Chennai Metropolitan Water Supply And Sewerage Board Tender

... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Chennai Metropolitan Water Supply And Sewerage Board - CMWSSB Tender

Civil And Construction
Eprocure
Opening Date21 Jul 2023
Closing Date8 Aug 2023
Tender Amount₹ 71,04,729.2 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
250 (253.6 mm OD)

-

-

-

... More
at 1.5m depth

60

-

1134.5

... More
at 2.0m depth

120

-

1217.9

... More
at 2.5m depth

30

-

5415.3

... More
CONSTRUCTION OF MAINTENANCE HOLES USING SULPHATE RESISTANT CEMENT

-

-

-

... More
Construction of maintainence holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Maintainence hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Maintainence hole (As per the type design drawing for maintainence holes).

-

-

-

... More
Maintainence hole Size 1.05 X 0.90 m

-

-

-

... More
at 1.5 m depth

3

-

35643

... More
Precast circular RCC maintainence holes using sulphate resistant cement by open excavation (From 2.00 m and upto 2.5 m average depth range)

-

-

-

... More
Construction of Precast circular RCC maintainence holes using sulphate resistant cement with M30 design mix concrete including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA anglesincluding material and labour cost, Providing CI steps,fixing FRC Maintainence hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast maintainence holes at the required position as directed by the engineer at site including testing the Maintainence hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.

-

-

-

... More
For Sewer diameter upto 450 mm Maintainence hole Size 1.20m Dia

-

-

-

... More
at 2.0 m depth

9

-

91200

... More
Hire charges for tractor mounted commpressor for cutting Non bus route asphalt roads

-

-

-

... More
Non bus route asphalt roads

261

-

700

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.

540

-

83

... More
Cement concrete 1:3:6 using 40mm gauge hard broken stone jelly & SRC for plain cement concrete works including laying in layers of not more than 15cm thick including ramming curing, etc., complete

5

-

5433

... More
Supplying and filling stone dust for foundations and basement including watering consolidating ramming, etc., complete

41.98

-

426

... More
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement

976.87

-

40.6

... More
Disposal of surplus earth

62.28

-

145.75

... More
Cutting Pipes

-

-

-

-

-

-

... More
250 mm

6

-

25.41

... More
Providing and removing dummy in the existing machine hole with safty procausaion at a depth of 2.0m depth

3

-

5000

... More
Hire charges diesal pumpset 7.5 HP

960

-

436.06

... More
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete

-

-

-

60

-

666.33

... More
Bill No.2. Sewer main shifting 81

-

-

-

... More
Corrugated DWC HDPE pipes

-

-

-

... More
Supplying Double Wall Corrugated HDPE pipes (SN 8 grade) as per the latest revision of IS 16098: 2013 with ISI markings on it, laying and jointing the pipes with rubber joint using sealing rings as per IS 5382, testing of DWC HDPE pipes including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches and aligning, bedding, haunching and initial backfilling extending upto 150mm above soffit of the pipe using stone dust, refilling the trenches with excavated soil as per IS 16098(Part 2):2013, watering and ramming to consolidation, disposal of surplus earth etc., complete including the cost of jointing materials.

-

-

-

... More
250 (253.6 mm OD)

-

-

-

... More
at 1.5m depth

30

-

1134.5

... More
at 2.0m depth

90

-

1217.9

... More
at 2.5m depth

160

-

5415.3

... More
CONSTRUCTION OF MAINTENANCE HOLES USING SULPHATE RESISTANT CEMENT

-

-

-

... More
Construction of maintainence holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Maintainence hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Maintainence hole (As per the type design drawing for maintainence holes).

-

-

-

... More
Maintainence hole Size 1.05 X 0.90 m

-

-

-

... More
at 1.5 m depth

1

-

35643

... More
Precast circular RCC maintainence holes using sulphate resistant cement by open excavation (From 2.00 m and upto 2.5 m average depth range)

-

-

-

... More
Construction of Precast circular RCC maintainence holes using sulphate resistant cement with M30 design mix concrete including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA anglesincluding material and labour cost, Providing CI steps,fixing FRC Maintainence hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast maintainence holes at the required position as directed by the engineer at site including testing the Maintainence hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.

-

-

-

... More
For Sewer diameter upto 450 mm Maintainence hole Size 1.20m Dia

-

-

-

... More
at 2.0 m depth

3

-

91200

... More
at 2.5 m depth

6

-

115200

... More
Hire charges for tractor mounted commpressor for cutting Non bus route asphalt roads

-

-

-

... More
Non bus route asphalt roads

310

-

700

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.

600

-

83

... More
Cement concrete 1:3:6 using 40mm gauge hard broken stone jelly & SRC for plain cement concrete works including laying in layers of not more than 15cm thick including ramming curing, etc., complete

5

-

5433

... More
Supplying and filling stone dust for foundations and basement including watering consolidating ramming, etc., complete

102.5

-

426

... More
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement

976.87

-

40.6

... More
Disposal of surplus earth

102.5

-

145.75

... More
Cutting Pipes

-

-

-

-

-

-

... More
250 mm

6

-

25.41

... More
Providing and removing dummy in the existing machine hole with safty procausaion at a depth of 2.5m depth

3

-

6000

... More
Hire charges diesal pumpset 7.5 HP

960

-

436.06

... More
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete

-

-

-

60

-

666.33

... More
Bill No.3. Water line shifting -85

-

-

-

... More
Labour and material

-

-

-

... More
Hire charges for tractor mounted compressor for breaking asphaltic concrete road

-

-

-

... More
Non Bus Route

90

-

700

... More
Supplying and laying of 100mm D.I. pipes and specials including earthwork excavation for trenches in hard stiff clay, blackcotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil depositing the earth on banks with initial lead of 10 m and initial lift of 2m carting the pipes from any of the Board’s Stores to the site of work lowering into the trenches, aligning, refilling the trenches with excavated soil, watering and ramming to consolidation, etc., complete at 1.50m deep.

180

-

1798.7

... More
Making rubber joint- 100 mm dia

33

-

187

... More
Supplying,Conveying and fixing of DI specials

-

-

-

... More
100 mm DI D/S 90 deg bend

3

-

2120.2

... More
100 mm DI D/S 45 deg bend

1

-

1843.8

... More
100 mm DI D/S 22 1/2 deg bend

1

-

1843.8

... More
100 mm dia DI MJ Collar

5

-

3083

... More
100mm Socket Tail piece

4

-

1843.8

... More
100mm Spigot Tail piece

4

-

2120.2

... More
Supplying,Conveying and fixing sluice valve with tail pieces including fixing the surface boxes/ valves and covers - 100 mm dia DI sluice valves

1

-

7915

... More
Construction of Sluice valve chamber for the size 100 to 250 mm - For 100 mm dia Sluice valve

1

-

56000

... More
Barrication work along one side of the trench for laying the pipe line with casuarina post at 1.52m centre to centre (8 to10 cm dia. and 1.52m height) verticals, painting the vertical posts in different colours, tieing with coir rope, fixing danger flags, danger lights, reflectors including watching during night for 1 metre

360

-

83

... More
Testing of DI pipes with hydraulic testing equipment by filling with water (including cost of water @ Rs. 73/KL) and testing to recommended pressure in convenient stretches and attending the bursts if any occurred during the test excluding the cost of pipes, including other incidental and operational charges etc. complete for the following diameters of pipes.- for 150mm dia

180

-

91

... More
Connection work to existing water main including cutting existing pipe, fixing branches, collars, lead jointing excluding excavation, etc complete., at Head works - 300mm to 100mm

3

-

5774

... More
Disposal of surplus earth

1.41

-

145.75

... More
Supplying,Conveying and fixing of DI specials for Interconnection works

-

-

-

... More
100 mm to 100mm Tee

1

-

2673

... More
Cutting of DI pipes 100mm DIA

6

-

231

... More
Hire charges for pumpset of 5HP

100

-

319.35

... More
Construction of dead end chamber

1

-

56000

... More
Bill No.4. Water line shifting -81

-

-

-

... More
Labour and material

-

-

-

... More
Hire charges for tractor mounted compressor for breaking asphaltic concrete road

-

-

-

... More
Non Bus Route

120

-

700

... More
Supplying and laying of 100mm D.I. pipes and specials including earthwork excavation for trenches in hard stiff clay, blackcotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil depositing the earth on banks with initial lead of 10 m and initial lift of 2m carting the pipes from any of the Board’s Stores to the site of work lowering into the trenches, aligning, refilling the trenches with excavated soil, watering and ramming to consolidation, etc., complete at 1.50m deep.

120

-

1798.7

... More
250mm DI pipe (K7) Avg depth 1.5m

120

-

3837

... More
Making rubber joint- 100 mm dia

22

-

187

... More
250mm dia

22

-

479

... More
Supplying,Conveying and fixing of DI specials

-

-

-

... More
100 mm DI D/S 90 deg bend

2

-

2120.2

... More
100 mm DI D/S 45 deg bend

1

-

1843.8

... More
100 mm DI D/S 22 1/2 deg bend

1

-

1843.8

... More
100 mm dia DI MJ Collar

3

-

3083

... More
100mm Socket Tail piece

1

-

1843.8

... More
100mm Spigot Tail piece

1

-

2120.2

... More
250mm DI D/S 90 deg bend

2

-

2673

... More
250mm DI D/S 45 deg bend

1

-

7270.6

... More
250mm DI MJ collar

3

-

5866.6

... More
250 X250 X 100mm Tee

1

-

8671

... More
Supplying,Conveying and fixing sluice valve with tail pieces including fixing the surface boxes/ valves and covers - 100 mm dia DI sluice valves

1

-

7915

... More
Construction of Sluice valve chamber for the size 100 to 250 mm - For 100 mm dia Sluice valve

2

-

56000

... More
Barrication work along one side of the trench for laying the pipe line with casuarina post at 1.52m centre to centre (8 to10 cm dia. and 1.52m height) verticals, painting the vertical posts in different colours, tieing with coir rope, fixing danger flags, danger lights, reflectors including watching during night for 1 metre

480

-

83

... More
Testing of DI pipes with hydraulic testing equipment by filling with water (including cost of water @ Rs. 73/KL) and testing to recommended pressure in convenient stretches and attending the bursts if any occurred during the test excluding the cost of pipes, including other incidental and operational charges etc. complete for the following diameters of pipes.- for 100mm dia

120

-

91

... More
Connection work to existing water main including cutting existing pipe, fixing branches, collars, lead jointing excluding excavation, etc complete., at Head works - 300mm to 100mm

3

-

5774

... More
Disposal of surplus earth

0.94

-

145.75

... More
Cutting of DI pipes 100mm DIA

3

-

231

... More
Hire charges for pumpset of 5HP

100

-

319.35

... More
Construction of dead end chamber size 1.35 X1.2X1.55

1

-

56000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.