Airports Authority Of India Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Airports Authority Of India - AAI Tender

Works
Machinery and Tools
Transportation and Logistics
Eprocure
Opening Date27 Jun 2024
Closing Date18 Jul 2024
Tender Amount₹ 14,76,82,376 
Notes
Download

Costs

Summary

Operation Of Bhs Make Pteris Global At Chennai Airport

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Domestic Terminal-4 East wing- First Year

12

-

-

... More
Domestic Terminal-4 West Wing - First Year

12

-

-

... More
FIRST YEAR Ensuring smooth & un-interrupted Operation of Baggage handling system for continuous flow of Baggage movement by deploying manpower as tabulated in Annexure-II on round the clock basis (3 Shift X 8 Hours) on all days including sundays / holidays as per the following site requirement and as per the directions of Engineer-In-Charge: (i) Identification, Clearing Bag Jam and Resetting the system at Arrival and Basement (ii)Identification causes for dieback and restarting of system at Basement. Departure level. Deployment of manpower and scope of work shall be as per SCC. (Note:The quoted rate shall be exclusive of GST, EPF & Bonus).

-

-

-

... More
Domestic Terminal-1 - First Year

12

-

-

... More
Domestic Terminal-4 - First Year

12

-

-

... More
FIRST YEAR Ensuring smooth & un-interrupted Operation of Baggage handling system for continuous flow of Baggage movement at Terminal T2 by deploying manpower as tabulated in Annexure-III on round the clock basis (3 Shift X 8 Hours) on all days including sundays / holidays as per site requirement for the following and as per the directions of Engineer-In-Charge: (i) Retrieval and shifting of tubs from Basement & arrival to Departure. Departure level. Deployment of manpower and scope of work shall be as per SCC. (Note:The quoted rate shall be exclusive of GST, EPF & Bonus).

-

-

-

... More
InternationalTerminal-2 Phase -1- First Year

12

-

-

... More
SECOND YEAR Ensuring smooth & un-interrupted Operation of Baggage handling system for continuous flow of Baggage movement by deploying manpower as tabulated in Annexure-I on round the clock basis (3 Shift X 8 Hours) on all days including sundays / holidays as per the following site requirement and as per the directions of Engineer-In-Charge: (i) Identification, Clearing Bag Jam and Resetting the system at Departure and Mezzanine (ii) Clearing Overheight and Overlength baggages and resetting the system at Mezzanine Floor (iii) Identification causes for dieback and restarting of system at Mezzanine Floor and Departure level. Deployment of manpower and scope of work shall be as per SCC. (Note:The quoted rate shall be exclusive of GST, EPF & Bonus).

-

-

-

... More
Domestic Terminal-1 East wing-Second Year

12

-

-

... More
Domestic Terminal-1 West wing-Second Year

12

-

-

... More
Domestic Terminal-4 East wing-Second Year

12

-

-

... More
Domestic Terminal-4 West wing-Second Year

12

-

-

... More
SECOND YEAR Ensuring smooth & un-interrupted Operation of Baggage handling system for continuous flow of Baggage movement by deploying manpower as tabulated in Annexure-II on round the clock basis (3 Shift X 8 Hours) on all days including sundays / holidays as per the following site requirement and as per the directions of Engineer-In-Charge: (i) Identification, Clearing Bag Jam and Resetting the system at Arrival and Basement (ii)Identification causes for dieback and restarting of system at Basement. Departure level. Deployment of manpower and scope of work shall be as per SCC. (Note:The quoted rate shall be exclusive of GST, EPF & Bonus).

-

-

-

... More
Domestic Terminal-1 - Second Year

12

-

-

... More
Domestic Terminal-4 - Second Year

12

-

-

... More
SECOND YEAR Ensuring smooth & un-interrupted Operation of Baggage handling system for continuous flow of Baggage movement at Terminal T2 by deploying manpower as tabulated in Annexure-III on round the clock basis (3 Shift X 8 Hours) on all days including sundays / holidays as per site requirement for the following and as per the directions of Engineer-In-Charge: (i) Retrieval and shifting of tubs from Basement & arrival to Departure. Departure level. Deployment of manpower and scope of work shall be as per SCC. (Note:The quoted rate shall be exclusive of GST, EPF & Bonus).

-

-

-

... More
International Terminal-2 Phase -1-Second Year

12

-

-

... More
THIRD YEAR Ensuring smooth & un-interrupted Operation of Baggage handling system for continuous flow of Baggage movement by deploying manpower as tabulated in Annexure-I on round the clock basis (3 Shift X 8 Hours) on all days including sundays / holidays as per the following site requirement and as per the directions of Engineer-In-Charge: (i) Identification, Clearing Bag Jam and Resetting the system at Departure and Mezzanine (ii) Clearing Overheight and Overlength baggages and resetting the system at Mezzanine Floor (iii) Identification causes for dieback and restarting of system at Mezzanine Floor and Departure level. Deployment of manpower and scope of work shall be as per SCC. (Note:The quoted rate shall be exclusive of GST, EPF & Bonus).

-

-

-

... More
Domestic Terminal-1 East wing- Third Year

12

-

-

... More
Domestic Terminal-1 West wing- Third Year

12

-

-

... More
Domestic Terminal-4 East wing- Third Year

12

-

-

... More
Domestic Terminal-4 West wing- Third Year

12

-

-

... More
THIRD YEAR Ensuring smooth & un-interrupted Operation of Baggage handling system for continuous flow of Baggage movement by deploying manpower as tabulated in Annexure-II on round the clock basis (3 Shift X 8 Hours) on all days including sundays / holidays as per the following site requirement and as per the directions of Engineer-In-Charge: (i) Identification, Clearing Bag Jam and Resetting the system at Arrival and Basement (ii)Identification causes for dieback and restarting of system at Basement. Departure level. Deployment of manpower and scope of work shall be as per SCC. (Note:The quoted rate shall be exclusive of GST, EPF & Bonus).

-

-

-

... More
Domestic Terminal-1 - Third Year

12

-

-

... More
Domestic Terminal-4 - Third Year

12

-

-

... More
THIRD YEAR Ensuring smooth & un-interrupted Operation of Baggage handling system for continuous flow of Baggage movement at Terminal T2 by deploying manpower as tabulated in Annexure-III on round the clock basis (3 Shift X 8 Hours) on all days including sundays / holidays as per site requirement for the following and as per the directions of Engineer-In-Charge: (i) Retrieval and shifting of tubs from Basement & arrival to Departure. Departure level. Deployment of manpower and scope of work shall be as per SCC. (Note:The quoted rate shall be exclusive of GST, EPF & Bonus).

-

-

-

... More
InternationalTerminal-2 Phase -1- Third Year

12

-

-

... More
FOR ALL YEARS: Providing manpower to attend any urgent/emergency work etc. as and when required and as per the direction of E-I-C. (The quoted rate shall be exclusive of GST, EPF, ESI & Bonus).

-

-

-

... More
Highly-Skilled Labour

50

-

-

... More
Semi-Skilled Labour

150

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.