Pradhan Mantri Gram Sadak Yojana Tender

View complete overview of Sikkim PMGSY Tender

Pradhan Mantri Gram Sadak Yojana - PMGSY Tender

Works
Eprocure
Opening Date11 Jan 2019
Closing Date17 Jan 2019
Tender Amount₹ 3,67,07,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
By Mix in Place Method (Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401) for grading- I Material Granular Sub-base with Close Graded Material (Table:- 400-1)

2200.77

-

1169.17

... More
Water Bound Macadam Base (Grading-II): Water Bound Macadam (Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with Smoothroller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density.) grading 2 as per technical specification clause 405

1528.31

-

1626.49

... More
Water Bound Macadam Base (Grading-III): Water Bound Macadam (Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density.) grading 3as per technical specification clause 405

1528.31

-

1686.87

... More
Prime Coat: Prime coat (Providing and applying primer coat with bitumen emulsion (ss-1)on prepared surface of granular Base including clearing of road surface and spraying primer at the rate 1.2 to 1.5 kg/sqm using mechanical means as per technical specification clause 503 High Porosity

20377.5

-

79.94

... More
Tack Coat: Tack coat (Providing and applying tack coat with bitumen emulsion using emulsion (RS-1)pressure distributor at required rate 0.25to 0.30 kg/sqmon the prepared bituminous/granular surface cleaned with mechanical broom.)as per clause 503 Granular Surface Treated with Primer

20377.5

-

17.53

... More
20mm thick Open-Graded Premix Carpet using Bituminous emulsion: I. Bitumen Emulsion Open - Graded Premix Surfacing (Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades to be followed by seal xcoat of either Type A Type B Type C as per technical specification clause 508.

20377.5

-

183.85

... More
Seal Coat: Case-I I: Type B (I) Using Bitumen 60/70 grade Seal Coat (Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per technical clause 510

20377.5

-

87.63

... More
carrage of stock materials (120 km)

-

-

-

... More
loading

92.31

-

110.42

... More
unloading

92.31

-

100.12

... More
Haulage

11077.21

-

4.2

... More
carraige of stone chips and binding metarials

-

-

-

... More
Stone( Lead 35 km)

-

-

-

... More
loading

7487.02

-

73.72

... More
unloading

7487.02

-

36.86

... More
Haulage

576500.54

-

4.2

... More
Stone Chips (Lead 120km)

-

-

-

... More
loading

550.19

-

73.72

... More
unloading

550.19

-

36.86

... More
Haulage

145250.82

-

4.2

... More
carraige of sand (lead 35 km)

-

-

-

... More
loading

122.27

-

36.86

... More
unloading

122.27

-

24.16

... More
Haulage

6847.12

-

4.2

... More
PROTECTIVE WORK

-

-

-

... More
Earth work in excavation for structure as per drawing for ordinary soil and ordinary rock(without blasting) upto 3 m depth as per specification 300

-

-

-

... More
soil 60%

1049.514

-

210.35

... More
Ordinary rock 40%

699.676

-

262.93

... More
Providing and laying. Random Rubble Stone masonary in (1:5cement mortar) as per technical specification clause 700

2153.09

-

2886.02

... More
Providing and laying Hand Packed wall with clean hard selected stone including centering aligning and slopes/curves etc. complete as per the direction of Engineer in Charg

-

-

-

... More
Providing and laying of boulder apron laid in wire crates with 4mm dia GI Wire conforming to IS : 280 and IS : 4826 in 100mm x 100mm mesh (woven diagonally) ncluding 10 percent extra for laps and joints with stone boulders weighing not less than 25 kg each as per drawing and technical specification clause 1301

391.99

-

1885.37

... More
Providing and laying hand packed stone filling behind abutment, wingwall and retaining wall complete as per drawing and technical specification clause 1204.3.8

680.3

-

487.58

... More
Parapets of 45 cm top to 60 cm bottom and 60 cm height

70

-

1474.94

... More
Providing & laying Plum concrete in 1:2:4 c.c. (1 cement, 2 coarse sand, 4 clean hard grade stone chips of 20 mm to 25 mm nominal guage) with 50% clean hard stone of sizes not exceeding 15 cm including shuttering, compacting and curing complete.

389.3

-

3441.42

... More
Slip clearance in mixed soil and throwing of spoils to lead of 30 m and lift of 1.50 m complete. Payment shall be done after actual measurement and as per the approved rate .

-

-

-

... More
carrage of stock materials (80 km)

-

-

-

... More
loading

203.79

-

94.24

... More
unloading

203.79

-

94.24

... More
Haulage

11208.66

-

4.2

... More
carraige of sand (lead 35 km)

-

-

-

... More
loading

471.25

-

36.86

... More
unloading

471.25

-

24.16

... More
Haulage

26390

-

4.2

... More
carraige of stone (lead 35 km)

-

-

-

... More
loading

3841.55

-

73.72

... More
unloading

3841.55

-

36.86

... More
Haulage

295799.35

-

4.2

... More
SIDE DRAIN AND C.D

-

-

-

... More
Construction of Hill Side Drain

4940

-

661.65

... More
Providing & laying hand packed stone soling of specified thickness with clean hard selected stones including hammer dressing of stone for laying as per required level and camber including packing with broken stones obtained from hammer dressing to fill the voids to give uniform surface as directed by the Engineer-in-Charge all complete but excluding carriage and consolidation using:

444.6

-

560.28

... More
Earth work in excavation for structure as per drawing for ordinary soil and ordinary rock(without blasting) upto 3 m depth as per specification 300

-

-

-

... More
soil 60%

240

-

210.35

... More
Ordinary rock 40%

160

-

262.93

... More
Providing and Laying reinforced Cement Concrete Pipe NP4 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2

72

-

5479.32

... More
carrage of stock materials (55 km)

-

-

-

... More
loading

166.78

-

94.24

... More
unloading

166.78

-

94.24

... More
Haulage

9171.91

-

4.2

... More
carraige of sand (lead 35 km)

-

-

-

... More
loading

232.18

-

73.72

... More
unloading

232.18

-

36.86

... More
Haulage

13002.08

-

4.2

... More
carraige of stone (lead 35 km)

-

-

-

... More
loading

1553.63

-

73.72

... More
unloading

1553.63

-

36.86

... More
Haulage

119629.51

-

4.2

... More
ROAD FURNITURE AND OTHERS

1

-

70831



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.