Rural Management And Development Department Tender

View complete overview of Sikkim Rural Management And Development Department Tender

Rural Management And Development Department Tender

Works
Civil And Construction
Eprocure
Opening Date21 Nov 2018
Closing Date13 Dec 2018
Tender Amount₹ 6,68,28,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Compacting cut formation

10785.555

-

26.29

... More
GSB Grading I with close graded material

4943.3794

-

1169.17

... More
WBM Base Grading II

2746.3219

-

1626.49

... More
WBM Base Grading III

2746.3219

-

1686.87

... More
Prime coat (SSI)

36617.625

-

79.94

... More
Tack Coat (RS I)

36617.625

-

17.53

... More
20mm thick open graded premix carpet

36617.625

-

178.34

... More
Seal coat (type B)

36617.625

-

61.58

... More
carriage stock ( Lead 130 km)

-

-

-

... More
Loading & Unloading

165.8778

-

188.48

... More
Haulage in surfaced road (130km)

21564.1194

-

4.2

... More
Carriage of sand (Lead 30 km)

-

-

-

... More
Loading & Unloading

219.7058

-

61.02

... More
Haulage in surfaced road (30km)

10545.876

-

4.2

... More
Carriage of stone (Lead 30 km)

-

-

-

... More
Loading & Unloading

15018.5358

-

210.54

... More
Haulage in surfaced road (30km)

991223.3632

-

4.2

... More
Carriage of stone chips (Lead 30 km)

-

-

-

... More
Loading & Unloading

988.6759

-

61.02

... More
Haulage in surfaced road (30km)

65252.6078

-

4.2

... More
PROTECTIVE WORK (B)

-

-

-

... More
E/W/E in all types of soils etc all complete.

-

-

-

... More
M.S (60 %)

2449.2

-

210.35

... More
O.R (40 %)

1632.8

-

262.93

... More
P/L RRM (1:5) c.m

4656.9079

-

2886.02

... More
P/L Boulder apron laid in wire Crate etc all complete

1093.394

-

1885.37

... More
P/L hand packed wall

91.828

-

488.65

... More
P/L Back filling etc all complete

1775

-

487.58

... More
P/L Plum concrete wall in 1:2:4 c.c etc all complete

533.8331

-

3441.42

... More
carriage stock ( Lead 30 km)

-

-

-

... More
Loading & Unloading

489.6329

-

188.48

... More
Haulage in surfaced road (30km)

14688.9867

-

4.2

... More
Carriage of sand (Lead 30 km)

-

-

-

... More
Loading & Unloading

1516.1171

-

61.02

... More
Haulage in surfaced road (30km)

72773.622

-

4.2

... More
Carriage of stone within 30km

-

-

-

... More
Loading & Unloading

5333.2445

-

61.02

... More
Haulage in surfaced road (30km)

351994.1393

-

4.2

... More
SIDE DRAIN AND C.D ©

-

-

-

... More
Const. of hill side drain with M10 cc

8877

-

661.65

... More
P/L H.P Stone soling etc all complete

1065.24

-

560.28

... More
Carriage stock ( Lead 30 km)

-

-

-

... More
Loading & Unloading

270.2869

-

188.48

... More
Haulage in surfaced road (30km)

8108.6069

-

4.2

... More
Carriage of sand (Lead 30 km)

-

-

-

... More
Loading & Unloading

577.4311

-

61.02

... More
Haulage in surfaced road (30km)

27716.6926

-

4.2

... More
Carriage of stone (Lead 30 km)

-

-

-

... More
Loading & Unloading

1998.8874

-

61.02

... More
Haulage in surfaced road (30km)

131926.5652

-

4.2

... More
COST OF ROAD FURNITURE (D)

-

-

-

... More
Uprooting of old sign board

1

-

6000

... More
Providing & fixing of PMGSY Logo board

2

-

11159.88

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign

54

-

6008.65

... More
Providing 5th Km stone

2

-

3615.19

... More
Providing ordinary Km stone

8

-

2130.63



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.