Pradhan Mantri Gram Sadak Yojana Tender

View complete overview of Sikkim PMGSY Tender

Pradhan Mantri Gram Sadak Yojana - PMGSY Tender

Works
Eprocure
Opening Date11 Jan 2019
Closing Date17 Jan 2019
Tender Amount₹ 4,66,60,000 
Notes
Download

Costs

Summary

Construction of road.

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
By Mix in Place Method (Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401) for grading- I Material Granular Sub-base with Close Graded Material (Table:- 400-1)

668.25

-

1169.17

... More
Water Bound Macadam Base (Grading-II): Water Bound Macadam (Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with Smoothroller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density.) grading 2 as per technical specification clause 405

464.06

-

1626.49

... More
Water Bound Macadam Base (Grading-III): Water Bound Macadam (Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density.) grading 3as per technical specification clause 405

2066.63

-

1686.87

... More
Scarifying existing bituminous surface to a depth of 50 mm by mechanical means (Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres.)

25050

-

9.7

... More
Embankment Construction with Material Obtained from Borrow Pits (Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2)

2700

-

207.09

... More
Prime Coat: Prime coat (Providing and applying primer coat with bitumen emulsion (ss-1)on prepared surface of granular Base including clearing of road surface and spraying primer at the rate 1.2 to 1.5 kg/sqm using mechanical means as per technical specification clause 503 High Porosity

27555

-

79.94

... More
Tack Coat: Tack coat (Providing and applying tack coat with bitumen emulsion using emulsion (RS-1)pressure distributor at required rate 0.25to 0.30 kg/sqmon the prepared bituminous/granular surface cleaned with mechanical broom.)as per clause 503 Granular Surface Treated with Primer

27555

-

17.53

... More
Semi - Dense Bituminous Concrete (Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects)

1102.2

-

10570

... More
Seal Coat: Case-I I: Type B (I) Using Bitumen 60/70 grade Seal Coat (Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per technical clause 510

27555

-

87.63

... More
carrage of stock materials (115 km)

-

-

-

... More
loading

180.21

-

110.42

... More
unloading

180.21

-

100.12

... More
Haulage

20724.12

-

4.2

... More
carraige of stone chips and binding metarials

-

-

-

... More
Stone( Lead 25 km)

-

-

-

... More
loading

4725.39

-

73.72

... More
unloading

4725.39

-

36.86

... More
Haulage

259891.89

-

4.2

... More
Stone Chips (Lead 115km)

-

-

-

... More
loading

1587.17

-

73.72

... More
unloading

1587.17

-

36.86

... More
Haulage

401553.5

-

4.2

... More
carraige of sand (lead 25 km)

-

-

-

... More
loading

165.33

-

36.86

... More
unloading

165.33

-

24.16

... More
Haulage

6613.2

-

4.2

... More
PROTECTIVE WORK

-

-

-

... More
Earth work in excavation for structure as per drawing for ordinary soil and ordinary rock(without blasting) upto 3 m depth as per specification 300

-

-

-

... More
soil 60%

752.71

-

210.35

... More
Ordinary rock 40%

501.81

-

262.93

... More
Providing and laying. Random Rubble Stone masonary in (1:5cement mortar) as per technical specification clause 700

1558.12

-

2886.02

... More
Providing and laying Hand Packed wall with clean hard selected stone including centering aligning and slopes/curves etc. complete as per the direction of Engineer in Charg

-

-

-

... More
Providing and laying of boulder apron laid in wire crates with 4mm dia GI Wire conforming to IS : 280 and IS : 4826 in 100mm x 100mm mesh (woven diagonally) ncluding 10 percent extra for laps and joints with stone boulders weighing not less than 25 kg each as per drawing and technical specification clause 1301

190.32

-

1885.37

... More
Providing and laying hand packed stone filling behind abutment, wingwall and retaining wall complete as per drawing and technical specification clause 1204.3.8

630.5

-

487.58

... More
Parapets of 45 cm top to 60 cm bottom and 60 cm height

70

-

1474.94

... More
Providing & laying Plum concrete in 1:2:4 c.c. (1 cement, 2 coarse sand, 4 clean hard grade stone chips of 20 mm to 25 mm nominal guage) with 50% clean hard stone of sizes not exceeding 15 cm including shuttering, compacting and curing complete.

413.37

-

3441.42

... More
Slip clearance in mixed soil and throwing of spoils to lead of 30 m and lift of 1.50 m complete. Payment shall be done after actual measurement and as per the approved rate .

-

-

-

... More
carrage of stock materials (55 km)

-

-

-

... More
loading

170.13

-

94.24

... More
unloading

170.13

-

94.24

... More
Haulage

9357.29

-

4.2

... More
carraige of sand (lead 25 km)

-

-

-

... More
loading

373.09

-

36.86

... More
unloading

373.09

-

24.16

... More
Haulage

14923.6

-

4.2

... More
carraige of stone (lead 25 km)

-

-

-

... More
loading

2954.56

-

73.72

... More
unloading

2954.56

-

36.86

... More
Haulage

162500.8

-

4.2

... More
SIDE DRAIN AND C.D

-

-

-

... More
Construction of Hill Side Drain

6680

-

1259.9

... More
Providing & laying hand packed stone soling of specified thickness with clean hard selected stones including hammer dressing of stone for laying as per required level and camber including packing with broken stones obtained from hammer dressing to fill the voids to give uniform surface as directed by the Engineer-in-Charge all complete but excluding carriage and consolidation using:

981.96

-

560.28

... More
Earth work in excavation for structure as per drawing for ordinary soil and ordinary rock(without blasting) upto 3 m depth as per specification 300

-

-

-

... More
soil 60%

1728.25

-

210.35

... More
Ordinary rock 40%

1152.17

-

262.93

... More
Providing and Laying reinforced Cement Concrete Pipe NP4 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2

48

-

5479.32

... More
carrage of stock materials (55 km)

-

-

-

... More
loading

387.3

-

94.24

... More
unloading

387.3

-

94.24

... More
Haulage

21301.72

-

4.2

... More
carraige of sand (lead 35 km)

-

-

-

... More
loading

694.72

-

73.72

... More
unloading

694.72

-

36.86

... More
Haulage

38904.32

-

4.2

... More
carraige of stone (lead 35 km)

-

-

-

... More
loading

3865.38

-

73.72

... More
unloading

3865.38

-

36.86

... More
Haulage

297634.26

-

4.2

... More
ROAD FURNITURE AND OTHERS

1

-

102076



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.