Rural Management And Development Department Tender

View complete overview of Sikkim Rural Management And Development Department Tender

Rural Management And Development Department Tender

Works
Eprocure
Opening Date11 Jan 2019
Closing Date17 Jan 2019
Tender Amount₹ 1,45,78,000 
Notes
Download

Costs

Summary

Tender for Rcr From T21-jorethang Namchi Road.

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Restoration of Rain Cuts (Restoration of rain cuts with soil, moorum, gravel or a mixture of these, clearing the loose soil, benching for 300 mm width, laying fresh material in layers not exceeding 250 mm and compacting with plate compactor or power rammers to restore the original alignment, levels and slopes)

240

28464

118.6

... More
Water Bound Macadam Base (Grade III)

-

-

-

... More
Providing laying, spreading & compacting stone aggre-

-

-

-

... More
gates of specific sizes to water bound madadam speci-

-

-

-

... More
fication i/c spreading in uniform thickness, hand pack

-

-

-

... More
rolling with smooth wheel roller 80-100 kN static roller

-

-

-

... More
in stages to proper grade and camber applying & bro-

-

-

-

... More
mming, water & compacting to the required density

-

-

-

... More
Grading II as per Technical Specification Clause 405

576.2

971974

1686.87

... More
Prime Coat :

-

-

-

... More
Providing & applying primer coat with Bitumen emulsion

-

-

-

... More
(SS-1) on prepared surface of granular base i/c clean

-

-

-

... More
of road surface and spraying primer at the rate of 0.90-

-

-

-

... More
1.2kg/sqm using mechnical means as per Technical

-

-

-

... More
Specification clause 502.

7686

479145

62.34

... More
Tack Coat:

-

-

-

... More
Pro. & applying tack coat with Bitumen emulsion(RS-1)

-

-

-

... More
using emulsion distributor at the rate of 0.25 to 0.30km

-

-

-

... More
per sqm on the prepared granular clause 503.

7686

134735

17.53

... More
20mm thick open graded premix carpet usingBituminous

-

-

-

... More
Binder ;

-

-

-

... More
Case I : By Mannual Means

-

-

-

... More
1. Bituemen (S-90)

-

-

-

... More
Providing & Laying & rolling of open graded premix carpet of 20mm thickness composed 13.2mm to 5.6mm aggregates either using penetration grade bitumen or emulsion to required lines laying & rolling with a three wheel 80 to 100kN static roller capacity finished to 100 Kn static roller capactity required seal coat of type B as per Tech. Clause 508

7686

1413071

183.85

... More
Seat Coat:

-

-

-

... More
Case : I Type B

-

-

-

... More
(1) Bitumen (S-90)

-

-

-

... More
Providing & laying seal coat sealing the voids in a

-

-

-

... More
bituminous surface laid to the specified level, grade &

-

-

-

... More
cross falling using Type A as per tech. Clause 510

7686

473303

61.58

... More
Carriage of Stock Materials : (Lead 100Km)

-

-

-

... More
Consumption of Cement/Steel/Bitumen/Emulsion

-

-

-

... More
Loading

28.9

3191

110.42

... More
Unloading

28.9

2893

100.12

... More
Haulage

2889.9

12137

4.2

... More
Carriage of stone boulder(Lead 20Km)

-

-

-

... More
Consumption of Stone

-

-

-

... More
Loading

881.59

32495

36.86

... More
Unloading

881.59

21299

24.16

... More
Haulage

38790

162918

4.2

... More
Carriage of stone chips(Lead 100Km)

-

-

-

... More
Consumption of Stone Chips & Dust

-

-

-

... More
Loading

207.52

7649

36.86

... More
Unloading

207.52

5013

24.16

... More
Haulage

49804.8

209180

4.2

... More
Carriage of sand(Lead 20Km)

-

-

-

... More
Loading

69.17

2549

36.86

... More
Unloading

69.17

1671

24.16

... More
Haulage

2545.46

10690

4.2

... More
Section B

-

-

-

... More
Earthwork in excavation for structures as per drawing

-

-

-

... More
i/c setting out, const. of shoring & bracing, removal of

-

-

-

... More
stumps & other deleterious materials & disposal upto

-

-

-

... More
lead of 50m necessary arrangement for dewatering shall

-

-

-

... More
be kept if required clause 305.1)

-

-

-

629

132310

210.35

... More
Ordinary Rock

419.36

110262

262.93

... More
Retaining wall and Brest Wall:

-

-

-

... More
Intermediate band of Random Rubble masonary with

-

-

-

... More
cement mortar (1:5),1(cement):5(sand)

2016.35

5819226

2886.02

... More
Providing and Laying Plain cement concrete in 1:2:4 mix including curing,compacting etc all complete.

67.24

333009

4952.55

... More
Providing & laying parapet of standard size on 1:2:4 mix plum cement concrete and plastering with cement mortar of 12mm thick all complete.(60cm height, 45cm top and 60cm bottom)

100

147494

1474.94

... More
Providing & laying of Gabian wall in wire crates

-

-

-

... More
with 4mm dia GI wire conforming to IS:280 & IS:4826 in

-

-

-

... More
100mm x 100mm mesh i/c 10% extra for laps & joints

-

-

-

... More
laid with hard durable regular in shape stone boulders

-

-

-

... More
weighing not less than 25kg each Clause 1301

150

267916

1786.11

... More
Backfilling behind abutment, wing wall & return wall complete as per drawing with well packed graded filter to a thickness not less than 600mm with smaller size soil & bigger size towards the wall & provided over the entire surface, wing or return wall to the full height as per Clause 1204.3.8)

182.7

89080

487.58

... More
Carriage of Stock materials : (Lead 20Km)

-

-

-

... More
Consumption of Cement/Steel/Bitumen/Emulsion

-

-

-

... More
Loading

252.88

23831

94.24

... More
Unloading

252.88

23831

94.24

... More
Haulage

5057.68

21242

4.2

... More
Carriage of Non-Stock materials(Lead 20Km)

-

-

-

... More
Consumption of Sand

-

-

-

... More
Loading

724.99

26723

36.86

... More
Unloading

724.99

17515

24.16

... More
Haulage

26679.78

112055

4.2

... More
Carriage of Non-Stock materials(Lead 20Km)

-

-

-

... More
Consumption of Stones

-

-

-

... More
Loading

2425.39

178800

73.72

... More
Unloading

2425.39

89400

36.86

... More
Haulage

106717.33

448212

4.2

... More
Section C

-

-

-

... More
Construction of Hill Side Drain

-

-

-

... More
construction of RCC cross drain of internal dimension (1.00mx1.00m) annexure enclosed.

8

964232

120529

... More
Const. of hill side drain with PCCM 10(1:3:6) in accordance with the requirement of specification true to line and grades. Clause 1606.1

1994

1319330

661.65

... More
Providing & laying hand packed stone soling of thickness

-

-

-

... More
with clean hard stones i/c hammer dressing of stone for

-

-

-

... More
laying as per required level and camber

203.39

113955

560.28

... More
Carriage of Stock materials : (Lead 20 Km)

-

-

-

... More
Consumption of Cement

-

-

-

... More
Loading

67.78

6387

94.24

... More
Unloading

67.78

6387

94.24

... More
Haulage

1355.52

5693

4.2

... More
Carriage of Non-Stock materials(Lead 20Km)

-

-

-

... More
Consumption of Sand

-

-

-

... More
Loading

144.79

5336

36.86

... More
Unloading

144.79

3498

24.16

... More
Haulage

5328.27

22378

4.2

... More
Carriage of Non-Stock materials(Lead 20Km)

-

-

-

... More
Consumption of Stones

-

-

-

... More
Loading

408.87

30141

73.72

... More
Unloading

408.87

15070

36.86

... More
Haulage

17990.28

75559

4.2

... More
Section D(Road Furniture)

-

-

-

... More
Reinforced cement concrete M15 kilometer stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc. as per Drawing and Technical Specification Clause 1703

-

-

-

... More
5km stone

-

-

-

... More
Ordinary Kilometer Stone (precast/ cast-in-situ)

3

4006

1335.58

... More
Reinforced cement concrete M15 kilometer stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc. as per Drawing and Technical Specification Clause 1703

-

-

-

... More
200 M Stone (precast/ cast-in-situ)

8

3214

401.82

... More
Providing and fixing 'Logo' of PMGSY project

2

12509

6254.77

... More
Providing & fixing of retro-reflectorised cautionary, man-

-

-

-

... More
datory & infomatory sign as per IRC:67 made of encap-

-

-

-

... More
sulated lens type reflective sheeting vide clause 1701.2.3

-

-

-

... More
fixed over aluminium sheeting 1.5mm thick surpported

-

-

-

... More
on a mild steel angle iron post 75mmx75mmx6mm fix

-

-

-

... More
to the gound by means of properly designed foundation

-

-

-

... More
with M15 grade c.c. 450mmx450mmx600mm,600mm

-

-

-

... More
below ground level as per drawing Clause 801

-

-

-

... More
900mm equilateral triangle

5

7597

1519.55

... More
600mm equilateral triangle

5

7480

1496.1



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.