Chennai Metro Rail Limited Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Chennai Metro Rail Limited - CMRL Tender

Works
Eprocure
Opening Date27 Jul 2019
Closing Date23 Aug 2019
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
20m to 30m

1000

-

1283

... More
30m to 40m

100

-

1580

... More
Exploratory drilling of Boreholes down to required depth,drilling of 150mm diameter boreholes in all type of soils except hard rock and large boulders (boulder core more than 30cm), including refilling, reinstating surface and disposing off surplus material including use of mechanical rigs with power operated winches as well as percussion / chieselling tool for advancing through occasional seams of hard strata to be employed where necessary in River bed area including standing/flowing water upto 2m depth with all necessary arrangements

-

-

-

... More
0m to 10m

20

-

3455

... More
10m to 20m

20

-

3949

... More
20m to 30m

20

-

4443

... More
30m to 40m

20

-

4936

... More
Drilling NX size through Hard Rock using TC bit/ diamond bit / Impregnated diamond bit upto 40m depth.

-

-

-

... More
0m to 10m

200

-

3455

... More
10m to 20m

1500

-

3949

... More
20m to 30m

1500

-

4443

... More
30m to 40m

100

-

4936

... More
Collecting undisturbed soil samples in 100mm dia 450mm long thin walled tube sampler at every 3m interval or as directed by the engineer, from boreholes including provisions of air tight containers for packing and labelling incl. transportation the samples to laboratory. Piston sampler shall be used for extracting undisturbed samples where necessary. Samples shall be collected as per IS 2132

1000

-

2962

... More
Conducting standard penetration tests as per IS:2131-1981 at 3.0 M interval or as directed by the engineer and collecting the disturbed sample. Packaging and labeling the same.

2500

-

494

... More
Conducting Field In situ Vane shear test for soil as per IS 4434 at required strata or as directed by engineer

100

-

9873

... More
Collection of Water Samples at intervals as decided by the engineer

320

-

988

... More
Conducting Electrical resistivity Tests as per latest codes to investigate upto 50 m depth.

20

-

25500

... More
In situ Permeabilty test at every 5m depth or as decided by the Engineer as per relevant IS Code

-

-

-

... More
(i)Soil

100

-

2125

... More
(ii) Rock (Double packer)

50

-

2125

... More
Grain size Analysis without Hydrometer (Sieve Analysis)

2500

-

197

... More
Hydrometer analysis including Grain size analysis

1000

-

420

... More
Bulk density ,dry density and moisture content on UD samples

1000

-

197

... More
Specific gravity of soil

-

-

173

... More
Conducting Chemical analysis to determine contents of sulphates,Sulphites, chlorides, pH value and organic matter contents on

-

-

-

... More
(i) Soil Samples

-

-

395

... More
(ii) Water Samples

-

-

519

... More
Atterbergs limits

3000

-

296

... More
Shrinkage Limit

-

-

197

... More
Free Swelling Index

-

-

197

... More
Swell Pressure Test

-

-

425

... More
Direct shear test, Box shear test

300

-

395

... More
Triaxial compressive strength test giving full test results including mohr circle, stress - strain curve, etc.

-

-

-

... More
(a) Un-consolidated undrained test (UU).

100

-

987

... More
(b) Consolidated Undrained test (CU) on clay samples giving relevant information as per IS-2720-XV-1986

100

-

2550

... More
Unconfined compressive strength test on clay soil samples as per IS:2720 - X - 1973 for each BH.

200

-

444

... More
consolidation test by Odeometer as per relevant IS

200

-

395

... More
Density Test & Specific Gravity test

160

-

197

... More
Water Absorption & Porosity test

160

-

49

... More
Hardness index test on rock samples

80

-

987

... More
Abrasivity Index test on Rock samples

80

-

371

... More
Unconfined compressive strength test on saturated (7 Days) Rock samples

160

-

148

... More
Point Load index Test on rock samples

160

-

988

... More
Modulus of Elasticity test

300

-

2962

... More
Petrographic analysis on rock samples

200

-

8500

... More
Preparation and submission of Report in four copies (soft and hard copy) giving recommendations for type of foundation, analysis of borelogs & tests results along with SBC values and calculations in approved format for every 2 Km alignment including stations. 60% of the LS amount shall be released on submission of draft report and balance 40% on submission of final report. Amount will be paid on Pro rata basis based on the KM of work completion and submission of report

-

-

-

... More
60 % of S.No 49 Draft Report

-

-

-

... More
40 % of S.No 49 for Final Report

-

-

-

... More
Any other items which are not covered under above will considered as per DSR 2018.

-

-

1



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.