Rural Management And Development Department Tender

View complete overview of Sikkim Rural Management And Development Department Tender

Rural Management And Development Department Tender

Works
Eprocure
Opening Date5 Mar 2024
Closing Date12 Mar 2024
Tender Amount₹ 31,76,08,438 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Clearing grass and removal of rubbish up to a distance of 30m outside the periphery of the area as per Technical Specification Clause 201.1 By Manual Means

0.67

58937

88494.12

... More
Preparation and surface treatment of formation by remocing mud and slurry, watering to the extent needed to maintain the desired moisture content, trimming to the required line, grade, profile and rolling with three wheel 80-100 kN static roller, complete as per Technical Specification Clause 301.5.5.1

24937.5

73815

2.96

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. Only Shoulder Portion (GSB)

1995

3609733

1809.39

... More
Cement Treated Crushed Rock or combination as per clause 403 and Table in Sub-base/base, Providing, Laying and spreading Material on a prepared sub-base,adding the designed quantity of cement to the spread material, mixing in place with rotavator, grading with motor grade and compactig with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base/base

700.5

1518691

2168.01

... More
Providing and applying primer coat with bitumen emultion (SS-1) on prepared surface of granular base including cleaning or road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per technical Clause: 502

26184.38

1199506

45.81

... More
TACK COAT-

-

-

-

... More
Providing and applying tack coat with bitumen emultion (RS-1) using emultion distributor at the rate of 0.25-0.30 kg/sqm on the prepared granular surface tresated with primer & cleaned with hydraulic broom as per technical specification Clause: 503

26184.38

399573

15.26

... More
Providing, laying of close graded premix surfacing (Mixed seal surfacing) material of 25mm thickness by hot mix plant using hard blasted granite crushed aggregates of 13.2mm to 0.09mm (Type "B") as per table 500.15 of specification 509 of MORD, premixed with bituminous binder 60/70 grade (S-65,VG-30 Bulk) @ 23.75kg per 10sqm area, including cost of all materials (excluding seigniorage) and transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled roller 8 to 10 tonnes as per MORD Specification 509 complete for finished item of work in all respects as directed by Engineer-in-charge

26184.38

5627022

214.9

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Bitumen/Emulsion)

-

-

-

... More
Carriage on Surface road

10997.44

45639

4.15

... More
Loading & Unloading

91.65

27150

296.26

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Cement) (5% of Cement in CTB)

-

-

-

... More
Carriage on Surface road

2800

19124

6.83

... More
Loading & Unloading

70

15992

228.47

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading. Stone chips for CTB

-

-

-

... More
Carriage on Surface road

62540.64

427152

6.83

... More
Loading & Unloading

896.64

76644

85.48

... More
Stone Chips For MSS

-

-

-

... More
Carriage on Surface road

61548.34

420375

6.83

... More
Loading & Unloading

882.41

75428

85.48

... More
Road Furniture

-

-

-

... More
Informatory Sign board with Logo

1

14388

14388.58

... More
Fixing of citizen board

2

28777

14388.58

... More
Maintenance Information board

1

14388

14388.58

... More
i) 900mm equilateral triangle

20

138091

6904.55

... More
Fixing of 5th KM stone

1

4182

4182.03

... More
Fixing of Ordinary KM stone

7

16966

2423.72

... More
Fixing of 200mtr stone

27

18831

697.45

... More
Painting lines, dashes, arrows, etc. on roads in two coats on new work with ready mixed road marking paint conforming to IS:164 on bituminous/concrete surface, including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control as per drawing and Technical Specification Clause 1702

1337.5

294183

219.95

... More
Type - A, "W" : Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810).

1500

6686085

4457.39

... More
Slip Clearance

-

-

-

... More
Slip clearance i/c breaking, removing and throwing of spoils of mixed slip with boulders within a lead of 30m and lift of 1.5m complete.

2298.69

94407

41.07

... More
Loading & Unloading

8045.41

858204

106.67

... More
Haulage

74017.79

505541

6.83

... More
H.S. Drain

-

-

-

... More
Providing box drain of 30 cm (ht) x 45 cm (width) internal dimension with 1:2:4 Plum concrete (20mm & down) in side walls thickness of 23 cm (hill side) and 30 cm (road side) and 1:3:6 (20 mm & down) base concrete of thickness of 15 cm with standard specification over 15 cm stone soling including providing & laying guard stones complete, as per the direction of the Engineer in Charge. As per Clause 13.2 of SOR other works

400

792172

1980.43

... More
Providing and laying standard 'V' shaped drain with cement concrete base in 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 20mm and down) mix of 100mm thick over clean hard selected stones soling of 150mm thick and 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 40mm and down) mix plum concrete along the vertical side of thickness 150mm and depth 450mm including curing, compacting, as per the direction of the Engineer- in - Charge. As per Clause 13.5 of SOR other works. (Including Excavation and Stone Soling)

3500

3602445

1029.27

... More
Providing and laying hand packed stone soling in buildings works with clean hard selected stones all complete. Details for 10cum. (manual means)

187.03

203037

1085.58

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications clauses 802, 803, 1202 & 1203 M10 Base

124.69

609678

4889.63

... More
Carriage of Stock Materials (Cement )

-

-

-

... More
Carriage on Surface road

6540

27141

4.15

... More
Loading & Unloading

163.5

48438

296.26

... More
Carriage of Non-Stock Materials (Sand )

-

-

-

... More
Carriage on Surface road

24352.69

101063

4.15

... More
Loading & Unloading

264.7

22626

85.48

... More
Carriage of Non-Stock Materials (Stone Chips )

-

-

-

... More
Carriage on Surface road

35277.3

146400

4.15

... More
Loading & Unloading

412.6

35269

85.48

... More
Carriage of Non-Stock Materials (Stone )

-

-

-

... More
Carriage on Surface road

65311.81

271044

4.15

... More
Loading & Unloading

742.18

120233

162

... More
Protection Work (Retaining Wall, Breast Wall)

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out,construction of shoring and bracing, removal of stumps andother deleterious material and disposal upto a lead of 50 m,dressing of sides and bottom and backfilling in trenches withexcavated suitable material.

854.9

401172

469.26

... More
Providing and laying hand packed stone soling in buildings works with clean hard selected stones all complete. Details for 10cum. (manual means)

60.74

65933

1085.58

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications clauses 802, 803, 1202 & 1203 M10 Base

60.74

296976

4889.63

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification clauses 702, 704, 1202 and 1204 Coursed Rubble masonry In cement mortar (1:3)

766.32

3475199

4534.92

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification clause Sandy material

104.64

133914

1279.76

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification clause Granular material

50.7

68767

1356.37

... More
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification clause 1204.3.8

252

324482

1287.63

... More
Providing weepholes in brick masonry/stone masonry,plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1 (V): 20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

265

89411

337.4

... More
Carriage of Stock Materials (Cement )

-

-

-

... More
Carriage on Surface road

4946

20525

4.15

... More
Loading & Unloading

123.65

36632

296.26

... More
Carriage of Non-Stock Materials (Sand )

-

-

-

... More
Carriage on Surface road

23776.67

98673

4.15

... More
Loading & Unloading

258.44

22091

85.48

... More
Carriage of Non-Stock Materials (Stone Chips )

-

-

-

... More
Carriage on Surface road

3770.35

15646

4.15

... More
Loading & Unloading

54.06

4620

85.48

... More
Carriage of Non-Stock Materials (Stone )

-

-

-

... More
Carriage on Surface road

22599.07

93786

4.15

... More
Loading & Unloading

256.81

41602

162

... More
Cross Drainage Work

-

-

-

... More
RCC SLAB CULVERT

-

-

-

... More
1X1X1.5

3

1979917

659972.51

... More
T03-Kewzing to Dalep

-

-

-

... More
FLEXIBLE PAVEMENT

-

-

-

... More
Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.

10062

312726

31.08

... More
Clearing grass and removal of rubbish up to a distance of 30m outside the periphery of the area as per Technical Specification Clause 201.1 By Manual Means

0.34

29734

88494.12

... More
Preparation and surface treatment of formation by removing mud and slurry, watering to the extent needed to maintain the desired moisture content, trimming to the required line, grade, profile and rolling with three wheel 80-100 kN static roller, complete as per Technical Specification Clause 301.5.5.1

12577.5

37229

2.96

... More
Construction of hard shoulders with GSB material with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.

169.7

277839

1637.24

146.74

240245

1637.24

... More
Cement Treated with Crushed Rock or combination as per clause 401.2.2 and Table 400-I Grading-I in Sub-base/base, Providing, Laying and spreading Material on a prepared sub-base,adding the designed quantity of cement to the spread material, mixing in place with rotavator, grading with motor grade and compactig with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base/base

1650.8

3383143

2049.4

... More
Cement Treated with Crushed Rock or combination as per clause 401.2.2 and Table 400-I Grading-I in Sub-base/base, Providing, Laying and spreading Material on a prepared sub-base,adding the designed quantity of cement to the spread material, mixing in place with rotavator, grading with motor grade and compactig with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base/base

1320.64

2863156

2168.01

... More
Providing and applying primer coat with bitumen emultion (SS-1) on prepared surface of granular base including cleaning or road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per technical Clause: 502

13206.38

604984

45.81

... More
Providing and applying tack coat with bitumen emultion (RS-1) using emultion distributor at the rate of 0.25-0.30 kg/sqm on the prepared granular surface tresated with primer & cleaned with hydraulic broom as per technical specification Clause: 503

-

-

-

... More
TACK COAT-

13206.38

201529

15.26

... More
Providing, laying of close graded premix surfacing (Mixed seal surfacing) material of 25mm thickness by hot mix plant using hard aggregates of 13.2mm to 0.09mm (Type "B") as per table 500.15 of specification 509 of MORD, premixed with bituminous binder 60/70 grade (S-65,VG-30 Bulk) @ 23.75kg per 10sqm area, including cost of all materials (excluding seigniorage) and transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled roller 8 to 10 tonnes as per MORD Specification 509 complete for finished item of work in all respects as directed by Engineer-in-charge

13206.38

2838049

214.9

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading

-

-

-

... More
Carriage on Surface road

5592.9

23210

4.15

... More
Carriage on Un Surface road

184.89

922

4.99

... More
Loading & Unloading

46.22

13693

296.26

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Cement) (4% of Cement in CTSB & 5% Cement (CTB)

-

-

-

... More
Carriage on Surface road

31944

132567

4.15

... More
Carriage on Un Surface road

1056

5269

4.99

... More
Loading & Unloading

264

78212

296.26

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading.

-

-

-

... More
a) Stone Chips For CTSB

-

-

-

... More
Carriage on Surface road

396296.9

1644632

4.15

... More
Carriage on Un Surface road

13100.72

65372

4.99

... More
Loading & Unloading

2113.02

180620

85.48

... More
a) Stone Chips For CTB

-

-

-

... More
Carriage on Surface road

317037.52

1315705

4.15

... More
Carriage on Un Surface road

10480.58

52298

4.99

... More
Loading & Unloading

1690.42

144496

85.48

... More
a) Stone Chips For MSS

-

-

-

... More
Carriage on Surface road

83470.04

346400

4.15

... More
Carriage on Un Surface road

2759.34

13769

4.99

... More
Loading & Unloading

445.06

38043

85.48

... More
ROAD FURNITUIRE

-

-

-

... More
Informatory Sign board with Logo

1

14388

14388.58

... More
Fixing of citizen board

1

14388

14388.58

... More
Maintenance Information board

1

14388

14388.58

... More
i) 900mm equilateral triangle

9

62140

6904.55

... More
ii) 600mm Circular

4.33

27037

6239.87

... More
Fixing of 5th KM stone

-

-

-

... More
Fixing of Ordinary KM stone

3

7271

2423.72

... More
Fixing of 200mtr stone

13

9066

697.45

... More
Painting lines, dashes, arrows, etc. on roads in two coats on new work with ready mixed road marking paint conforming to IS:164 on bituminous/concrete surface, including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control as per drawing and Technical Specification Clause 1702

678.3

149192

219.95

... More
Type - A, "W" : Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810).

98

436824

4457.39

... More
H.S. DRAIN

-

-

-

... More
Providing and laying standard 'V' shaped drain with cement concrete base in 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 20mm and down) mix of 100mm thick over clean hard selected stones soling of 150mm thick and 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 40mm and down) mix plum concrete along the vertical side of thickness 150mm and depth 450mm including curing, compacting, as per the direction of the Engineer- in - Charge. As per Clause 13.5 of SOR other works

3354

3452171

1029.27

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading

-

-

-

... More
Carriage on Surface road

26257

108966

4.15

... More
Carriage on Un Surface road

868

4331

4.99

... More
Loading & Unloading

217

64288

296.26

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading (Sand)

-

-

-

... More
Carriage on Surface road

7541.4

31296

4.15

... More
Carriage on Un Surface road

1160.22

5789

4.99

... More
Loading & Unloading

157.64

13474

85.48

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading.

-

-

-

... More
Carriage on Surface road

59130.01

245389

4.15

... More
Carriage on Un Surface road

4

19

4.99

... More
Loading & Unloading

315.28

26949

85.48

-

-

-

... More
Carriage on Surface road

19376.73

80413

4.15

... More
Carriage on Un Surface road

2981.04

14875

4.99

... More
Loading & Unloading

338.75

54878

162

... More
PROTECTION WALL(BREAST WALL & RETAINING WALL)

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out,construction of shoring and bracing, removal of stumps andother deleterious material and disposal upto a lead of 50 m,dressing of sides and bottom and backfilling in trenches withexcavated suitable material..

336.21

157769

469.26

... More
Stone Soiling for road works Providing & laying hand packed stone soling of specified thickness with clean hard selected stones including hammer dressing of stone for laying as per required level and camber including packing with broken stones obtained from hammer dressing to fill the voids to give uniform surface as directed by the Engineer-in-Charge all complete but excluding carriage and consolidation using:

29.37

27704

943.28

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications clauses 802, 803, 1202 & 1203 M10 Base

29.37

143608

4889.63

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification clauses 702, 704, 1202 and 1204 Coursed Rubble masonry In cement mortar (1:3)

343.4

1557291

4534.92

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification clause Sandy material

35.9

45948

1279.76

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification clause Granular material

49.8

67547

1356.37

... More
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification clause 1204.3.8

106.2

136746

1287.63

... More
Providing weepholes in brick masonry/stone masonry,plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1 (V): 20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

140

47236

337.4

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Cement)

-

-

-

... More
Carriage on Surface road

6425.1

26664

4.15

... More
Carriage on Un Surface road

212.4

1059

4.99

... More
Loading & Unloading

53.1

15731

296.26

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading (Sand)

-

-

-

... More
Carriage on Surface road

11280.3

46813

4.15

... More
Carriage on Un Surface road

1735.43

8659

4.99

... More
Loading & Unloading

155.63

13303

85.48

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading.

-

-

-

... More
Carriage on Surface road

29212.02

121229

4.15

... More
Carriage on Un Surface road

965.69

4818

4.99

... More
Loading & Unloading

148.88

12726

85.48

... More
b)Stone

-

-

-

... More
Carriage on Surface road

17903.78

74300

4.15

... More
Carriage on Un Surface road

2754.43

13744

4.99

... More
Loading & Unloading

313

50706

162

... More
CROSS DRAINAGE WORK

-

-

-

... More
RCC SLAB Culvert

-

-

-

... More
1x1x1.5

2

1358862

679431.24

... More
T06-Link road from Ralong Gumpa to Namlung

-

-

-

... More
Flexiable Pavement

-

-

-

... More
Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.

22440

697435

31.08

... More
Clearing grass and removal of rubbish up to a distance of 30m outside the periphery of the area as per Technical Specification Clause 201.1 By Manual Means

0.6

53096

88494.12

... More
Preparation and surface treatment of formation by remocing mud and slurry, watering to the extent needed to maintain the desired moisture content, trimming to the required line, grade, profile and rolling with three wheel 80-100 kN static roller, complete as per Technical Specification Clause 301.5.5.1

22440

66422

2.96

... More
Dismentaling

-

-

-

... More
Below foundation

308.31

632963

2053.01

79.29

113897

1436.47

... More
Construction of hard shoulders with GSB material with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.

224.4

385276

1716.92

... More
Profile Correction with approved material obtained from borrow pits with all lifts and leads,transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1

2333.74

597950

256.22

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401

423

726257

1716.92

... More
Cement Treated Crushed Rock or combination as per clause 403 and Table in Sub-base/base, Providing, Laying and spreading Material on a prepared sub-base,adding the designed quantity of cement to the spread material, mixing in place with rotavator, grading with motor grade and compactig with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base/base

2356.2

5108265

2168.01

... More
Providing and applying primer coat with bitumen emultion (SS-1) on prepared surface of granular base including cleaning or road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per technical Clause: 502

23562

1079375

45.81

... More
TACK COAT-

-

-

-

... More
Providing and applying tack coat with bitumen emultion (RS-1) using emultion distributor at the rate of 0.25-0.30 kg/sqm on the prepared granular surface tresated with primer & cleaned with hydraulic broom as per technical specification Clause: 503

23562

359556

15.26

... More
Providing, laying of close graded premix surfacing (Mixed seal surfacing) material of 25mm thickness by hot mix plant using hard blasted granite crushed aggregates of 13.2mm to 0.09mm (Type "B") as per table 500.15 of specification 509 of MORD, premixed with bituminous binder 60/70 grade (S-65,VG-30 Bulk) @ 23.75kg per 10sqm area, including cost of all materials (excluding seigniorage) and transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled roller 8 to 10 tonnes as per MORD Specification 509 complete for finished item of work in all respects as directed by Engineer-in-charge

23562

5063473

214.9

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Bitumen/Emulsion)

-

-

-

... More
Carriage on Surface road

10803.18

44833

4.15

... More
Carriage on Un Surface road

329.87

1646

4.99

... More
Loading & Unloading

82.47

24431

296.26

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Cement) (5% of Cement in CTB)

-

-

-

... More
Carriage on Surface road

30916

128301

4.15

... More
Carriage on Un Surface road

944

4710

4.99

... More
Loading & Unloading

236

69917

296.26

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading. Stone chips for CTB

-

-

-

... More
Carriage on Surface road

589012.3

2444401

4.15

... More
Carriage on Un Surface road

18698.8

93307

4.99

... More
Loading & Unloading

3015.94

257802

85.48

... More
Stone Chips For MSS

-

-

-

... More
Carriage on Surface road

155075.9

643564

4.15

... More
Carriage on Un Surface road

4923.04

24565

4.99

... More
Loading & Unloading

794.04

67874

85.48

... More
Road Furniture

-

-

-

... More
Informatory Sign board with Logo

15

215828

14388.58

... More
Fixing of citizen board

10

143885

14388.58

... More
Maintenance Information board

1

14388

14388.58

... More
i) 900mm equilateral triangle

25

172613

6904.55

... More
ii) 600mm Circular

45

280794

6239.87

... More
Fixing of 5th KM stone

5

20910

4182.03

... More
Fixing of Ordinary KM stone

20

48474

2423.72

... More
Fixing of 200mtr stone

24

16738

697.45

... More
Painting lines, dashes, arrows, etc. on roads in two coats on new work with ready mixed road marking paint conforming to IS:164 on bituminous/concrete surface, including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control as per drawing and Technical Specification Clause 1702

1204.3

264885

219.95

... More
Type - A, "W" : Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810).

100.1

446184

4457.39

... More
H.S. Drain

-

-

-

... More
Providing box drain of 30 cm (ht) x 45 cm (width) internal dimension with 1:2:4 Plum concrete (20mm & down) in side walls thickness of 23 cm (hill side) and 30 cm (road side) and 1:3:6 (20 mm & down) base concrete of thickness of 15 cm with standard specification over 15 cm stone soling including providing & laying guard stones complete, as per the direction of the Engineer in Charge. As per Clause 13.2 of SOR other works

598.4

1185089

1980.43

... More
Providing and laying standard 'V' shaped drain with cement concrete base in 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 20mm and down) mix of 100mm thick over clean hard selected stones soling of 150mm thick and 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 40mm and down) mix plum concrete along the vertical side of thickness 150mm and depth 450mm including curing, compacting, as per the direction of the Engineer- in - Charge. As per Clause 13.5 of SOR other works. (Including Excavation and Stone Soling)

5385.6

5543236

1029.27

... More
Carriage of Stock Materials (Cement )

-

-

-

... More
Carriage on Surface road

54627

226702

4.15

... More
Carriage on Un Surface road

1668

8323

4.99

... More
Loading & Unloading

417

123540

296.26

... More
Carriage of Non-Stock Materials (Sand )

-

-

-

... More
Carriage on Surface road

23790.52

98730

4.15

... More
Carriage on Un Surface road

2321.03

11581

4.99

... More
Loading & Unloading

315.36

26956

85.48

... More
Carriage of Non-Stock Materials (Stone Chips )

-

-

-

... More
Carriage on Surface road

123295.23

511675

4.15

... More
Carriage on Un Surface road

4

19

4.99

... More
Loading & Unloading

631.31

53964

85.48

... More
Carriage of Non-Stock Materials (Stone )

-

-

-

... More
Carriage on Surface road

57160.25

237215

4.15

... More
Carriage on Un Surface road

5576.61

27827

4.99

... More
Loading & Unloading

633.71

102660

162

... More
Protecton Work

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out,construction of shoring and bracing, removal of stumps andother deleterious material and disposal upto a lead of 50 m,dressing of sides and bottom and backfilling in trenches withexcavated suitable material.

750.86

352347

469.26

... More
Stone Soiling for road works Providing & laying hand packed stone soling of specified thickness with clean hard selected stones including hammer dressing of stone for laying as per required level and camber including packing with broken stones obtained from hammer dressing to fill the voids to give uniform surface as directed by the Engineer-in-Charge all complete but excluding carriage and consolidation using:

65.74

62009

943.28

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications clauses 802, 803, 1202 & 1203 M10 Base

65.74

321434

4889.63

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification clauses 702, 704, 1202 and 1204 Coursed Rubble masonry In cement mortar (1:3)

772.04

3501130

4534.92

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification clause Sandy material

71.37

91336

1279.76

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification clause Granular material

136.05

184534

1356.37

... More
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification clause 1204.3.8

235.62

303391

1287.63

... More
Providing weepholes in brick masonry/stone masonry,plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1 (V): 20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

318

107293

337.4

... More
Carriage of Stock Materials (Cement )

-

-

-

... More
Carriage on Surface road

16885.9

70076

4.15

... More
Carriage on Un Surface road

515.6

2572

4.99

... More
Loading & Unloading

128.9

38187

296.26

... More
Carriage of Non-Stock Materials (Sand )

-

-

-

... More
Carriage on Surface road

41309.7

171435

4.15

... More
Carriage on Un Surface road

4030.21

20110

4.99

... More
Loading & Unloading

319.09

27275

85.48

... More
Carriage of Non-Stock Materials (Stone Chips )

-

-

-

... More
Carriage on Surface road

67596.43

280525

4.15

... More
Carriage on Un Surface road

2145.92

10708

4.99

... More
Loading & Unloading

330.25

28229

85.48

... More
Carriage of Non-Stock Materials (Stone )

-

-

-

... More
Carriage on Surface road

63432.49

263244

4.15

... More
Carriage on Un Surface road

6188.54

30880

4.99

... More
Loading & Unloading

703.24

113925

162

... More
Cross Drainage Work

-

-

-

... More
RCC SLAB CULVERT

-

-

-

... More
1X1X1.5

8

5518311

689788.88

2

1569010

784505.27

... More
T18-Rakyong Tinkitam to Makthang

-

-

-

... More
Flexible Pavement

-

-

-

... More
Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.

27982.5

869696

31.08

... More
Clearing grass and removal of rubbish up to a distance of 30m outside the periphery of the area as per Technical Specification Clause 201.1 By Manual Means

0.75

66370

88494.12

... More
Preparation and surface treatment of formation by removing mud and slurry, watering to the extent needed to maintain the desired moisture content, trimming to the required line, grade, profile and rolling with three wheel 80-100 kN static roller, complete as per Technical Specification Clause 301.5.5.1

27982.5

82828

2.96

... More
Dismentaling

-

-

-

... More
Below foundation

215.82

443080

2053.01

55.5

79724

1436.47

... More
Construction of hard shoulders with GSB material with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.

733.14

1258746

1716.92

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401

1185.69

2035741

1716.92

... More
Cement Treated with Crushed Rock or combination as per clause 401.2.2 and Table 400-I Grading-I in Sub-base/base, Providing, Laying and spreading Material on a prepared sub-base,adding the designed quantity of cement to the spread material, mixing in place with rotavator, grading with motor grade and compactig with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base/base

2938.16

6369966

2168.01

... More
Providing and applying primer coat with bitumen emultion (SS-1) on prepared surface of granular base including cleaning or road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per technical Clause: 502

29381.63

1345972

45.81

... More
TACK COAT-

-

-

-

... More
Providing and applying tack coat with bitumen emultion (RS-1) using emultion distributor at the rate of 0.25-0.30 kg/sqm on the prepared granular surface tresated with primer & cleaned with hydraulic broom as per technical specification Clause: 503

29381.63

448363

15.26

... More
Providing, laying of close graded premix surfacing (Mixed seal surfacing) material of 25mm thickness by hot mix plant using hard blasted granite crushed aggregates of 13.2mm to 0.09mm (Type "B") as per table 500.15 of specification 509 of MORD, premixed with bituminous binder 60/70 grade (S-65,VG-30 Bulk) @ 23.75kg per 10sqm area, including cost of all materials (excluding seigniorage) and transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled roller 8 to 10 tonnes as per MORD Specification 509 complete for finished item of work in all respects as directed by Engineer-in-charge

29381.63

6314111

214.9

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Bitumen/Emulsion)

-

-

-

... More
Carriage on Surface road

13471.48

55906

4.15

... More
Carriage on Un Surface road

411.34

2052

4.99

... More
Loading & Unloading

102.84

30466

296.26

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Cement) (5% of Cement in CTB)

-

-

-

... More
Carriage on Surface road

38514

159833

4.15

... More
Carriage on Un Surface road

1176

5868

4.99

... More
Loading & Unloading

294

87100

296.26

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading. Stone chips for CTB

-

-

-

... More
Carriage on Surface road

734493.61

3048148

4.15

... More
Carriage on Un Surface road

23317.26

116353

4.99

... More
Loading & Unloading

3760.85

321477

85.48

... More
Stone Chips For MSS

-

-

-

... More
Carriage on Surface road

193378.4

802520

4.15

... More
Carriage on Un Surface road

6139

30633

4.99

... More
Loading & Unloading

990.16

84638

85.48

... More
Road Furniture

-

-

-

... More
Informatory Sign board with Logo

10

143885

14388.58

... More
Fixing of citizen board

8

115108

14388.58

... More
Maintenance Information board

1

14388

14388.58

... More
i) 900mm equilateral triangle

15

103568

6904.55

... More
ii) 600mm Circular

20

124797

6239.87

... More
Fixing of 5th KM stone

1

4182

4182.03

... More
Fixing of Ordinary KM stone

7

16966

2423.72

... More
Fixing of 200mtr stone

30

20923

697.45

... More
Painting lines, dashes, arrows, etc. on roads in two coats on new work with ready mixed road marking paint conforming to IS:164 on bituminous/concrete surface, including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control as per drawing and Technical Specification Clause 1702

1499.9

329903

219.95

... More
Type - A, "W" : Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810).

161.2

718531

4457.39

... More
H.S. Drain

-

-

-

... More
Providing and laying standard 'V' shaped drain with cement concrete base in 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 20mm and down) mix of 100mm thick over clean hard selected stones soling of 150mm thick and 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 40mm and down) mix plum concrete along the vertical side of thickness 150mm and depth 450mm including curing, compacting, as per the direction of the Engineer- in - Charge. As per Clause 13.5 of SOR other works. (Including Excavation and Stone Soling)

6525

6715986

1029.27

... More
Carriage of Stock Materials (Cement )

-

-

-

... More
Carriage on Surface road

55282

229420

4.15

... More
Carriage on Un Surface road

1688

8423

4.99

... More
Loading & Unloading

422

125021

296.26

... More
Carriage of Non-Stock Materials (Sand )

-

-

-

... More
Carriage on Surface road

23135.56

96012

4.15

... More
Carriage on Un Surface road

2257.13

11263

4.99

... More
Loading & Unloading

306.68

26214

85.48

... More
Carriage of Non-Stock Materials (Stone Chips )

-

-

-

... More
Carriage on Surface road

119787.26

497117

4.15

... More
Carriage on Un Surface road

4

19

4.99

... More
Loading & Unloading

613.35

52429

85.48

... More
Carriage of Non-Stock Materials (Stone )

-

-

-

... More
Carriage on Surface road

59444.06

246692

4.15

... More
Carriage on Un Surface road

5799.42

28939

4.99

... More
Loading & Unloading

659.03

106762

162

... More
Protection Work

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out,construction of shoring and bracing, removal of stumps andother deleterious material and disposal upto a lead of 50 m,dressing of sides and bottom and backfilling in trenches withexcavated suitable material.

2317.31

1087419

469.26

... More
Stone Soiling for road works Providing & laying hand packed stone soling of specified thickness with clean hard selected stones including hammer dressing of stone for laying as per required level and camber including packing with broken stones obtained from hammer dressing to fill the voids to give uniform surface as directed by the Engineer-in-Charge all complete but excluding carriage and consolidation using:

157.69

148743

943.28

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications clauses 802, 803, 1202 & 1203 M10 Base

157.69

771035

4889.63

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification clauses 702, 704, 1202 and 1204 Coursed Rubble masonry In cement mortar (1:3)

2036.54

9235559

4534.92

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification clause Sandy material

258.91

331337

1279.76

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification clause Granular material

138.6

187992

1356.37

... More
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification clause 1204.3.8

665.1

856402

1287.63

... More
Providing weepholes in brick masonry/stone masonry,plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1 (V): 20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

816

275318

337.4

... More
Carriage of Stock Materials (Cement )

-

-

-

... More
Carriage on Surface road

42208.2

175164

4.15

... More
Carriage on Un Surface road

1288.8

6431

4.99

... More
Loading & Unloading

322.2

95454

296.26

... More
Carriage of Non-Stock Materials (Sand )

-

-

-

... More
Carriage on Surface road

94853.84

393643

4.15

... More
Carriage on Un Surface road

9254.03

46177

4.99

... More
Loading & Unloading

902.05

77107

85.48

... More
Carriage of Non-Stock Materials (Stone Chips )

-

-

-

... More
Carriage on Surface road

185560.67

770076

4.15

... More
Carriage on Un Surface road

5890.82

29395

4.99

... More
Loading & Unloading

914.7

78188

85.48

... More
Carriage of Non-Stock Materials (Stone )

-

-

-

... More
Carriage on Surface road

165980.14

688817

4.15

... More
Carriage on Un Surface road

16193.19

80803

4.99

... More
Loading & Unloading

1840.14

298101

162

... More
Cross Drainage Work

-

-

-

... More
RCC SLAB CULVERT

-

-

-

... More
1X1X1.5

4

2759155

689788.88

... More
T04-Tinkitam Road to Lower Tinkitam

-

-

-

... More
Flexiable Pavement

-

-

-

... More
Clearing grass and removal of rubbish up to a distance of 30m outside the periphery of the area as per Technical Specification Clause 201.1 By Manual Means

0.68

60176

88494.12

... More
Preparation and surface treatment of formation by remocing mud and slurry, watering to the extent needed to maintain the desired moisture content, trimming to the required line, grade, profile and rolling with three wheel 80-100 kN static roller, complete as per Technical Specification Clause 301.5.5.1

25488.75

75446

2.96

... More
Construction of hard shoulders with GSB material with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.

598.99

1028411

1716.92

... More
Cement Treated Crushed Rock or combination as per clause 403 and Table in Sub-base/base, Providing, Laying and spreading Material on a prepared sub-base,adding the designed quantity of cement to the spread material, mixing in place with rotavator, grading with motor grade and compactig with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base/base

-

-

-

3345.4

6856058

2049.4

2676.32

5802297

2168.01

... More
Providing and applying primer coat with bitumen emultion (SS-1) on prepared surface of granular base including cleaning or road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per technical Clause: 502

26763.19

1226021

45.81

... More
TACK COAT-

-

-

-

... More
Providing and applying tack coat with bitumen emultion (RS-1) using emultion distributor at the rate of 0.25-0.30 kg/sqm on the prepared granular surface tresated with primer & cleaned with hydraulic broom as per technical specification Clause: 503

26763.19

408406

15.26

... More
Providing, laying of close graded premix surfacing (Mixed seal surfacing) material of 25mm thickness by hot mix plant using hard blasted granite crushed aggregates of 13.2mm to 0.09mm (Type "B") as per table 500.15 of specification 509 of MORD, premixed with bituminous binder 60/70 grade (S-65,VG-30 Bulk) @ 23.75kg per 10sqm area, including cost of all materials (excluding seigniorage) and transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled roller 8 to 10 tonnes as per MORD Specification 509 complete for finished item of work in all respects as directed by Engineer-in-charge

26763.19

5751409

214.9

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Bitumen/Emulsion)

-

-

-

... More
Carriage on Surface road

11334.21

47036

4.15

... More
Carriage on Un Surface road

374.69

1869

4.99

... More
Loading & Unloading

93.67

27750

296.26

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Cement) (5% of Cement in CTB)

-

-

-

... More
Carriage on Surface road

4280

17762

4.15

... More
Carriage on Un Surface road

2140

10678

4.99

... More
Loading & Unloading

535

158499

296.26

... More
Stone chips for CTSB

-

-

-

... More
Carriage on Surface road

803109.73

3332905

4.15

... More
Carriage on Un Surface road

26549.08

132479

4.99

... More
Loading & Unloading

4282.11

366034

85.48

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading. Stone chips for CTB

-

-

-

... More
Carriage on Surface road

642489.05

2666329

4.15

... More
Carriage on Un Surface road

21239.31

105984

4.99

... More
Loading & Unloading

3425.7

292828

85.48

... More
Stone Chips For MSS

-

-

-

... More
Carriage on Surface road

169154.99

701993

4.15

... More
Carriage on Un Surface road

5591.9

27903

4.99

... More
Loading & Unloading

901.92

77096

85.48

... More
Road Furniture

-

-

-

... More
Informatory Sign board with Logo

1

14388

14388.58

... More
Fixing of citizen board

1

14388

14388.58

... More
Maintenance Information board

1

14388

14388.58

... More
i) 900mm equilateral triangle

12

82854

6904.55

... More
ii) 600mm Circular

15

93598

6239.87

... More
Fixing of 5th KM stone

4

16728

4182.03

... More
Fixing of Ordinary KM stone

12

29084

2423.72

... More
Fixing of 200mtr stone

30

20923

697.45

... More
Painting lines, dashes, arrows, etc. on roads in two coats on new work with ready mixed road marking paint conforming to IS:164 on bituminous/concrete surface, including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control as per drawing and Technical Specification Clause 1702

1366.9

300649

219.95

... More
Type - A, "W" : Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810).

198

882563

4457.39

... More
H.S. Drain

-

-

-

... More
Providing and laying standard 'V' shaped drain with cement concrete base in 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 20mm and down) mix of 100mm thick over clean hard selected stones soling of 150mm thick and 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 40mm and down) mix plum concrete along the vertical side of thickness 150mm and depth 450mm including curing, compacting, as per the direction of the Engineer- in - Charge. As per Clause 13.5 of SOR other works. (Including Excavation and Stone Soling)

6797

6995948

1029.27

... More
Carriage of Stock Materials (Cement )

-

-

-

... More
Carriage on Surface road

3512

14574

4.15

... More
Carriage on Un Surface road

1756

8762

4.99

... More
Loading & Unloading

439

130058

296.26

... More
Carriage of Non-Stock Materials (Sand )

-

-

-

... More
Carriage on Surface road

24099.99

100014

4.15

... More
Carriage on Un Surface road

2351.22

11732

4.99

... More
Loading & Unloading

319.46

27307

85.48

... More
Carriage of Non-Stock Materials (Stone Chips )

-

-

-

... More
Carriage on Surface road

119829.07

497290

4.15

... More
Carriage on Un Surface road

4

19

4.99

... More
Loading & Unloading

638.92

54614

85.48

... More
Carriage of Non-Stock Materials (Stone )

-

-

-

... More
Carriage on Surface road

61922.03

256976

4.15

... More
Carriage on Un Surface road

6041.17

30145

4.99

... More
Loading & Unloading

686.5

111212

162

... More
Protection Work

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out,construction of shoring and bracing, removal of stumps andother deleterious material and disposal upto a lead of 50 m,dressing of sides and bottom and backfilling in trenches withexcavated suitable material.

945.27

443575

469.26

... More
Stone Soiling for road works Providing & laying hand packed stone soling of specified thickness with clean hard selected stones including hammer dressing of stone for laying as per required level and camber including packing with broken stones obtained from hammer dressing to fill the voids to give uniform surface as directed by the Engineer-in-Charge all complete but excluding carriage and consolidation using:

81.99

77334

943.28

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications clauses 802, 803, 1202 & 1203 M10 Base

81.99

400876

4889.63

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification clauses 702, 704, 1202 and 1204 Coursed Rubble masonry In cement mortar (1:3)

978.53

4437532

4534.92

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification clause Sandy material

99.18

126926

1279.76

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification clause Granular material

137.7

186772

1356.37

... More
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification clause 1204.3.8

301.44

388143

1287.63

... More
Providing weepholes in brick masonry/stone masonry,plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1 (V): 20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

402

135634

337.4

... More
Carriage of Stock Materials (Cement )

-

-

-

... More
Carriage on Surface road

1202.8

4991

4.15

... More
Carriage on Un Surface road

601.4

3000

4.99

... More
Loading & Unloading

150.35

44542

296.26

... More
Carriage of Non-Stock Materials (Sand )

-

-

-

... More
Carriage on Surface road

49954.76

207312

4.15

... More
Carriage on Un Surface road

4873.64

24319

4.99

... More
Loading & Unloading

426.31

36440

85.48

... More
Carriage of Non-Stock Materials (Stone Chips )

-

-

-

... More
Carriage on Surface road

82664.89

343059

4.15

... More
Carriage on Un Surface road

2732.72

13636

4.99

... More
Loading & Unloading

416.96

35641

85.48

... More
Carriage of Non-Stock Materials (Stone )

-

-

-

... More
Carriage on Surface road

80283.6

333176

4.15

... More
Carriage on Un Surface road

7832.55

39084

4.99

... More
Loading & Unloading

890.06

144190

162

... More
Cross Drainage Work

-

-

-

... More
RCC SLAB CULVERT

-

-

-

... More
1X1X1.5

3

2026880

675626.73

... More
T11-Bermiok Bazaar to Berthang via Middle Martam

-

-

-

... More
Flexiable Pavement

-

-

-

... More
Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.

34076.25

1059089

31.08

... More
Clearing grass and removal of rubbish up to a distance of 30m outside the periphery of the area as per Technical Specification Clause 201.1 By Manual Means

0.91

80529

88494.12

... More
Preparation and surface treatment of formation by remocing mud and slurry, watering to the extent needed to maintain the desired moisture content, trimming to the required line, grade, profile and rolling with three wheel 80-100 kN static roller, complete as per Technical Specification Clause 301.5.5.1

34076.25

100865

2.96

... More
Dismentaling

-

-

-

... More
Below foundation

197.9

406290

2053.01

47.57

68332

1436.47

... More
Removing Pipe

7.62

5372

705.09

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. Only shoulder portion

1817.4

465654

256.22

... More
Laying and spreading available soil in the sub-grade on a prepared surface, pulverising, mixing the spread soil in place with rotavator with 3 per cent slaked lime having minimum content of 70 per cent of CaO, grading with motor grader and compacting with the road roller at OMC to the desired density to form a layer of improved sub grade (Rate as per SOR2020)

187.5

340783

1817.51

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401

2140.55

3502980

1636.49

... More
Cement Treated Crushed Rock or combination as per clause 403 and Table in Sub-base/base, Providing, Laying and spreading Material on a prepared sub-base,adding the designed quantity of cement to the spread material, mixing in place with rotavator, grading with motor grade and compactig with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base/base

-

-

-

3578.01

7757165

2168.01

... More
Providing and applying primer coat with bitumen emultion (SS-1) on prepared surface of granular base including cleaning or road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per technical Clause: 502

35780.06

1639084

45.81

... More
TACK COAT-

-

-

-

... More
Providing and applying tack coat with bitumen emultion (RS-1) using emultion distributor at the rate of 0.25-0.30 kg/sqm on the prepared granular surface tresated with primer & cleaned with hydraulic broom as per technical specification Clause: 503

35780.06

546003

15.26

... More
Providing, laying of close graded premix surfacing (Mixed seal surfacing) material of 25mm thickness by hot mix plant using hard blasted granite crushed aggregates of 13.2mm to 0.09mm (Type "B") as per table 500.15 of specification 509 of MORD, premixed with bituminous binder 60/70 grade (S-65,VG-30 Bulk) @ 23.75kg per 10sqm area, including cost of all materials (excluding seigniorage) and transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled roller 8 to 10 tonnes as per MORD Specification 509 complete for finished item of work in all respects as directed by Engineer-in-charge

35780.06

7689135

214.9

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Bitumen/Emulsion)

-

-

-

... More
Carriage on Surface road

15263.78

63344

4.15

... More
Carriage on Un Surface road

193.21

964

4.99

... More
Loading & Unloading

128.81

38160

296.26

... More
Cost of Haulage for Lime

-

-

-

... More
Carriage on Surface road

382.59

1587

4.15

... More
Carriage on Un Surface road

14.91

74

4.99

... More
Loading & Unloading

9.94

2944

296.26

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Cement) (5% of Cement in CTB)

-

-

-

... More
Carriage on Surface road

13783

57199

4.15

... More
Carriage on Un Surface road

537

2679

4.99

... More
Loading & Unloading

358

106061

296.26

... More
Stone Chips For CTB

-

-

-

... More
Carriage on Surface road

308796.7

1281506

4.15

... More
Carriage on Un Surface road

10648.16

53134

4.99

... More
Loading & Unloading

4579.86

391486

85.48

... More
Stone Chips For MSS

-

-

-

... More
Carriage on Surface road

81300.26

337396

4.15

... More
Carriage on Un Surface road

2803.46

13989

4.99

... More
Loading & Unloading

1205.79

103070

85.48

... More
Road Furniture

-

-

-

... More
Informatory Sign board with Logo

1

14388

14388.58

... More
Fixing of citizen board

2

28777

14388.58

... More
Maintenance Information board

1

14388

14388.58

... More
900mm equilateral triangle

36

248563

6904.55

... More
ii) 600mm Circular

12

74878

6239.87

... More
Fixing of 5th KM stone

1

4182

4182.03

... More
Fixing of Ordinary KM stone

8

19389

2423.72

... More
Fixing of 200mtr stone

36

25108

697.45

... More
Painting lines, dashes, arrows, etc. on roads in two coats on new work with ready mixed road marking paint conforming to IS:164 on bituminous/concrete surface, including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control as per drawing and Technical Specification Clause 1702

1824.9

401386

219.95

... More
Type - A, "W" : Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810).

198.4

884346

4457.39

... More
Slip Clearance

-

-

-

... More
Slip clearance i/c breaking, removing and throwing of spoils of mixed slip with boulders within a lead of 30m and lift of 1.5m complete.

8034

329956

41.07

... More
Throwing of Spoils

-

-

-

... More
Haulage

263964.8

1095453

4.15

... More
H.S. Drain

-

-

-

... More
Providing box drain of 30 cm (ht) x 45 cm (width) internal dimension with 1:2:4 Plum concrete (20mm & down) in side walls thickness of 23 cm (hill side) and 30 cm (road side) and 1:3:6 (20 mm & down) base concrete of thickness of 15 cm with standard specification over 15 cm stone soling including providing & laying guard stones complete, as per the direction of the Engineer in Charge. As per Clause 13.2 of SOR other works

2244.49

4445053

1980.43

... More
Providing and laying standard 'V' shaped drain with cement concrete base in 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 20mm and down) mix of 100mm thick over clean hard selected stones soling of 150mm thick and 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 40mm and down) mix plum concrete along the vertical side of thickness 150mm and depth 450mm including curing, compacting, as per the direction of the Engineer- in - Charge. As per Clause 13.5 of SOR other works. (Including Excavation and Stone Soling)

3207.71

3301600

1029.27

... More
Carriage of Stock Materials (Cement )

-

-

-

... More
Carriage on Surface road

8983.61

37281

4.15

... More
Carriage on Un Surface road

350.01

1746

4.99

... More
Loading & Unloading

233.34

69129

296.26

... More
Carriage of Non-Stock Materials (Sand )

-

-

-

... More
Carriage on Surface road

27215.97

112946

4.15

... More
Carriage on Un Surface road

1060.36

5291

4.99

... More
Loading & Unloading

384.19

32840

85.48

... More
Carriage of Non-Stock Materials (Stone Chips )

-

-

-

... More
Carriage on Surface road

51959.26

215630

4.15

... More
Carriage on Un Surface road

1791.7

8940

4.99

... More
Loading & Unloading

770.62

65872

85.48

... More
Carriage of Non-Stock Materials (Stone )

-

-

-

... More
Carriage on Surface road

41422.89

171904

4.15

... More
Carriage on Un Surface road

2180.15

10878

4.99

... More
Loading & Unloading

660.65

107025

162

... More
Protection Work

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out,construction of shoring and bracing, removal of stumps andother deleterious material and disposal upto a lead of 50 m,dressing of sides and bottom and backfilling in trenches withexcavated suitable material.

3150.59

1478447

469.26

... More
Providing and laying hand packed stone soling in buildings works with clean hard selected stones all complete. Details for 10cum. (manual means)

176.3

166295

943.28

... More
Providing and Laying Plum concrete in 1:2:4 c.c. (1cement, 2coarse sand, 4clean hard graded stone chips of 20 mm down nominal gauge) with 70% clean hard stone of sizes not exceeding 15cm including shuttering, compacting and curing complete, as per the direction of Engineer in Charge.

135.92

624217

4592.67

... More
Boulder apron laid in wire crates (Providing and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including 10% extra for laps and joints laid with stone boulders weighing less not less than 40 kgs each.

1955.19

4197977

2147.1

... More
Providing and laying parapet of standard size on 1:2:4 (1cement, 2coarse sand, 4clean hard graded stone chips of 20 mm down nominal gauge) plum concrete and plastering with 1:4 mix cement mortar of 12mm thick with recron 3S with lime washing three or more coats, complete as per the direction of the Engineer- in- Charge.As per Clause 12.10 of SOR other works

190.04

808266

4253.14

... More
Boulder apron laid in wire crates (Providing and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including 10% extra for laps and joints laid with stone boulders weighing less not less than 20 kgs each..As per Clause 15.2 of SOR other works

74.87

207149

2766.98

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications clauses 802, 803, 1202 & 1203 M10 Base

163.34

798657

4889.63

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification clauses 702, 704, 1202 and 1204 Coursed Rubble masonry In cement mortar (1:3)

1683.34

7633825

4534.92

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification clause Sandy material

265.56

339853

1279.76

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification clause Granular material

213.45

289517

1356.37

... More
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification clause 1204.3.8

562.56

724369

1287.63

... More
Providing weepholes in brick masonry/stone masonry,plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1 (V): 20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

745

251363

337.4

... More
Carriage of Stock Materials (Cement )

-

-

-

... More
Carriage on Surface road

13121.06

54452

4.15

... More
Carriage on Un Surface road

559.77

2793

4.99

... More
Loading & Unloading

342.78

101552

296.26

... More
Stock Material (G.I wire)

-

-

-

... More
Carriage on Surface road

851.8

3534

4.15

... More
Carriage on Un Surface road

33.26

165

4.99

... More
Loading & Unloading

0.73

216

296.26

... More
Carriage of Non-Stock Materials (Sand )

-

-

-

... More
Carriage on Surface road

92487.78

383824

4.15

... More
Carriage on Un Surface road

3611.02

18018

4.99

... More
Loading & Unloading

1020.81

87258

85.48

... More
Carriage of Non-Stock Materials (Stone Chips )

-

-

-

... More
Carriage on Surface road

65048.59

269951

4.15

... More
Carriage on Un Surface road

2355.33

11753

4.99

... More
Loading & Unloading

1125.66

96221

85.48

... More
Carriage of Non-Stock Materials (Stone )

-

-

-

... More
Carriage on Surface road

226940.08

941801

4.15

... More
Carriage on Un Surface road

22666

113103

4.99

... More
Loading & Unloading

3587.8

581223

162

... More
Cross Drainage Work

-

-

-

... More
RCC SLAB CULVERT

-

-

-

... More
1X1X1.5

5

3275511

655102.2

4

2973050

743262.56

... More
T04-Rock Garden to Dhargaon

-

-

-

... More
Flexiable Pavement

-

-

-

... More
Clearing grass and removal of rubbish up to a distance of 30m outside the periphery of the area as per Technical Specification Clause 201.1 By Manual Means

0.7

61945

88494.12

... More
Preparation and surface treatment of formation by remocing mud and slurry, watering to the extent needed to maintain the desired moisture content, trimming to the required line, grade, profile and rolling with three wheel 80-100 kN static roller, complete as per Technical Specification Clause 301.5.5.1

26223.75

77622

2.96

... More
Construction shoulders with approved material providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification

-

-

-

... More
Only Shoulder Portion (Earthen)

1398.6

358349

256.22

... More
Only Shoulder Portion (GSB)

699.3

1089201

1557.56

... More
Profile Correction with approved material obtained from borrow pits with all lifts and leads,transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1

9271.51

2375545

256.22

... More
Cement Treated Crushed Rock or combination as per clause 403 and Table in Sub-base/base, Providing, Laying and spreading Material on a prepared sub-base,adding the designed quantity of cement to the spread material, mixing in place with rotavator, grading with motor grade and compactig with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base/base (With Referance with Section 400 Clause 401.2.2 Table 400-4 cement, Clause 401.2.2 Table 400-1, Grading

-

-

-

3441.87

7053762

2049.4

2753.5

5969613

2168.01

... More
Providing and applying primer coat with bitumen emultion (SS-1) on prepared surface of granular base including cleaning or road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per technical Clause: 502

27534.94

1261375

45.81

... More
TACK COAT-

-

-

-

... More
Providing and applying tack coat with bitumen emultion (RS-1) using emultion distributor at the rate of 0.25-0.30 kg/sqm on the prepared granular surface tresated with primer & cleaned with hydraulic broom as per technical specification Clause: 503

27534.94

420183

15.26

... More
Providing, laying of close graded premix surfacing (Mixed seal surfacing) material of 25mm thickness by hot mix plant using hard blasted granite crushed aggregates of 13.2mm to 0.09mm (Type "B") as per table 500.15 of specification 509 of MORD, premixed with bituminous binder 60/70 grade (S-65,VG-30 Bulk) @ 23.75kg per 10sqm area, including cost of all materials (excluding seigniorage) and transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled roller 8 to 10 tonnes as per MORD Specification 509 complete for finished item of work in all respects as directed by Engineer-in-charge

27534.94

5917258

214.9

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Bitumen/Emulsion)

-

-

-

... More
Carriage on Surface road

9733.6

40394

4.15

... More
Carriage on Un Surface road

385.49

1923

4.99

... More
Loading & Unloading

96.37

28551

296.26

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Cement) (4% of Cement in CTSB )

-

-

-

... More
Carriage on Surface road

3025

12553

4.15

... More
Carriage on Un Surface road

1100

5489

4.99

... More
Loading & Unloading

275

81471

296.26

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Cement) (5% of Cement in CTB)

-

-

-

... More
Carriage on Surface road

3025

12553

4.15

... More
Carriage on Un Surface road

1100

5489

4.99

... More
Loading & Unloading

275

81471

296.26

... More
Stone Chips For CTSB

-

-

-

... More
Carriage on Surface road

177545.28

736812

4.15

... More
Carriage on Un Surface road

27314.66

136300

4.99

... More
Loading & Unloading

4405.59

376589

85.48

... More
Stone Chips For CTB

-

-

-

... More
Carriage on Surface road

142036.49

589451

4.15

... More
Carriage on Un Surface road

21851.77

109040

4.99

... More
Loading & Unloading

3524.48

301272

85.48

... More
Stone Chips For MSS

-

-

-

... More
Carriage on Surface road

37395.47

155191

4.15

... More
Carriage on Un Surface road

5753.15

28708

4.99

... More
Loading & Unloading

927.93

79319

85.48

... More
Road Furniture

-

-

-

... More
Informatory Sign board with Logo

1

14388

14388.58

... More
Fixing of citizen board

2

28777

14388.58

... More
Maintenance Information board

1

14388

14388.58

... More
900mm equilateral triangle

18.67

128887

6904.55

... More
600mm Circular

9.33

58236

6239.87

... More
Fixing of 5th KM stone

1

4182

4182.03

... More
Fixing of Ordinary KM stone

6

14542

2423.72

... More
Fixing of 200mtr stone

28

19528

697.45

... More
Painting lines, dashes, arrows, etc. on roads in two coats on new work with ready mixed road marking paint conforming to IS:164 on bituminous/concrete surface, including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control as per drawing and Technical Specification Clause 1702

1406.1

309271

219.95

... More
Type - A, "W" : Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810).

930

4145372

4457.39

... More
H.S. Drain

-

-

-

... More
Providing box drain of 30 cm (ht) x 45 cm (width) internal dimension with 1:2:4 Plum concrete (20mm & down) in side walls thickness of 23 cm (hill side) and 30 cm (road side) and 1:3:6 (20 mm & down) base concrete of thickness of 15 cm with standard specification over 15 cm stone soling including providing & laying guard stones complete, as per the direction of the Engineer in Charge. As per Clause 13.2 of SOR other works

699.3

1384914

1980.43

... More
Providing and laying standard 'V' shaped drain with cement concrete base in 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 20mm and down) mix of 100mm thick over clean hard selected stones soling of 150mm thick and 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 40mm and down) mix plum concrete along the vertical side of thickness 150mm and depth 450mm including curing, compacting, as per the direction of the Engineer- in - Charge. As per Clause 13.5 of SOR other works. (Including Excavation and Stone Soling)

6293.7

6477916

1029.27

... More
Carriage of Stock Materials (Cement )

-

-

-

... More
Carriage on Surface road

5357

22231

4.15

... More
Carriage on Un Surface road

1948

9720

4.99

... More
Loading & Unloading

487

144278

296.26

... More
Carriage of Non-Stock Materials (Sand )

-

-

-

... More
Carriage on Surface road

7459.07

30955

4.15

... More
Carriage on Un Surface road

2712.39

13534

4.99

... More
Loading & Unloading

368.53

31502

85.48

... More
Carriage of Non-Stock Materials (Stone Chips )

-

-

-

... More
Carriage on Surface road

29731.79

123386

4.15

... More
Carriage on Un Surface road

4

19

4.99

... More
Loading & Unloading

737.76

63063

85.48

... More
Carriage of Non-Stock Materials (Stone )

-

-

-

... More
Carriage on Surface road

17921.52

74374

4.15

... More
Carriage on Un Surface road

6516.92

32519

4.99

... More
Loading & Unloading

740.56

119970

162

... More
Protection Work

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out,construction of shoring and bracing, removal of stumps andother deleterious material and disposal upto a lead of 50 m,dressing of sides and bottom and backfilling in trenches withexcavated suitable material.

1079.23

506440

469.26

... More
Stone Soiling for road works Providing & laying hand packed stone soling of specified thickness with clean hard selected stones including hammer dressing of stone for laying as per required level and camber including packing with broken stones obtained from hammer dressing to fill the voids to give uniform surface as directed by the Engineer-in-Charge all complete but excluding carriage and consolidation using:

80.34

75780

943.28

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications clauses 802, 803, 1202 & 1203 M10 Base

80.34

392818

4889.63

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification clauses 702, 704, 1202 and 1204 Coursed Rubble masonry In cement mortar (1:3)

936.11

4245161

4534.92

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification clause Sandy material

127.92

163706

1279.76

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification clause Granular material

87.06

118085

1356.37

... More
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification clause 1204.3.8

305.28

393087

1287.63

... More
Providing weepholes in brick masonry/stone masonry,plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1 (V): 20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

380

128212

337.4

... More
Carriage of Stock Materials (Cement )

-

-

-

... More
Carriage on Surface road

1624.15

6740

4.15

... More
Carriage on Un Surface road

590.6

2947

4.99

... More
Loading & Unloading

147.65

43742

296.26

... More
Carriage of Non-Stock Materials (Sand )

-

-

-

... More
Carriage on Surface road

12557.5

52113

4.15

... More
Carriage on Un Surface road

4566.36

22786

4.99

... More
Loading & Unloading

453.17

38737

85.48

... More
Carriage of Non-Stock Materials (Stone Chips )

-

-

-

... More
Carriage on Surface road

17884.36

74220

4.15

... More
Carriage on Un Surface road

2751.44

13729

4.99

... More
Loading & Unloading

422.63

36125

85.48

... More
Carriage of Non-Stock Materials (Stone )

-

-

-

... More
Carriage on Surface road

20649.54

85695

4.15

... More
Carriage on Un Surface road

7508.92

37469

4.99

... More
Loading & Unloading

855.16

138535

162

... More
Cross Drainage Work

-

-

-

... More
RCC SLAB CULVERT

-

-

-

... More
1X1X1.5

7

4469034

638433.45



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.