Rural Management And Development Department Tender

View complete overview of Sikkim Rural Management And Development Department Tender

Rural Management And Development Department Tender

Works
Eprocure
Opening Date11 Jan 2019
Closing Date17 Jan 2019
Tender Amount₹ 2,42,93,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Clearing and grubbing road land including uprooting wild vegetation

0.5

-

53512.05

... More
Hill cutting works in mixed soil by mechanical means

4851.79

-

107.34

... More
Hill cutting works in mixed soil by manual means

2079.34

-

131.47

... More
Hill cutting works in Ordinary rock by mechanical means

4871.18

-

171.76

... More
Hill cutting works in Ordinary rock by manual means

2087.65

-

289.23

... More
Removal of unsuitable soil including excavation, loading and disposal upto 1000m lead

12515.12

-

45.96

... More
Slip clearance works

-

-

-

... More
PROTECTIVE WORKS

-

-

-

... More
Earthwork excavation in foundation trenches in mixed soil

474.06

-

210.35

... More
Earthwork excavation in foundation trenches in Ordinary Rock

316.04

-

262.93

... More
Handpacked wall with clean hard selected stones

-

-

-

... More
Providing and laying boulder apron laid in wire crates

132.5

-

1885.37

... More
Providing and laying RRM wall in 1:5 CM

1026.14

-

2886.02

... More
Providing and laying filling behind retaining wall

210

-

487.58

... More
Providing and laying 1:2:4mix Plum concrete wall

530.27

-

3441.42

... More
Carriage of Stock materials (Cement)

-

-

-

... More
(i) Loading and Unloading

173.91

-

188.48

... More
(ii) Haulage on surface road within 45 km

7826.02

-

4.2

... More
(iii) Haulage on unsurface road within 8 km

1391.29

-

5.05

... More
Carriage of Non Stock materials (Sand)

-

-

-

... More
(i) Loading and Unloading

426.09

-

61.02

... More
(ii) Haulage on surface road within 45 km

30678.53

-

4.2

... More
(iii) Haulage on unsurface road within 8 km

5453.96

-

5.05

... More
(iv) Haulage on Katcha road within 5 km

3408.73

-

10.17

... More
Carriage of Non Stock materials (Stone)

-

-

-

... More
(i) Loading and Unloading

1457.81

-

61.02

... More
(ii) Haulage on surface road within 45 km

144323.38

-

4.2

... More
(iii) Haulage on unsurface road within 8 km

25657.49

-

5.05

... More
(iv) Haulage on Katcha road within 5 km

16035.93

-

10.17

... More
CONSTRUCTION OF CULVERTS

-

-

-

... More
Earthwork excavation in foundation trenches

594.61

-

249.76

... More
Providing and laying 1:2:4mix Plum concrete in Abutment

255.32

-

3441.42

... More
Stone masonry in 1:5mortar in Wing wall & Dirt wall

773.79

-

3018.41

... More
Providing and Laying flexible apron in floor bed

16.5

-

806.02

... More
Providing Reinforced Cement concrete in M20 grade

94.62

-

4952.35

... More
Providing Plain Cement concrete in M20 grade

11.24

-

4952.35

... More
Providing weep holes in Abutment and wing wall

166.6

-

290

... More
Back filling behind abutment

310.57

-

487.58

... More
Providing tar paper bearing under Deck slab

45

-

100

... More
Providing & fixing 20mm thick compressible fibre board in expansion joint

679.28

-

264.08

... More
Supplying, fitting and placing of HYSD bar reinforcement

145.41

-

6742.8

... More
P/F/F of 32mm dia GI pipe railing

67.2

-

353.18

... More
Drainage spouts complete

6

-

3173.15

... More
Filling fondation and plinth with excavated earth well watered and rammed etc complete as per drawing and Technical Specifications

139.22

-

133.95

... More
Carriage of Stock materials (Cement)

-

-

-

... More
(i) Loading and Unloading

139.72

-

188.48

... More
(ii) Haulage within 50km

6985.95

-

4.2

... More
Carriage of Stock materials (HYSD bar)

-

-

-

... More
(i) Loading and Unloading

14.54

-

210.54

... More
(ii) Haulage within 50km

727.08

-

4.2

... More
Carriage of Non Stock materials (Sand)

-

-

-

... More
(i) Loading and Unloading

322.63

-

61.02

... More
(ii) Haulage within 50km

16131.28

-

4.2

... More
Carriage of Non Stock materials (Stone)

-

-

-

... More
(i) Loading and Unloading

1185.57

-

61.02

... More
(ii) Haulage within 30km

35567.18

-

4.2

... More
C.D. AND SIDE DRAIN

-

-

-

... More
Construction of 1.00x1.00m internal dimension RCC slabcross drain

-

-

-

... More
Construction of Hill side drain - C.C. "V" shaped drain

2079

-

661.65

... More
Providing and laying hand packed stone soling

249.48

-

560.28

... More
Carriage of Stock materials (Cement)

-

-

-

... More
(i) Loading and Unloading

63.3

-

188.48

... More
(ii) Haulage on surface road within 45 km

2848.56

-

4.2

... More
(iii) Haulage on unsurface road within 8 km

506.41

-

5.05

... More
Carriage of Non Stock materials (Sand)

-

-

-

... More
(i) Loading and Unloading

135.23

-

61.02

... More
(ii) Haulage on surface road within 45 km

9736.91

-

4.2

... More
(iii) Haulage on unsurface road within 8 km

1731.01

-

5.05

... More
(iv) Haulage on Katcha road within 5 km

1081.88

-

10.17

... More
Carriage of Non Stock materials (Stone)

-

-

-

... More
(i) Loading and Unloading

468.14

-

61.02

... More
(ii) Haulage on surface road within 45 km

46345.95

-

4.2

... More
(iii) Haulage on unsurface road within 8 km

8239.28

-

5.05

... More
(iv) Haulage on Katcha road within 5 km

5149.55

-

10.17

... More
PAVEMENT WORKS

-

-

-

... More
Construction of Subgrade and Earthen shoulders

966.74

-

200.49

... More
Compacting Cut Formation

966.74

-

26.29

... More
Construction of Granular sub-base I

-

-

-

... More
Construction of water bound macadam (Grading II) base

643.19

-

1626.49

... More
Construction of water bound macadam (Grading III) base

643.19

-

1686.87

... More
Providing and applying Prime coat

8575.88

-

79.94

... More
Providing and applying Tack coat

8575.88

-

17.53

... More
Providing and laying 20mm thick open graded Premix carpet

8575.88

-

178.34

... More
Providing and applying seal coat

8575.88

-

61.58

... More
Carriage of Stock materials (Bitumen)

-

-

-

... More
(i) Loading and Unloading

38.85

-

188.48

... More
(ii) Haulage on surface road within 145 km

5633.06

-

4.2

... More
(iii) Haulage on unsurface road within 7 km

271.94

-

5.05

... More
Carriage of Non Stock materials (Sand)

-

-

-

... More
(i) Loading and Unloading

51.46

-

61.02

... More
(ii) Haulage on surface road within 45 km

3704.78

-

4.2

... More
(iii) Haulage on unsurface road within 8 km

658.63

-

5.05

... More
(iv) Haulage on Katcha road within 5 km

411.64

-

10.17

... More
Carriage of Non Stock materials (Stone chips)

-

-

-

... More
(i) Loading and Unloading

231.55

-

61.02

... More
(ii) Haulage on surface road within 45 km

22923.31

-

4.2

... More
(iii) Haulage on unsurface road within 8 km

4075.26

-

5.05

... More
(iv) Haulage on Katcha road within 5 km

2547.03

-

10.17

... More
Carriage of Non Stock materials (Stone)

-

-

-

... More
(i) Loading and Unloading

2038.91

-

210.54

... More
(ii) Haulage on surface road within 45 km

201852.51

-

4.2

... More
(iii) Haulage on unsurface road within 8 km

35884.89

-

5.05

... More
(iv) Haulage on Katcha road within 5 km

22428.06

-

10.17

... More
ROAD FURNITURE

-

-

-

... More
Providing and fixing of typical PMGSY Informatory sign board

2

-

11159.88

... More
RCC M15 grade Kilometer stone - 5th Km stone

-

-

-

... More
RCC M15 grade Kilometer stone - Ordinary Km stone

3

-

2130.63

... More
RCC M15 grade Kilometer stone - 200m stone

10

-

609.13

... More
Providing and fixing retro-reflectorised cautionary sign (600mm equilateral triangle)

15

-

3524.49



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.