Chennai Metropolitan Water Supply And Sewerage Board Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Chennai Metropolitan Water Supply And Sewerage Board - CMWSSB Tender

Works
Civil And Construction
Drainage Work
Eprocure
Opening Date24 Nov 2023
Closing DateCancelled
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
at 5.5 m deep

200

-

-

... More
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly for plain cement concrete works including laying in layers of not more than 15cm thick including ramming curing, etc., complete for End concrete.

6.3

-

-

... More
Construction of RCC machineholes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,sinking well kerb below 2m from G.L.or by open excavation for various depth as per site condition with M30 mix for side wall, raft and roof slab,including cost of steel reinforcement ,including bailing and pumping out water, formwork, plugging the bottom with PCC 1:3:6 using 40mm hard broken granite jelly, laying plain cement concrete 1:3:6 using 12mm to 20mm hard broken granite jelly for fixing frame, fixing FRC machine holes cover and frame, providing CI steps, ,benching and channelling including refilling the trenches with excavated earth and disposal of earth etc. Including testing the machine holes with water for 48hours to check water tightness and rectifying the defects if any complete for the following size of machineholes.

-

-

-

... More
1500mm dia Circular machine holes for Sewers (500mm dia & above)

-

-

-

... More
at 5.5m deep

7

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites

200

-

-

... More
Hire charge for Cutting Cement Concrete Road using tractor compressor

-

-

-

... More
CC -CS (2.4 m2/hr)

150

-

-

... More
Cutting CI Pipes

-

-

-

... More
700 mm

9

-

-

... More
Dewatering using 10HP to 70HP diesel engine pumpset including Hire charges, cost of Diesel, Engine oil, pump operator, labour charges, conveyance of pumpset and fuel to site and back, loading, unloading and any other incidental charges etc., complete.

-

-

-

... More
Hire charges for Diesel Pump set for 10 HP

3600

-

-

... More
Hire charges for Diesel Pump set for 20 HP

600

-

-

... More
Conveyance of excavated earth from the narrow street (width less than 3.75m) to stock yard at nearest place (up to a lead of 5.00Km) including Head load charges from 10 meters to 100 meters and conveyance charges.

1980

-

-

... More
Re-Conveyance of earth from the stock yard to the narrow street (width less than 3.75m) for refilling the trenches after laying the pipe line (up to a lead of 5.00Km) including Head load charges from 10 meters to 100 meters and conveyance charges.

1980

-

-

... More
Where the Site has already been surveyed and maps available in UTM Zone44 coordinate system with TBM available on ground or coordinates of other assets available on Ground.

-

-

-

... More
The Contractor must obtain the existing Static GCP points from CMWSSB which should be considered as the control point with known coordinates X, Y and Z. Survey consultant to ensure the closing error is within permissible limits (Sol Standards) while transferring the levels from the existing Static GCP points and the same to be presented as a report. The same process shall be adopted for random verification of positional accuracy of points established using the PBMs as base. As built survey for every sewage and water pipeline and other assets must be done using DGPS based RTK method by transferring the coordinates from the nearest Static GCP of CMWSSB. Where there are signal interruptions for the RTK method, Total Station can be used. The coordinates from the static GCP shall be transferred to the Total Station by RTK method and the co-ordinates of the assets can then be captured by Total Station.

1

-

-

... More
All the features, attributes of all the assets, utilities captured shall be Geo referenced as per standard Coordinate reference system (WGS 84 UTM Zone 44N). The final base map with assets and utilities shall be fumished in (shp) format. The geo referenced assets and utilities along with the attributes (as specified by the GIS Wing. CMWSSB) shall be converted into proper geo database (FGDB/PGDB) with the attributes. One set Hard and Soft Copy of all the CMWSSB assets and utility has to be prepared category wise network wise in A0 Print for verification in a print scale of 1:1000 in A0 plot, with standard legends in international and NUIS standards and should be legible and three sets of final Hard Copy in A0 print a) For the Underground/Surface Assets along the roads for the distance ranging from: 2km

-

-

-

... More
Sub Total (excluding GST)

1

-

-

... More
GST @ 18%

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.