Rural Management And Development Department Tender

View complete overview of Sikkim Rural Management And Development Department Tender

Rural Management And Development Department Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date31 Jan 2024
Closing Date19 Feb 2024
Tender Amount₹ 17,63,03,300 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Clearing grass and removal of rubbish up to a distance of 30m outside the periphery of the area as per Technical Specification Clause 201.1 By Manual Means

0.58

50884

88494.12

... More
Preparation and surface treatment of formation by removing mud and slurry, watering to the extent needed to maintain the desired moisture content, trimming to the required line, grade, profile and rolling with three wheel 80-100 kN static roller, complete as per Technical Specification Clause 301.5.5.1

21510

63669

2.96

... More
Dismentaling

-

-

-

-

-

-

... More
Below foundation)

-

-

-

... More
Removing Pipe

-

-

-

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.

1147.2

293935

256.22

... More
Laying and spreading available soil in the sub-grade on a prepared surface, pulverising, mixing the spread soil in place with rotavator with 3 per cent slaked lime having minimum content of 70 per cent of CaO, grading with motor grader and compacting with the road roller at OMC to the desired density to form a layer of improved sub grade (Rate as per SOR2020)

-

-

-

... More
Construction of granular sub base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.

573.6

938690

1636.49

... More
Cement Treated Crushed Rock or combination as per clause 403 and Table in Sub-base/base, Providing, Laying and spreading Material on a prepared sub-base,adding the designed quantity of cement to the spread material, mixing in place with rotavator, grading with motor grade and compactig with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base/base

2258.55

4896558

2168.01

... More
Cement Treated Crushed Rock or combination as per clause 403 and Table in Sub-base/base, Providing, Laying and spreading Material on a prepared sub-base,adding the designed quantity of cement to the spread material, mixing in place with rotavator, grading with motor grade and compactig with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base/base

2823.19

5785841

2049.4

... More
Providing and applying primer coat with bitumen emultion (SS-1) on prepared surface of granular base including cleaning or road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per technical Clause: 502

-

-

-

... More
Prime Coat-

22585.5

1034641

45.81

... More
Providing and applying tack coat with bitumen emultion (RS-1) using emultion distributor at the rate of 0.25-0.30 kg/sqm on the prepared granular surface tresated with primer & cleaned with hydraulic broom as per technical specification Clause: 503(TACK COAT-)

22585.5

344654

15.26

... More
Providing, laying of close graded premix surfacing (Mixed seal surfacing) material of 25mm thickness by hot mix plant using hard aggregates of 13.2mm to 0.09mm (Type "B") as per table 500.15 of specification 509 of MORD, premixed with bituminous binder 60/70 grade (S-65,VG-30 Bulk) @ 23.75kg per 10sqm area, including cost of all materials (excluding seigniorage) and transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled roller 8 to 10 tonnes as per MORD Specification 509 complete for finished item of work in all respects as directed by Engineer-in-charge

22585.5

4853623

214.9

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Bitumen/Emulsion)

-

-

-

... More
Carriage on Surface road

12074.21

50107

4.15

... More
Carriage on Un Surface road

121.96

608

4.99

... More
Loading & Unloading

81.31

24088

296.26

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Cement) (4% of Cement in CTSB)

-

-

-

... More
Carriage on Surface road

9831

40798

4.15

... More
Carriage on Un Surface road

339

1691

4.99

... More
Loading & Unloading

226

66954

296.26

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading.

-

-

-

... More
Carriage on Surface road

254854.78

1057647

4.15

... More
Carriage on Un Surface road

8401.81

41925

4.99

... More
Loading & Unloading

3613.68

308897

85.48

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Cement) (5% of Cement in CTB)

-

-

-

... More
a) Stone Chips For CTSB

-

-

-

... More
Carriage on Surface road

9831

40798

4.15

... More
Carriage on Un Surface road

339

1691

4.99

... More
Loading & Unloading

226

66954

296.26

... More
a) Stone Chips For CTB

-

-

-

... More
Carriage on Surface road

203883.83

846117

4.15

... More
Carriage on Un Surface road

6721.45

33540

4.99

... More
Loading & Unloading

2890.94

247117

85.48

... More
b) Stone Chips For MSS

-

-

-

... More
Carriage on Surface road

157497.11

653612

4.15

... More
Carriage on Un Surface road

1769.63

8830

4.99

... More
Loading & Unloading

761.13

65061

85.48

... More
ROAD SIGNAGE

-

-

-

... More
Informatory Sign board with Logo

1

14388

14388.58

... More
Fixing of citizen board

2

28777

14388.58

... More
Maintenance Information board

1

14388

14388.58

... More
i) 900mm equilateral triangle

23

158804

6904.55

... More
ii) 600mm Circular

7.67

47841

6239.87

... More
Fixing of 5th KM stone

1

4182

4182.03

... More
Fixing of Ordinary KM stone

5

12118

2423.72

... More
Fixing of 200mtr stone

23

16041

697.45

... More
Painting lines, dashes, arrows, etc. on roads in two coats on new work with ready mixed road marking paint conforming to IS:164 on bituminous/concrete surface, including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control as per drawing and Technical Specification Clause 1702

1154.7

253976

219.95

... More
Type - A, "W" : Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810).

207

922679

4457.39

... More
HILL CUTTING

-

-

-

... More
Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in acordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3

5718.6

246014

43.02

... More
Excavation in Ordinary Rock using Hydraulic Excavation and Tippers with disposal upto 1000 m.Excavation for roadway in ordinary rock wih hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, transporting to embankment site with a lift upto 1.5 m and lead upto 1000 m, trimming bottom and side slopes in accordance with requirements of lines,grades and cross-sections as per Technical Specification Clause 302.3.5

635.4

43976

69.21

... More
Cost of haulage excluding loading and unloading.

22239

92291

4.15

... More
SLIP CLEARANCE

-

-

-

... More
Slip clearance i/c breaking, removing and throwing of spoils of mixed slip with boulders within a lead of 30m and lift of 1.5m complete.

4881.54

323988

66.37

... More
Cost of haulage excluding loading and unloading.

35570

198124

5.57

... More
Providing box drain of 30 cm (ht) x 45 cm (width) internal dimension with 1:2:4 Plum concrete (20mm & down) in side walls thickness of 23 cm (hill side) and 30 cm (road side) and 1:3:6 (20 mm & down) base concrete of thickness of 15 cm with standard specification over 15 cm stone soling including providing & laying guard stones complete, as per the direction of the Engineer in Charge. As per Clause 13.2 of SOR other works

-

-

-

... More
HILL SIDE DRAINGE WORK

-

-

-

... More
Providing box drain of 30 cm (ht) x 45 cm (width) internal dimension with 1:2:4 Plum concrete (20mm & down) in side walls thickness of 23 cm (hill side) and 30 cm (road side) and 1:3:6 (20 mm & down) base concrete of thickness of 15 cm with standard specification over 15 cm stone soling including providing & laying guard stones complete, as per the direction of the Engineer in Charge. As per Clause 13.2 of SOR other works. (Including Excavation and Stone Soling)

1720.8

3407923

1980.43

... More
Providing and laying standard 'V' shaped drain with cement concrete base in 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 20mm and down) mix of 100mm thick over clean hard selected stones soling of 150mm thick and 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 40mm and down) mix plum concrete along the vertical side of thickness 150mm and depth 450mm including curing, compacting, as per the direction of the Engineer- in - Charge. As per Clause 13.5 of SOR other works

2868

2951946

1029.27

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Cement )

-

-

-

... More
Carriage on Surface road

8356.29

34678

4.15

... More
Carriage on Un Surface road

288.15

1437

4.99

... More
Loading & Unloading

192.1

56911

296.26

... More
Carriage of Non-Stock Materials (Sand )

-

-

-

... More
Carriage on Surface road

26267.92

109011

4.15

... More
Carriage on Un Surface road

865.98

4321

4.99

... More
Loading & Unloading

313.76

26820

85.48

... More
Carriage of Non-Stock Materials (Stone Chips )

-

-

-

... More
Carriage on Surface road

130205.32

540352

4.15

... More
Carriage on Un Surface road

1462.98

7300

4.99

... More
Loading & Unloading

629.24

53787

85.48

... More
Carriage of Non-Stock Materials (Stone )

-

-

-

... More
Carriage on Surface road

34346.31

142537

4.15

... More
Carriage on Un Surface road

1807.7

9020

4.99

... More
Loading & Unloading

547.79

88741

162

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(GI Wire)

-

-

-

... More
Carriage on Surface road

-

-

-

... More
Carriage on Un Surface road

-

-

-

... More
Loading & Unloading

-

-

-

... More
PROTECTION WALL(BREAST WALL & RETAINING WALL)

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out,construction of shoring and bracing, removal of stumps andother deleterious material and disposal upto a lead of 50 m,dressing of sides and bottom and backfilling in trenches withexcavated suitable material.

1164.09

546259

469.26

... More
Stone Soiling for road works Providing & laying hand packed stone soling of specified thickness with clean hard selected stones including hammer dressing of stone for laying as per required level and camber including packing with broken stones obtained from hammer dressing to fill the voids to give uniform surface as directed by the Engineer-in-Charge all complete but excluding carriage and consolidation using:

100.42

94723

943.28

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications clauses 802, 803, 1202 & 1203 M10 Base

92.64

452994

4889.63

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification clauses 702, 704, 1202 and 1204 Coursed Rubble masonry In cement mortar (1:3)

962.75

4365980

4534.92

... More
Providing and Laying Plum concrete in 1:2:4 c.c. (1cement, 2coarse sand, 4clean hard graded stone chips of 20 mm down nominal gauge) with 70% clean hard stone of sizes not exceeding 15cm including shuttering, compacting and curing complete, as per the direction of Engineer in Charge.

81.55

374532

4592.67

... More
Boulder apron laid in wire crates (Providing and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including 10% extra for laps and joints laid with stone boulders weighing less not less than 40 kgs each.

41.39

88870

2147.1

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification clause Sandy material

127.2

162785

1279.76

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification clause Granular material

163.8

222173

1356.37

... More
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification clause 1204.3.8

309.24

398186

1287.63

... More
Providing weepholes in brick masonry/stone masonry,plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1 (V): 20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

418

141033

337.4

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Cement )

-

-

-

... More
Carriage on Surface road

7909.1

32822

4.15

... More
Carriage on Un Surface road

272.73

1360

4.99

... More
Loading & Unloading

181.82

53865

296.26

... More
Carriage of Non-Stock Materials (Sand )

-

-

-

... More
Carriage on Surface road

62368.48

258829

4.15

... More
Carriage on Un Surface road

2056.1

10259

4.99

... More
Loading & Unloading

509.17

43523

85.48

... More
Carriage of Non-Stock Materials (Stone Chips )

-

-

-

... More
Carriage on Surface road

102776.88

426524

4.15

... More
Carriage on Un Surface road

1154.8

5762

4.99

... More
Loading & Unloading

483.46

41326

85.48

... More
Carriage of Non-Stock Materials (Stone )

-

-

-

... More
Carriage on Surface road

61235.54

254127

4.15

... More
Carriage on Un Surface road

3222.92

16082

4.99

... More
Loading & Unloading

976.64

158216

162

... More
CROSS DRAINAGE WORK

-

-

-

... More
RCC SLAB CULVERT

-

-

-

... More
1X1X1.5

8

5419192

677399.1

1

772100

772100.55

... More
T09-Sribadam to Mangalbaria

-

-

-

... More
FLEXIBLE PAVEMENT

-

-

-

... More
Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.

29917.5

929835

31.08

... More
Clearing grass and removal of rubbish up to a distance of 30m outside the periphery of the area as per Technical Specification Clause 201.1 By Manual Means

0.8

70795

88494.12

... More
Preparation and surface treatment of formation by removing mud and slurry, watering to the extent needed to maintain the desired moisture content, trimming to the required line, grade, profile and rolling with three wheel 80-100 kN static roller, complete as per Technical Specification Clause 301.5.5.1

29917.5

88555

2.96

... More
Dismentaling

-

-

-

31.72

45564

1436.47

... More
Below foundation

123.33

253197

2053.01

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.

1595.6

408824

256.22

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.

3989.12

1022093

256.22

... More
Construction of granular sub base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.

2248.3

3679322

1636.49

... More
Cement Treated Crushed Rock or combination as per clause 403 and Table in Sub-base/base, Providing, Laying and spreading Material on a prepared sub-base,adding the designed quantity of cement to the spread material, mixing in place with rotavator, grading with motor grade and compactig with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base/base

3141.34

6810452

2168.01

... More
Cement Treated Crushed Rock or combination as per clause 403 and Table in Sub-base/base, Providing, Laying and spreading Material on a prepared sub-base,adding the designed quantity of cement to the spread material, mixing in place with rotavator, grading with motor grade and compactig with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base/base

-

-

-

... More
Providing and applying primer coat with bitumen emultion (SS-1) on prepared surface of granular base including cleaning or road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per technical Clause: 502

-

-

-

... More
Prime Coat-

31413.38

1439046

45.81

... More
Providing and applying tack coat with bitumen emultion (RS-1) using emultion distributor at the rate of 0.25-0.30 kg/sqm on the prepared granular surface tresated with primer & cleaned with hydraulic broom as per technical specification Clause: 503(TACK COAT-)

31413.38

479368

15.26

... More
Providing, laying of close graded premix surfacing (Mixed seal surfacing) material of 25mm thickness by hot mix plant using hard aggregates of 13.2mm to 0.09mm (Type "B") as per table 500.15 of specification 509 of MORD, premixed with bituminous binder 60/70 grade (S-65,VG-30 Bulk) @ 23.75kg per 10sqm area, including cost of all materials (excluding seigniorage) and transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled roller 8 to 10 tonnes as per MORD Specification 509 complete for finished item of work in all respects as directed by Engineer-in-charge

31413.38

6750734

214.9

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Bitumen/Emulsion)

-

-

-

... More
Carriage on Surface road

12270.06

50920

4.15

... More
Carriage on Un Surface road

169.63

846

4.99

... More
Loading & Unloading

113.09

33503

296.26

... More
Cost of Haulage for Lime

-

-

-

... More
Carriage on Surface road

-

-

-

... More
Carriage on Un Surface road

-

-

-

... More
Loading & Unloading

-

-

-

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Cement) (5% of Cement in CTB)

-

-

-

... More
Carriage on Surface road

8949

37138

4.15

... More
Carriage on Un Surface road

471

2350

4.99

... More
Loading & Unloading

314

93025

296.26

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading.

-

-

-

... More
a) Stone Chips For CTB

-

-

-

... More
Carriage on Surface road

676216.88

2806300

4.15

... More
Carriage on Un Surface road

9348.62

46649

4.99

... More
Loading & Unloading

4020.91

343707

85.48

... More
b) Stone Chips For MSS

-

-

-

... More
Carriage on Surface road

178035.22

738846

4.15

... More
Carriage on Un Surface road

2461.32

12281

4.99

... More
Loading & Unloading

1058.63

90491

85.48

... More
ROAD FURNITURE

-

-

-

... More
Informatory Sign board with Logo

1

14388

14388.58

... More
Fixing of citizen board

2

28777

14388.58

... More
Maintenance Information board

1

14388

14388.58

... More
i) 900mm equilateral triangle

32

220945

6904.55

... More
ii) 600mm Circular

10.67

66560

6239.87

... More
Fixing of 5th KM stone

1

4182

4182.03

... More
Fixing of Ordinary KM stone

7

16966

2423.72

... More
Fixing of 200mtr stone

32

22318

697.45

... More
Painting lines, dashes, arrows, etc. on roads in two coats on new work with ready mixed road marking paint conforming to IS:164 on bituminous/concrete surface, including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control as per drawing and Technical Specification Clause 1702

1603.1

352601

219.95

... More
Type - A, "W" : Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810).

238

1060858

4457.39

... More
HILL CUTTING

-

-

-

... More
Cost of haulage excluding loading and unloading.

-

-

-

... More
Surface road

59692.5

332487

5.57

... More
Excavation in soil in hilly areas by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 meters.

11938.5

1195998

100.18

... More
Excavation in hilly areas in ordinary rock not requiring blasting by mechanical means including cutting and trimming of slopes and disposal of cut material with all lift and lead upto 1000 metters.

5116.5

782619

152.96

... More
SLIP CLEARANCE

-

-

-

... More
Slip clearance i/c breaking, removing and throwing of spoils of mixed slip with boulders within a lead of 30m and lift of 1.5m complete.

3357.55

137894

41.07

... More
H.S.DRAIN

-

-

-

... More
Providing box drain of 30 cm (ht) x 45 cm (width) internal dimension with 1:2:4 Plum concrete (20mm & down) in side walls thickness of 23 cm (hill side) and 30 cm (road side) and 1:3:6 (20 mm & down) base concrete of thickness of 15 cm with standard specification over 15 cm stone soling including providing & laying guard stones complete, as per the direction of the Engineer in Charge. As per Clause 13.2 of SOR other works

2135

4228218

1980.43

... More
Providing and laying standard 'V' shaped drain with cement concrete base in 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 20mm and down) mix of 100mm thick over clean hard selected stones soling of 150mm thick and 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 40mm and down) mix plum concrete along the vertical side of thickness 150mm and depth 450mm including curing, compacting, as per the direction of the Engineer- in - Charge. As per Clause 13.5 of SOR other works

4265

4389836

1029.27

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Cement )

-

-

-

... More
Carriage on Surface road

7443.13

30888

4.15

... More
Carriage on Un Surface road

391.74

1954

4.99

... More
Loading & Unloading

261.16

77372

296.26

... More
Carriage of Non-Stock Materials (Sand )

-

-

-

... More
Carriage on Surface road

22155.64

91945

4.15

... More
Carriage on Un Surface road

1166.09

5818

4.99

... More
Loading & Unloading

422.5

36114

85.48

... More
Carriage of Non-Stock Materials (Stone Chips )

-

-

-

... More
Carriage on Surface road

142465.25

591230

4.15

... More
Carriage on Un Surface road

1969.57

9828

4.99

... More
Loading & Unloading

847.13

72412

85.48

... More
Carriage of Non-Stock Materials (Stone )

-

-

-

... More
Carriage on Surface road

47088.64

195417

4.15

... More
Carriage on Un Surface road

2478.35

12366

4.99

... More
Loading & Unloading

751.02

121664

162

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(GI Wire)

-

-

-

... More
Carriage on Surface road

-

-

-

... More
Carriage on Un Surface road

-

-

-

... More
Loading & Unloading

-

-

-

... More
PROTECTION WORK

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out,construction of shoring and bracing, removal of stumps andother deleterious material and disposal upto a lead of 50 m,dressing of sides and bottom and backfilling in trenches withexcavated suitable material..

1835.76

861449

469.26

... More
Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in acordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3

-

-

-

... More
Excavation in Ordinary Rock using Hydraulic Excavation and Tippers with disposal upto 1000 m.Excavation for roadway in ordinary rock wih hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, transporting to embankment site with a lift upto 1.5 m and lead upto 1000 m, trimming bottom and side slopes in accordance with requirements of lines,grades and cross-sections as per Technical Specification Clause 302.3.5

-

-

-

... More
Stone Soiling for road works Providing & laying hand packed stone soling of specified thickness with clean hard selected stones including hammer dressing of stone for laying as per required level and camber including packing with broken stones obtained from hammer dressing to fill the voids to give uniform surface as directed by the Engineer-in-Charge all complete but excluding carriage and consolidation using:

150.66

142113

943.28

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications clauses 802, 803, 1202 & 1203 M10 Base

144.83

708155

4889.63

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification clauses 702, 704, 1202 and 1204 Coursed Rubble masonry In cement mortar (1:3)

1647.59

7471702

4534.92

... More
Providing and Laying Plum concrete in 1:2:4 c.c. (1cement, 2coarse sand, 4clean hard graded stone chips of 20 mm down nominal gauge) with 70% clean hard stone of sizes not exceeding 15cm including shuttering, compacting and curing complete, as per the direction of Engineer in Charge.

61.16

280896

4592.67

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification clause Sandy material

205.76

263320

1279.76

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification clause Granular material

229.65

311490

1356.37

... More
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification clause 1204.3.8

527.7

679482

1287.63

... More
Providing weepholes in brick masonry/stone masonry,plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1 (V): 20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

636

214586

337.4

... More
Boulder apron laid in wire crates (Providing and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including 10% extra for laps and joints laid with stone boulders weighing less not less than 40 kgs each.

31.04

66652

2147.1

... More
Boulder apron laid in wire crates (Providing and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including 10% extra for laps and joints laid with stone boulders weighing less not less than 40 kgs each..As per Clause 15.2 of SOR other works

-

-

-

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Cement )

-

-

-

... More
Carriage on Surface road

8455.63

35090

4.15

... More
Carriage on Un Surface road

445.03

2220

4.99

... More
Loading & Unloading

296.69

87897

296.26

... More
Carriage of Non-Stock Materials (Sand )

-

-

-

... More
Carriage on Surface road

61654.41

255865

4.15

... More
Carriage on Un Surface road

3244.97

16192

4.99

... More
Loading & Unloading

702.36

60038

85.48

... More
Carriage of Non-Stock Materials (Stone Chips )

-

-

-

... More
Carriage on Surface road

134551.94

558390

4.15

... More
Carriage on Un Surface road

1860.17

9282

4.99

... More
Loading & Unloading

733.43

62693

85.48

... More
Carriage of Non-Stock Materials (Stone )

-

-

-

... More
Carriage on Surface road

98580.24

409107

4.15

... More
Carriage on Un Surface road

5188.43

25890

4.99

... More
Loading & Unloading

1572.25

254704

162

... More
CROSS DRAINAGE WORK

-

-

-

... More
RCC SLAB CULVERT

-

-

-

... More
1X1X1.5

7

4660314

665759.23

2

1512431

756215.5

... More
MRL07-12th Mile Hathidhuuuuunga to Hitteybong

-

-

-

... More
FLEXIBLE PAVEMENT

-

-

-

... More
Clearing grass and removal of rubbish up to a distance of 30m outside the periphery of the area as per Technical Specification Clause 201.1 By Manual Means

0.5

44247

88494.12

... More
Preparation and surface treatment of formation by removing mud and slurry, watering to the extent needed to maintain the desired moisture content, trimming to the required line, grade, profile and rolling with three wheel 80-100 kN static roller, complete as per Technical Specification Clause 301.5.5.1

18720

55411

2.96

... More
Construction of hard shoulders with GSB material with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.

998.4

255810

256.22

... More
Construction of granular sub base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.

499.2

816935

1636.49

... More
Cement Treated with Crushed Rock or combination as per clause 401.2.2 and Table 400-I Grading-I in Sub-base/base, Providing, Laying and spreading Material on a prepared sub-base,adding the designed quantity of cement to the spread material, mixing in place with rotavator, grading with motor grade and compactig with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base/base

-

-

-

2457

5035375

2049.4

1965.6

4261440

2168.01

... More
Providing and applying primer coat with bitumen emultion (SS-1) on prepared surface of granular base including cleaning or road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per technical Clause: 502

19656

900441

45.81

... More
Providing and applying tack coat with bitumen emultion (RS-1) using emultion distributor at the rate of 0.25-0.30 kg/sqm on the prepared granular surface tresated with primer & cleaned with hydraulic broom as per technical specification Clause: 503

-

-

-

... More
TACK COAT-

19656

299950

15.26

... More
Providing, laying of close graded premix surfacing (Mixed seal surfacing) material of 25mm thickness by hot mix plant using hard aggregates of 13.2mm to 0.09mm (Type "B") as per table 500.15 of specification 509 of MORD, premixed with bituminous binder 60/70 grade (S-65,VG-30 Bulk) @ 23.75kg per 10sqm area, including cost of all materials (excluding seigniorage) and transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled roller 8 to 10 tonnes as per MORD Specification 509 complete for finished item of work in all respects as directed by Engineer-in-charge

19656

4224074

214.9

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading

-

-

-

... More
Carriage on Surface road

9800.48

40672

4.15

... More
Carriage on Un Surface road

106.14

529

4.99

... More
Loading & Unloading

70.76

20963

296.26

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Cement) (4% of Cement in CSTB)

-

-

-

... More
Carriage on Surface road

75691

314117

4.15

... More
Carriage on Un Surface road

2949

14715

4.99

... More
Loading & Unloading

1966

582447

296.26

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading.

-

-

-

... More
a) Stone Chips For CTSB

-

-

-

... More
Carriage on Surface road

197424.86

819313

4.15

... More
Carriage on Un Surface road

7312.03

36487

4.99

... More
Loading & Unloading

3144.96

268831

85.48

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Cement) (5% of Cement in CTB)

-

-

-

... More
Carriage on Surface road

7584.5

31475

4.15

... More
Carriage on Un Surface road

295.5

1474

4.99

... More
Loading & Unloading

197

58363

296.26

... More
a) Stone Chips For CTB

-

-

-

... More
Carriage on Surface road

157939.89

655450

4.15

... More
Carriage on Un Surface road

5849.63

29189

4.99

... More
Loading & Unloading

2515.97

215064

85.48

... More
b) Stone Chips For MSS

-

-

-

... More
Carriage on Surface road

131934.95

547530

4.15

... More
Carriage on Un Surface road

1540.1

7685

4.99

... More
Loading & Unloading

662.41

56622

85.48

... More
ROAD FURNITUIRE

-

-

-

... More
Informatory Sign board with Logo

1

14388

14388.58

... More
Fixing of citizen board

2

28777

14388.58

... More
Maintenance Information board

1

14388

14388.58

... More
i) 900mm equilateral triangle

20

138091

6904.55

... More
ii) 600mm Circular

6.67

41601

6239.87

... More
Fixing of 5th KM stone

1

4182

4182.03

... More
Fixing of Ordinary KM stone

4

9694

2423.72

... More
Fixing of 200mtr stone

20

13949

697.45

... More
Painting lines, dashes, arrows, etc. on roads in two coats on new work with ready mixed road marking paint conforming to IS:164 on bituminous/concrete surface, including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control as per drawing and Technical Specification Clause 1702

1005.9

221247

219.95

... More
Type - A, "W" : Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810).

86

383335

4457.39

... More
HILL CUTTING

-

-

-

... More
Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in acordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3

19224

827016

43.02

... More
Excavation in Ordinary Rock using Hydraulic Excavation and Tippers with disposal upto 1000 m.Excavation for roadway in ordinary rock wih hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, transporting to embankment site with a lift upto 1.5 m and lead upto 1000 m, trimming bottom and side slopes in accordance with requirements of lines,grades and cross-sections as per Technical Specification Clause 302.3.5

2136

147832

69.21

... More
Cost of haulage excluding loading and unloading.

74760

310254

4.15

... More
SLIP CLEARANCE

-

-

-

... More
Slip clearance i/c breaking, removing and throwing of spoils of mixed slip with boulders within a lead of 30m and lift of 1.5m complete.

4103.87

168545

41.07

... More
H.S. DRAIN

-

-

-

... More
Providing and laying standard 'V' shaped drain with cement concrete base in 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 20mm and down) mix of 100mm thick over clean hard selected stones soling of 150mm thick and 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 40mm and down) mix plum concrete along the vertical side of thickness 150mm and depth 450mm including curing, compacting, as per the direction of the Engineer- in - Charge. As per Clause 13.5 of SOR other works

3144.96

3237012

1029.27

... More
Providing box drain of 30 cm (ht) x 45 cm (width) internal dimension with 1:2:4 Plum concrete (20mm & down) in side walls thickness of 23 cm (hill side) and 30 cm (road side) and 1:3:6 (20 mm & down) base concrete of thickness of 15 cm with standard specification over 15 cm stone soling including providing & laying guard stones complete, as per the direction of the Engineer in Charge. As per Clause 13.2 of SOR other works

599.04

1186356

1980.43

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading

-

-

-

... More
Carriage on Surface road

5243.96

21762

4.15

... More
Carriage on Un Surface road

204.31

1019

4.99

... More
Loading & Unloading

136.21

40352

296.26

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading (Sand)

-

-

-

... More
Carriage on Surface road

15657.64

64979

4.15

... More
Carriage on Un Surface road

579.91

2893

4.99

... More
Loading & Unloading

210.11

17960

85.48

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading.

-

-

-

... More
Carriage on Surface road

26417.33

109631

4.15

... More
Carriage on Un Surface road

978.42

4882

4.99

... More
Loading & Unloading

420.83

35972

85.48

-

-

-

... More
Carriage on Surface road

25550.06

106032

4.15

... More
Carriage on Un Surface road

1344.74

6710

4.99

... More
Loading & Unloading

407.5

66014

162

... More
PROTECTION WALL(BREAST WALL & RETAINING WALL)

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out,construction of shoring and bracing, removal of stumps andother deleterious material and disposal upto a lead of 50 m,dressing of sides and bottom and backfilling in trenches withexcavated suitable material..

914.85

429302

469.26

... More
Stone Soiling for road works Providing & laying hand packed stone soling of specified thickness with clean hard selected stones including hammer dressing of stone for laying as per required level and camber including packing with broken stones obtained from hammer dressing to fill the voids to give uniform surface as directed by the Engineer-in-Charge all complete but excluding carriage and consolidation using:

79.36

74853

943.28

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications clauses 802, 803, 1202 & 1203 M10 Base

75.47

369010

4889.63

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification clauses 702, 704, 1202 and 1204 Coursed Rubble masonry In cement mortar (1:3)

767.56

3480809

4534.92

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification clause Sandy material

98.37

125889

1279.76

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification clause Granular material

145.8

197758

1356.37

... More
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification clause 1204.3.8

244.5

314825

1287.63

... More
Providing weepholes in brick masonry/stone masonry,plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1 (V): 20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

339

114378

337.4

... More
Providing and Laying Plum concrete in 1:2:4 c.c. (1cement, 2coarse sand, 4clean hard graded stone chips of 20 mm down nominal gauge) with 70% clean hard stone of sizes not exceeding 15cm including shuttering, compacting and curing complete, as per the direction of Engineer in Charge.

40.78

187266

4592.67

... More
Boulder apron laid in wire crates (Providing and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including 10% extra for laps and joints laid with stone boulders weighing less not less than 40 kgs each.

20.7

44436

2147.1

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Cement)

-

-

-

... More
Carriage on Surface road

5500.08

22825

4.15

... More
Carriage on Un Surface road

214.29

1069

4.99

... More
Loading & Unloading

142.86

42323

296.26

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading (Sand)

-

-

-

... More
Carriage on Surface road

45002.33

186759

4.15

... More
Carriage on Un Surface road

1666.75

8317

4.99

... More
Loading & Unloading

405.39

34652

85.48

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading. (Stone Chips)

-

-

-

... More
Carriage on Surface road

24124.18

100115

4.15

... More
Carriage on Un Surface road

893.49

4458

4.99

... More
Loading & Unloading

376.36

32171

85.48

... More
b)Stone

-

-

-

... More
Carriage on Surface road

47247.12

196075

4.15

... More
Carriage on Un Surface road

2486.69

12408

4.99

... More
Loading & Unloading

753.54

122073

162

... More
CROSS DRAINAGE WORK

-

-

-

... More
RCC SLAB CULVERTS (1x2x2)

1

744676

744676.47

... More
RCC SLAB CULVERTS (1x1x1.5)

6

3928773

654795.58

... More
T11-Soreng Kaluk Road to Lower Samdong

-

-

-

... More
FLEXIBLE PAVEMENT

-

-

-

... More
Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.

14641.88

455069

31.08

... More
Clearing grass and removal of rubbish up to a distance of 30m outside the periphery of the area as per Technical Specification Clause 201.1 By Manual Means

0.51

45132

88494.12

... More
Preparation and surface treatment of formation by removing mud and slurry, watering to the extent needed to maintain the desired moisture content, trimming to the required line, grade, profile and rolling with three wheel 80-100 kN static roller, complete as per Technical Specification Clause 301.5.5.1

18886.88

55905

2.96

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.

1007.3

258090

256.22

... More
Construction of granular sub base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.

1413.33

2388872

1690.25

... More
Cement Treated Crushed Rock or combination as per clause 403 and Table in Sub-base/base, Providing, Laying and spreading Material on a prepared sub-base,adding the designed quantity of cement to the spread material, mixing in place with rotavator, grading with motor grade and compactig with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base/base

1983.13

4299434

2168.01

... More
Providing and applying primer coat with bitumen emultion (SS-1) on prepared surface of granular base including cleaning or road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per technical Clause: 502

-

-

-

... More
Prime Coat-

19831.22

908468

45.81

... More
Providing and applying tack coat with bitumen emultion (RS-1) using emultion distributor at the rate of 0.25-0.30 kg/sqm on the prepared granular surface tresated with primer & cleaned with hydraulic broom as per technical specification Clause: 503(TACK COAT-)

19831.22

302624

15.26

... More
Providing, laying of close graded premix surfacing (Mixed seal surfacing) material of 25mm thickness by hot mix plant using hard aggregates of 13.2mm to 0.09mm (Type "B") as per table 500.15 of specification 509 of MORD, premixed with bituminous binder 60/70 grade (S-65,VG-30 Bulk) @ 23.75kg per 10sqm area, including cost of all materials (excluding seigniorage) and transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled roller 8 to 10 tonnes as per MORD Specification 509 complete for finished item of work in all respects as directed by Engineer-in-charge

19831.22

4261730

214.9

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Bitumen/Emulsion)

-

-

-

... More
Carriage on Surface road

7746.08

32146

4.15

... More
Carriage on Un Surface road

107.09

534

4.99

... More
Loading & Unloading

71.39

21150

296.26

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Cement) (5% of Cement in CTB)

-

-

-

... More
Carriage on Surface road

7623

31635

4.15

... More
Carriage on Un Surface road

297

1482

4.99

... More
Loading & Unloading

198

58659

296.26

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading.

-

-

-

... More
a) Stone Chips For CTB

-

-

-

... More
Carriage on Surface road

230169.36

955202

4.15

... More
Carriage on Un Surface road

5901.78

29449

4.99

... More
Loading & Unloading

2538.4

216982

85.48

... More
b) Stone Chips For MSS

-

-

-

... More
Carriage on Surface road

60599.21

251486

4.15

... More
Carriage on Un Surface road

1553.83

7753

4.99

... More
Loading & Unloading

668.31

57127

85.48

... More
ROAD FURNITURE

-

-

-

... More
Informatory Sign board with Logo

1

14388

14388.58

... More
Fixing of citizen board

2

28777

14388.58

... More
Maintenance Information board

1

14388

14388.58

... More
i) 900mm equilateral triangle

20

138091

6904.55

... More
ii) 600mm Circular

6.67

41601

6239.87

... More
Fixing of 5th KM stone

1

4182

4182.03

... More
Fixing of Ordinary KM stone

4

9694

2423.72

... More
Fixing of 200mtr stone

20

13949

697.45

... More
Painting lines, dashes, arrows, etc. on roads in two coats on new work with ready mixed road marking paint conforming to IS:164 on bituminous/concrete surface, including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control as per drawing and Technical Specification Clause 1702

1014.8

223205

219.95

... More
Type - A, "W" : Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810).

100

445739

4457.39

... More
HILL CUTTING

-

-

-

... More
Cost of haulage excluding loading and unloading.

-

-

-

... More
Surface road

17717.5

73527

4.15

... More
Excavation in soil in hilly areas by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 meters.

5075.25

646789

127.44

... More
Excavation in hilly areas in ordinary rock not requiring blasting by mechanical means including cutting and trimming of slopes and disposal of cut material with all lift and lead upto 1000 metters.

3783.5

745198

196.96

... More
SLIP CLEARANCE

-

-

-

... More
Slip clearance i/c breaking, removing and throwing of spoils of mixed slip with boulders within a lead of 30m and lift of 1.5m complete.

5349.47

219702

41.07

... More
Throwing of spoils

-

-

-

... More
Loading & Unloading

1337.37

142656

106.67

... More
Haulage

13373.67

55500

4.15

... More
H.S.DRAIN

-

-

-

... More
Providing box drain of 30 cm (ht) x 45 cm (width) internal dimension with 1:2:4 Plum concrete (20mm & down) in side walls thickness of 23 cm (hill side) and 30 cm (road side) and 1:3:6 (20 mm & down) base concrete of thickness of 15 cm with standard specification over 15 cm stone soling including providing & laying guard stones complete, as per the direction of the Engineer in Charge. As per Clause 13.2 of SOR other works

1145.5

2268582

1980.43

... More
Providing and laying standard 'V' shaped drain with cement concrete base in 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 20mm and down) mix of 100mm thick over clean hard selected stones soling of 150mm thick and 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 40mm and down) mix plum concrete along the vertical side of thickness 150mm and depth 450mm including curing, compacting, as per the direction of the Engineer- in - Charge. As per Clause 13.5 of SOR other works

1372.75

1412930

1029.27

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Cement )

-

-

-

... More
Carriage on Surface road

4256.16

17663

4.15

... More
Carriage on Un Surface road

165.83

827

4.99

... More
Loading & Unloading

110.55

32751

296.26

... More
Carriage of Non-Stock Materials (Sand )

-

-

-

... More
Carriage on Surface road

13009.86

53990

4.15

... More
Carriage on Un Surface road

506.88

2529

4.99

... More
Loading & Unloading

183.65

15698

85.48

... More
Carriage of Non-Stock Materials (Stone Chips )

-

-

-

... More
Carriage on Surface road

33409.02

138647

4.15

... More
Carriage on Un Surface road

856.64

4274

4.99

... More
Loading & Unloading

368.45

31494

85.48

... More
Carriage of Non-Stock Materials (Stone )

-

-

-

... More
Carriage on Surface road

26297.04

109132

4.15

... More
Carriage on Un Surface road

1024.56

5112

4.99

... More
Loading & Unloading

310.47

50296

162

... More
PROTECTION WORK

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out,construction of shoring and bracing, removal of stumps andother deleterious material and disposal upto a lead of 50 m,dressing of sides and bottom and backfilling in trenches withexcavated suitable material..

770.97

361783

469.26

... More
Stone Soiling for road works Providing & laying hand packed stone soling of specified thickness with clean hard selected stones including hammer dressing of stone for laying as per required level and camber including packing with broken stones obtained from hammer dressing to fill the voids to give uniform surface as directed by the Engineer-in-Charge all complete but excluding carriage and consolidation using:

78.32

73880

943.28

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications clauses 802, 803, 1202 & 1203 M10 Base

70.55

344958

4889.63

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification clauses 702, 704, 1202 and 1204 Coursed Rubble masonry In cement mortar (1:3)

957.73

4343224

4534.92

... More
Providing and Laying Plum concrete in 1:2:4 c.c. (1cement, 2coarse sand, 4clean hard graded stone chips of 20 mm down nominal gauge) with 70% clean hard stone of sizes not exceeding 15cm including shuttering, compacting and curing complete, as per the direction of Engineer in Charge.

81.55

374532

4592.67

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification clause Sandy material

63.78

81623

1279.76

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification clause Granular material

131.55

178430

1356.37

... More
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification clause 1204.3.8

281.4

362339

1287.63

... More
Providing weepholes in brick masonry/stone masonry,plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1 (V): 20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

393

132598

337.4

... More
Boulder apron laid in wire crates (Providing and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including 10% extra for laps and joints laid with stone boulders weighing less not less than 40 kgs each.

41.39

88870

2147.1

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Cement )

-

-

-

... More
Carriage on Surface road

5673.69

23545

4.15

... More
Carriage on Un Surface road

221.05

1103

4.99

... More
Loading & Unloading

147.37

43659

296.26

... More
Carriage of Non-Stock Materials (Sand )

-

-

-

... More
Carriage on Surface road

43766.31

181630

4.15

... More
Carriage on Un Surface road

1705.18

8508

4.99

... More
Loading & Unloading

383.42

32775

85.48

... More
Carriage of Non-Stock Materials (Stone Chips )

-

-

-

... More
Carriage on Surface road

40076.4

166317

4.15

... More
Carriage on Un Surface road

1027.6

5127

4.99

... More
Loading & Unloading

423.47

36197

85.48

... More
Carriage of Non-Stock Materials (Stone )

-

-

-

... More
Carriage on Surface road

80591.03

334452

4.15

... More
Carriage on Un Surface road

3139.91

15668

4.99

... More
Loading & Unloading

951.49

154141

162

... More
CROSS DRAINAGE WORK

-

-

-

... More
RCC SLAB CULVERT

-

-

-

... More
1X1X1.5

4

2644591

661147.78

1

1845838

1845838.68



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.