Bharat Sanchar Nigam Limited Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Bharat Sanchar Nigam Limited - BSNL Tender

Works
Telecommunication Services
Eprocure
Opening Date20 Mar 2024
Closing Date16 Apr 2024
Tender Amount₹ 2,18,40,200 
Notes
Download

Costs

Summary

Outsourcing For The Maintenance Of Ofc In Tvl Ba

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavating trenches across the road on Tarred surface/ cement concrete surface to a depth of 165 cm and back filling the Excavated trenches with cement concrete after laying the PLB pipe with or without protection. (Rate Per Running Metre)

1

212

212

... More
Laying of PLB Pipes (40mm/50mm dia), placing, adjusting and jointing length suitable couplers providing and drawing nylon ropes if needed for pulling OF Cable inside PLB pipes (the rate quoted should be same whether the pipe used is HDPE or PLB) (Rate Per Running Metre)

1

12

12

... More
Laying and Fixing of GI/DWC Pipes on inside/outside the bridges and culverts with PLB pipe inside including cost of clamps, nails etc (Rate Per Running Metre)

1.57

23

15

... More
Planting Route Joint Indicators and base concreting (1:2:4) (Rate Per unit)

1

120

120

... More
Providing & laying CC 1:2:4 (cement: sand: stone) aggregate 20mm normal size for encasing GI/DWC pipes in road bridges, crossings, culverts and rocky surfaces. (Rate per running metre)

1

2000

2000

... More
Road/Railway crossing through Horizontal boring method and inserting GI /DWC Pipes and placing PLB inside the hole (Rate Per Running Metre)

1

650

650

... More
Pulling of OF cables through the existing PLB pipes using the Nylon rope already available inside the pipes or pulling by blowing method. (Rate per running metre)

1

15

15

... More
Pulling of OF cables through new PLB pipes using the Nylon rope already available inside the pipes or pulling by blowing method. (Rate per running metre)

1

15

15

... More
Joint Manhole pits for OF jointing: Excavation and reinstating of existing Joint pits provided as per detailed specification suitable for making joints and reinstating after completion. (Rate Per pit)

1

1850

1850

... More
Digging Joint manhole / Test pits for the purpose like tracing of OFC, attending maintenance cable fault etc. (Rate Per pit)

1

800

800

... More
Opening of Chamber/Man hole covers, dewatering of chambers, taking out the OF Cable coils and jointing kits, closing the man holes after placing the kit back after splicing with full protection and neatly closing the man hole. (Rate Per unit)

1

600

600

... More
Maintenance of Chambers/Man holes if damaged, taking out the OF Cable coils and jointing kits, reconstructing the man holes and placing the coils, kit back with full protection and neatly closing the man hole (Rate Per unit)

1

2500

2500

... More
Maintenance of Chamber/Man holes top covers per slab if damaged, reconstructing the man holes covers including supply of materials concreting and placing the covers, with full protection and neatly closing the man hole (Rate Per unit)

1

950

950

... More
OF Cable Splicing preliminary works Cleaning, cleaving and numbering, if needed, of OF Cables and Splicing of make ready for Splicing 4F/6F (Rate Per joint)

1

200

200

... More
OF Cable Splicing preliminary works, Cleaning, cleaving and numbering if needed of OF Cables and make ready for Splicing 12F per joint (Rate Per joint)

1

250

250

... More
OF Cable Splicing preliminary works, Cleaning, cleaving and numbering if needed of OF Cables and make ready for Splicing 24F per joint (Rate Per joint)

1

300

300

... More
OF Cable Splicing preliminary works, Cleaning, cleaving and numbering if needed of OF Cables and make ready for Splicing 48F per joint (Rate Per joint) For Single Core Fibre Cable

1

500

500

... More
OF Cable Splicing preliminary works, Cleaning, cleaving and numbering if needed of OF Cables and make ready for Splicing 96F per joint (Rate Per joint) For Single Core Fibre Cable

1

800

800

... More
Splicing OF Cables 4F/6F/12F/24F/48F/96F per joint (Rate Per Splicing)

1

80

80

... More
Splicing OF Cables 24F/48F - Ribbon Type (Rate Per Splicing)

1

1500

1500

... More
Splicing OF Cables 96F - Ribbon Type (Rate Per Splicing)

1

2200

2200

... More
OFC Cable Splicing (Pigtail) and Termination inside the boxes and routing the Fibres to FDF. 4F/6F/12F/24F/48F/96F as per standard. (Rate Per Fibre)

1

49

49

... More
Fixing of OFC Cable Termination boxes. (Rate Per unit)

1

250

250

... More
Removal of OFC Cable Termination boxes. (Rate Per unit)

1

150

150

... More
Recovery of Patch cords (Rate Per fibre)

1

50

50

... More
Patch Cords erection in proper standards with sufficient support / hose etc to safeguards from external agency, Rat bite etc. (Rate Per fibre)

1

75

75

... More
Patch Cords replacement in BSNL standards , checking of Optical power etc with sufficient support / hose etc to safeguard from external agency, Rat bite etc for remote sites which are more than 5 km away. (Rate Per unit)

1

250

250

... More
Testing of Spare Fibres between the Stations. (Rate Per fibre)

1

150

150

... More
Installation of ADM/MADM/STM/CPAN/MNGPAN /MAAN systems (Rate Per unit)

1

1000

1000

... More
Dismantling of ADM/MADM/STM/CPAN/MNGPAN/MAAN systems (Rate Per unit)

1

500

500

... More
Installation of FDF (24F/48F/96F) per unit (Rate Per unit)

1

300

300

... More
Dismantling of FDF (24F/48F/96F) per unit (Rate Per unit)

1

150

150

... More
Installation of DDF Bay, Fixing Modules and Wiring (Rate Per unit)

1

336

336

... More
Dismantling of DDF Bay, Removing Modules etc. (Rate Per unit)

1

280

280

... More
Installation of IDF Bay Fixing (Rate Per unit)

1

250

250

... More
Dismantling of IDF Bay Fixing (Rate Per unit)

1

125

125

... More
Termination of CT Boxes (Rate Per unit)

1

120

120

... More
Installation of CPE- A/B/C NODE/MODEM/Converter systems (Rate Per unit)

1

450

450

... More
Dismantling of CPE/ A/B/C NODE/MODEM/Converter systems (Rate Per unit)

1

240

240

... More
Replacement of CPE/ A/B/C NODE/MODEM/Converter systems (Rate Per unit)

1

175

175

... More
Replacement of CPE/ A/B/C NODE/MODEM/Converter systems at remote sites which are more than 5 km away (Rate Per unit)

1

275

275

... More
Wiring of E1 Stream cable per unit (Rate Per unit)

1

100

100

... More
Testing the E1 Stream cable per unit (Rate Per unit)

1

50

50

... More
Dismantling / Recovery and erection of unused posts of any type and transporting to the site/store (cost includes transportation loading and unloading charges also (Rate Per post)

1

600

600

... More
OF Cable overhead pulling for maintenance work 4F/6F (OF cable will be supplied by BSNL) with stay wire (Rate Per Running Metre)

1

18

18

... More
OF Cable overhead pulling for maintenance work 4F/6F (OF cable will be supplied by BSNL) without stay wire (Rate Per Running Metre)

1

12

12

... More
OF Cable overhead pulling for maintenance work 12F/24F/48F (OF cable will be supplied by BSNL) without stay wire (Rate Per Running Metre)

1

24

24

... More
OF Cable recovery from overhead through the any type of posts inclusive of loading, unloading and transportation. (Rate Per Running Metre)

1

9

9

... More
Fixing of Termination boxes at the sub offices (Rate Per unit)

1

200

200

... More
Fixing of splitter boxes/ spare fibre boxes /ONT/ UPS (Rate Per unit)

1

200

200

... More
Leading of OF Cables through green flexible hose (Rate Per Running Metre)

1

15

15

... More
Laying of 50mm PVC pipes by clamping on the wall for pulling cable drop fiber / low count fibers (Rate Per metre)

1

50

50

... More
Lowering of OF cable down and then restoring back to original condition in the alignment during fault Clearance in OH alignment (Rate Per unit)

1

300

300

... More
Monitoring and Safe guarding the OFC Cables in places of works by outside agencies like PWD,TWAD Board, Road widening etc are under taken for making security arrangements and monitoring to avoid damage rate per location per day. (Rate Per day)

1

600

600

... More
Monitoring and Safe guarding the OFC Cables in places of works by outside agencies like PWD,TWAD Board, Road widening etc are under taken for making security arrangements and monitoring to avoid damage rate per location per Night. (Rate Per night)

1

725

725

... More
Testing / replacing of Modem/SFP / Power adapter / attenuators /Converter status at Sub Offices during the fault occurrences.

1

100

100



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.