Rural Management And Development Department Tender

View complete overview of Sikkim Rural Management And Development Department Tender

Rural Management And Development Department Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date23 Feb 2024
Closing Date29 Feb 2024
Tender Amount₹ 6,42,76,200 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Clearing grass and removal of rubbish up to a distance of 30m outside the periphery of the area as per Technical Specification Clause 201.1 By Manual Means

0.91

80529

88494.12

... More
Preparation and surface treatment of formation by remocing mud and slurry, watering to the extent needed to maintain the desired moisture content, trimming to the required line, grade, profile and rolling with three wheel 80-100 kN static roller, complete as per Technical Specification Clause 301.5.5.1

34076.25

100865

2.96

... More
Dismentaling

-

-

-

... More
Below foundation

197.9

406290

2053.01

47.57

68332

1436.47

... More
Removing Pipe

7.62

5372

705.09

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. Only shoulder portion

1817.4

465654

256.22

... More
Laying and spreading available soil in the sub-grade on a prepared surface, pulverising, mixing the spread soil in place with rotavator with 3 per cent slaked lime having minimum content of 70 per cent of CaO, grading with motor grader and compacting with the road roller at OMC to the desired density to form a layer of improved sub grade (Rate as per SOR2020)

187.5

340783

1817.51

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401

2140.55

3502980

1636.49

... More
Cement Treated Crushed Rock or combination as per clause 403 and Table in Sub-base/base, Providing, Laying and spreading Material on a prepared sub-base,adding the designed quantity of cement to the spread material, mixing in place with rotavator, grading with motor grade and compactig with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base/base

-

-

-

3578.01

7757165

2168.01

... More
Providing and applying primer coat with bitumen emultion (SS-1) on prepared surface of granular base including cleaning or road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per technical Clause: 502

35780.06

1639084

45.81

... More
TACK COAT-

-

-

-

... More
Providing and applying tack coat with bitumen emultion (RS-1) using emultion distributor at the rate of 0.25-0.30 kg/sqm on the prepared granular surface tresated with primer & cleaned with hydraulic broom as per technical specification Clause: 503

35780.06

546003

15.26

... More
Providing, laying of close graded premix surfacing (Mixed seal surfacing) material of 25mm thickness by hot mix plant using hard blasted granite crushed aggregates of 13.2mm to 0.09mm (Type "B") as per table 500.15 of specification 509 of MORD, premixed with bituminous binder 60/70 grade (S-65,VG-30 Bulk) @ 23.75kg per 10sqm area, including cost of all materials (excluding seigniorage) and transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled roller 8 to 10 tonnes as per MORD Specification 509 complete for finished item of work in all respects as directed by Engineer-in-charge

35780.06

7689135

214.9

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Bitumen/Emulsion)

-

-

-

... More
Carriage on Surface road

15263.78

63344

4.15

... More
Carriage on Un Surface road

193.21

964

4.99

... More
Loading & Unloading

128.81

38160

296.26

... More
Cost of Haulage for Lime

-

-

-

... More
Carriage on Surface road

382.59

1587

4.15

... More
Carriage on Un Surface road

14.91

74

4.99

... More
Loading & Unloading

9.94

2944

296.26

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Cement) (5% of Cement in CTB)

-

-

-

... More
Carriage on Surface road

13783

57199

4.15

... More
Carriage on Un Surface road

537

2679

4.99

... More
Loading & Unloading

358

106061

296.26

... More
Stone Chips For CTB

-

-

-

... More
Carriage on Surface road

308796.7

1281506

4.15

... More
Carriage on Un Surface road

10648.16

53134

4.99

... More
Loading & Unloading

4579.86

391486

85.48

... More
Stone Chips For MSS

-

-

-

... More
Carriage on Surface road

81300.26

337396

4.15

... More
Carriage on Un Surface road

2803.46

13989

4.99

... More
Loading & Unloading

1205.79

103070

85.48

... More
Road Furniture

-

-

-

... More
Informatory Sign board with Logo

1

14388

14388.58

... More
Fixing of citizen board

2

28777

14388.58

... More
Maintenance Information board

1

14388

14388.58

... More
900mm equilateral triangle

36

248563

6904.55

... More
ii) 600mm Circular

12

74878

6239.87

... More
Fixing of 5th KM stone

1

4182

4182.03

... More
Fixing of Ordinary KM stone

8

19389

2423.72

... More
Fixing of 200mtr stone

36

25108

697.45

... More
Painting lines, dashes, arrows, etc. on roads in two coats on new work with ready mixed road marking paint conforming to IS:164 on bituminous/concrete surface, including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control as per drawing and Technical Specification Clause 1702

1824.9

401386

219.95

... More
Type - A, "W" : Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810).

198.4

884346

4457.39

... More
Slip Clearance

-

-

-

... More
Slip clearance i/c breaking, removing and throwing of spoils of mixed slip with boulders within a lead of 30m and lift of 1.5m complete.

8034

329956

41.07

... More
Throwing of Spoils

-

-

-

... More
Haulage

263964.8

1095453

4.15

... More
H.S. Drain

-

-

-

... More
Providing box drain of 30 cm (ht) x 45 cm (width) internal dimension with 1:2:4 Plum concrete (20mm & down) in side walls thickness of 23 cm (hill side) and 30 cm (road side) and 1:3:6 (20 mm & down) base concrete of thickness of 15 cm with standard specification over 15 cm stone soling including providing & laying guard stones complete, as per the direction of the Engineer in Charge. As per Clause 13.2 of SOR other works

2244.49

4445053

1980.43

... More
Providing and laying standard 'V' shaped drain with cement concrete base in 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 20mm and down) mix of 100mm thick over clean hard selected stones soling of 150mm thick and 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 40mm and down) mix plum concrete along the vertical side of thickness 150mm and depth 450mm including curing, compacting, as per the direction of the Engineer- in - Charge. As per Clause 13.5 of SOR other works. (Including Excavation and Stone Soling)

3207.71

3301600

1029.27

... More
Carriage of Stock Materials (Cement )

-

-

-

... More
Carriage on Surface road

8983.61

37281

4.15

... More
Carriage on Un Surface road

350.01

1746

4.99

... More
Loading & Unloading

233.34

69129

296.26

... More
Carriage of Non-Stock Materials (Sand )

-

-

-

... More
Carriage on Surface road

27215.97

112946

4.15

... More
Carriage on Un Surface road

1060.36

5291

4.99

... More
Loading & Unloading

384.19

32840

85.48

... More
Carriage of Non-Stock Materials (Stone Chips )

-

-

-

... More
Carriage on Surface road

51959.26

215630

4.15

... More
Carriage on Un Surface road

1791.7

8940

4.99

... More
Loading & Unloading

770.62

65872

85.48

... More
Carriage of Non-Stock Materials (Stone )

-

-

-

... More
Carriage on Surface road

41422.89

171904

4.15

... More
Carriage on Un Surface road

2180.15

10878

4.99

... More
Loading & Unloading

660.65

107025

162

... More
Protection Work

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out,construction of shoring and bracing, removal of stumps andother deleterious material and disposal upto a lead of 50 m,dressing of sides and bottom and backfilling in trenches withexcavated suitable material.

3150.59

1478447

469.26

... More
Providing and laying hand packed stone soling in buildings works with clean hard selected stones all complete. Details for 10cum. (manual means)

176.3

166295

943.28

... More
Providing and Laying Plum concrete in 1:2:4 c.c. (1cement, 2coarse sand, 4clean hard graded stone chips of 20 mm down nominal gauge) with 70% clean hard stone of sizes not exceeding 15cm including shuttering, compacting and curing complete, as per the direction of Engineer in Charge.

135.92

624217

4592.67

... More
Boulder apron laid in wire crates (Providing and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including 10% extra for laps and joints laid with stone boulders weighing less not less than 40 kgs each.

1955.19

4197977

2147.1

... More
Providing and laying parapet of standard size on 1:2:4 (1cement, 2coarse sand, 4clean hard graded stone chips of 20 mm down nominal gauge) plum concrete and plastering with 1:4 mix cement mortar of 12mm thick with recron 3S with lime washing three or more coats, complete as per the direction of the Engineer- in- Charge.As per Clause 12.10 of SOR other works

190.04

808266

4253.14

... More
Boulder apron laid in wire crates (Providing and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including 10% extra for laps and joints laid with stone boulders weighing less not less than 20 kgs each..As per Clause 15.2 of SOR other works

74.87

207149

2766.98

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications clauses 802, 803, 1202 & 1203 M10 Base

163.34

798657

4889.63

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification clauses 702, 704, 1202 and 1204 Coursed Rubble masonry In cement mortar (1:3)

1683.34

7633825

4534.92

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification clause Sandy material

265.56

339853

1279.76

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification clause Granular material

213.45

289517

1356.37

... More
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification clause 1204.3.8

562.56

724369

1287.63

... More
Providing weepholes in brick masonry/stone masonry,plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1 (V): 20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

745

251363

337.4

... More
Carriage of Stock Materials (Cement )

-

-

-

... More
Carriage on Surface road

13121.06

54452

4.15

... More
Carriage on Un Surface road

559.77

2793

4.99

... More
Loading & Unloading

342.78

101552

296.26

... More
Stock Material (G.I wire)

-

-

-

... More
Carriage on Surface road

851.8

3534

4.15

... More
Carriage on Un Surface road

33.26

165

4.99

... More
Loading & Unloading

0.73

216

296.26

... More
Carriage of Non-Stock Materials (Sand )

-

-

-

... More
Carriage on Surface road

92487.78

383824

4.15

... More
Carriage on Un Surface road

3611.02

18018

4.99

... More
Loading & Unloading

1020.81

87258

85.48

... More
Carriage of Non-Stock Materials (Stone Chips )

-

-

-

... More
Carriage on Surface road

65048.59

269951

4.15

... More
Carriage on Un Surface road

2355.33

11753

4.99

... More
Loading & Unloading

1125.66

96221

85.48

... More
Carriage of Non-Stock Materials (Stone )

-

-

-

... More
Carriage on Surface road

226940.08

941801

4.15

... More
Carriage on Un Surface road

22666

113103

4.99

... More
Loading & Unloading

3587.8

581223

162

... More
Cross Drainage Work

-

-

-

... More
RCC SLAB CULVERT

-

-

-

... More
1X1X1.5

5

3275511

655102.2

4

2973050

743262.56



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.