Rural Management And Development Department Tender

View complete overview of Sikkim Rural Management And Development Department Tender

Rural Management And Development Department Tender

Works
Civil And Construction
Eprocure
Opening Date31 Jan 2024
Closing Date19 Feb 2024
Tender Amount₹ 3,89,77,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Dismentaling

-

-

-

... More
Below foundation

246.65

506374

2053.01

... More
Slab

63.43

91115

1436.47

... More
Construction of hard shoulders with GSB material with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.

276.03

429937

1557.56

... More
a

204.47

318472

1557.56

... More
Cement Treated with Crushed Rock or combination as per clause 401.2.2 and Table 400-I Grading-I in Sub-base/base, Providing, Laying and spreading Material on a prepared sub-base,adding the designed quantity of cement to the spread material, mixing in place with rotavator, grading with motor grade and compactig with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base/base

2683.65

5499876

2049.4

... More
Cement Treated with Crushed Rock or combination as per clause 401.2.2 and Table 400-I Grading-I in Sub-base/base, Providing, Laying and spreading Material on a prepared sub-base,adding the designed quantity of cement to the spread material, mixing in place with rotavator, grading with motor grade and compactig with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base/base

2146.93

4654554

2168.01

... More
Providing and applying primer coat with bitumen emultion (SS-1) on prepared surface of granular base including cleaning or road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per technical Clause: 502

21469.22

983505

45.81

... More
Providing and applying tack coat with bitumen emultion (RS-1) using emultion distributor at the rate of 0.25-0.30 kg/sqm on the prepared granular surface tresated with primer & cleaned with hydraulic broom as per technical specification Clause: 503

-

-

-

... More
TACK COAT-

21469.22

327620

15.26

... More
Providing, laying of close graded premix surfacing (Mixed seal surfacing) material of 25mm thickness by hot mix plant using hard aggregates of 13.2mm to 0.09mm (Type "B") as per table 500.15 of specification 509 of MORD, premixed with bituminous binder 60/70 grade (S-65,VG-30 Bulk) @ 23.75kg per 10sqm area, including cost of all materials (excluding seigniorage) and transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled roller 8 to 10 tonnes as per MORD Specification 509 complete for finished item of work in all respects as directed by Engineer-in-charge

21469.22

4613736

214.9

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading

-

-

-

... More
Carriage on Surface road

8716.51

36173

4.15

... More
Carriage on Un Surface road

300.57

1499

4.99

... More
Loading & Unloading

75.14

22261

296.26

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Cement) (4% of Cement in CTSB & 5% Cement (CTB)

-

-

-

... More
Carriage on Surface road

6864

28485

4.15

... More
Carriage on Un Surface road

1716

8562

4.99

... More
Loading & Unloading

429

127095

296.26

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading.

-

-

-

... More
a) Stone Chips For CTSB

-

-

-

... More
Carriage on Surface road

484517.33

2010746

4.15

... More
Carriage on Un Surface road

21297.47

106274

4.99

... More
Loading & Unloading

3435.08

293630

85.48

... More
a) Stone Chips For CTB

-

-

-

... More
Carriage on Surface road

387614.34

1608599

4.15

... More
Carriage on Un Surface road

17037.99

85019

4.99

... More
Loading & Unloading

2748.06

234904

85.48

... More
a) Stone Chips For MSS

-

-

-

... More
Carriage on Surface road

102051.49

423513

4.15

... More
Carriage on Un Surface road

4485.78

22384

4.99

... More
Loading & Unloading

723.51

61845

85.48

... More
ROAD FURNITUIRE

-

-

-

... More
Informatory Sign board with Logo

1

14388

14388.58

... More
Fixing of citizen board

1

14388

14388.58

... More
Maintenance Information board

1

14388

14388.58

... More
i) 900mm equilateral triangle

14.67

101269

6904.55

... More
ii) 600mm Circular

7.33

45756

6239.87

... More
Fixing of 5th KM stone

-

-

-

... More
Fixing of 5th KM stone

1

4182

4182.03

... More
Fixing of Ordinary KM stone

5

12118

2423.72

... More
Fixing of 200mtr stone

22

15343

697.45

... More
Painting lines, dashes, arrows, etc. on roads in two coats on new work with ready mixed road marking paint conforming to IS:164 on bituminous/concrete surface, including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control as per drawing and Technical Specification Clause 1702

1098

241505

219.95

... More
Type - A, "W" : Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810).

148

659693

4457.39

... More
H.S. DRAIN

-

-

-

... More
Providing and laying standard 'V' shaped drain with cement concrete base in 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 20mm and down) mix of 100mm thick over clean hard selected stones soling of 150mm thick and 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 40mm and down) mix plum concrete along the vertical side of thickness 150mm and depth 450mm including curing, compacting, as per the direction of the Engineer- in - Charge. As per Clause 13.5 of SOR other works

4907.25

5050885

1029.27

... More
Providing box drain of 30 cm (ht) x 45 cm (width) internal dimension with 1:2:4 Plum concrete (20mm & down) in side walls thickness of 23 cm (hill side) and 30 cm (road side) and 1:3:6 (20 mm & down) base concrete of thickness of 15 cm with standard specification over 15 cm stone soling including providing & laying guard stones complete, as per the direction of the Engineer in Charge. As per Clause 13.2 of SOR other works

545.25

1079829

1980.43

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading

-

-

-

... More
Carriage on Surface road

6080

25232

4.15

... More
Carriage on Un Surface road

1520

7584

4.99

... More
Loading & Unloading

380

112578

296.26

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading (Sand)

-

-

-

... More
Carriage on Surface road

5815.9

24135

4.15

... More
Carriage on Un Surface road

2114.87

10553

4.99

... More
Loading & Unloading

287.35

24562

85.48

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading.

-

-

-

... More
Carriage on Surface road

81137.43

336720

4.15

... More
Carriage on Un Surface road

4

19

4.99

... More
Loading & Unloading

575.24

49171

85.48

... More
Stone

-

-

-

... More
Carriage on Surface road

13973.56

57990

4.15

... More
Carriage on Un Surface road

5081.29

25355

4.99

... More
Loading & Unloading

577.42

93542

162

... More
PROTECTION WALL(BREAST WALL & RETAINING WALL)

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out,construction of shoring and bracing, removal of stumps andother deleterious material and disposal upto a lead of 50 m,dressing of sides and bottom and backfilling in trenches withexcavated suitable material..

663.4

311308

469.26

... More
Stone Soiling for road works Providing & laying hand packed stone soling of specified thickness with clean hard selected stones including hammer dressing of stone for laying as per required level and camber including packing with broken stones obtained from hammer dressing to fill the voids to give uniform surface as directed by the Engineer-in-Charge all complete but excluding carriage and consolidation using:

55.84

52676

943.28

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications clauses 802, 803, 1202 & 1203 M10 Base

55.84

273056

4889.63

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification clauses 702, 704, 1202 and 1204 Coursed Rubble masonry In cement mortar (1:3)

578.48

2623369

4534.92

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification clause Sandy material

71.81

91897

1279.76

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification clause Granular material

111.3

150963

1356.37

... More
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification clause 1204.3.8

183.6

236408

1287.63

... More
Providing weepholes in brick masonry/stone masonry,plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1 (V): 20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

241

81313

337.4

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Cement)

-

-

-

... More
Carriage on Surface road

1684.8

6991

4.15

... More
Carriage on Un Surface road

421.2

2101

4.99

... More
Loading & Unloading

105.3

31196

296.26

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading (Sand)

-

-

-

... More
Carriage on Surface road

9041

37520

4.15

... More
Carriage on Un Surface road

3287.64

16405

4.99

... More
Loading & Unloading

272.32

23277

85.48

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading.

-

-

-

... More
Carriage on Surface road

38669.39

160477

4.15

... More
Carriage on Un Surface road

1699.75

8481

4.99

... More
Loading & Unloading

260.4

22259

85.48

... More
b)Stone

-

-

-

... More
Carriage on Surface road

12903.25

53548

4.15

... More
Carriage on Un Surface road

4692.09

23413

4.99

... More
Loading & Unloading

533.19

86377

162

... More
CROSS DRAINAGE WORK

-

-

-

... More
RCC SLAB CULVERT

-

-

-

... More
1X1X1.5

5

3267153

653430.7

... More
1X2X2

1

741559

741559.92



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.