Rural Management And Development Department Tender

View complete overview of Sikkim Rural Management And Development Department Tender

Rural Management And Development Department Tender

Works
Eprocure
Opening Date27 Apr 2018
Closing Date7 May 2018
Tender Amount₹ 11,75,63,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Subgrade and Earthen Shoulders: Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1

1394.42

279567

200.49

... More
Compacting Cut Formation :

-

-

-

... More
Loosening , levelling and compacting the cut formation to facilitate placement of granular sub-base course , scarified to a depth of 150 mm, mixed with water at OMC and compacting by rolling so as to achieve minimum dry density as given in Table no. 300

676.08

24818

36.71

... More
Construction of granular sub-base by providing local material, spreading in uniform layers, watering, ramming to required template and consolidating with power road roller 80-100 kN capacity to achieve the desired density complete. The thickness of the compacted base to be 150 mm. Work to be done as per direction of Engineer-in-charge .(Using Naturally Occuring River Bed Materials)

1426.11

1667365

1169.17

... More
Water Bound Macadam Base (Grade-II): Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN static roller in stages to proper grade and camber applying and brooming , stone screening/binding materials to fillup the interstices of coarse aggregate , watering and compacting to the required density Grading II as per Technical Specification clause 405 . By Mannual Means.

792.28

1288635

1626.49

... More
Water Bound Macadam Base (Grade-III): Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN static roller in stages to proper grade and camber applying and brooming , stone screening/binding materials to fillup the interstices of coarse aggregate , watering and compacting to the required density Grading III as per Technical Specification clause 405 . By Mannual Means.

792.28

1336473

1686.87

... More
Prime Coat: Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90- 1.2 kg/sqm using mechanical means as per Technical Specification cl. 502.

10563.75

658544

62.34

... More
Tack Coat: Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.

10563.75

185076

17.52

... More
20mm thick Open-Graded Premix Carpet using Bituminous Binder: Case I : By Mannual Means I. Bitumen (S-90) Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base , including mixing in asuitable plant , laying and rolling with a three wheel 80 to 100 kN static roller capacity finished to required level and grades to be followed by seal coat of Type B as per Technical Specification clause 508 .

10563.75

1942145

183.85

... More
Seal Coat: Case-I : Type B (I) Bitumen (S-90) Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A as per Technical Specification Clause 510

10563.75

650515

61.58

... More
Providing and laying Bituminous wearing course with 20mm thk premix carpetting over tack coat laid on concrete surface of deck slab of bridge/culvert and seal coat Type B over premix carpetting as per drawing including laying the same with proper camber and curing so as to avoid formation of shrinkage cracks in hot weather as per Technical specifications cl. 508, 503, 510 .

67.5

21193

313.98

... More
Carriage of Stock Materials : (Lead 50 km).

-

-

-

... More
Consumption of Cement/steel/Bitumen/Emulsion:

-

-

-

... More
loading

45.25

5004

110.6

... More
Unloading

45.25

5004

110.6

... More
Haulage

1064.25

4469

4.2

... More
Carriage of Non-Stock Materials : (Lead 30 km).

-

-

-

... More
Consumption of Stone Boulder & Dust

-

-

-

... More
loading and unloading

4249.81

259323

61.02

... More
Haulage

443058.13

1860844

4.2

... More
Carriage of Non-Stock Materials : (Lead 120 km).

-

-

-

... More
Consumption of Stone Chips

-

-

-

... More
loading and unloading

285.22

31539

110.58

... More
Haulage

87847.76

368960

4.2

... More
Section B

-

-

-

... More
Earthwork in excavation for structures as per drawing including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.The foundation bed shall be levelled, watered & rammed both longitudinally and vertically before placing the foundation . Necessary arrangement for dewatering shall be kept if required (technical specifications Clause 305.1).

139.72

29390

210.35

... More
Retaining wall and Brest wall :

-

-

-

... More
(b) Intermediate band of Random Rubble masonry with cement mortar In cement mortar (1:5) , ( 1 (cement) : 5(sand))

1708.32

4930245

2886.02

... More
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with sound , hard , durable and fairly regular in shape stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301

445.24

839442

1885.37

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings with well packed graded filter to a thickness not less than 600 mm with smaller size towards soil and bigger size towards the wall and provided over the entire surface behind abutment , wing or return wall to the full height as per direction of the Engineer (technical specification Clause 1204.3.8).

461

224774

487.58

... More
Slip clearance in mixed soil and throwing of spoils to lead of 30 m and lift of 1.50 m complete. Payment shall be done after actual measurement and as per the approved rate .

6128

226490

36.96

... More
Carriage of Stock Materials : (Lead 50 km).

-

-

-

... More
Consumption of Cement/steel/Bitumen/Emulsion:

-

-

-

... More
loading

174.76

16469

94.24

... More
Unloading

174.76

16469

94.24

... More
Haulage

3495.24

14680

4.2

... More
Carriage of Non-Stock Materials : (Lead 30 km).

-

-

-

... More
Consumption of Sand

-

-

-

... More
loading and unloading

591.93

36119

61.02

... More
Haulage

47354.4

198888

4.2

... More
Carriage of Non-Stock Materials : (Lead 30 km).

-

-

-

... More
Consumption of Stones

-

-

-

... More
loading and unloading

3170.98

350646

110.58

... More
Haulage

246656.81

1035958

4.2

... More
Section C

-

-

-

... More
Construction of Hill Side Drain

-

-

-

... More
Construction of hill side drain with P.C.C M10 (1:3:6) in accordance with the requirement of specifications true to lines and grades. Dimesions and other particulars as per drawing and Technical Specification Clause 1606.1

2820

1865853

661.65

... More
Providing & laying hand packed stone soling of specified thickness with clean hard selected stones including hammer dressing of stone for laying as per required level and camber including packing with broken stones obtained from hammer dressing to fill the voids to give uniform surface as directed by the Engineer-in-Charge all complete.

317.25

206187

649.92

... More
Carriage of Stock Materials : (Lead 50 km).

-

-

-

... More
Consumption of Cement/steel/Bitumen/Emulsion:

-

-

-

... More
loading

98.7

9301

94.24

... More
Unloading

98.7

9301

94.24

... More
Haulage

1974

8290

4.2

... More
Carriage of Non-Stock Materials : (Lead 30 km).

-

-

-

... More
Consumption of Sand

-

-

-

... More
loading and unloading

189.5

11563

61.02

... More
Haulage

15160

63672

4.2

... More
Carriage of Non-Stock Materials : (Lead 30 km).

-

-

-

... More
Consumption of Stones

-

-

-

... More
loading and unloading

648.68

71731

110.58

... More
Haulage

57083.84

239752

4.2

... More
Section D (Road furnitures)

-

-

-

... More
Providing and Fixing 'Logo' of PMGSY Project

-

-

-

... More
Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1

4

37620

9405

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801

20

62278

3113.9

... More
L114-Lingding to Sichey gaon via Rai Gaon

-

-

-

... More
Boundary Pillar

-

-

-

... More
Reinforced cement concrete M15 grade boundary pillars/local stone of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting as per drawing and Technical Specification Clause 1704

95

45584

479.84

... More
Construction of Subgrade and Earthen Shoulders: Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1

2055.74

412155

200.49

... More
Compacting Cut Formation :

-

-

-

... More
Loosening , levelling and compacting the cut formation to facilitate placement of granular sub-base course , scarified to a depth of 150 mm, mixed with water at OMC and compacting by rolling so as to achieve minimum dry density as given in Table no. 300

1042.62

38274

36.71

... More
Construction of granular sub-base by providing local material, spreading in uniform layers, watering, ramming to required template and consolidating with power road roller 80-100 kN capacity to achieve the desired density complete. The thickness of the compacted base to be 150 mm. Work to be done as per direction of Engineer-in-charge .(Using Naturally Occuring River Bed Materials)

2102.47

2458144

1169.17

... More
Water Bound Macadam Base (Grade-II): Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN static roller in stages to proper grade and camber applying and brooming , stone screening/binding materials to fillup the interstices of coarse aggregate , watering and compacting to the required density Grading II as per Technical Specification clause 405 . By Mannual Means.

1168.04

1899805

1626.49

... More
Water Bound Macadam Base (Grade-III): Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN static roller in stages to proper grade and camber applying and brooming , stone screening/binding materials to fillup the interstices of coarse aggregate , watering and compacting to the required density Grading III as per Technical Specification clause 405 . By Mannual Means.

1168.04

1970331

1686.87

... More
Prime Coat: Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90- 1.2 kg/sqm using mechanical means as per Technical Specification cl. 502.

15573.75

970867

62.34

... More
Tack Coat: Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.

15573.75

272852

17.52

... More
20mm thick Open-Graded Premix Carpet using Bituminous Binder: Case I : By Mannual Means I. Bitumen (S-90) Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base , including mixing in asuitable plant , laying and rolling with a three wheel 80 to 100 kN static roller capacity finished to required level and grades to be followed by seal coat of Type B as per Technical Specification clause 508 .

15573.75

2863233

183.85

... More
Seal Coat: Case-I : Type B (I) Bitumen (S-90) Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A as per Technical Specification Clause 510

15573.75

959031

61.58

... More
Providing and laying Bituminous wearing course with 20mm thk premix carpetting over tack coat laid on concrete surface of deck slab of bridge/culvert and seal coat Type B over premix carpetting as per drawing including laying the same with proper camber and curing so as to avoid formation of shrinkage cracks in hot weather as per Technical specifications cl. 508, 503, 510 .

142.5

44742

313.98

... More
Carriage of Stock Materials : (Lead 50 km).

-

-

-

... More
Consumption of Cement/steel/Bitumen/Emulsion:

-

-

-

... More
loading

66.74

7381

110.6

... More
Unloading

66.74

7381

110.6

... More
Haulage

1588.55

6671

4.2

... More
Carriage of Non-Stock Materials : (Lead 30 km).

-

-

-

... More
Consumption of Stone Boulder & Dust

-

-

-

... More
loading and unloading

6265.37

382312

61.02

... More
Haulage

659425.71

2769587

4.2

... More
Carriage of Non-Stock Materials : (Lead 120 km).

-

-

-

... More
Consumption of Stone Chips

-

-

-

... More
loading and unloading

420.5

46498

110.58

... More
Haulage

120401.1

505684

4.2

... More
Section B

-

-

-

... More
Earthwork in excavation for structures as per drawing including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.The foundation bed shall be levelled, watered & rammed both longitudinally and vertically before placing the foundation . Necessary arrangement for dewatering shall be kept if required (technical specifications Clause 305.1).

596.49

125471

210.35

... More
Retaining wall and Brest wall :

-

-

-

... More
(b) Intermediate band of Random Rubble masonry with cement mortar In cement mortar (1:5) , ( 1 (cement) : 5(sand))

1785.26

5152296

2886.02

... More
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with sound , hard , durable and fairly regular in shape stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301

1442.74

2720098

1885.37

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings with well packed graded filter to a thickness not less than 600 mm with smaller size towards soil and bigger size towards the wall and provided over the entire surface behind abutment , wing or return wall to the full height as per direction of the Engineer (technical specification Clause 1204.3.8).

915.11

446189

487.58

... More
Slip clearance in mixed soil and throwing of spoils to lead of 30 m and lift of 1.50 m complete. Payment shall be done after actual measurement and as per the approved rate .

11233.53

415191

36.96

... More
Carriage of Stock Materials : (Lead 50 km).

-

-

-

... More
Consumption of Cement/steel/Bitumen/Emulsion:

-

-

-

... More
loading

182.63

17211

94.24

... More
Unloading

182.63

17211

94.24

... More
Haulage

3652.68

15341

4.2

... More
Carriage of Non-Stock Materials : (Lead 30 km).

-

-

-

... More
Consumption of Sand

-

-

-

... More
loading and unloading

618.59

37746

61.02

... More
Haulage

49487.2

207846

4.2

... More
Carriage of Non-Stock Materials : (Lead 30 km).

-

-

-

... More
Consumption of Stones

-

-

-

... More
loading and unloading

5577.6

616771

110.58

... More
Haulage

413640.14

1737288

4.2

... More
Section C

-

-

-

... More
Construction of Hill Side Drain

-

-

-

... More
Construction of hill side drain with P.C.C M10 (1:3:6) in accordance with the requirement of specifications true to lines and grades. Dimesions and other particulars as per drawing and Technical Specification Clause 1606.1

4145

2742539

661.65

... More
Providing & laying hand packed stone soling of specified thickness with clean hard selected stones including hammer dressing of stone for laying as per required level and camber including packing with broken stones obtained from hammer dressing to fill the voids to give uniform surface as directed by the Engineer-in-Charge all complete.

466.31

303064

649.92

... More
Carriage of Stock Materials : (Lead 50 km).

-

-

-

... More
Consumption of Cement/steel/Bitumen/Emulsion:

-

-

-

... More
loading

145.08

13672

94.24

... More
Unloading

145.08

13672

94.24

... More
Haulage

2901.5

12186

4.2

... More
Carriage of Non-Stock Materials : (Lead 30 km).

-

-

-

... More
Consumption of Sand

-

-

-

... More
loading and unloading

278.55

16997

61.02

... More
Haulage

22284

93592

4.2

... More
Carriage of Non-Stock Materials : (Lead 30 km).

-

-

-

... More
Consumption of Stones

-

-

-

... More
loading and unloading

953.47

105434

110.58

... More
Haulage

114789.91

482117

4.2

... More
Section D (Road furnitures)

-

-

-

... More
Providing and Fixing 'Logo' of PMGSY Project

-

-

-

... More
Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1

4

37620

9405

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801

43

133897

3113.9

... More
L123-Daragaon to Mullasso

-

-

-

... More
BOUNDARY PILLARS Reinforced cement concrete M15 grade boundary pillars/local stone of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting as per drawing and Technical Specification Clause 1704

142

68137

479.84

... More
HAND PACKED SOLING FOR SIDE PACKING Providing & laying hand packed stone soling of specified thickness with clean hard selected stones including hammer dressing of stone for laying as per required level and camber including packing with broken stones obtained from hammer dressing to fill the voids to give uniform surface as directed by the Engineer-in-Charge all complete.

1952.5

1268968

649.92

... More
CONSTRUCTION OF SUBGRADE & EARTHERN SHOULDERS Construction of Subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1

3865.95

775084

200.49

... More
COMPACTING ORIGINAL GROUND SUPPORTING SUBGRADE Loosening of the ground upto a level of 300 mm below the,subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per technical specification clause 303.5.2.

6326.1

232231

36.71

... More
GRANULAR SUB-BASE WITH WELL GRADED MATERIAL (TABLE 400.1) (A) By Mix in Place Method Construction of granular sub base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (i) For Grading I Material (A) By Manual Means

3953.81

4622676

1169.17

... More
WATER BOUND MACADAM (GRADING - II) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including speading in uniform thickness, hand packing, rolling wih smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading II as per Technical Specification Clause 405 (A) By Manual Means

2196.56

3572682

1626.49

... More
WATER BOUND MACADAM (GRADING - III) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including speading in uniform thickness, hand packing, rolling wih smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading III as per Technical Specification Clause 405 (A) By Manual Means

2196.56

3705311

1686.87

... More
PRIME COAT (ii). MEDIUM POROSITY Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90-1.2 kg/sqm using mechanical means as per Technical Specificaion clause 502

29287.5

1825782

62.34

... More
TACK COAT ii). Providing and applying tack coat with Bitumen emulsion (RS-1)using emulsion distrubutor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per technical specification clause 503.

29287.5

513409

17.53

... More
20MM THK OPEN-GRADED PREMIX CARPET USING BITUMINOUS (PENETRATION GRADE / MODIFIED BITUMEN) BINDER Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capcaity, finished to required level and grades to be followed by seal coat of either type A or type B or type C as per technical specification clause 508.Case - I By Manual Means

29287.5

5384506

183.85

... More
SEAL COAT : CASE - I (I) BITUMEN (S - 90) Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A as per Technical Specification Clause 510

29287.5

1803524

61.58

... More
Carriage of stock materials for a distance 30 km by mechnical means

-

-

-

... More
** Pre-mix carpetting

-

-

-

... More
Loading of bitumen

125.35

13841

110.42

... More
Unloading of bitumen

125.35

12550

100.12

... More
Haulage ( 30KM LEAD)

3760.5

15794

4.2

... More
Carriage of non - materials for a distance 40 km by mechnical means

-

-

-

... More
Loading & Unloading of Stone Boulder & Dust

11782.36

718959

61.02

... More
Haulage ( 40KM LEAD)

1036847.68

4354760

4.2

... More
Loading & Unloading of Stone chips

2450.39

270964

110.58

... More
Haulage ( 150KM LEAD)

808628.7

3396240

4.2

... More
Earthwork in excavation for structures as per drawing including setting out, construction of ahoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. The foundation bed shall be levelled, watered and rammed both longitudinally and vertically before placing the foundation. Necessary arrangement for dewatering shall be kept if required (technical specifications Clause 305.1)

-

-

-

... More
Soil =

2132.55

448581

210.35

... More
Ordinary Rock =

-

-

-

... More
Retaining wall and Brest wall :

-

-

-

... More
(a) Intermediate band of Random Rubble masonry with cement mortar In cement mortar (1:5) , ( 1 (cement) : 5 (sand))

2345.16

6768172

2886.02

... More
(b) Providing and laying Hand Packed wall with clean hard selected stone including centering aligning and slopes/curves etc. complete as per the direction of Engineer in Charge.

202.45

154570

763.5

... More
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 & IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with sound , hard, durable & fairly regular in shape stone boulders weighing not less than 25 kg each as per drawing & technical specifications Clause 1301

1172.58

2210747

1885.37

... More
Slip clearance in mixed soil and throwing of spoils to lead of 30 m and lift of 1.50 m complete. Payment shall be done after actual measurement and as per the approved rate .

18235.93

673999

36.96

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings with well packed graded filter to a thickness not less than 600 mm with smaller size towards soil and bigger size towards the wall and provided over the entire surface behind abutment, wing or return wall to the full height as per direction of the Engineer (technical specification Clause 1204.3.8).

79.93

38972

487.58

... More
Carriage of stock materials for a distance 30 km by mechnical means

-

-

-

... More
Loading of Cement

239.91

22609

94.24

... More
Unloading of Cement

239.91

22609

94.24

... More
Haulage

7197.3

30228

4.2

... More
Carriage of non - materials for a distance 40 km by mechnical means

-

-

-

... More
Loading & Unloading of Sand

812.6

49584

61.02

... More
Haulage ( 40KM LEAD)

65008

273033

4.2

... More
Loading & Unloading of Stone Chips

4347.51

480747

110.58

... More
Haulage ( 40KM LEAD)

382580.88

1606839

4.2

... More
ROAD WIDENING

-

-

-

... More
Construction of hill side drain with P.C.C M10 (1:3:6) in accordance with the requirement of specifications true to lines and grades. Dimesions and other particulars as per drawing & Technical Specification Clause 1606.1

7100

4697715

661.65

... More
Providing & laying hand packed stone soling of specified thickness with clean hard selected stones including hammer dressing of stone for laying as per required level and camber including packing with broken stones obtained from hammer dressing to fill the voids to give uniform surface as directed by the Engineer-in-Charge all complete.

798.75

519123

649.92

... More
Carriage of stock materials for a distance 30 km by mechnical means

-

-

-

... More
Loading of Cement

248.5

23418

94.24

... More
Unloading of Cement

248.5

23418

94.24

... More
Haulage

7455

31311

4.2

... More
Carriage of non - materials for a distance 40 km by mechnical means

-

-

-

... More
Loading & Unloading of Sand

477.12

29113

61.02

... More
Haulage ( 40KM LEAD)

38169.6

160312

4.2

... More
Loading & Unloading of Stone

1633.18

180597

110.58

... More
Haulage ( 40KM LEAD)

143719.84

603623

4.2

... More
Providing and fixing 'Logo' of PMGSY Project Providing & fixing of typical PMGSY informatory sign board with logo as per MORD specifications & drawing. Three MS plates of 1.6mm thick, top & middle plate duly welded with MS flat iron 25 mm x 5 m size on back on edges. The lower lplate will be welded with MS angle iron frame of 25mm x 25mm x5mm. The angle iron frame of the lower most plate & flat irom frame of middle plate will be welded to 2 nos. 75 mm x 75 mm of 12 SWG sheet tubes 450 mm x 450 mm x 600mm, 600mm below ground level.The top most diamond plate will be welded to middle plate by 47 mm x47 mm of 12 SWG steel plate tube. All M.S will be stove enameled on both sides. Lettering & printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade & colour. All sections of framed posts & steel tube will be painted with primer & two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1

2

22319

11159.88

... More
A. Retro- reflectorised Traffic Signs (1) Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type rflective sheeting, vide clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450mm 600mm, 600mm below ground level as per drawings and Technical Specification Clause 801.

-

-

-

... More
(a) 600 mm equilateral triangle

36

216311

6008.65

... More
(b) 900 mm equilateral triangle

36

126881

3524.49

... More
L119-Nechudara to Bahun Gaon (Lingdok)

-

-

-

... More
Reinforced cement concrete M15 grade boundary pillars/local stone of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting as per drawing and Technical Specification Clause 1704

-

-

-

... More
Construction of Subgrade and Earthen Shoulders: Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1

2862.09

573820

200.49

... More
Providing edge stone on valley side of formation as per drawing and technical specification clause 1608.2.6

5782

1255040

217.06

... More
Compacting Cut Formation :

-

-

-

... More
Loosening , levelling and compacting the cut formation to facilitate placement of granular sub-base course , scarified to a depth of 150 mm, mixed with water at OMC and compacting by rolling so as to achieve minimum dry density as given in Table no. 300

-

-

-

... More
Construction of granular sub-base by providing local material, spreading in uniform layers, watering, ramming to required template and consolidating with power road roller 80-100 kN capacity to achieve the desired density complete. The thickness of the compacted base to be 150 mm. Work to be done as per direction of Engineer-in-charge .(Using Naturally Occuring River Bed Materials)

3073.49

3593432

1169.17

... More
Providing and laying filter material at the edge of GSB complete as per Drawing and technical specification clause 1302

867.3

823180

949.13

... More
Water Bound Macadam Base (Grade-II): Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN static roller in stages to proper grade and camber applying and brooming , stone screening/binding materials to fillup the interstices of coarse aggregate , watering and compacting to the required density Grading II as per Technical Specification clause 405 . By Mannual Means.

1707.5

2777231

1626.49

... More
Water Bound Macadam Base (Grade-III): Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN static roller in stages to proper grade and camber applying and brooming , stone screening/binding materials to fillup the interstices of coarse aggregate , watering and compacting to the required density Grading III as per Technical Specification clause 405 . By Mannual Means.

1707.5

2880330

1686.87

... More
Prime Coat: Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90- 1.2 kg/sqm using mechanical means as per Technical Specification cl. 502.

22766.63

1419271

62.34

... More
Tack Coat: Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.

22766.63

399099

17.53

... More
20mm thick Open-Graded Premix Carpet using Bituminous Binder: Case I : By Mannual Means I. Bitumen (S-90) Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base , including mixing in asuitable plant , laying and rolling with a three wheel 80 to 100 kN static roller capacity finished to required level and grades to be followed by seal coat of Type B as per Technical Specification clause 508 .

22766.63

4185644

183.85

... More
Seal Coat: Case-I : Type B (I) Bitumen (S-90) Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A as per Technical Specification Clause 510

22766.63

1401969

61.58

... More
Providing and laying Bituminous wearing course with 20mm thk premix carpetting over tack coat laid on concrete surface of deck slab of bridge/culvert and seal coat Type B over premix carpetting as per drawing including laying the same with proper camber and curing so as to avoid formation of shrinkage cracks in hot weather as per Technical specifications cl. 508, 503, 510 .

-

-

-

... More
Carriage of Non-Stock Materials : (Lead 55 km).

-

-

-

... More
Consumption of Cement/steel/Bitumen/Emulsion:

-

-

-

... More
loading

97.44

10759

110.42

... More
unloading

97.44

9755

100.12

... More
Haulage

4872.06

20462

4.2

... More
carriage of non stock material ; ( lead 40 km )

-

-

-

... More
Consumption of Stone Boulder & Dust

-

-

-

... More
loading and unloading

10370.52

632809

61.02

... More
Haulage

1140757.53

4791181

4.2

... More
Carriage of Non-Stock Materials : (Lead 140 km).

-

-

-

... More
Consumption of Stone Chips

-

-

-

... More
loading and unloading

819.6

51651

63.02

... More
Haulage

90155.84

378654

4.2

... More
Section B

-

-

-

... More
Earthwork in excavation for structures as per drawing including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.The foundation bed shall be levelled, watered & rammed both longitudinally and vertically before placing the foundation . Necessary arrangement for dewatering shall be kept if required (technical specifications Clause 305.1).

274.9

57825

210.35

183.26

48184

262.93

... More
Retaining wall and Brest wall :

-

-

-

... More
(b) Intermediate band of Random Rubble masonry with cement mortar In cement mortar (1:5) , ( 1 (cement) : 5(sand))

476.57

1531219

3213

... More
Hand packed Dry stone wall.

-

-

-

... More
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with sound , hard , durable and fairly regular in shape stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301

156.45

294966

1885.37

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings with well packed graded filter to a thickness not less than 600 mm with smaller size towards soil and bigger size towards the wall and provided over the entire surface behind abutment , wing or return wall to the full height as per direction of the Engineer (technical specification Clause 1204.3.8).

95.5

46563

487.58

... More
Parapet of 45cm top to 60cm height providing and laying plum concrete in 1:2:4 c.c with 50% clean hard stone of size noy exceeding 15cm including shuttering ,i/c carriage compacting and curing complete.

44

101728

2312

... More
Carriage of Stock Materials : (Lead 55 km).

-

-

-

... More
Consumption of Cement/steel/Bitumen/Emulsion:

-

-

-

... More
loading

52.5

4947

94.24

... More
unloading

52.5

4947

94.24

... More
Haulage

1968.62

8268

4.2

... More
Head load

525

18322

34.9

... More
Carriage of Non-Stock Materials : (Lead 40 km).

-

-

-

... More
Consumption of Sand

-

-

-

... More
loading and unloading

168.39

10275

61.02

... More
Haulage

58828.09

247077

4.2

... More
Head load

168.39

109199

648.49

... More
Carriage of Non-Stock Materials : (Lead 40 km).

-

-

-

... More
Consumption of Stones

-

-

-

... More
loading and unloading

623.15

68907

110.58

... More
Haulage

113903.57

478394

4.2

... More
Head load

623.15

404106

648.49

... More
Section C

-

-

-

... More
Construction of Hill Side Drain

-

-

-

... More
Construction of hill side drain with P.C.C M10 (1:3:6) in accordance with the requirement of specifications true to lines and grades. Dimesions and other particulars as per drawing and Technical Specification Clause 1606.1

5782

4707530

814.17

... More
Providing & laying hand packed stone soling of specified thickness with clean hard selected stones including hammer dressing of stone for laying as per required level and camber including packing with broken stones obtained from hammer dressing to fill the voids to give uniform surface as directed by the Engineer-in-Charge all complete.

-

-

-

... More
Carriage of Stock Materials : (Lead 55 km).

-

-

-

... More
Consumption of Cement/steel/Bitumen/Emulsion:

-

-

-

... More
loading and unloading

192.62

18152

94.24

... More
loading and unloading

192.62

18152

94.24

... More
Haulage

4815.5

20225

4.2

... More
head load

1926.2

67224

34.9

... More
Carriage of Non-Stock Materials : (Lead 40 km).

-

-

-

... More
Consumption of Sand

-

-

-

... More
loading and unloading

336.31

20521

61.02

... More
Haulage

26904.64

112999

4.2

... More
head load

336.31

218093

648.49

... More
Carriage of Non-Stock Materials : (Lead 40 km).

-

-

-

... More
Consumption of Stones

-

-

-

... More
loading and unloading

566.84

62681

110.58

... More
Haulage

62352

261878

4.2

... More
head load

566.84

367590

648.49

... More
RCC culvert 3mx3m span (0-3.10km)

-

-

-

... More
Section D (Road furnitures)

-

-

-

... More
Providing and Fixing 'Logo' of PMGSY Project

-

-

-

... More
Reinforced cement concrete M15 grade km stone/local stone of standrad design as per IRC:8 (5th Kilometre stone)

3

10845

3615.19

... More
Reinforced cement concrete M15 grade km stone/local stone of standrad design as per IRC:8 (Ordinary Kilometre stone)

5

10653

2130.63

... More
Reinforced cement concrete M15 grade km stone/local stone of standrad design as per IRC:8 (200M stone)

15

9136

609.13

... More
Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1

1

11159

11159.88

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801

15

90129

6008.65

... More
Construction of Job Pillar as per Fig. 1600.1 (d) and Technical Specification Clause 1602.4

5

2427

485.46

... More
Construction of hume pipe from 0km to 5.8km

21

1388415

66115

... More
L100-NH31A To Lower Martam

-

-

-

... More
Boundary Pillar

-

-

-

... More
Reinforced cement concrete M15 grade boundary pillars/local stone of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting as per drawing and Technical Specification Clause 1704

60

28790

479.84

... More
Construction of Subgrade and Earthen Shoulders: Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1

1359.07

272479

200.49

... More
Compacting Cut Formation :

-

-

-

... More
Loosening , levelling and compacting the cut formation to facilitate placement of granular sub-base course , scarified to a depth of 150 mm, mixed with water at OMC and compacting by rolling so as to achieve minimum dry density as given in Table no. 300

2223.94

81640

36.71

... More
Construction of granular sub-base by providing local material, spreading in uniform layers, watering, ramming to required template and consolidating with power road roller 80-100 kN capacity to achieve the desired density complete. The thickness of the compacted base to be 150 mm. Work to be done as per direction of Engineer-in-charge .(Using Naturally Occuring River Bed Materials)

1389.96

1625099

1169.17

... More
Water Bound Macadam Base (Grade-II): Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN static roller in stages to proper grade and camber applying and brooming , stone screening/binding materials to fillup the interstices of coarse aggregate , watering and compacting to the required density Grading II as per Technical Specification clause 405 . By Mannual Means.

772.2

1255975

1626.49

... More
Water Bound Macadam Base (Grade-III): Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN static roller in stages to proper grade and camber applying and brooming , stone screening/binding materials to fillup the interstices of coarse aggregate , watering and compacting to the required density Grading III as per Technical Specification clause 405 . By Mannual Means.

772.2

1302601

1686.87

... More
Prime Coat: Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90- 1.2 kg/sqm using mechanical means as per Technical Specification cl. 502.

10296

641852

62.34

... More
Tack Coat: Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.

10296

180385

17.52

... More
20mm thick Open-Graded Premix Carpet using Bituminous Binder: Case I : By Mannual Means I. Bitumen (S-90) Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base , including mixing in asuitable plant , laying and rolling with a three wheel 80 to 100 kN static roller capacity finished to required level and grades to be followed by seal coat of Type B as per Technical Specification clause 508 .

10296

1892919

183.85

... More
Seal Coat: Case-I : Type B (I) Bitumen (S-90) Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A as per Technical Specification Clause 510

10296

634027

61.58

... More
Providing and laying Bituminous wearing course with 20mm thk premix carpetting over tack coat laid on concrete surface of deck slab of bridge/culvert and seal coat Type B over premix carpetting as per drawing including laying the same with proper camber and curing so as to avoid formation of shrinkage cracks in hot weather as per Technical specifications cl. 508, 503, 510 .

-

-

-

... More
Carriage of Stock Materials : (Lead 30 km).

-

-

-

... More
Consumption of Cement/steel/Bitumen/Emulsion:

-

-

-

... More
loading

44.07

4874

110.6

... More
Unloading

44.07

4874

110.6

... More
Haulage

1322.1

5552

4.2

... More
Carriage of Non-Stock Materials : (Lead 40 km).

-

-

-

... More
Consumption of Stone Boulder & Dust

-

-

-

... More
loading and unloading

4142.09

252750

61.02

... More
Haulage

318940.93

1339551

4.2

... More
Carriage of Non-Stock Materials : (Lead 148km).For pre-mix

-

-

-

... More
Consumption of Stone Chips

-

-

-

... More
loading and unloading

277.99

30740

110.58

... More
Haulage

90513.54

380156

4.2

... More
Section B

-

-

-

... More
Earthwork in excavation for structures as per drawing including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.The foundation bed shall be levelled, watered & rammed both longitudinally and vertically before placing the foundation . Necessary arrangement for dewatering shall be kept if required (technical specifications Clause 305.1).

1325.72

278865

210.35

... More
Retaining wall and Brest wall :

-

-

-

... More
(b) Intermediate band of Random Rubble masonry with cement mortar In cement mortar (1:5) , ( 1 (cement) : 5(sand))

1574.04

4542710

2886.02

... More
(c ) Handpacked Dry stone wall

234.2

178811

763.5

... More
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with sound , hard , durable and fairly regular in shape stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301

-

-

-

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings with well packed graded filter to a thickness not less than 600 mm with smaller size towards soil and bigger size towards the wall and provided over the entire surface behind abutment , wing or return wall to the full height as per direction of the Engineer (technical specification Clause 1204.3.8).

206.1

100490

487.58

... More
Slip clearance in mixed soil and throwing of spoils to lead of 30 m and lift of 1.50 m complete. Payment shall be done after actual measurement and as per the approved rate .

8116.89

300000

36.96

... More
Carriage of Stock Materials : (Lead 30 km).

-

-

-

... More
Consumption of Cement/steel/Bitumen/Emulsion:

-

-

-

... More
loading

161.02

15174

94.24

... More
Unloading

161.02

15174

94.24

... More
Haulage

4830.72

20289

4.2

... More
Carriage of Non-Stock Materials : (Lead 40 km).

-

-

-

... More
Consumption of Sand

-

-

-

... More
loading and unloading

545.4

33280

61.02

... More
Haulage

43632

183254

4.2

... More
Carriage of Non-Stock Materials : (Lead 23 km).

-

-

-

... More
Consumption of Stones

-

-

-

... More
loading and unloading

2148.62

237594

110.58

... More
Haulage

108720.17

456624

4.2

... More
Section C

-

-

-

... More
Construction of Hill Side Drain

-

-

-

... More
Construction of hill side drain with P.C.C M10 (1:3:6) in accordance with the requirement of specifications true to lines and grades. Dimesions and other particulars as per drawing and Technical Specification Clause 1606.1

2496

1651478

661.65

... More
Providing & laying hand packed stone soling of specified thickness with clean hard selected stones including hammer dressing of stone for laying as per required level and camber including packing with broken stones obtained from hammer dressing to fill the voids to give uniform surface as directed by the Engineer-in-Charge all complete.

280.8

182497

649.92

... More
Carriage of Stock Materials : (Lead 20 km).

-

-

-

... More
Consumption of Cement/steel/Bitumen/Emulsion:

-

-

-

... More
loading

87.36

8232

94.24

... More
Unloading

87.36

8232

94.24

... More
Haulage

2620.8

11007

4.2

... More
Carriage of Non-Stock Materials : (Lead 39 km).

-

-

-

... More
Consumption of Sand

-

-

-

... More
loading and unloading

167.73

10234

61.02

... More
Haulage

13082.94

54948

4.2

... More
Carriage of Non-Stock Materials : (Lead 35 km).

-

-

-

... More
Consumption of Stones

-

-

-

... More
loading and unloading

574.14

63488

110.58

... More
Haulage

44208.78

185676

4.2

... More
Section D (Road furnitures)

-

-

-

... More
Providing and Fixing 'Logo' of PMGSY Project

-

-

-

... More
Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1

2

22319

11159.88

... More
900 mm side octagonal

6

21254

3542.49

... More
600 mm side equilateral triangle

10

35424

3542.49



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.