

-

... More
110mm

15

-

-

... More
160mm

4

-

-

... More
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.

-

-

-

... More
250mm

6

-

-

... More
300mm

5

-

-

... More
Temporary bypassing of sewer including Plugging the mouth of pipe/s inside sewer manhole using suitable plugging system and installation of bypass arrangement for bypassing the sewage flow, including, but not limited, to pumps, pipes, connections, couplings, electrical accessories, support traffic diversions arrangements etc. including desilting of manholes, disposal of debris as per the instructions of Engineer-in-Charge and keeping the manhole free from seepage and removal of bypass by deplugging the mouth of pipe inside sewer manhole and removal of by pass system and making the sewer system operational including all labour, Machinery, material, taxes etc. as per the specifications and directions of the Engineer.

-

-

-

... More
Non Bus Route

-

-

-

... More
For manholes of pipes upto 1200 mm dia

112

-

-

... More
Dismantling of manhole including R.C.C. top slab, C.I. cover with frame including stacking of useful material including bricks duly cleaned from mortar near the site and disposal of unserviceable materials into railway dumps within 50m lead including all excavation, refilling watering and ramming etc. complete

-

-

-

... More
Non Bus Route

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
at 1.0m deep

11

-

-

... More
at 1.5m deep

79

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 2.0m deep

14

-

-

... More
at 2.5m deep

1

-

-

... More
at 3.5m deep

1

-

-

... More
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)

-

-

-

... More
at 2.0m deep

2

-

-

... More
at 2.5m deep

1

-

-

... More
Bus Route

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
at 1.5m deep

3

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 3.5m deep

1

-

-

... More
Hire charges for diesel pumpset for 5HP

1752

-

-

... More
The contractor must obtain the existing static GCP points from CMWSSB which shoud be considered as the control point with known coordinates X,Y and Z. Survey consultant to ensure the closing error is wtihin permissible limits while transfering the levels from the existing static GCP points and the same to be presented as a report. The same process shall be adopted for random verification of positional accuracy of points established using the PBMs as base etc 2km

2.07

-

-

... More
For the points Underground/ Surface Assets along the roads

112

-

-

... More
Bill No. 12 - Replacement of old DI pipe to CI pipe 350mm Dia of Sewer pumping main from Vyasarpadi SPS to Erukanchery SPS in Area IV and Strengthening of sewer collection system in Tondiarpet F (Old) commanding Area (Depot 42), Area IV

-

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
Non Bus Route

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 1.5 m deep

581

-

-

... More
at 2 m deep

363

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
Non Bus Route

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 2.5 m deep

773

-

-

... More
at 3 m deep

253

-

-

... More
at 3.5 m deep

107

-

-

... More
at 4 m deep

489

-

-

... More
at 4.5 m deep

321

-

-

... More
358/300mm OD/ID DWC PE or PP pipe

-

-

-

... More
at 4 m deep

26

-

-

... More
Bus Route

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 1.5 m deep

204

-

-

... More
Supply, delivery of CI socket spigot pipes of LA class including rubber gaskets as per the latest revision of IS 1536, laying, jointing and testing CI pipes (LA class) including earth work excavation for trenches in hard stiff clay, black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and initial lift of 2m, lowering the pipes in to the trenches, aligning, making rubber joints, testing CI pipes, refilling the trenches with excavated soil, watering and ramming to consolidation, disposal of surplus earth including timbering the trenches for the depths of 2.5m and above, pumping out sub soil water etc., complete. (For Gravity Sewers)

-

-

-

... More
Non Bus Route

-

-

-

... More
250mm dia CI pipe

-

-

-

... More
at 5 m deep

45

-

-

... More
500mm dia CI pipe

-

-

-

... More
at 5 m deep

13

-

-

... More
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.

-

-

-

... More
Non Bus Route

52

-

-

... More
Bus Route

6

-

-

... More
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
Non Bus Route

-

-

-

... More
at 1.5m deep

30

-

-

... More
Bus Route

-

-

-

... More
at 1.5m deep

9

-

-

... More
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles including material and labour cost, Providing CI steps,fixing FRC Machine Hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast Machine Holes at the required position as directed by the engineer at site including testing the Machine Hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.

-

-

-

... More
Non Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 2.0m deep

18

-

-

... More
at 2.5m deep

38

-

-

... More
Construction of RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,sinking well kerb below 2m from G.L.or by open excavation for various depth as per site condition with M30 mix for side wall, raft and roof slab,including cost of steel reinforcement ,including bailing and pumping out water, formwork, plugging the bottom with PCC 1:3:6 using 40mm hard broken granite jelly, laying plain cement concrete 1:3:6 using 12mm to 20mm hard broken granite jelly for fixing frame, fixing FRC Machine Hole cover and frame, providing CI steps, ,benching and channelling including refilling the trenches with excavated earth and disposal of earth etc. Including testing the Machine Hole with water for 48hours to check water tightness and rectifying the defects if any complete for the following size of Machine Holes.

-

-

-

... More
Non Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 3.0m deep

11

-

-

... More
at 3.5m deep

4

-

-

... More
at 4.0m deep

21

-

-

... More
at 4.5m deep

13

-

-

... More
at 5m deep

3

-

-

... More
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.

-

-

-

... More
Non Bus Route

7

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.

-

-

-

... More
Non Bus Route

5820

-

-

... More
Bus Route

408

-

-

... More
Road Cutting

-

-

-

... More
Non Bus Route

-

-

-

... More
Asphalt Road

2951

-

-

... More
Bus Route

-

-

-

... More
Asphalt Road

164

-

-

... More
Cutting DWC Pipes

-

-

-

... More
250mm

104

-

-

... More
300mm

2

-

-

... More
500mm

1

-

-

... More
Cutting CI Pipes

-

-

-

... More
250mm dia CI pipe

3

-

-

... More
500mm dia CI pipe

2

-

-

... More
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete

-

-

-

... More
Non Bus Route

-

-

-

... More
110mm dia upto a depth of 1.0m

4637

-

-

... More
160mm dia upto a depth of 1.5m

1159

-

-

... More
Bus Route

-

-

-

... More
110mm dia upto a depth of 1.0m

302

-

-

... More
160mm dia upto a depth of 1.5m

76

-

-

... More
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.

-

-

-

... More
Non Bus Route

-

-

-

... More
Bedding

303

-

-

... More
Bus Route

-

-

-

... More
Bedding

17

-

-

... More
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).

-

-

-

... More
Non Bus Route

7679

-

-

... More
Bus Route

149

-

-

... More
Disposal of surplus earth (for DWC PE or PP pipe length)

-

-

-

... More
Non Bus Route

1656

-

-

... More
Bus Route

89

-

-

... More
Making through holes in plain or reinforced cement concrete with diamond core drilling system by using BOSCH power tools of following diameters - depth per cm

-

-

-

... More
Non Bus Route

-

-

-

... More
110mm

663

-

-

... More
160mm

166

-

-

... More
Bus Route

-

-

-

... More
110mm

44

-

-

... More
160mm

11

-

-

... More
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.

-

-

-

... More
250mm

1044

-

-

... More
300mm

9

-

-

... More
500mm

5

-

-

... More
Temporary bypassing of sewer including Plugging the mouth of pipe/s inside sewer manhole using suitable plugging system and installation of bypass arrangement for bypassing the sewage flow,including, but not limited, to pumps, pipes,connections, couplings,electrical accessories, support traffic diversions arrangements etc.including desilting of manholes, disposal of debris as per the instructions of Engineer-in-Charge and keeping the manhole free from seepage and removal of bypass by deplugging the mouth of pipe inside sewer manhole and removal of by pass system and making the sewer system operational including all labour,Machinery, material, taxes etc. as per the specifications and directions of the Engineer.

-

-

-

... More
Non Bus Route

-

-

-

... More
For manholes of pipes upto 1200 mm dia

138

-

-

... More
Bus Route

-

-

-

... More
For manholes of pipes upto 1200 mm dia

9

-

-

... More
Dismantling of manhole including R.C.C. top slab, C.I cover with frame including stacking of useful material including bricks duly cleaned from mortar near the site and disposal of unserviceable materials into railway dumps within 50m lead including all excavation, refilling watering and ramming etc. complete

-

-

-

... More
Non Bus Route

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
at 1.5m deep

30

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 2.0m deep

18

-

-

... More
at 2.5m deep

38

-

-

... More
at 3.0m deep

11

-

-

... More
at 3.5m deep

4

-

-

... More
at 4.0m deep

21

-

-

... More
at 4.5m deep

13

-

-

... More
at 5m deep

3

-

-

... More
Bus Route

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
at 1.5m deep

9

-

-

... More
As built survey every sewage and water pipeline and other assetsmust be done using DGPS based RTK method by transferring the coordinates from the nearest static GCP of CMWSSB. Where there are signal interruption for the RTK method, Total station can be used. The coordinates from the static GCP shall be transferred to the Total Station by RTK method and the co-odinates of the assets can then be captured by Total Station. All the features, attributes of all the assets, utilities captured shall be Geo reference as per standard coordinate reference system ( WGS 84 UTM Zone 44N). The final basemap with assets and utilities shall be furnished in (.shp) format. The geo reference assets and utilities along with the attributes (as specified by the GIS Wing, CMWSSB) shall be converted into proper geo database (FGDB/PGDB) with the attributes. One set Hard and Soft copy of all the CMWSSB assets and utility has to be prepared category wise network wise in A0 print for verification in a print scale of 1:1000 in A0 plot, with standard legends in international and NUIS standards and should be legible and three sets of final hard copy in A0 print. a.For the undergrond/surface assets along the roads for the distance ranging from: (2KM)

-

-

-

... More
2 to 5 Km

3.17

-

-

... More
For the Point Underground Surface Assets along the Road

1768

-

-

... More
Hire charges for diesel pumpset for 5HP with fuel and crew charges including transportation

1560

-

-

... More
Sub Total (excluding GST)

1

-

-

... More
GST @18%

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.