Chennai Metropolitan Water Supply And Sewerage Board Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Chennai Metropolitan Water Supply And Sewerage Board - CMWSSB Tender

Works
Civil And Construction
Eprocure
Opening Date31 Aug 2024
Closing Date30 Sep 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Construction And Completion Of Balance Works Including Retrofitting, Rectification Of Completed Units With Supply, Erection, Testing And Commissioning Of Electromechanical Machernies, Instruments And Allied Installations Including Supplied Items

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Erection, Testing and Commissioning charges

1

-

-

... More
Defect Rectification Works

-

-

-

... More
SBR feed sump- Discharge valve leakage -Service required

2

-

-

... More
SBR feed sump- Motor valves should be connected to SCADA for open and close purpose- supply and service required

1

-

-

... More
SBR feed sump - Level transmitter - Service required

1

-

-

... More
SBR feed pump- Sometimes pumps trip - Pump service

1

-

-

... More
Electrical - Control HRC FUSES, 6amps,10amps - spare required

15

-

-

... More
Electrical - Electrical, mechanical additional tools (multi meter, clamp meter)-spare required

1

-

-

... More
SBR Blower - Oil & grease - spare required

3

-

-

... More
ACF treated tank -Level transmitter -Service required

1

-

-

... More
Safety materials-PGTR - Glows nose mask, ear plugs etc.,-spare required

3

-

-

... More
All location -Pressure gauge- under rectification

10

-

-

... More
Final treated pipe - Gear valve not working -Pin spare required

5

-

-

... More
SBR blower-B - Service alarm showing - Service required

1

-

-

... More
Decant-1 - Service alarm showing for oil, auto grease - Spare supply/Service required

2

-

-

... More
MGF-A Filter - Air vent valve pipe broken - Need service

1

-

-

... More
MGF-B Filter - Air vent valve pipe broken Feed Pump – B - Need service

1

-

-

... More
UF -Skid B - Butterfly valve handle issue - Mechanical issue

1

-

-

... More
UF CIP Pump-A - pump leakage gland rope side - Mechanical service

1

-

-

... More
Final Treated Pump-A and B - Pipe Line Leakage - FRP insulation

1

-

-

... More
ACF-A - Filter (A) top side Leakage - Mechanical fitter

1

-

-

... More
Final Treated Pipe Line - Common Delivery Valve problem - Spare required

1

-

-

... More
Ozone -Dryer problem - Spare supply/Service required

1

-

-

... More
Compressor-1 & 2 - Service alarm showing - Spare supply/Service required

1

-

-

... More
EB structure pole - Lightning surge arrestor problem - EB service man

1

-

-

... More
Flow meter - Flow meter not matched field to SCADA - Need to instrument

1

-

-

... More
Fire alarm - Fire alarm problem - Fire alarm checking

1

-

-

... More
COD,BOD,TSS Analyzer - SBR outlet Analyzer showing error reading - Service required/Spare required

1

-

-

... More
UF Skid Pipeline Leak - Need service

3

-

-

... More
Miscellaneous Works in the plant - Repainting Works, yard lighting replacement, etc.,

1

-

-

... More
SBR - Air Blower-C - Service required

1

-

-

... More
Supply and erection of Blowers - Turbo Blower - 1No

-

-

-

... More
Supply - Turbo Blower - 4500m3/hr

1

-

-

... More
Erection

1

-

-

... More
Testing & Commissioning

1

-

-

... More
Performance test & commissioning certificate

1

-

-

... More
Continnuous effluent monitering system with TNPCB

-

-

-

... More
Supply - OCEMS

1

-

-

... More
Erection

1

-

-

... More
Testing & Commissioning

1

-

-

... More
Performance test & commissioning certificate

1

-

-

... More
GIS mapping - Establishment of static GCP

-

-

-

... More
For the Underground Utilities / Surface Assets like WTP, STP, Filling Station etc.*

2

-

-

... More
For pipeline for a length of 1.7km (2 km)

7

-

-

... More
Bill No 2:Balance and Rectification works in Porur 6MLD Water Treatment Plant (WTP) including operation and Maintenance for Seven Years

-

-

-

... More
Supply and erection of diesel generator with Auto Main Failure Panel for the following capacity at various sites of Intake, WTP.

-

-

-

... More
Porur 6 MLD WTP - 250 KVA & Porur Intake -125 KVA

-

-

-

... More
Supply of DG set

2

-

-

... More
Erection, Testing and Commissioning charges

2

-

-

... More
DEFECTS RECTIFICATION WORKS AT PORUR WTP

-

-

-

... More
Porur Lake - Discharge side improvement and Lorry filling point at Lake

1

-

-

... More
Intake pump -Auto backwash filter system not working properly - Need service

1

-

-

... More
Intake to Porur plant pipe line -Pipe Line Mild Leakage near to lake and kovil side road -Need service

1

-

-

... More
DAF Recycle pump - Recycle pump-B suction manual valve not properly closed - Need service

1

-

-

... More
MGF Feed pump-B -Pressure gauge connecting pipe damaged - Need service

1

-

-

... More
Filter Feed tank - pressure Transmitter - Need service

1

-

-

... More
MGF-A Filter - Air vent valve pipe line flange damaged -Need service

1

-

-

... More
MGF-B Filter -Pressure transmitter pipe damaged - Need service

1

-

-

... More
MGF-C Filter - Both delivery and suction pipe line Pressure Gauges readings are not shown -Need service

1

-

-

... More
ACF-A Filter - Both delivery pipe line Pressure Gauges readings are not shown and drain line Flange damaged - Need service

1

-

-

... More
ACF-B Filter -Pressure transmitter pipe damaged -Need service

1

-

-

... More
ACF-C Filter -Both delivery and suction pipe line Pressure Gauges readings are not shown -Need service.

1

-

-

... More
Backwash collection tank - Submersible pump-A not working due to winding temperature - Need service

1

-

-

... More
Printer - Printer not working - Cartridge needed

1

-

-

... More
ADT -Rota meter 1 no's not working -Need service

1

-

-

... More
Hypo dosing pump-B -Hypo chemical dosing pump not working properly - Need service

1

-

-

... More
Pump – A, B - Alum dosing pump -Need service

1

-

-

... More
Repainting Works in the plant

1

-

-

... More
Backwash sump-Permanent discharge pipeline -Need service

1

-

-

... More
Ozonation System including construction of housing unit with PEB structure and it is allied works

-

-

-

... More
Supply

1

-

-

... More
Erection

1

-

-

... More
Testing & Commissioning

1

-

-

... More
Performance test & commissioning certificate

1

-

-

... More
OCEMS

-

-

-

... More
Supply

1

-

-

... More
Erection

1

-

-

... More
Testing & Commissioning

1

-

-

... More
Performance test & commissioning certificate

1

-

-

... More
GIS mapping - Establishment of static GCP

-

-

-

... More
For the Underground Utilities / Surface Assets like WTP, STP, Filling Station etc.*

1

-

-

... More
For pipeline for a length of 1.7km (2 km)

1.3

-

-

... More
Bill No 3:Balance and Rectification works in Perungudi 10MLD Water Treatment Plant (WTP) including operation and Maintenance for Seven Years

-

-

-

... More
Walk Way

-

-

-

... More
MCC Room To Backwash

-

-

-

... More
MCC Room To Backwash-Excavation

13.96

-

-

... More
MCC Room To Backwash-Crusher Dust

6.98

-

-

... More
MCC Room To Backwash-Load bearing Paver 60 mm thick

46.53

-

-

... More
MCC Room To Backwash-Kerb Stone

138

-

-

... More
Chemical House to Sludge

-

-

-

... More
Chemical House to Sludge-Excavation

13.41

-

-

... More
Chemical House to Sludge-Crusher Dust

6.71

-

-

... More
Chemical House to Sludge-Load bearing Paver 60 mm thick

44.72

-

-

... More
Chemical House to Sludge-Kerb Stone

134

-

-

... More
MCC Room To ACF

-

-

-

... More
MCC Room To ACF-Excavation

10.21

-

-

... More
MCC Room To ACF-Crusher Dust

3.95

-

-

... More
MCC Room To ACF-Load bearing Paver 60 mm thick

26.33

-

-

... More
MCC Room To ACF-Kerb Stone

78

-

-

... More
Chemical House to Backwash

-

-

-

... More
Chemical House to Backwash-Excavation

6.39

-

-

... More
Chemical House to Backwash-Crusher Dust

3.19

-

-

... More
Chemical House to Backwash-Load bearing Paver 60 mm thick

21.29

-

-

... More
Chemical House to Backwash-Kerb Stone

64

-

-

... More
Compound wall

-

-

-

... More
Compound wall-Excavation

19.48

-

-

... More
Compound wall-Crusher Dust

9.74

-

-

... More
Compound wall-Load bearing Paver 60 mm thick

64.92

-

-

... More
Compound wall-Kerb Stone

194

-

-

... More
Around Screw pump

-

-

-

... More
Around Screw pump-Excavation

4.57

-

-

... More
Around Screw pump-Crusher Dust

2.28

-

-

... More
Around Screw pump-Load bearing Paver 60 mm thick

15.23

-

-

... More
Around Screw pump-Kerb Stone

76

-

-

... More
ADT to Filter Feed

-

-

-

... More
ADT to Filter Feed-Excavation

3.53

-

-

... More
ADT to Filter Feed-Crusher Dust

1.76

-

-

... More
ADT to Filter Feed-Load bearing Paver 60 mm thick

11.76

-

-

... More
ADT to Filter Feed-Kerb Stone

44

-

-

... More
Road

-

-

-

... More
Over all quantity-Excavation

284.35

-

-

... More
Over all quantity-Crusher Dust

43.82

-

-

... More
Over all quantity-GSB

568.7

-

-

... More
Over all quantity-Load bearing Paver 60 mm thick

576.42

-

-

... More
Over all quantity-Kerb Stone

427

-

-

... More
Painting work

-

-

-

... More
CEILING PAINTING 3 COAT WHITE WASH (Lvl: +4.975m to +5.1m)

-

-

-

... More
Ground Floor

-

-

-

... More
Operator change room

13.4

-

-

... More
Store room

15.8

-

-

... More
Poly and alum storage area

26.9

-

-

... More
Maintenance area

18.8

-

-

... More
Room

16.4

-

-

... More
Dosing tank & passage area

180.7

-

-

... More
Toilet area

22.32

-

-

... More
Filter press area

76.58

-

-

... More
First floor

-

-

-

... More
Staff room

17.17

-

-

... More
Senior office room

17.17

-

-

... More
Passage

18.09

-

-

... More
Laboratory room

39.72

-

-

... More
Toilet

10.51

-

-

... More
Toilet

6.35

-

-

... More
Filter press

58.09

-

-

... More
Beam side from c3-a3

3.43

-

-

... More
Beam side a1-2 to a1-4

3.18

-

-

... More
Filter press area roof beams

12.53

-

-

... More
INNER WALL PAINTING 2 COAT WALL PUTTY , 1COAT PRIMER, 2 COAT PLASTIC EMULSION

-

-

-

... More
Ground Floor

439.81

-

-

... More
First Floor

322.67

-

-

... More
MCC Room

140.02

-

-

... More
Side wall (East, West, North, South)

94.35

-

-

... More
EXTERNAL WALL PAINTING (East, West, North, South)

895.79

-

-

... More
MCC ROOM

157.94

-

-

... More
Intake

-

-

-

... More
EXTERNAL WALL

115.5

-

-

... More
WTP compound wall

-

-

-

... More
South side wall

156.8

-

-

... More
East side wall

148

-

-

... More
East side wall

130

-

-

... More
Ceiling Painting -Grill, Gate, rolling shutter -Enamel paint

-

-

-

... More
MCC Building

19.8

-

-

... More
Cover

2.7

-

-

... More
Chemical House

25.8

-

-

... More
Window Grill

64.8

-

-

... More
Main Gate

37.8

-

-

... More
Perungudi Intake door

6

-

-

... More
Perungudi Intake Window

7.2

-

-

... More
Road Kerb stone with Blue & white with one coat white & two coat Emulsion paint

-

-

-

... More
MCC Room Walkway area

9.56

-

-

... More
Near Backwash Collection Sump

2.48

-

-

... More
Near Chemical House Staircase Area

0.79

-

-

... More
Filter Feed GLS Tank Area

4.28

-

-

... More
DAF Platform, Screw Pump Area Walkway

7.99

-

-

... More
Near Septic Tank walkway area

1.58

-

-

... More
ADT, Compressor Room Walkway Area

8.21

-

-

... More
Near C & I Room Area

2.59

-

-

... More
Road Garden Side Kerb Stone

10.13

-

-

... More
Near Main Gate area

4.16

-

-

... More
Road Plantation area Kerb stone

12.6

-

-

... More
Near Main Gate area

3.15

-

-

... More
1 coat primer & 2 coat Emulsion paint for pipe support & Equipment foundation

-

-

-

... More
ACF & MGF

37.85

-

-

... More
Pump foundation

5.88

-

-

... More
MGF air blower

2.14

-

-

... More
MGF Backwash

3.87

-

-

... More
Air compressor

2

-

-

... More
DAF recycle

4.68

-

-

... More
ADT

4.8

-

-

... More
Filter press feed pump

3.46

-

-

... More
Air receiver

0.19

-

-

... More
Pipe support Pedestal

130.65

-

-

... More
3.FENCING WORK

-

-

-

... More
Excavation

8.52

-

-

... More
PCC 1:5:10

1.63

-

-

... More
RCC M25

3.16

-

-

... More
Prov.Shuttering fixing & removal

3.48

-

-

... More
230 mm thk brickwork

8.74

-

-

... More
External plastering 20 mm thk

84.74

-

-

... More
backfilling

2.86

-

-

... More
Prov. Fabrication ,fixing & painting of Fencing work

38

-

-

... More
Fencing Gate (1sqm = 7Kg)

4.5

-

-

... More
4. FINISHING ITEM

-

-

-

... More
Rolling shutter

-

-

-

... More
Rolling shutter (CH) -Gear Operated

10.5

-

-

... More
Rolling shutter ( MCC) -Manually operated

9

-

-

... More
Aluminium Qty

-

-

-

... More
Aluminium Partition

26

-

-

... More
Aluminium Partition door

2.5

-

-

... More
Door

34.5

-

-

... More
Window

31.2

-

-

... More
Lowers

1.62

-

-

... More
False ceiling

49

-

-

... More
Window Grill (1sqm = 7Kg)

31.2

-

-

... More
GI Hand rail -38 Top rail

-

-

-

... More
Vertical

30

-

-

... More
Horizontal

76

-

-

... More
Toe guard

85

-

-

... More
SS Hand rail

-

-

-

... More
vertical

38

-

-

... More
Horizontal

68

-

-

... More
toe guard

34

-

-

... More
AR tiles

213

-

-

... More
Wall & Floor tiles

-

-

-

... More
Toilet

-

-

-

... More
Ceramic Floor tiles

25

-

-

... More
Ceramic wall dado tiles

98

-

-

... More
Laboratory tiles

24

-

-

... More
Plumbing Material cum fixing ( 3 toilet )

1

-

-

... More
laboratory

1

-

-

... More
sanitary line Chamber connecting to existing outside sewage line

1

-

-

... More
Roof Weathering coarse with 230*230 manglore tiles

376

-

-

... More
5.Chemical House AR Tiling Work

-

-

-

... More
Alum Storage area

-

-

-

... More
Floor

12.4

-

-

... More
sides

12.7

-

-

... More
Poly Storage area

-

-

-

... More
Floor

7.6

-

-

... More
sides

10.3

-

-

... More
Dosing tank area

-

-

-

... More
Floor

74.48

-

-

... More
Drain wall side

15.39

-

-

... More
Below stair case

1.3

-

-

... More
walkway platform

20.64

-

-

... More
Alum Dosing tank -02 nos

5.53

-

-

... More
Poly dosing tank -03 nos

6.5

-

-

... More
Hypo-dosing area -02 nos

4.34

-

-

... More
Kerb wall

10.16

-

-

... More
Drain side length

13.49

-

-

... More
Platform support column

10.89

-

-

... More
Addition of pedestal sides

-

-

-

... More
Dosing pump foundation

3.43

-

-

... More
Support pedestal

3.8

-

-

... More
6.Chemical House Weathering Coarse

-

-

-

... More
Floor

195.4

-

-

... More
First roof -floor

141.28

-

-

... More
Toilet roof-floor

38.77

-

-

... More
7. DI PIPE LAYING WORK AT PERUNGUDI

-

-

-

... More
Perungudi 300mm dia DI pipe (K7)

-

-

-

... More
Supply and laying of 300mm dia DI Soc/Spi Pipes as per IS 8329/2000

200

-

-

... More
Supply and fixing of 300 mm DI D/S 90 deg bend (67Kg) as per IS 9523/2000

2

-

-

... More
Disposal of surplus earth

14.13

-

-

... More
Labour for fixing of 300mm dia rubber joints

34

-

-

... More
Testing of pipes - 300mm

200

-

-

... More
Providing iron barrication

200

-

-

... More
Supply and fixing of 300mm dia MJ Collars for DI pipes

2

-

-

... More
Construction of Thrust Block using Cement Concrete 1:3:6 ,40mm B.G.jelly for Plain Cement Concrete

2

-

-

... More
EMI PERUNGUDI LAKE

-

-

-

... More
Pump, Filters

-

-

-

... More
Erection, Cable replacement, Pummp, filter reerection

2

-

-

... More
Testing & Commissioning

2

-

-

... More
Performance test & commissioning certificate

2

-

-

... More
Pontoon

-

-

-

... More
Erection

1

-

-

... More
Testing & Commissioning

1

-

-

... More
Performance test & commissioning certificate

1

-

-

... More
Bridge

-

-

-

... More
Erection

1

-

-

... More
Testing & Commissioning

1

-

-

... More
Performance test & commissioning certificate

1

-

-

... More
Flexible Hoses

-

-

-

... More
Erection

1

-

-

... More
Testing & Commissioning

1

-

-

... More
Performance test & commissioning certificate

1

-

-

... More
Electrical and C & I (Intake Panel -1 No, Pump cable replacement - 1 Lot, DG set -1 (SOR) No, LTCT meter box - 1 Nos)

-

-

-

... More
Supply

7

-

-

... More
Erection - Cable yaing, panel, DG , meter erection, earthing works

9

-

-

... More
Testing & Commissioning

9

-

-

... More
Performance test & commissioning certificate

9

-

-

... More
PERUNGUDI WTP

-

-

-

... More
DAF System

-

-

-

... More
Testing & Commissioning

2

-

-

... More
Performance test & commissioning certificate

2

-

-

... More
Process Pumps - (DAF recycle - 3Nos, Filter Feed - 3 Nos, MGF back wash - 2 Nos)

-

-

-

... More
Pump partial Erection

8

-

-

... More
Testing & Commissioning

8

-

-

... More
Performance test & commissioning certificate

8

-

-

... More
Multi grade Filter

-

-

-

... More
Testing & Commissioning

3

-

-

... More
Performance test & commissioning certificate

3

-

-

... More
Activated Carbon Filter

-

-

-

... More
Testing & Commissioning

3

-

-

... More
Performance test & commissioning certificate

3

-

-

... More
Filter Media (Anthracite - 26 MT, Pebble gravel (5-12 mm) -16 MT, Pebble gravel (2-5 mm) -16 MT, Filter Media Sand - 48 MT and Activated carbon with iodine No. Min 950 - 22 MT, media trap - 6 Nos and View Glass 150 NB - 12 )

-

-

-

... More
Supply

6

-

-

... More
Erection

6

-

-

... More
Testing & Commissioning

6

-

-

... More
Performance test & commissioning certificate

6

-

-

... More
Filter Nozzle

-

-

-

... More
Testing & Commissioning

1

-

-

... More
Performance test & commissioning certificate

1

-

-

... More
MGF Back Wash Blowers

-

-

-

... More
Testing & Commissioning

2

-

-

... More
Performance test & commissioning certificate

2

-

-

... More
Pumps (Submersible) (Backwash waste collection transfer pump - 2Nos)

-

-

-

... More
Erection

2

-

-

... More
Testing & Commissioning

2

-

-

... More
Performance test & commissioning certificate

2

-

-

... More
Pumps (Screw)

-

-

-

... More
Testing & Commissioning

3

-

-

... More
Performance test & commissioning certificate

3

-

-

... More
Filter Press

-

-

-

... More
Erection

2

-

-

... More
Testing & Commissioning

2

-

-

... More
Performance test & commissioning certificate

2

-

-

... More
Dosing Tanks (Alum Dosing - 2 Nos, DWPE Solusion Dosing - 1No, Poly electrolite dosing - 2 Nos, Hypo Dosing - 1no)

-

-

-

... More
Erection

5

-

-

... More
Testing & Commissioning

5

-

-

... More
Performance test & commissioning certificate

5

-

-

... More
Agitator - (Flash Mixer Agitator - 2Nos, Alum Dosing - 2 Nos, DWPE Solusion Dosing - 1No, Poly electrolite dosing - 2 Nos, Hypo Dosing - 1no)

-

-

-

... More
Erection

5

-

-

... More
Testing & Commissioning

5

-

-

... More
Performance test & commissioning certificate

5

-

-

... More
Dosing Pumps (Alum Dosing - 2 Nos, DWPE Solusion Dosing - 2Nos, Poly electrolite dosing - 2 Nos, Hypo Dosing - 2no)

-

-

-

... More
Erection

6

-

-

... More
Testing & Commissioning

6

-

-

... More
Performance test & commissioning certificate

6

-

-

... More
HVAC

-

-

-

... More
Supply

3

-

-

... More
Erection

3

-

-

... More
Testing & Commissioning

3

-

-

... More
Performance test & commissioning certificate

3

-

-

... More
Air Compressor 2 Nos including service water pumps 2 Nos

-

-

-

... More
Supply

4

-

-

... More
Erection

4

-

-

... More
Testing & Commissioning

4

-

-

... More
Performance test & commissioning certificate

4

-

-

... More
Fire Alarm

-

-

-

... More
Supply

1

-

-

... More
Erection

1

-

-

... More
Testing & Commissioning

1

-

-

... More
Performance test & commissioning certificate

1

-

-

... More
Laboratory Equipments

-

-

-

... More
Supply

1

-

-

... More
Erection

1

-

-

... More
Testing & Commissioning

1

-

-

... More
Performance test & commissioning certificate

1

-

-

... More
Interconnecting Piping (GRP pipes - 66 m, GRP Specials - 235 Nos, MS pipe - 24 m, GI pipes -12 m, GI specials - 37 Nos, CS specials - 99 Nos, pipe saddle support - 1 set)

-

-

-

... More
Supply

375

-

-

... More
Erection

375

-

-

... More
Testing & Commissioning

375

-

-

... More
Performance test & commissioning certificate

375

-

-

... More
Valves - Balance erection

-

-

-

... More
Erection

1

-

-

... More
Testing & Commissioning

1

-

-

... More
Performance test & commissioning certificate

1

-

-

... More
Electrical (Lighting work (Chemical House and MCC room) - 1 lot, Chequered plate - 1 lot, Dosing pump and agitator termination - 1 lot, Submersible LCP -1 No, Earthing - 1 lot, Outdoor lighting - 6 Nos)

-

-

-

... More
Supply

2

-

-

... More
Erection

11

-

-

... More
Testing & Commissioning

11

-

-

... More
Performance test & commissioning certificate

11

-

-

... More
C&I (PLC & Scada -1 No, ACDB - 3 No, Flow indicator - 13 No, Level switch - 7 No, Pressure transmitter -4 No, Flow Transmitter - 3 Nos, Level Transmitters DP type -1 Nos, Level Transmitter Hydro static & US type - 1 Nos, COD/BOD/TOC DO & TDS Analyzer PH/Turbidity Analyzer -3 No, pH Analayzer Ph &Turbity Analyzer - 2 No, Junction box - 10 Nos, Inst Cables - 1 lot , Instrument fittings - 1 lot , Cable trays - 285 m, cable gland - 1 lot)

-

-

-

... More
Supply

8

-

-

... More
Erection

51

-

-

... More
Testing & Commissioning

51

-

-

... More
Performance test & commissioning certificate

51

-

-

... More
Ozonation System including construction of housing unit with PEB structure and it is allied works

-

-

-

... More
Supply

1

-

-

... More
Erection

1

-

-

... More
Testing & Commissioning

1

-

-

... More
Performance test & commissioning certificate

1

-

-

... More
Continnuous effluent monitering system with TNPCB

-

-

-

... More
Supply - OCEMS

1

-

-

... More
Erection

1

-

-

... More
Testing & Commissioning

1

-

-

... More
Performance test & commissioning certificate

1

-

-

... More
GIS mapping - Establishment of static GCP

-

-

-

... More
For the Underground Utilities / Surface Assets like WTP, STP, Filling Station etc.*

1

-

-

... More
For pipeline for a length of 1.7km (2 km)

1.7

-

-

... More
Provision for extended warrantee, guarantee, repair and replacement for existing supplied materials

1

-

-

... More
Bill No 4:Balance and Rectification works in Perungudi 10MLD Tertiary Treatment Plant (TTUF) including operation and Maintenance for Seven Years

-

-

-

... More
Earth work excavation 0-3M

-

-

-

... More
UF shed

-

-

-

... More
Plinth protection

27

-

-

... More
plinth drain

14.85

-

-

... More
Ramp

1.88

-

-

... More
steps

1.15

-

-

... More
Pump Foundation

-

-

-

... More
Sludge transfer pump / filter press feed pump , Service water pump

29.15

-

-

... More
MCC building

-

-

-

... More
Plinth protection

11.65

-

-

... More
plinth drain

12.18

-

-

... More
Ramp

3.24

-

-

... More
steps

1.73

-

-

... More
Process drain

-

-

-

... More
Balance process drain

103.2

-

-

... More
Storm water drain

-

-

-

... More
Road sides

93.75

-

-

... More
Road work

-

-

-

... More
Road area

331.49

-

-

... More
Walkway area

84.17

-

-

... More
Backfilling with available earth

-

-

-

... More
Process drain

41.76

-

-

... More
Storm water drain

100

-

-

... More
Cablepit duck bank

29.25

-

-

... More
PCC

-

-

-

... More
UF shed

-

-

-

... More
Plinth protection

9

-

-

... More
plinth drain

2.7

-

-

... More
Ramp

0.63

-

-

... More
steps

0.38

-

-

... More
Pump Foundation

-

-

-

... More
Sludge transfer pump / filter press feed pump

1.05

-

-

... More
MCC building

-

-

-

... More
Plinth protection

3.88

-

-

... More
plinth drain

1.77

-

-

... More
Ramp

1.08

-

-

... More
steps

0.58

-

-

... More
Process drain

-

-

-

... More
Balance process drain

9.46

-

-

... More
Storm water drain

-

-

-

... More
Road sides

18.75

-

-

... More
Filter press building

-

-

-

... More
Floor PCC

5.7

-

-

... More
RCC-M25 Below 0.00M

-

-

-

... More
Process drain

-

-

-

... More
Balance process drain

14.19

-

-

... More
Wall

12.9

-

-

... More
Storm water drain

-

-

-

... More
Road sides

33.75

-

-

... More
RCC-M25 above 0.00M

-

-

-

... More
UF shed

5.56

-

-

... More
MCC Building

8

-

-

... More
RCC-M30 sub & super structure

-

-

-

... More
Pump Foundation

-

-

-

... More
Sludge transfer pump / filter press feed pump

2.71

-

-

... More
Pedestal

1.16

-

-

... More
RCC-M35

-

-

-

... More
SBR TANK Outlet sump extension

-

-

-

... More
Wall

1.3

-

-

... More
Slab

0.68

-

-

... More
SBR FEED SUMP

-

-

-

... More
Wall

11.25

-

-

... More
Shuttering below FGL

-

-

-

... More
UF shed

-

-

-

... More
Plinth protection PCC

9

-

-

... More
MCC building

-

-

-

... More
Plinth protection

3.88

-

-

... More
Equipment foundation

-

-

-

... More
PCC Shuttering

-

-

-

... More
Filter press feed pump -equipment foundation raft

1.46

-

-

... More
RCC Shuttering

-

-

-

... More
Filter press feed pump -equipment foundation raft

4.15

-

-

... More
Pedestal shuttering

5.78

-

-

... More
Process drain

-

-

-

... More
PCC shuttering

17.2

-

-

... More
RCC Raft Shuttering

25.8

-

-

... More
Wall Shuttering

172

-

-

... More
Storm water drain

-

-

-

... More
PCC shuttering

25

-

-

... More
RCC Raft Shuttering

37.5

-

-

... More
Wall Shuttering

250

-

-

... More
Shuttering above FGL

-

-

-

... More
SBR TANK

-

-

-

... More
Outlet sump

10.4

-

-

... More
Slab

4.5

-

-

... More
UF shed

-

-

-

... More
Lintel beam

15.16

-

-

... More
Sunshade for windows

5.13

-

-

... More
Sunshade for windows

29.86

-

-

... More
MCC Building

-

-

-

... More
Column

22.08

-

-

... More
Lintel beam

25.71

-

-

... More
Band beam

25.71

-

-

... More
Sunshade for windows

4.1

-

-

... More
Sunshade for Door

3.93

-

-

... More
Sunshade for Rolling shutter

2.36

-

-

... More
SBR FEED SUMP

-

-

-

... More
Sump wall

131.4

-

-

... More
Reinforcement supply, cutting & bending work

-

-

-

... More
SBR-Tank outlet sump

120

-

-

... More
UF shed-lintel cum sunshade

500

-

-

... More
MCC -lintel cum sunshade

560

-

-

... More
Pump foundation

286

-

-

... More
Process drain

900

-

-

... More
Storm water drain

1350

-

-

... More
Supply & laying 230 mm thk Brickwork

-

-

-

... More
UF shed

-

-

-

... More
Above FFL

29.87

-

-

... More
MCC Building

18.06

-

-

... More
Filter press Building

-

-

-

... More
Parapet wall

6.76

-

-

... More
Toilet

5.93

-

-

... More
Supply & laying 115 mm thk Brickwork

-

-

-

... More
Dyke wall -Dosing area

8.85

-

-

... More
Internl plastering of 12 mm thk CM 1:4

-

-

-

... More
UF shed

-

-

-

... More
Wall inner front side

9.02

-

-

... More
Back side

1.65

-

-

... More
Ozonator room

116

-

-

... More
Lab room

54.38

-

-

... More
Office room

61.63

-

-

... More
Long wall inner side ( UF skid side)

75.84

-

-

... More
Material storage room

86.65

-

-

... More
Addition of soffit & jambs

18.4

-

-

... More
MCC Building

-

-

-

... More
Wall inner

163.59

-

-

... More
Filter press building -parapet wall

60.35

-

-

... More
External plastering of 12 mm thk CM 1:5

-

-

-

... More
UF shed

165.67

-

-

... More
MCC building

177.45

-

-

... More
Filter press building -parapet wall

68.04

-

-

... More
Providing & filling of quarry dust

-

-

-

... More
Filter press feed pump pump

13.56

-

-

... More
Providing & filling of GSB

-

-

-

... More
Filter press feed pump pump

13.56

-

-

... More
Ceiling plastering

-

-

-

... More
Filter press building

8.32

-

-

... More
Road work & walk way work

-

-

-

... More
S & L OF 150 MM THK GSB COMPACTION WITH ROLLAR

1325.93

-

-

... More
S & L OF 50 MM THK QUARRY DUST

49.72

-

-

... More
S & L OF 60 MM THK M30 GR RUBMOULD PAVER BLOCK

943.54

-

-

... More
S & L OF 150 MM THK QUARRY DUST OVER SUB BASE

42.08

-

-

... More
S & I M20 GRADE KERB STONE

1044

-

-

... More
Granolithic flooring

-

-

-

... More
UF shed

305.15

-

-

... More
MCC room

92.02

-

-

... More
Filter press building

103.82

-

-

... More
Painting qty

-

-

-

... More
Ceiling - white wash -03 coats

8.34

-

-

... More
Inner paint with 2 coat putty , one coat primer , 2 coat emulsion paint

620

-

-

... More
External paint with one coat white wash , 2 coat snow cem paint

411

-

-

... More
2. Road work

-

-

-

... More
Excavation

415.66

-

-

... More
Crusher Dust

91.81

-

-

... More
GSB

662.97

-

-

... More
Load bearing Paver 60 mm

943.54

-

-

... More
Kerb Stone

1044

-

-

... More
3. Fencing work

-

-

-

... More
Excavation

61.02

-

-

... More
PCC 1:5:10

5.49

-

-

... More
RCC M25

15.71

-

-

... More
Prov.Shuttering fixing & removal

57.77

-

-

... More
230 mm thk brickwork

6.83

-

-

... More
External plastering 20 mm thk

82.17

-

-

... More
backfilling

36.41

-

-

... More
Prov. Fabrication ,fixing & painting of Fencing work

99

-

-

... More
Fencing Gate (1sqm = 7Kg)

9

-

-

... More
Reinforcement providing, cuting ,bending & tying

1261.66

-

-

... More
4. Finishing item

-

-

-

... More
Rolling shutter

-

-

-

... More
Rolling shutter (CH) -Gear Operated

-

-

-

... More
Rolling shutter ( MCC) -Manually operated

9

-

-

... More
Aluminium Qty

-

-

-

... More
Aluminium Partition

55.42

-

-

... More
Aluminium Partition door

2.5

-

-

... More
Door

16.5

-

-

... More
Window

18

-

-

... More
Lowers

0.54

-

-

... More
false ceiling

-

-

-

... More
UF shed -office room

18

-

-

... More
Lab room

14

-

-

... More
C & I room

49.85

-

-

... More
PVC Door

3.15

-

-

... More
Window Grill (1sqm = 7Kg)

18

-

-

... More
GI Hand rail -530 Top rail SBR tank , backwash collection sump

-

-

-

... More
vertical

1380

-

-

... More
Horizontal

-

-

-

... More
toe guard

530

-

-

... More
SS Hand rail -Filter press building

-

-

-

... More
vertical

20

-

-

... More
Horizontal

40

-

-

... More
toe guard

20

-

-

... More
AR tiles

146

-

-

... More
Wall & Floor tiles

-

-

-

... More
Toilet

-

-

-

... More
Ceramic Floor tiles

8

-

-

... More
Ceramic wall dado tiles

29

-

-

... More
Vertified floor tiles

20

-

-

... More
Laboratory tiles

14

-

-

... More
Plumbing work for 01 toilet

1

-

-

... More
5. AR TILES

-

-

-

... More
Hypo Dosing tank Area

1.18

-

-

... More
CI, CII, CIII, Poly tank Area

3.57

-

-

... More
CIP Tank Drain Area (Floor)

0.68

-

-

... More
CIP Tank Pit Area

1.13

-

-

... More
Hypo Tank Drain Area

1.73

-

-

... More
Hypo Tank to UF Strainer

6.17

-

-

... More
Drain Side

18.78

-

-

... More
Flooring

59.15

-

-

... More
Dosing Tank Side - CI, CII, CIII

3.99

-

-

... More
Hypo Dosing Tank

2.99

-

-

... More
Poly Dosing Tank

2.83

-

-

... More
Fume Absorber

2.39

-

-

... More
Dosing tank Pedestal Side

2.98

-

-

... More
Drain Area (Top)

6.39

-

-

... More
Dyke Wall Top

2.86

-

-

... More
Dyke Wall Side

4.21

-

-

... More
Pipe Support Pedestal

25.27

-

-

... More
PIPE SUPPORT PEDESTAL

-

-

-

... More
PCC

14.76

-

-

... More
RCC FOOTING

39.45

-

-

... More
FOOTING SHUTTERING

146.22

-

-

... More
RCC PEDESTAL

17.32

-

-

... More
PEDESTAL SHUTTERING

171.62

-

-

... More
STEEL QTY

8.4

-

-

... More
EMI works - Perungudi TTUF

-

-

-

... More
PERUNGUDI STP

-

-

-

... More
Pump (Submersible) -SBR Feed - 02 Nos, SAS - 02 Nos, RAS - 02 Nos, B/wash pumps - 02 Nos

-

-

-

... More
Erection

8

-

-

... More
Testing & Commissioning

8

-

-

... More
Performance test & commissioning certificate

8

-

-

... More
Blowers (MGF Blowers - 02 Nos, SBR Blowers - 03 Nos), Turbo Blower - 1No

-

-

-

... More
Supply - Turbo Blower

1

-

-

... More
Erection

5

-

-

... More
Testing & Commissioning

5

-

-

... More
Performance test & commissioning certificate

5

-

-

... More
SBR System (Decanter - 2 Nos and Diffusers - 1 Lot)

-

-

-

... More
Erection

1

-

-

... More
Testing & Commissioning

1

-

-

... More
Performance test & commissioning certificate

1

-

-

... More
Ozonation System

-

-

-

... More
Erection

1

-

-

... More
Testing & Commissioning

1

-

-

... More
Performance test & commissioning certificate

1

-

-

... More
Pump (Filter feed pump - 3 Nos, ACF feed pump - 3 Nos, MGF B/w pump - 2 Nos and ACF treated water pump -2 Nos , CIP pumps - 02 Nos)

-

-

-

... More
Erection

12

-

-

... More
Testing & Commissioning

12

-

-

... More
Performance test & commissioning certificate

12

-

-

... More
Multi grade Filter

-

-

-

... More
Supply

2

-

-

... More
Erection

3

-

-

... More
Testing & Commissioning

3

-

-

... More
Performance test & commissioning certificate

3

-

-

... More
Filter Media (Anthracite - 26 MT, Pebble gravel (5-12 mm) -16 MT, Pebble gravel (2-5 mm) -16 MT, Filter Media Sand - 48 MT and Activated carbon with iodine No. Min 950 - 22 MT, Media trap - 03 Nos, MSRL piping - 1 lot)

-

-

-

... More
Supply

1

-

-

... More
Erection

1

-

-

... More
Testing & Commissioning

1

-

-

... More
Performance test & commissioning certificate

1

-

-

... More
Filter Nozzle (4800 Nos)

-

-

-

... More
Supply

4800

-

-

... More
Erection

4800

-

-

... More
Testing & Commissioning

4800

-

-

... More
Performance test & commissioning certificate

4800

-

-

... More
Basket Strainer (04 Nos)

-

-

-

... More
Erection

1

-

-

... More
Testing & Commissioning

1

-

-

... More
Performance test & commissioning certificate

1

-

-

... More
UF Membranes (3 modules)

-

-

-

... More
Erection

3

-

-

... More
Testing & Commissioning

3

-

-

... More
Performance test & commissioning certificate

3

-

-

... More
Tanks (FRP)- UF CEB tank -I - 1 Nos, UF CEB tank II - 1 Nos, UF CEB tank III - 1 Nos, UF CIP tank - 1 No, Hypo dosing tank - 1 No, DWPE poly dosing tank - 01 No)

-

-

-

... More
Erection

6

-

-

... More
Testing & Commissioning

6

-

-

... More
Performance test & commissioning certificate

6

-

-

... More
Agitator

-

-

-

... More
Erection

6

-

-

... More
Testing & Commissioning

6

-

-

... More
Performance test & commissioning certificate

6

-

-

... More
ACF

-

-

-

... More
Supply

3

-

-

... More
Erection

3

-

-

... More
Testing & Commissioning

3

-

-

... More
Performance test & commissioning certificate

3

-

-

... More
Dosing Pumps (UF CEB -I - 2 Nos, UF CEB II -2 Nos, UF CEB III - 2 Nos, UF CIP - 2 No, Hypo dosing - 2 No, DWPE poly dosing - 02 No)

-

-

-

... More
Erection

12

-

-

... More
Testing & Commissioning

12

-

-

... More
Performance test & commissioning certificate

12

-

-

... More
Pump (Screw)

-

-

-

... More
Erection

3

-

-

... More
Testing & Commissioning

3

-

-

... More
Performance test & commissioning certificate

3

-

-

... More
Filter Press

-

-

-

... More
Erection

2

-

-

... More
Testing & Commissioning

2

-

-

... More
Performance test & commissioning certificate

2

-

-

... More
HVAC

-

-

-

... More
Supply

3

-

-

... More
Erection

3

-

-

... More
Testing & Commissioning

3

-

-

... More
Performance test & commissioning certificate

3

-

-

... More
Hoist

-

-

-

... More
Erection

1

-

-

... More
Testing & Commissioning

1

-

-

... More
Performance test & commissioning certificate

1

-

-

... More
Fire Alarm

-

-

-

... More
Supply

1

-

-

... More
Erection

1

-

-

... More
Testing & Commissioning

1

-

-

... More
Performance test & commissioning certificate

1

-

-

... More
Laboratory Equipments

-

-

-

... More
Supply

1

-

-

... More
Erection

1

-

-

... More
Testing & Commissioning

1

-

-

... More
Performance test & commissioning certificate

1

-

-

... More
Interconnecting Piping (CS pipe - 424 m, GI pipes - 478 M, SS pipes - 198 m, GRP pipes - 386 m and UPVC pipe - 560 m, victaulic coupling - 347 Pc, MSRL pipes (MGF & ACF) including all pipes specials fittings and fasteners, pipe support and saddle etc.

-

-

-

... More
Supply

6

-

-

... More
Erection

6

-

-

... More
Testing & Commissioning

6

-

-

... More
Performance test & commissioning certificate

6

-

-

... More
Valves (Metallic valves - 286 Nos, Non Metallic Valves - 12 Nos)

-

-

-

... More
Supply

298

-

-

... More
Erection

298

-

-

... More
Testing & Commissioning

298

-

-

... More
Performance test & commissioning certificate

298

-

-

... More
Electrical (SAS and RAS panel - 2 No, MCC panel erection - 1 lot, APFC Panel - 1 No, Chequered plate - 1 lot, SBR air blower VFD - 1 no, Bus duct - 1 lot, SBR feed sump panel - 1 no, cable termination - 1 lot, lighting pole - 1 lot, CEIG certificate - 1No, local push button - 1 lot, light fittings - 1 Lot)

-

-

-

... More
Supply

6

-

-

... More
Erection

17

-

-

... More
Testing & Commissioning

17

-

-

... More
Performance test & commissioning certificate

17

-

-

... More
C&I (PLC & Scada -1 No, ACDB - 3 No, Flow indicator - 7 No, Level switch - 7 No, Pressure transmitter - 8 No, Differential Pressure Transmitter - 3 Nos, Flow Transmitter - 7 Nos, Level Transmitters DP type - 2 Nos, Level Transmitter Hydro static & US type - 5 Nos, Turbidity Analyser-1 No,TOC/BOD/COD (1Analyser - 3 Stream) - 1 No, DO meters - 1 Nos, Junction box - 17 Nos, Inst Cables - 1 lot , Instrument fittings - 1 lot , Cable trays - 1 lot, cable gland - 1 lot)

-

-

-

... More
Supply

9

-

-

... More
Erection

67

-

-

... More
Testing & Commissioning

67

-

-

... More
Performance test & commissioning certificate

67

-

-

... More
Continuous effluent monitering system with TNPCB

-

-

-

... More
Supply - OCEMS

1

-

-

... More
Erection

1

-

-

... More
Testing & Commissioning

1

-

-

... More
Performance test & commissioning certificate

1

-

-

... More
GIS mapping - Establishment of static GCP

-

-

-

... More
For the Underground Utilities / Surface Assets like WTP, STP, Filling Station etc.*

2

-

-

... More
For pipeline for a length of 1.7km (2 km)

1.7

-

-

... More
Provision for extended warrantee, guarantee, repair and replacement for existing supplied materials

1

-

-

... More
Construction of Fish Pond at TTUF sites

-

-

-

... More
Perungudi TTUF

-

-

-

... More
Excavation in hard stiff clay, stiff black cotton, hard red earth, shales, muram, gravel stoney earth and earth mixed with small size boulders as per SS 20B with initial lead of 10m and lift of 2.0m

5.81

-

-

... More
Cement concrete 1:3:6 using Crushed stone sand (Msand) and 12 to 20mm gauge hard broken stone jelly for plain cement concrete works including laying, compacting, curing, etc., complete.

1.45

-

-

... More
Providing and laying in position machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly excluding the cost of centering and shuttering and reinforcement but including curing, fixing, fan clamps etc., as per standard specification and as directed by the Board officers complete. (CMWSSB SOR 23-24 Pg No.129 S No.22.2)

3.66

-

-

... More
Supplying and fabricating CRS / Thermo Mechanically Treated High Corrosion Resistance bars manufactured by Primary steel producers / Integrated Steel Plants as per IS:1786 - 2008,including fixing with binding wires, assembling and laying in position for all RCC works.(CMWSSB SOR 23-24 Pg No.102 S No.4.19.2 i)

233

-

-

... More
Providing form work with centering for soffits of reinforced cement concrete slabs or plain surfaces including strutting upto 3m high (CMWSSB SOR 23-24 Pg No.102 S No.4.20)

19.12

-

-

... More
Mosaic in situ finish in cement mortar in flooring and in wall surface (PWD SOR 23-24 Pg No.22 W-00041)

30.77

-

-

... More
Epoxy painting with shalli prime 2E one coat and Shalipoxy 400 two coats on the surface of walls and floors (Market Rate)

30.77

-

-

... More
Other Miscallenous works

-

-

-

... More
Supply and installation of full color LED video display (Text, image and video) outdoor, water proof, day and night visible at lake - P6 Pitch Mm, cabinet size: 4.7 ft (H) x 6.59 ft (W), Display area : 1344 mm x 1920 mm, 95 mm depth and structure - pole, frame, civil work and installation

-

-

-

... More
Perungudi lake

1

-

-

... More
Electrical Works:-

-

-

-

... More
Transformer Sub Station related works and CEIG approval

-

-

-

... More
Perungudi TTUF - 1000 KVA

-

-

-

... More
Designing and preparation of CEIG drawings, obtaining Approval and safety certificate including submission of Completion report and rectification report.

1

-

-

... More
Supply, erection, testing and commissioning of 11 KV Outdoor DP structure with 9145 MM long 200x100 mm RSJ joist, 100x50x6 mm MS channels, 11 KV lightining arrestor, support insulator & N 'O' Cu. Jumpering etc. and as per TNEB/CEIG Norms

1

-

-

... More
Construction of transformer plinth

1

-

-

... More
Chain link fencing with gate including the TNEB 2 poles spreading of materials as per CEIG requirements

1

-

-

... More
Transformer yard earthing using copper flat and TWIN earthing as per IS (above 250 Kva)

1

-

-

... More
Transformer sub station erection charges

1

-

-

... More
Safety items - 11 KV Danger Board

3

-

-

... More
Safety items - 11 KV Hand gloves (PWD SOR 23-24 (Pg.No 153 ,S.No M-1980)

1

-

-

... More
Safety items - 11 KV Shock Treatment Chart (PWD SOR 23-24 (Pg.No 153 ,S.No M-1978)

1

-

-

... More
Safety items - First Aid Box (PWD SOR 23-24 (Pg.No 153 ,S.No M-1977)

1

-

-

... More
Safety items - Rubber Mat (PWD SOR 23-24 (Pg.No 153 ,S.No M-1976) 5 Nos

2

-

-

... More
Safety items - Fire bucket stand with 4 Nos of Buckets with hood (PWD SOR 23-24 (Pg.No 153 ,S.No M-1979)

1

-

-

... More
Safety items - Earth Discharge rod (PWD SOR 23-24 (Pg.No 153 ,S.No M-1983)

1

-

-

... More
Safety items - Fire Extenguisher 4.5 kgs capacity (PWD SOR 23-24 (Pg.No 153 ,S.No M-1982) 4.5kg

1

-

-

... More
Supply and erection of LT/HT metering cubical Box (Market Rate)

1

-

-

... More
Construction of plinth for HT metering cubical Box

2

-

-

... More
Supply and erection of NCT - 200/5A with enclosure

1

-

-

... More
Construction of Earth Chamber .45 cm x .45 cm inner and suitable cover slab

5

-

-

... More
Supply and erection of diesel generator with Auto Main Failure Panel for the following capacity at various sites of Intake, WTPs & TTUFs.

-

-

-

... More
Perungudi 10 MLD TTUF - 1010 KVA

-

-

-

... More
Supply of DG Set [Market Rate]

1

-

-

... More
Erection, Testing and Commissioning charges

1

-

-

... More
Bill No 5:Balance and Rectification works in Kolathur 10MLD Water Treatment Plant (WTP) including operation and Maintenance for Seven Years

-

-

-

... More
Supply and erection of diesel generator with Auto Main Failure Panel for the following capacity at various sites of Intake, WTPs & TTUFs.

-

-

-

... More
Kolathur 10 MLD WTP - 320 KVA

-

-

-

... More
Supply of DG set

1

-

-

... More
Erection, Testing and Commissioning charges

1

-

-

... More
Defects Rectification Works

-

-

-

... More
Intake pontoon - Pontoon and pipeline relocated - Need service

1

-

-

... More
DAF B - Need service including all necessary spares.

1

-

-

... More
Filter vessel - Pressure gauges are removed -Need service

1

-

-

... More
Hypo dosing tank -Level Gauge not fixed - Need service

1

-

-

... More
Equipment Tools & safety gadgets - Attending immediate fault and replacement - Spare/ Service needed

1

-

-

... More
Backwash sump -Permanent discharge pipeline -Need service

1

-

-

... More
Printer - Printer not working -Service needed

1

-

-

... More
Level transmitter, Pressure transmitter and analyzers - Instruments Calibration - Need service

1

-

-

... More
SCADA System - Recovery for operation trend cannot be made -Need service

1

-

-

... More
Repainting Works in the plant, Hypo Storage Tank

1

-

-

... More
KOLATHUR INTAKE

-

-

-

... More
Commissioning of Pump-set, Flexible Hoses, Unused HDPE Pipes, Cables, Floaters and accessories and Arranging them in Site Storage Area.

1

-

-

... More
Hiring of 350 Ton Crane with operator for lifting and lowering of pump-set and pontoon at Lake

1

-

-

... More
Hiring of 20 Ton Crane with operator for arranging flexible hoses, pumps and pontoons for shifting from yard.

1

-

-

... More
Technical Assistant Grade - I (BE /MSc/BSc Passed)

1

-

-

... More
Technical Assistant Grade-II (Diploma passed / BE failed)

1

-

-

... More
Labour charges Mazdoor Category - I

1

-

-

... More
Laying of flexible rubber hoses

1

-

-

... More
Jointing of flexible rubber hoses of 300 mm dia with rubber insertion or any equivalent to the required specifications with MS bolts and nuts etc. complete including charges for special tools and plants such as air compressor and helmets and sheet piles

1

-

-

... More
Jointing of floaters

1

-

-

... More
Supplying and fixing of cable gland and termination with Aluminium cable by 3½ core 240 sq.mm .PVC UG cable and with earth connection

1

-

-

... More
Ozonation System including construction of housing unit with PEB structure and it is allied works

-

-

-

... More
Supply

1

-

-

... More
Erection

1

-

-

... More
Testing & Commissioning

1

-

-

... More
Performance test & commissioning certificate

1

-

-

... More
OCEMS

-

-

-

... More
Supply

1

-

-

... More
Erection

1

-

-

... More
Testing & Commissioning

1

-

-

... More
Performance test & commissioning certificate

1

-

-

... More
GIS mapping - Establishment of static GCP

-

-

-

... More
For the Underground Utilities / Surface Assets like WTP, STP, Filling Station etc.*

1

-

-

... More
For pipeline for a length of 1.7km (2 km)

1.6

-

-

... More
Bill No 6:Balance and Rectification works in Perumbakkam 10MLD Water Treatment Plant (WTP) including operation and Maintenance for Seven Years

-

-

-

... More
Civil Works - Perumbakkam

-

-

-

... More
Backwash collection sump pump pedestal (2 Nos)

-

-

-

... More
shuttering qty -2*(.6+.9+.6+.9)*.25

1.5

-

-

... More
Concrete qty -M30 (0.6*.9*.25*2)

0.27

-

-

... More
Hydrotest for GLS tank (2 Nos)

-

-

-

... More
MGF Backwash tank GLS tank hydrotest water qty-3.14*5.73*5.73*4.85 *1000

500012.23

-

-

... More
Filter feed GLS tank hydrotest water qty-3.14*54.97*4.97*4.85 *1000

376170.01

-

-

... More
Flash mixer header pipe pedestal (2 Nos)

-

-

-

... More
Exavation-2*1*1*.5

1

-

-

... More
PCC-2*1.2*1.2*.1

0.29

-

-

... More
footing RCC M25 -2*1.0*1.0*.3

0.6

-

-

... More
pedestal RCC M25 -.6*.6*.7*2

0.5

-

-

... More
Shuttering

-

-

-

... More
PCC-2*1.2*4*.1

0.96

-

-

... More
RCC -2*1.0*4*.3

2.4

-

-

... More
pedestal 2*4*.6*.7

3.36

-

-

... More
Insert plate

-

-

-

... More
.45*.45*.01*2 nos

31.8

-

-

... More
steel -10 mm , 8 mm ties

72

-

-

... More
Thrust block (2 Nos)

-

-

-

... More
Exavation-2*1*1*.5

1

-

-

... More
PCC-2*1.0*1.0*1

2

-

-

... More
Shuttering -2*4*1*1

8

-

-

... More
2.ROAD WORKS

-

-

-

... More
EXECAVATION - TOP SOIL REMOVALS

355.5

-

-

... More
S & L OF 300 MM THK GSB COMPACTION WITH ROLLAR

420

-

-

... More
S & L OF 75 MM THK QUARRY DUST

31.5

-

-

... More
S & L OF 60 MM THK M30 GR RUBMOULD PAVER BLOCK

905

-

-

... More
S & L OF 150 MM THK QUARRY DUST OVER SUB BASE

72.75

-

-

... More
S & I M20 GRADE KERB STONE

1723

-

-

... More
3. PAINTING WORKS

-

-

-

... More
Grill Painting , Gate, Rolling shutter- Enamel Painting

150.9

-

-

... More
Pipe supports with emulsion paint

195.51

-

-

... More
Compound wall (NTI)

-

-

-

... More
Excavation

999.45

-

-

... More
PCC 1:5:10

43.96

-

-

... More
RCC M25

108.41

-

-

... More
Prov.Shuttering fixing & removal

686.06

-

-

... More
230 mm thk brickwork

113.99

-

-

... More
External plastering 20 mm thk

1151.8

-

-

... More
backfilling

847.68

-

-

... More
Reinforcement providing, cuting ,bending & tying

5500

-

-

... More
MS Gate (1sqm = 7 Kg)

9

-

-

... More
4.Finishing Item

-

-

-

... More
Rolling shutter

-

-

-

... More
Rolling shutter (CH) -Gear Operated

10.5

-

-

... More
Rolling shutter (MCC) -Manually operated

9

-

-

... More
Aluminium Qty

-

-

-

... More
Aluminium Partition

32

-

-

... More
Aluminium Partition door

2.5

-

-

... More
Door

31.3

-

-

... More
Window

33

-

-

... More
Lowers

1.35

-

-

... More
false ceiling

56.4

-

-

... More
PVC Door

9.45

-

-

... More
Window Grill

33

-

-

... More
GI Hand rail -85 Top rail

-

-

-

... More
vertical

58

-

-

... More
Horizontal

170

-

-

... More
toe guard

85

-

-

... More
SS Hand rail

-

-

-

... More
vertical

38

-

-

... More
Horizontal

68

-

-

... More
toe guard

34

-

-

... More
AR tiles

213

-

-

... More
Wall & Floor tiles

-

-

-

... More
Toilet

-

-

-

... More
Ceramic Floor tiles

25

-

-

... More
Ceramic wall dado tiles

98

-

-

... More
Laboratory tiles

24

-

-

... More
Plumbing Material cum fixing ( 3 toilet )

3

-

-

... More
laboratory

1

-

-

... More
sanitary line Chamber connecting to existing outside sewage line

1

-

-

... More
Roof Weathering coarse with 230*230 manglore tiles

376

-

-

... More
5.Chemical house AR tiling work

-

-

-

... More
chemical house AR tiling work and toilet tiling work

358.06

-

-

... More
6.EPOXY PAINTING WORK

-

-

-

... More
L/C FOR COAL TAR EPOXY PAINTING WORK FOR INSIDE OF TANKS

-

-

-

... More
FLASH MIXER

110

-

-

... More
GLS TANK FLOOR PAINT

-

-

-

... More
FILTER FEED TANK -GLS

77.56

-

-

... More
ACF treated water tank -GLS

103.1

-

-

... More
PROCESS DRAIN

-

-

-

... More
floor

22.13

-

-

... More
Wall area

41.44

-

-

... More
Sump area

4.92

-

-

... More
L/C for Waterproof ( Anti Corrosive ) paint for outside wall above FGL

-

-

-

... More
SLUDGE TANK

-

-

-

... More
WALLS

10.12

-

-

... More
BACKWASH COLLECTION SUMP

-

-

-

... More
WALLS

13.6

-

-

... More
FLASH MIXER

87.12

-

-

... More
PROCESS DRAIN

-

-

-

... More
Wall area

15.43

-

-

... More
7.Chemical house weathering coarse

-

-

-

... More
Floor

195.4

-

-

... More
First roof -floor

141.28

-

-

... More
Toilet roof-floor

38.77

-

-

... More
8.Flash Mixer

-

-

-

... More
M30 concrete

-

-

-

... More
Wall

10.55

-

-

... More
cover slab

1.35

-

-

... More
Shuttering

-

-

-

... More
wall

102.12

-

-

... More
cover slab

12.27

-

-

... More
9.DAF - Dissolved Air Flotation

-

-

-

... More
Pedestal -M25 Concrete

0.49

-

-

... More
Shuttering

-

-

-

... More
Pedestal shuttering work

4.32

-

-

... More
10.Chemical House

-

-

-

... More
1ST FLOOR ROOF SLAB LEVEL 9.05M SHUTTERING

-

-

-

... More
slab (A to C) 2 to 4 th grid

120.43

-

-

... More
slab (A to C) 1 to 2nd grid

62.86

-

-

... More
Beam RB1 outer side (A2 to A4) grid

3.35

-

-

... More
Beam RB1 in side (A2 to A4) grid

2.86

-

-

... More
Beam RB5 outer side (A1 to A2) grid

2.18

-

-

... More
Beam RB5 in side (A1 to A2) grid

1.97

-

-

... More
Beam RB10 A to B /2 to 4 th grid medial area

3.08

-

-

... More
Beam RB3 B1 to B4 grid

9.85

-

-

... More
Beam RB4 outer side (C1 to C6) grid

5.61

-

-

... More
Beam RB4 in side (C1 to C6) grid

4.83

-

-

... More
Beam RB6 C1 to A1 grid outer side

1.56

-

-

... More
in side

1.37

-

-

... More
Beam RB7 A to C /1 to 2nd grid medial area

2.73

-

-

... More
Beam RB8 C2 to A2 grid

3.54

-

-

... More
Beam RB1 C3 to A3 grid

5.16

-

-

... More
Beam RB9 C4 to A4 grid

5.45

-

-

... More
1ST FLOOR ROOF SLAB LEVEL 9.05M M25 CONCRETE QTY

-

-

-

... More
slab (A to C) 2 to 4 th grid

15.05

-

-

... More
slab (A to C) 1 to 2nd grid

7.86

-

-

... More
Beam RB2 (A2 to A4) grid

0.95

-

-

... More
Beam RB5 (A1 to A2) grid

0.68

-

-

... More
Beam RB10 A to B /2 to 4 th grid medial area

0.46

-

-

... More
Beam RB3 B1 to B4 grid

1.45

-

-

... More
Beam RB4 (C1 to C6) grid

1.45

-

-

... More
Beam RB6 C1 to A1 grid

0.48

-

-

... More
Beam RB7 A to C /1 to 2nd grid medial area

0.42

-

-

... More
Beam RB8 C2 to A2 grid

0.58

-

-

... More
Beam RB1 C3 to A3 grid

0.58

-

-

... More
Beam RB9 C4 to B4 grid

0.2

-

-

... More
Column C4 grid

0.06

-

-

... More
Beam RB9 B4 to A4 grid

0.66

-

-

... More
1ST FLOOR WATER TANK WALL M25 CONCRETE QTY

-

-

-

... More
L/S WALL

1.68

-

-

... More
S/S WALL

0.98

-

-

... More
1ST FLOOR WATER TANK WALL SHUTTERING

-

-

-

... More
L/S WALL OUTER SIDE

11.18

-

-

... More
L/S WALL INNER SIDE

10.4

-

-

... More
S/S WALL OUTER SIDE

7.28

-

-

... More
S/S WALL INNER SIDE

6.5

-

-

... More
Ground floor water trench 230 mm soiling work

281.25

-

-

... More
Ground floor slab PCC work (CC 1:3:6)

28

-

-

... More
Ground floor slab PCC side fixing work

-

-

-

... More
Grade slab A to C/2 to 6th grid

2

-

-

... More
Grade slab A to C/2 to 6th grid

1.02

-

-

... More
Grade slab A to C/1st to 2nd grid

0.64

-

-

... More
Grade slab A to C/1st to 2nd grid

0.81

-

-

... More
230 mm brick work (Ground floor level)

69.66

-

-

... More
230 mm thk brick work (First Floor Level)

54.09

-

-

... More
115 mm brick work (Ground floor level)

0.97

-

-

... More
115 mm thk brick work (First Floor Level)

5.59

-

-

... More
115 mm thk brick work (First Floor Level) (7.650&9.05m)

-

-

-

... More
Grid C4 to C5 (7.650m level)

0.67

-

-

... More
Grid C5 to B5 (7.650m level)

0.62

-

-

... More
Grid B4 to B5 (7.650m level)

0.63

-

-

... More
Grid C1 to C4

1.97

-

-

... More
Grid C4 to A4

1.3

-

-

... More
Grid A2 to A4

1.09

-

-

... More
Grid A.1/2 to A2

0.22

-

-

... More
Grid A1 to A2

0.76

-

-

... More
Grid C1 to A1

1.06

-

-

... More
Ground floor water trench 230 mm soiling work

281.25

-

-

... More
RCC CONCRETE WORK M25

-

-

-

... More
GRID C TO KERB WALL/2 TO 6

10.35

-

-

... More
AREA INFRONT OF TOILET

0.62

-

-

... More
GRID A TO KERB WALL/2 TO 6

12.49

-

-

... More
DOSING TANK

6.42

-

-

... More
DRAIN TRENCH WALL

2.74

-

-

... More
CABLE TRENCH RAFT

2.59

-

-

... More
CABLE TRENCH WALL

1.98

-

-

... More
STUB COLUMNS

0.49

-

-

... More
SHUTTERING WORK UPTO FFL

-

-

-

... More
DRAIN TRENCH OUTER

64.14

-

-

... More
DRAIN TRENCH INNER

64.18

-

-

... More
CABLE TRENCH OUTER

63.77

-

-

... More
CABLE TRENCH INNER

55.22

-

-

... More
GRADE SLAB OUTER

39.52

-

-

... More
SHUTTERING WORK ABOVE FFL

-

-

-

... More
DOSING TANK

58.32

-

-

... More
POCKET

17.5

-

-

... More
STUB COLUMNS

16.73

-

-

... More
Internal Wall Plastering - Ground Floor

544.12

-

-

... More
First Floor

572.61

-

-

... More
Ceiling Plastering - Ground Floor

-

-

-

... More
Operator change room

13.4

-

-

... More
Store room

15.8

-

-

... More
Poly and alum storage area

26.9

-

-

... More
Maintanace area

18.8

-

-

... More
Room

16.4

-

-

... More
Dosing tank & passage area

180.7

-

-

... More
Toilet area

22.32

-

-

... More
Filter fress area

76.58

-

-

... More
toilet roof slab bottom

8.07

-

-

... More
toilet roof slab top

9.77

-

-

... More
First Floor

-

-

-

... More
Staff room

17.17

-

-

... More
Senior office room

17.17

-

-

... More
Passage

18.09

-

-

... More
Laboratory room

39.72

-

-

... More
Toilet

10.51

-

-

... More
Toilet

6.35

-

-

... More
Filter fress

58.09

-

-

... More
beam side from c3-a3

3.43

-

-

... More
beam side a1-2 to a1-4

3.18

-

-

... More
filter press area roof beams

12.53

-

-

... More
External plastering

-

-

-

... More
North side wall

199.84

-

-

... More
West side wall

143.13

-

-

... More
South side wall

213.09

-

-

... More
East side wall

259.11

-

-

... More
Sunshade

41.25

-

-

... More
Over head tank

12.54

-

-

... More
Backfillig

254.18

-

-

... More
11.MCC Room

-

-

-

... More
Excavtion

-

-

-

... More
F1

100.86

-

-

... More
F2

19.44

-

-

... More
trench

75.76

-

-

... More
PCC

-

-

-

... More
F1

2.74

-

-

... More
F2

0.55

-

-

... More
Shuttering for PCC

-

-

-

... More
F1

59.2

-

-

... More
F2

10

-

-

... More
Raft RCC

27.52

-

-

... More
Shuttering for Raft

62

-

-

... More
Column RCC

7.5

-

-

... More
Above FFL

-

-

-

... More
MC1

1.76

-

-

... More
Lintel beam

2.51

-

-

... More
Band beam

2.19

-

-

... More
Column shuttering

-

-

-

... More
C1

42

-

-

... More
C2

10

-

-

... More
Above FFL

-

-

-

... More
mc1

30.64

-

-

... More
Lintel beam

116.85

-

-

... More
Band beam

116.85

-

-

... More
Plinth beam PCC

2.38

-

-

... More
Plinth beam RCC

8.56

-

-

... More
Plinth beam shuttering

152.08

-

-

... More
Trench pcc

9.09

-

-

... More
Trench pcc shuttering

105.2

-

-

... More
Trench RCC

36.34

-

-

... More
Trench RCC shuttering

181.71

-

-

... More
Trench wall RCC

16.87

-

-

... More
Trench wall shutterimg

224.98

-

-

... More
Grade slab pcc

5.39

-

-

... More
Grade slab soling

53.89

-

-

... More
Grade slab RCC

10.78

-

-

... More
230 thk brick work

30.42

-

-

... More
Inner plastering

132.26

-

-

... More
Outer plastering

135.23

-

-

... More
Backfillig

55.12

-

-

... More
MGF

-

-

-

... More
M25 RCC

-

-

-

... More
pedastal

0.36

-

-

... More
Shuttering above FGL

-

-

-

... More
pedastel

2.94

-

-

... More
13. PUMP FOUNDATION

-

-

-

... More
Filter feed

-

-

-

... More
GSB

15.21

-

-

... More
PCC

1.2

-

-

... More
RAFT

5.16

-

-

... More
MGF AIR BLOWER

-

-

-

... More
GSB

8.1

-

-

... More
PCC

0.58

-

-

... More
RAFT

2.37

-

-

... More
MGF BACKWASH

-

-

-

... More
EXCAVATION

6.89

-

-

... More
DUST/Filling

4.75

-

-

... More
GSB

4.75

-

-

... More
PCC

0.31

-

-

... More
RAFT

3.32

-

-

... More
ACF TREATED WATER

-

-

-

... More
EXCAVATION

17.81

-

-

... More
DUST

12.29

-

-

... More
GSB

12.29

-

-

... More
PCC

0.91

-

-

... More
RAFT

6.97

-

-

... More
DAF RECYCLE

-

-

-

... More
EXCAVATION

16.64

-

-

... More
DUST

11.48

-

-

... More
GSB

11.48

-

-

... More
PCC

0.87

-

-

... More
RAFT

3.31

-

-

... More
ADT

-

-

-

... More
EXCAVATION

17.51

-

-

... More
DUST

12.08

-

-

... More
GSB

12.08

-

-

... More
PCC

0.94

-

-

... More
RAFT

2.79

-

-

... More
FILTER PRESS

-

-

-

... More
EXCAVATION

22.54

-

-

... More
DUST

15.55

-

-

... More
GSB

15.55

-

-

... More
PCC

1.24

-

-

... More
RAFT

3.93

-

-

... More
AIR RECEIVER

-

-

-

... More
EXCAVATION

5.09

-

-

... More
DUST

3.51

-

-

... More
GSB

3.51

-

-

... More
PCC

0.18

-

-

... More
RAFT

0.89

-

-

... More
SHUTTERING

-

-

-

... More
Filter feed

17.95

-

-

... More
MGF AIR BLOWER

10.07

-

-

... More
MGF BACKWASH

12.35

-

-

... More
ACF TREATED WATER

17.2

-

-

... More
DAF RECYCLE

14.65

-

-

... More
ADT

13.8

-

-

... More
FILTER PRESS

16.42

-

-

... More
AIR RECEIVER

9.21

-

-

... More
14. Pipe Support

-

-

-

... More
Excavation

324

-

-

... More
PCC

40

-

-

... More
shuttering upto FFL

655

-

-

... More
M25 Concrete

135

-

-

... More
Backfilling

174

-

-

... More
15. Process Dain

-

-

-

... More
Excavation

-

-

-

... More
chemical house to backwash

24.11

-

-

... More
fiter feed gls to backwash

4.32

-

-

... More
acf &mgf to backwash

12.51

-

-

... More
acf to mgf

10.8

-

-

... More
back filling

-

-

-

... More
excavation qty

19.81

-

-

... More
PCC

-

-

-

... More
chemical house to backwash

3.35

-

-

... More
fiter feed gls to backwash

0.6

-

-

... More
acf &mgf to backwash

1.74

-

-

... More
acf to mgf

1.5

-

-

... More
Raft

-

-

-

... More
chemical house to backwash

5.36

-

-

... More
fiter feed gls to backwash

0.96

-

-

... More
acf &mgf to backwash

2.78

-

-

... More
acf to mgf

2.4

-

-

... More
Wall - M25

-

-

-

... More
chemical house to backwash

5.02

-

-

... More
fiter feed gls to backwash

0.9

-

-

... More
acf &mgf to backwash

2.61

-

-

... More
acf to mgf

2.25

-

-

... More
Shuttering for PCC

-

-

-

... More
chemical house to backwash

6.7

-

-

... More
fiter feed gls to backwash

1.2

-

-

... More
acf &mgf to backwash

3.48

-

-

... More
acf to mgf

3

-

-

... More
Shuttering for Raft

-

-

-

... More
chemical house to backwash

13.39

-

-

... More
fiter feed gls to backwash

2.4

-

-

... More
acf &mgf to backwash

6.95

-

-

... More
acf to mgf

6

-

-

... More
Shuttering for Wall

-

-

-

... More
chemical house to backwash

33.48

-

-

... More
fiter feed gls to backwash

6

-

-

... More
acf &mgf to backwash

17.38

-

-

... More
acf to mgf

15

-

-

... More
16. Strom Water Drain

-

-

-

... More
Excavation

57.6

-

-

... More
backfillig

17.6

-

-

... More
PCC

8

-

-

... More
Raft - M25

12.8

-

-

... More
Wall - M25

12

-

-

... More
Shuttering

-

-

-

... More
pcc

16

-

-

... More
raft

32

-

-

... More
wall

160

-

-

... More
EMI - Perumbakkam

-

-

-

... More
PERUMBAKKAM INTAKE

-

-

-

... More
Pump + Filter

-

-

-

... More
Erection - Pump cable replacement

2

-

-

... More
Testing & Commissioning

2

-

-

... More
Performance test & commissioning certificate

2

-

-

... More
Pontoon

-

-

-

... More
Supply

1

-

-

... More
Erection

1

-

-

... More
Testing & Commissioning

1

-

-

... More
Performance test & commissioning certificate

1

-

-

... More
Bridge

-

-

-

... More
Supply

1

-

-

... More
Erection

1

-

-

... More
Testing & Commissioning

1

-

-

... More
Performance test & commissioning certificate

1

-

-

... More
Flexible Hoses

-

-

-

... More
Supply

40

-

-

... More
Erection

40

-

-

... More
Testing & Commissioning

40

-

-

... More
Performance test & commissioning certificate

40

-

-

... More
Floats

-

-

-

... More
Supply

40

-

-

... More
Erection

40

-

-

... More
Testing & Commissioning

40

-

-

... More
Performance test & commissioning certificate

40

-

-

... More
Sub Total Perumbakkam Intake - EMI (B.04)

-

-

-

... More
PERUMBAKKAM WTP

-

-

-

... More
DAF System

-

-

-

... More
Supply

2

-

-

... More
Erection

2

-

-

... More
Testing & Commissioning

2

-

-

... More
Performance test & commissioning certificate

2

-

-

... More
Pumps - (DAF recycle - 3 Nos, Filter Feed - 3 Nos, MGF back wash - 2 Nos, Service water pump - 2 Nos)

-

-

-

... More
Supply - Service Water Pump

2

-

-

... More
Erection

10

-

-

... More
Testing & Commissioning

10

-

-

... More
Performance test & commissioning certificate

10

-

-

... More
Multi Grade Filter and Media Trap

-

-

-

... More
Supply

3

-

-

... More
Erection

3

-

-

... More
Testing & Commissioning

3

-

-

... More
Performance test & commissioning certificate

3

-

-

... More
Activated Carbon Filter and Media Trap

-

-

-

... More
Supply

3

-

-

... More
Erection

3

-

-

... More
Testing & Commissioning

3

-

-

... More
Performance test & commissioning certificate

3

-

-

... More
Filter Media (Anthracite, Sand, Gravel, Carbon)

-

-

-

... More
Supply

127.14

-

-

... More
Erection

127.14

-

-

... More
Testing & Commissioning

127.14

-

-

... More
Performance test & commissioning certificate

127.14

-

-

... More
Filter Nozzle

-

-

-

... More
Supply

4800

-

-

... More
Erection

4800

-

-

... More
Testing & Commissioning

4800

-

-

... More
Performance test & commissioning certificate

4800

-

-

... More
Blowers (MGF air scqureing Blower - 2Nos)

-

-

-

... More
Erection

2

-

-

... More
Testing & Commissioning

2

-

-

... More
Performance test & commissioning certificate

2

-

-

... More
Chlorination 1No , Booster pump - 2Nos

-

-

-

... More
Supply

3

-

-

... More
Erection

3

-

-

... More
Testing & Commissioning

3

-

-

... More
Performance test & commissioning certificate

3

-

-

... More
Pumps (Submersible) (Backwash waste collection transfer pump - 2Nos)

-

-

-

... More
Erection

2

-

-

... More
Testing & Commissioning

2

-

-

... More
Performance test & commissioning certificate

2

-

-

... More
Pumps (Screw)

-

-

-

... More
Erection

3

-

-

... More
Testing & Commissioning

3

-

-

... More
Performance test & commissioning certificate

3

-

-

... More
Filter Press

-

-

-

... More
Erection

2

-

-

... More
Testing & Commissioning

2

-

-

... More
Performance test & commissioning certificate

2

-

-

... More
Dosing Tanks (Alum Dosing - 2 Nos, DWPE Solusion Dosing - 1No, Poly electrolite dosing - 2 Nos)

-

-

-

... More
Erection

5

-

-

... More
Testing & Commissioning

5

-

-

... More
Performance test & commissioning certificate

5

-

-

... More
Agitator - (Flash Mixer Agitator - 2Nos, Alum Dosing - 2 Nos, DWPE Solusion Dosing - 1No, Poly electrolite dosing - 2 Nos)

-

-

-

... More
Erection

7

-

-

... More
Testing & Commissioning

7

-

-

... More
Performance test & commissioning certificate

7

-

-

... More
Dosing Pumps (Alum Dosing - 2 Nos, DWPE Solusion Dosing - 2Nos, Poly electrolite dosing - 2 Nos)

-

-

-

... More
Erection

6

-

-

... More
Testing & Commissioning

6

-

-

... More
Performance test & commissioning certificate

6

-

-

... More
GLS Tank (Filter feed tank - 1No, MGF backwah tank - 1No)

-

-

-

... More
Supply

2

-

-

... More
Erection

2

-

-

... More
Testing & Commissioning

2

-

-

... More
Performance test & commissioning certificate

2

-

-

... More
HVAC

-

-

-

... More
Supply

3

-

-

... More
Erection

3

-

-

... More
Testing & Commissioning

3

-

-

... More
Performance test & commissioning certificate

3

-

-

... More
Air Compressor and receiver

-

-

-

... More
Supply

3

-

-

... More
Erection

3

-

-

... More
Testing & Commissioning

3

-

-

... More
Performance test & commissioning certificate

3

-

-

... More
Fire Alarm

-

-

-

... More
Supply

1

-

-

... More
Erection

1

-

-

... More
Testing & Commissioning

1

-

-

... More
Performance test & commissioning certificate

1

-

-

... More
Laboratory Equipments

-

-

-

... More
Supply

1

-

-

... More
Erection

1

-

-

... More
Testing & Commissioning

1

-

-

... More
Performance test & commissioning certificate

1

-

-

... More
Interconnecting Piping (Filters MSRL pipes and fitting - 90 Nos, GRP pipe and Fittings - 1 Lot, CS and GI - 1 Lot, UPVC- 1 Lot, pipe support - 1set, Fastners - 1 set)

-

-

-

... More
Supply

95

-

-

... More
Erection

95

-

-

... More
Testing & Commissioning

95

-

-

... More
Performance test & commissioning certificate

95

-

-

... More
Valves (BFV, Additional Ball & UPVC valve)

-

-

-

... More
Supply

143

-

-

... More
Erection

143

-

-

... More
Testing & Commissioning

143

-

-

... More
Performance test & commissioning certificate

143

-

-

... More
Electrical (Panels - 630A ACB -1 Intake - 1NO, APFC - 1NO, LPBS - 40Nos, cables - 4748m, Light fixture -132Nos, Light Acc - 1 Lot, Tray - 351 m, Light poles - 9Nos, High mast - 1 No, Erathing Matrial - 735 m)

-

-

-

... More
Supply

186

-

-

... More
Erection

186

-

-

... More
Testing & Commissioning

186

-

-

... More
Performance test & commissioning certificate

186

-

-

... More
C&I (cables - 4748m, PLC & SCADA - 1No, Flow indicator - 13Nos, Level Switch - 7Nos, Presserue Transmitter - 4Nos, Flow Transmitter - 3Nos, Level Transmitter - 1No, DP type - 1No, Analyser - 2Nos, JBs - 12Nos, Instrumentation cable - 3160 m, ACDB & PDB - 3 Nos, tube and fitting - 1lot, Pressure switch - 6Nos, Gauge - 52 Nos, UPS and battery - 1 No, FDA system - 1set)

-

-

-

... More
Supply

10

-

-

... More
Erection

111

-

-

... More
Testing & Commissioning

111

-

-

... More
Performance test & commissioning certificate

111

-

-

... More
Ozonation System including construction of housing unit with PEB structure and it is allied works

-

-

-

... More
Supply

1

-

-

... More
Erection

1

-

-

... More
Testing & Commissioning

1

-

-

... More
Performance test & commissioning certificate

1

-

-

... More
Continnuous effluent monitering system with TNPCB

-

-

-

... More
Supply - OCEMS

1

-

-

... More
Erection

1

-

-

... More
Testing & Commissioning

1

-

-

... More
Performance test & commissioning certificate

1

-

-

... More
GIS mapping - Establishment of static GCP

-

-

-

... More
For the Underground Utilities / Surface Assets like WTP, STP, Filling Station etc.*

1

-

-

... More
For pipeline for a length of 2.1 km (2 km)

2.1

-

-

... More
Electrical Works:-

-

-

-

... More
Supply and delivery of 11/433Volts, three Phase 50HZ double wound oil immersed natural air cooled, core type continous rating, outdoor distribution power transformer with copper winding for voltage ratio 22-11KV/433 volts between phases with neutral brought out at LV side. The transfer shall be contained in a mild steel plain & radiator cooled tank, conforming to IS2026 with off-load tap switch for ± 10% on L.V side and ± 5% on H.V. side.The transformer shall be supplied with first filling of oil and consisting of all the fittings and accessories such as Inspection cover, Oil level indicator with minimum and filling level markings, Externally operated off circuit tap changing switch with locking device & keys, H.V.Terminals Bushings, L.V. Terminals cable box rating plate, two earthing terminals, two lifting hooks etc complete as per IS 1180 (Part I) of 2014 and as amended thereafter.

1

-

-

... More
Transformer Sub Station related works and CEIG approval

-

-

-

... More
Designing and preparation of CEIG drawings, obtaining Approval and safety certificate including submission of Completion report and rectification report.

1

-

-

... More
Supply, erection, testing and commissioning of 11 KV Outdoor DP structure with 9145 MM long 200x100 mm RSJ joist, 100x50x6 mm MS channels, 11 KV lightining arrestor, support insulator & N 'O' Cu. Jumpering etc. and as per TNEB/CEIG Norms

1

-

-

... More
Construction of transformer plinth

1

-

-

... More
Chain link fencing with gate including the TNEB 2 poles spreading of materials as per CEIG requirements

1

-

-

... More
Transformer yard earthing using copper flat and TWIN earthing as per IS (above 250 Kva)

1

-

-

... More
Transformer sub station erection charges

1

-

-

... More
Safety items - 11 KV Danger Board

3

-

-

... More
Safety items - 11 KV Hand gloves

1

-

-

... More
Safety items - 11 KV Shock Treatment Chart

1

-

-

... More
Safety items - First Aid Box

1

-

-

... More
Safety items - Rubber Mat

2

-

-

... More
Safety items - Fire bucket stand with 4 Nos of Buckets with hood

1

-

-

... More
Safety items - Earth Discharge rod

1

-

-

... More
Safety items - Fire Extenguisher 9 kgs capacity

1

-

-

... More
Supply and erection of LT/HT metering cubical Box

1

-

-

... More
Construction of plinth for HT metering cubical Box

2

-

-

... More
Supply and erection of NCT - 200/5A with enclosure

1

-

-

... More
Construction of Earth Chamber .45 cm x .45 cm inner and suitable cover slab

5

-

-

... More
Supply and erection of diesel generator with Auto Main Failure Panel for the following capacity at various sites of Intake, WTPs & TTUFs.

-

-

-

... More
Supply of DG set - 125 KVA (Market Rate)

1

-

-

... More
Erection, Testing and Commissioning charges @ 5%

1

-

-

... More
Mechanical Works

-

-

-

... More
Treated water pumps 2 Nos (1 W + 1 S) (Horizontal centrifugal type with 60 m head , 417 m3 discharge and motor rating of 110 Kw, Model No. SCW 150/ 450 at Perubakkam WTP

-

-

-

... More
Erection, testing and commissiong charges for pump & motor @ 5%

2

-

-

... More
The provision for extended warantee, Guarantee, Repair/ Replacement of componenets for existing supplied materials

1

-

-

... More
34.Supply and laying of 300mm dia DI pipes (K7) for Perumbakkam WTP works

-

-

-

... More
Perumbakkam 300mm dia DI pipe (K7)

-

-

-

... More
Supply and laying of 300mm dia DI Soc/Spi Pipes as per IS 8329/2000

1700

-

-

... More
Supply and fixing of 300 mm DI D/S 90 deg bend (67Kg) as per IS 9523/2000

1

-

-

... More
Disposal of surplus earth

120.11

-

-

... More
Labour for fixing of 300mm dia rubber joints

285

-

-

... More
Testing of pipes - 300mm

1700

-

-

... More
Cutting asphaltic road surface

-

-

-

... More
Bus Route

1190

-

-

... More
Providing iron barrication

1700

-

-

... More
Air Valves

-

-

-

... More
Supply and fixing of C.I. Double Air Valve as per ISI 14845/2000

3

-

-

... More
Supply and fixing of 300x80 mm DI D/F concentric taper (31Kg)

3

-

-

... More
Supply of 300 mm DI Fl/ Spi tail piece (48Kg) as per IS 9523/2000

3

-

-

... More
Supply of 300 mm DI Fl/ Soc tail piece (37Kg) as per IS 9523/2000

3

-

-

... More
Supply and fixing of 300mm dia MJ Collars for DI pipes

6

-

-

... More
Construction of 80mm Double Air Valve chamber for 100mm to 350mm dia.pipeline including providing and fixing FRC cover and frame of size 60 x 60cm for size 1.2 x 0.9 x 1.8 m - 300mm pipe

3

-

-

... More
Construction of Thrust Block using Cement Concrete 1:3:6 ,40mm B.G.jelly for Plain Cement Concrete

1

-

-

... More
Bill No 7:Balance and Rectification works in Mogappair 10MLD Water Treatment Plant (WTP) including operation and Maintenance for Seven Years

-

-

-

... More
Backwash collection sump pump pedestal

-

-

-

... More
shuttering qty -2*(.6+.9+.6+.9)*.25

1.5

-

-

... More
Concrete qty -M30 (0.6*.9*.25*2)

0.27

-

-

... More
Hydrotest for GLS tank

-

-

-

... More
MGF Backwash tank GLS tank hydrotest water qty-3.14*2.295*2.295*4.85 *1000

80211.52

-

-

... More
Filter feed GLS tank hydrotest water qty-3.14*5.35*5.35*3.0 *1000

269623.95

-

-

... More
Flash mixer header pipe pedestal

-

-

-

... More
Exavation

1

-

-

... More
PCC

0.29

-

-

... More
Footing RCC M25

0.6

-

-

... More
Pedestal RCC M25

0.5

-

-

... More
Shuttering

-

-

-

... More
PCC

0.96

-

-

... More
RCC

2.4

-

-

... More
Pedestal

3.36

-

-

... More
Insert plate

-

-

-

... More
.45*.45*.01*2 nos

31.8

-

-

... More
Steel -10 mm , 8 mm ties

72

-

-

... More
Thrust block (2 Nos)

-

-

-

... More
Exavation

1

-

-

... More
PCC

2

-

-

... More
Shuttering

8

-

-

... More
Road work

-

-

-

... More
Excavation - Top Soil Removals

328.12

-

-

... More
S & L Of 300 Mm Thk GSB Compaction With Rollar

506.37

-

-

... More
S & L Of80 Mm Thk Quarry Dust

37.98

-

-

... More
S & L Of 60 Mm Thk M30 Gr Rubmould Paver Block

756.15

-

-

... More
S & L Of 150 Mm Thk Quarry Dust Over Sub Base

37.47

-

-

... More
S & I M20 Grade Kerb Stone

1195

-

-

... More
Painting

-

-

-

... More
Ceiling Painting

557.13

-

-

... More
Painting -Inner wall

996.85

-

-

... More
Painting -External wall

1604.02

-

-

... More
Grill Painting , Gate, Rolling shutter- Enamel Painting

164.1

-

-

... More
Kerb stones with emulsion paint

67.5

-

-

... More
Pipe supports with emulsion paint

195.51

-

-

... More
Fencing work

-

-

-

... More
Excavation

64.1

-

-

... More
PCC 1:5:10

7.41

-

-

... More
RCC M25

17.61

-

-

... More
Prov.Shuttering fixing & removal

37.66

-

-

... More
230 mm thick brickwork

10.9

-

-

... More
External plastering 20 mm thk

131.14

-

-

... More
Backfilling

33.62

-

-

... More
Prov. Fabrication ,fixing & painting of Fencing work

158

-

-

... More
MS Gate (1sqm = 7 Kg)

9

-

-

... More
Reinforcement providing, cuting ,bending & tying

630.83

-

-

... More
Finishing item

-

-

-

... More
Rolling shutter

-

-

-

... More
Rolling shutter (CH) -Gear Operated

10.5

-

-

... More
Rolling shutter ( MCC) -Manually operated

9

-

-

... More
Aluminium Qty

-

-

-

... More
Aluminium Partition

32

-

-

... More
Aluminium Partition door

2.5

-

-

... More
Door

31.3

-

-

... More
Window

33

-

-

... More
Louvers

1.35

-

-

... More
False ceiling

56.4

-

-

... More
PVC Door

9.45

-

-

... More
Window Grill (1sqm =7Kg)

33

-

-

... More
GI Hand rail -85 Top rail

-

-

-

... More
Vertical

58

-

-

... More
Horizontal

170

-

-

... More
Toe guard

85

-

-

... More
SS Hand rail

-

-

-

... More
vertical

38

-

-

... More
Horizontal

68

-

-

... More
toe guard

34

-

-

... More
AR tiles

213

-

-

... More
Wall & Floor tiles

-

-

-

... More
Toilet

-

-

-

... More
Ceramic Floor tiles

25

-

-

... More
Ceramic wall dado tiles

98

-

-

... More
Laboratory tiles

24

-

-

... More
Plumbing Material cum fixing (3 toilet)

1

-

-

... More
Laboratory

1

-

-

... More
Sanitary line Chamber connecting to existing outside sewage line

1

-

-

... More
Roof Weathering coarse with 230*230 manglore tiles

376

-

-

... More
Chemical House AR Tiling work and Toilet tiling work

-

-

-

... More
Chemical House AR Tiling work and Toilet tiling work

358.06

-

-

... More
Epoxy Work

-

-

-

... More
L/C FOR COAL TAR EPOXY PAINTING WORK FOR INSIDE OF TANKS

-

-

-

... More
FLASH MIXER

-

-

-

... More
Slab

23.72

-

-

... More
Wall

77.28

-

-

... More
Cover slab

9

-

-

... More
GLS TANK FLOOR PAINT

-

-

-

... More
FILTER FEED TANK -GLS

89.88

-

-

... More
MGF BACKWASH TANK -GLS

16.54

-

-

... More
PROCESS DRAIN

-

-

-

... More
Floor

22.13

-

-

... More
Wall area

41.44

-

-

... More
Sump area

4.92

-

-

... More
L/C for Waterproof ( Anti Corrosive ) paint for outside wall above FGL

-

-

-

... More
SLUDGE TANK

-

-

-

... More
WALLS

-

-

-

... More
Outer

5.52

-

-

... More
Top

4.6

-

-

... More
BACKWASH COLLECTION SUMP

-

-

-

... More
WALLS

-

-

-

... More
Outer

9.6

-

-

... More
Top

4

-

-

... More
FLASH MIXER

-

-

-

... More
Slab

26.48

-

-

... More
Wall

32.64

-

-

... More
Column

28

-

-

... More
PROCESS DRAIN

-

-

-

... More
Wall area

15.43

-

-

... More
Chemical house weathering coarse

375.46

-

-

... More
Intake and WTP MCC

-

-

-

... More
EXCAVTION-Intake MCC

-

-

-

... More
Footing

145.67

-

-

... More
DG Foundation

6.74

-

-

... More
Back filling-Intake MCC

-

-

-

... More
Footing area

97.11

-

-

... More
mcc room

33.5

-

-

... More
DG Foundation

2.03

-

-

... More
PCC - Intake MCC

-

-

-

... More
Footing PCC

4.78

-

-

... More
Plinth Beam

0.98

-

-

... More
DG Foundation

1.15

-

-

... More
Grade Slab

2.79

-

-

... More
plinth production

5.27

-

-

... More
RCC m25 upto FFL-Intake MCC

-

-

-

... More
Footing

14.81

-

-

... More
Columns

0.83

-

-

... More
Plinth Beam

2.35

-

-

... More
Grade Slab

4.19

-

-

... More
DG Foundation

15.25

-

-

... More
RCC m25 Above FFL -Intake MCC

-

-

-

... More
cover slab

0.3

-

-

... More
panel wall

0.65

-

-

... More
Columns

1.72

-

-

... More
Lintel Beam

2.72

-

-

... More
Roof Beam

6.98

-

-

... More
WTP -MCC -Lintel Beam

1.04

-

-

... More
Band Beam

0.53

-

-

... More
Sunshade

0.3

-

-

... More
shuttering upto FFL

22.72

-

-

... More
shuttering Above FFL -Intake MCC

-

-

-

... More
Columns

26.39

-

-

... More
panel wall

9.18

-

-

... More
cover slab

3.88

-

-

... More
Lintel Beam

11.03

-

-

... More
Roof Beam

4.55

-

-

... More
WTP MCC -Lintel Beam

17

-

-

... More
230mm brick wall - Intake MCC

-

-

-

... More
Grid A1 to A3

7.55

-

-

... More
Grid B1 to B3

9.13

-

-

... More
Grid A1 to B1 & Grid A3 to B3

8.98

-

-

... More
Platfrom wall

0.6

-

-

... More
Platfrom step

0.24

-

-

... More
Door step

0.18

-

-

... More
WTP -MCC room

11.99

-

-

... More
External plastering - 20mm thick - Intake MCC

-

-

-

... More
Grid A1 to A3 & Grid B1 to B3

73.7

-

-

... More
Grid A1 to B1 & Grid A3 to B3

36.3

-

-

... More
Panel wall

16.38

-

-

... More
Step

0.88

-

-

... More
Door step

2.52

-

-

... More
WTP -MCC room

62.73

-

-

... More
Internal plastering-Intake MCC

-

-

-

... More
Grid A1 to A3 & Grid B1 to B2

63.54

-

-

... More
Grid A1 to B1 & Grid A3 to B3

32.5

-

-

... More
WTP -MCC room

62.01

-

-

... More
GSB

-

-

-

... More
Grade slab

139.58

-

-

... More
DG Foundation

46.23

-

-

... More
60mm flooring

-

-

-

... More
Intake MCC -grade slab

27.92

-

-

... More
WTP MCC

29.7

-

-

... More
Barrow soil

-

-

-

... More
MCC Room North Side 01

22.03

-

-

... More
MCC Room East Side 02

91.46

-

-

... More
MCC Room West Side 03

45.6

-

-

... More
MCC Room South Side 04

20.92

-

-

... More
Roofing work

33.24

-

-

... More
Doors & windows- Intake MCC -steel door & windows

-

-

-

... More
Window

5.4

-

-

... More
Door

3

-

-

... More
Mogappair-350mm dia DI pipe (K7)

-

-

-

... More
Supply and laying of 350mm dia DI Soc/Spi Pipes as per IS 8329/2000

480

-

-

... More
laying of 350mm dia DI Soc/Spi Pipes as per IS 8329/2000

900

-

-

... More
Supply and laying of 300mm dia DI Soc/Spi Pipes as per IS 8329/2000

80

-

-

... More
Supply and fixing of 350 mm DI D/S 90 deg bend (86Kg) as per IS 9523/2000

2

-

-

... More
Supply and fixing of 300 mm DI D/S 90 deg bend (67Kg) as per IS 9523/2000

1

-

-

... More
Disposal of surplus earth

138.36

-

-

... More
Labour for fixing of 350mm dia rubber joints

231

-

-

... More
Labour for fixing of 300mm dia rubber joints

14

-

-

... More
Testing of pipes - 350mm

1380

-

-

... More
Testing of pipes - 300mm

80

-

-

... More
Providing iron barrication

1460

-

-

... More
Air Valves

-

-

-

... More
Supply and fixing of 100mm C.I. Double Air Valve as per ISI 14845/2000

6

-

-

... More
Supply and fixing of 350x100 mm DI D/F concentric taper (49Kg)

6

-

-

... More
Supply of 350 mm DI Fl/ Spi tail piece (57Kg) as per IS 9523/2000

6

-

-

... More
Supply and fixing of 350mm dia MJ Collars for DI pipes

6

-

-

... More
Construction of 80mm Double Air Valve chamber for 100mm to 350mm dia.pipeline including providing and fixing FRC cover and frame of size 60 x 60cm for size 1.2 x 0.9 x 1.8 m

6

-

-

... More
Construction of Thrust Block using Cement Concrete 1:3:6 ,40mm B.G.jelly for Plain Cement Concrete for 300mm pipe

1

-

-

... More
Construction of Thrust Block using Cement Concrete 1:3:6 ,40mm B.G.jelly for Plain Cement Concrete for 350mm pipe

2

-

-

... More
EMI Works

-

-

-

... More
EMI WORKS AT AYANAMBAKKAM INTAKE

-

-

-

... More
Pump + Filter

-

-

-

... More
Erection + Cable Replacement

2

-

-

... More
Testing & Commissioning

2

-

-

... More
Completion Drawing, Performance test & commissioning certificate

2

-

-

... More
Pontoon

-

-

-

... More
Supply

1

-

-

... More
Erection

1

-

-

... More
Testing & Commissioning

1

-

-

... More
Completion Drawing, Performance test & commissioning certificate

1

-

-

... More
Bridge

-

-

-

... More
Supply

1

-

-

... More
Erection

1

-

-

... More
Testing & Commissioning

1

-

-

... More
Completion Drawing, Performance test & commissioning certificate

1

-

-

... More
Flexible Hoses

-

-

-

... More
Supply

23

-

-

... More
Erection

46

-

-

... More
Testing & Commissioning

46

-

-

... More
Performance test & commissioning certificate

46

-

-

... More
Floats

-

-

-

... More
Supply

40

-

-

... More
Erection

40

-

-

... More
Testing & Commissioning

40

-

-

... More
Completion Drawing, Performance test & commissioning certificate

40

-

-

... More
EMI WORKS AT MOGAPPAIR WTP

-

-

-

... More
DAF System - 2nos

-

-

-

... More
Erection

2

-

-

... More
Testing & Commissioning

2

-

-

... More
Completion Drawing, Performance test & commissioning certificate

2

-

-

... More
Pumps - (DAF recycle - 3Nos, Filter Feed - 3 Nos, MGF back wash - 2 Nos, Service water pump - 2Nos)

-

-

-

... More
Supply - Service Water pump

2

-

-

... More
Erection

10

-

-

... More
Testing & Commissioning

10

-

-

... More
Completion Drawing, Performance test & commissioning certificate

10

-

-

... More
Multi grade Filter and Media Trap

-

-

-

... More
Supply

3

-

-

... More
Erection

3

-

-

... More
Testing & Commissioning

3

-

-

... More
Completion Drawing, Performance test & commissioning certificate

3

-

-

... More
Activated Carbon Filter and Media Trap

-

-

-

... More
Supply

3

-

-

... More
Erection

3

-

-

... More
Testing & Commissioning

3

-

-

... More
Completion Drawing, Performance test & commissioning certificate

3

-

-

... More
Filter Media (Anthracite, Sand, Gravel, Carbon)

-

-

-

... More
Supply

128.5

-

-

... More
Erection

128.5

-

-

... More
Testing & Commissioning

128.5

-

-

... More
Completion Drawing, Performance test & commissioning certificate

128.5

-

-

... More
Filter Nozzle

-

-

-

... More
Supply

4800

-

-

... More
Erection

4800

-

-

... More
Testing & Commissioning

4800

-

-

... More
Completion Drawing, Performance test & commissioning certificate

4800

-

-

... More
Blowers (MGF air scqureing Blower - 2Nos)

-

-

-

... More
Erection

2

-

-

... More
Testing & Commissioning

2

-

-

... More
Completion Drawing, Performance test & commissioning certificate

2

-

-

... More
Pumps (Submersible) (Backwash waste collection transfer pump - 2Nos)

-

-

-

... More
Erection

2

-

-

... More
Testing & Commissioning

2

-

-

... More
Completion Drawing, Performance test & commissioning certificate

2

-

-

... More
Pumps (Screw)

-

-

-

... More
Erection

3

-

-

... More
Testing & Commissioning

3

-

-

... More
Completion Drawing, Performance test & commissioning certificate

3

-

-

... More
Filter Press

-

-

-

... More
Erection

2

-

-

... More
Testing & Commissioning

2

-

-

... More
Completion Drawing, Performance test & commissioning certificate

2

-

-

... More
Dosing Tanks (Alum Dosing - 2 Nos, DWPE Solusion Dosing - 1No, Poly electrolite dosing - 2 Nos, Hypo Dosing - 1no)

-

-

-

... More
Erection

6

-

-

... More
Testing & Commissioning

6

-

-

... More
Completion Drawing, Performance test & commissioning certificate

6

-

-

... More
Agitator - (Flash Mixer Agitator - 2Nos, Alum Dosing - 2 Nos, DWPE Solusion Dosing - 1No, Poly electrolite dosing - 2 Nos, Hypo Dosing - 1no)

-

-

-

... More
Erection

8

-

-

... More
Testing & Commissioning

8

-

-

... More
Completion Drawing, Performance test & commissioning certificate

8

-

-

... More
Dosing Pumps (Alum Dosing - 2 Nos, DWPE Solusion Dosing - 2Nos, Poly electrolite dosing - 2 Nos, Hypo Dosing - 2no)

-

-

-

... More
Erection

8

-

-

... More
Testing & Commissioning

8

-

-

... More
Completion Drawing, Performance test & commissioning certificate

8

-

-

... More
GLS Tank (Filter feed tank -1No, MGF back wash tank - 1 Nos)

-

-

-

... More
Supply

2

-

-

... More
Erection

2

-

-

... More
Testing & Commissioning

2

-

-

... More
Completion Drawing, Performance test & commissioning certificate

2

-

-

... More
HVAC - 3 Nos

-

-

-

... More
Supply

3

-

-

... More
Erection

3

-

-

... More
Testing & Commissioning

3

-

-

... More
Completion Drawing, Performance test & commissioning certificate

3

-

-

... More
Air Compressor 2 Nos and Receiver -1No

-

-

-

... More
Supply

2

-

-

... More
Erection

3

-

-

... More
Testing & Commissioning

3

-

-

... More
Completion Drawing, Performance test & commissioning certificate

3

-

-

... More
Fire Alarm

-

-

-

... More
Supply

1

-

-

... More
Erection

1

-

-

... More
Testing & Commissioning

1

-

-

... More
Completion Drawing, Performance test & commissioning certificate

1

-

-

... More
Laboratory Equipments

-

-

-

... More
Supply

1

-

-

... More
Erection

1

-

-

... More
Testing & Commissioning

1

-

-

... More
Completion Drawing, Performance test & commissioning certificate

1

-

-

... More
Interconnecting Piping (Filters MSRL pipes and fitting - 90 Nos, GRP pipe and Fittings - 1 Lot, CS and GI - 1 Lot, UPVC- 1 Lot, pipe support - 1set, Fastners - 1 set)

-

-

-

... More
Supply

95

-

-

... More
Erection

95

-

-

... More
Testing & Commissioning

95

-

-

... More
Completion Drawing, Performance test & commissioning certificate

95

-

-

... More
Valves (BFV, Additional Ball Metallic & Non Metallic & UPVC valve)

-

-

-

... More
Supply

297

-

-

... More
Erection

297

-

-

... More
Testing & Commissioning

297

-

-

... More
Completion Drawing, Performance test & commissioning certificate

297

-

-

... More
Electrical (Panel - 3 Nos, LPBS - 40Nos, cables - 4507m, Light fixture -67Nos, Light Acc - 1 Lot, Tray - 351 m, Light poles - 9Nos, High mast - 1 No, Earthing Material - 735 m)

-

-

-

... More
Supply

121

-

-

... More
Erection

121

-

-

... More
Testing & Commissioning

121

-

-

... More
Completion Drawing, Performance test & commissioning certificate

121

-

-

... More
C&I (cables - 4506m, Tray - 351 m, PLC & SCADA - 1No, Flow indicator - 13Nos, Level Switch - 7Nos, Presserue Transmitter - 4Nos, Flow Transmitter - 3Nos, Level Transmitter - 1No, DP type - 1No, Analyser - 2Nos, JBs - 12Nos, Instrumentation cable - 3150 m, ACDB & PDB - 3 Nos, tube and fitting - 1lot, Pressure switch - 6Nos, Gauge - 52 Nos, UPS and battery - 1 No)

-

-

-

... More
Supply - Level Switch

12

-

-

... More
Erection

111

-

-

... More
Testing & Commissioning

111

-

-

... More
Completion Drawing, Performance test & commissioning certificate

111

-

-

... More
Ozonation System including construction of housing unit with PEB structure and it is allied works

-

-

-

... More
Supply

1

-

-

... More
Erection

1

-

-

... More
Testing & Commissioning

1

-

-

... More
Performance test & commissioning certificate

1

-

-

... More
Continnuous effluent monitoring system with TNPCB

-

-

-

... More
Supply - OCEMS

1

-

-

... More
Erection

1

-

-

... More
Testing & Commissioning

1

-

-

... More
Performance test & commissioning certificate

1

-

-

... More
GIS mapping - Establishment of static GCP

-

-

-

... More
For the Underground Utilities / Surface Assets like WTP, STP, Filling Station etc.*

1

-

-

... More
For pipeline for a length of 7.9km (2 km)

7.9

-

-

... More
Electrical Works:-

-

-

-

... More
Supply and delivery of 11/433Volts, three Phase 50HZ double wound oil immersed natural air cooled, core type continous rating, outdoor distribution power transformer with copper winding for voltage ratio 22-11KV/433 volts between phases with neutral brought out at LV side. The transfer shall be contained in a mild steel plain & radiator cooled tank, conforming to IS2026 with off-load tap switch for ± 10% on L.V side and ± 5% onH.V. side.The transformer shall be supplied with first filling of oil and consisting of all the fittings and accessories such as Inspection cover, Oil level indicator with minimum and filling level markings, Externally operated off circuit tap changing switch with locking device & keys, H.V.Terminals Bushings, L.V. Terminals cable box rating plate, two earthing terminals, two lifting hooks etc complete as per IS 1180 (Part I) of 2014 and as amended thereafter.

-

-

-

... More
Aynambakkam Intake - 250 KVA

1

-

-

... More
Mogappair 10 MLD WTP - 315KVA

1

-

-

... More
Transformer Sub Station related works and CEIG approval

-

-

-

... More
Aynambakkam Intake - 250 KVA

-

-

-

... More
Designing and preparation of CEIG drawings, obtaining Approval and safety certificate including submission of Completion report and rectification report.

1

-

-

... More
Supply, erection, testing and commissioning of 11 KV Outdoor DP structure with 9145 MM long 200x100 mm RSJ joist, 100x50x6 mm MS channels, 11 KV lightining arrestor, support insulator & N 'O' Cu. Jumpering etc. and as per TNEB/CEIG Norms

1

-

-

... More
Construction of transformer plinth

1

-

-

... More
Chain link fencing with gate including the TNEB 2 poles spreading of materials as per CEIG requirements

1

-

-

... More
Transformer yard earthing using copper flat and TWIN earthing as per IS (upto 250 Kva)

1

-

-

... More
Transformer sub station erection charges

1

-

-

... More
Safety items - 11 KV Danger Board

3

-

-

... More
Safety items - 11 KV Hand gloves

1

-

-

... More
Safety items - 11 KV Shock Treatment Chart

1

-

-

... More
Safety items - First Aid Box

1

-

-

... More
Safety items - Rubber Mat

2

-

-

... More
Safety items - Fire bucket stand with 4 Nos of Buckets with hood

1

-

-

... More
Safety items - Earth Discharge rod

1

-

-

... More
Safety items - Fire Extenguisher 9 kgs capacity

1

-

-

... More
Supply and erection of LT/HT metering cubical Box ( Maket Rate)

1

-

-

... More
Construction of plinth for HT metering cubical Box

2

-

-

... More
Supply and erection of NCT - 200/5A with enclosure enclosure

1

-

-

... More
Construction of Earth Chamber .45 cm x .45 cm inner and suitable cover slab

5

-

-

... More
Mogappair 10 MLD - 315 KVA

-

-

-

... More
Designing and preparation of CEIG drawings, obtaining Approval and safety certificate including submission of Completion report and rectification report.

1

-

-

... More
Supply, erection, testing and commissioning of 11 KV Outdoor DP structure with 9145 MM long 200x100 mm RSJ joist, 100x50x6 mm MS channels, 11 KV lightining arrestor, support insulator & N 'O' Cu. Jumpering etc. and as per TNEB/CEIG Norms

1

-

-

... More
Construction of transformer plinth

1

-

-

... More
Chain link fencing with gate including the TNEB 2 poles spreading of materials as per CEIG requirements

1

-

-

... More
Transformer yard earthing using copper flat and TWIN earthing as per IS (upto 250 Kva)

1

-

-

... More
Transformer sub station erection charges

1

-

-

... More
Safety items - 11 KV Danger Board

3

-

-

... More
Safety items - 11 KV Hand gloves

1

-

-

... More
Safety items - 11 KV Shock Treatment Chart

1

-

-

... More
Safety items - First Aid Box

1

-

-

... More
Safety items - Rubber Mat

2

-

-

... More
Safety items - Fire bucket stand with 4 Nos of Buckets with hood

2

-

-

... More
Safety items - Earth Discharge rod

1

-

-

... More
Safety items - Fire Extenguisher 9 kgs capacity

1

-

-

... More
Supply and erection of LT/HT metering cubical Box

1

-

-

... More
Construction of plinth for HT metering cubical Box

2

-

-

... More
Supply and erection of NCT - 200/5A with enclosure

1

-

-

... More
Construction of Earth Chamber .45 cm x .45 cm inner and suitable cover slab

5

-

-

... More
Sub total for CEIG and Substation works

-

-

-

... More
Supply and erection of diesel generator with Auto Main Failure Panel for the following capacity at various sites of Intake, WTPs & TTUFs.

-

-

-

... More
Mogapair 10 MLD WTP - 320 KVA & Ayanambakkam Intake -250 KVA

-

-

-

... More
Supply of DG set

2

-

-

... More
Erection, Testing and Commissioning charges

2

-

-

... More
The provision for extended warantee, Guarantee, Repair/ Replacement of componenets for existing supplied materials

1

-

-

... More
Sub Total for construction (excluding GST)

1

-

-

... More
SCHEDULE C – OPERATION AND MAINTENANCE SUMMARY OF FIXED AND VARIABLE PAYMENTS

-

-

-

... More
O&M COST FOR 10 MLD TTUF NESAPAKKAM

-

-

-

... More
1st year

1

-

-

... More
2nd year

1

-

-

... More
3rd year

1

-

-

... More
4th year

1

-

-

... More
5th year

1

-

-

... More
6th year

1

-

-

... More
7th year

1

-

-

... More
O&M COST FOR 6 MLD WTP PORUR

-

-

-

... More
1st year

1

-

-

... More
2nd year

1

-

-

... More
3rd year

1

-

-

... More
4th year

1

-

-

... More
5th year

1

-

-

... More
6th year

1

-

-

... More
7th year

1

-

-

... More
O&M COST FOR 10 MLD WTP PERUNGUDI

-

-

-

... More
1st year

1

-

-

... More
2nd year

1

-

-

... More
3rd year

1

-

-

... More
4th year

1

-

-

... More
5th year

1

-

-

... More
6th year

1

-

-

... More
7th year

1

-

-

... More
O&M COST FOR 10 MLD TTUF PERUNGUDI

-

-

-

... More
1st year

1

-

-

... More
2nd year

1

-

-

... More
3rd year

1

-

-

... More
4th year

1

-

-

... More
5th year

1

-

-

... More
6th year

1

-

-

... More
7th year

1

-

-

... More
O&M COST FOR 10 MLD WTP KOLATHUR

-

-

-

... More
1st year

1

-

-

... More
2nd year

1

-

-

... More
3rd year

1

-

-

... More
4th year

1

-

-

... More
5th year

1

-

-

... More
6th year

1

-

-

... More
7th year

1

-

-

... More
O&M COST FOR 10 MLD WTP PERUMBAKKAM

-

-

-

... More
1st year

1

-

-

... More
2nd year

1

-

-

... More
3rd year

1

-

-

... More
4th year

1

-

-

... More
5th year

1

-

-

... More
6th year

1

-

-

... More
7th year

1

-

-

... More
O&M COST FOR 10 MLD WTP MOGAPAIR

-

-

-

... More
1st year

1

-

-

... More
2nd year

1

-

-

... More
3rd year

1

-

-

... More
4th year

1

-

-

... More
5th year

1

-

-

... More
6th year

1

-

-

... More
7th year

1

-

-

... More
Sub Total (excluding GST)

1

-

-

... More
GST @18%

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.