Roads And Bridges Department Tender

View complete overview of Sikkim Roads And Bridges Department Tender

Roads And Bridges Department Tender

Works
Eprocure
Opening Date11 Nov 2019
Closing Date17 Dec 2019
Tender Amount₹ 7,80,68,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Provision for throwing of spoils obtain from hill cutting within 5 km radius from work site to dumping area. Carriage on Un-Surfaced road For 5 Km

1823.076

-

-

... More
PAVEMENT WORKS

-

-

-

... More
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared.

1200

-

-

... More
Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead up to 1000 meters.

646.75

-

-

... More
Granular Sub-base with Close Graded Material By Mix in Place Method (Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401) Using Screening Type-A (13.2mm Agg.) for grading- I Material

174

-

-

... More
Water Bound Macadam (Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density.)

-

-

-

... More
Grading-II Using Screening Type-A (13.2mm Agg.)

82.5

-

-

... More
Grading-III Using Screening Type-B (11.2mm Agg.)

82.5

-

-

... More
BITUMINOUS WORKS

-

-

-

... More
Prime coat (Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate shown in 500-1 using mechanical means.) Low Porosity

1100

-

-

... More
Tack coat (Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at required rate on the prepared bituminous/granular surface cleaned with mechanical broom.) Granular Surface Treated with Primer

1100

-

-

... More
Open - Graded Premix Surfacing (Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or cut-back or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades.) Mechanical method using Penetration grade Bitumen and HMP of appropriate capacity not less than 75 tonnes/hour.

1100

-

-

... More
Seal Coat (Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A and B seal coats) Using Modified Bitumen, Case - II : Type B (Providing and laying of premix sand seal coat with HMP of appropriate capacity not less than 75 tonnes/ hours using crushed stone chipping 6.7 mm size and penetration bitumen of suitable grade.)

1100

-

-

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading Bitumin/Emulsion For 50 Km

-

-

-

... More
Carriage on Surface road

3.4

-

-

... More
Loading & Unloading

3.4

-

-

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading. Stone Chips/aggregates For 50 Km

-

-

-

... More
Carriage on Surface road

351.64

-

-

... More
Loading & Unloading

191.11

-

-

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading. Stone For 15 Km

-

-

-

... More
Carriage on Surface road

902.42

-

-

... More
Loading & Unloading

410.19

-

-

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading. Binding Material For 15 Km

-

-

-

... More
Carriage on Surface road

24.288

-

-

... More
Loading & Unloading

13.2

-

-

... More
STEEL BRIDGE (55.0 Mtr. Span)

-

-

-

... More
ABUTMENT

-

-

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) Manual Means Hard rock (requiring blasting)

1224.3

-

-

... More
Providing and laying hand packed stone soling with clean hard selected stones, all complete

23.1

-

-

... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)

22.3

-

-

... More
Reinforced cement concrete in M35 FOUNDATION complete as per drawing and technical specifications ( using Concrete mixture machine)

220.32

-

-

... More
Furnishing and Placing Reinforced cement concrete in Sub-Structure M-30 as per drawing and Technical Specification ( using Concrete mixture machine)

165.53

-

-

... More
Provision for Bearing (PTFE sliding plate bearing of 80 Mt)

10

-

-

... More
Drainage Spouts complete as per drawing and Technical specification

20

-

-

... More
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications

28.64

-

-

... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications

16.55

-

-

... More
Providing 40mm expansion joint Compression Seal Joint (Providing and laying of compression seal joint consisting of steel armored nosing at two edges of the joint gap suitably anchored to the deck concrete and a preformed chloroprene elastomer or closed cell foam joint sealer compressed and fixed into the joint gap with special adhesive binder to cater for a horizontal movement upto 40 mm and vertical movement of 3 mm.)

17

-

-

... More
Providing and laying hand packed stone filling with clean hard selected stones and mixed filling i/c consolidation by ramming etc., all complete.

-

-

-

... More
(a) Mixed Filling

15.48

-

-

... More
(b) Stone Filling

36.12

-

-

... More
Back filling behind abutment , wing wall and return wall with selected imporied granuller material (stone filling of approved quality, complete as per drawing and technical specification.

315

-

-

... More
Providing weep holes in abutments,wingwall and return wall etc complete as per drawing and technical specification.

120

-

-

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading

-

-

-

... More
Loading & Unloading For 50 Km

167.185

-

-

... More
Carriage on Surface road

167.185

-

-

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading of SAND

-

-

-

... More
Loading & Unloading For 50 Km

183.67

-

-

... More
Carriage on Surface road

337.946

-

-

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading of STONE CHIPS

-

-

-

... More
Loading & Unloading For 50 Km

367.332

-

-

... More
Carriage on Surface road

686.911

-

-

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading of STONE For 50 Km

-

-

-

... More
Loading & Unloading

52.65

-

-

... More
Carriage on Surface road

96.87

-

-

... More
DECKING

-

-

-

... More
Providing and laying reinforcement cement concrete in M35 including shuttering, compacting and curing all complete.

123.34

-

-

... More
Supplying bending and binding in position tor steel including straightening, cutting bending and placing in position i/c binding wire all complete.

160.34

-

-

... More
Providing and laying cement mortar in 1:1 (1 cement and 1 Coarse sand) mix including curing etc. all complete: Wearing coat:

28.24

-

-

... More
Providing and laying 12mm thick cement plaster of 1:3 mix in single coat including finishing even and smooth surface and curing, all complete.

88

-

-

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading For 50 Km

-

-

-

... More
Loading & Unloading

144.951

-

-

... More
Carriage on Surface road

144.951

-

-

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading of SAND For 50 Km

-

-

-

... More
Loading & Unloading

95.103

-

-

... More
Carriage on Surface road

174.99

-

-

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading of STONE CHIPS For 50 Km

-

-

-

... More
Loading & Unloading

111.006

-

-

... More
Carriage on Surface road

207.581

-

-

... More
RIVER TRAINING WORK

-

-

-

... More
Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.

1860

-

-

... More
Providing and laying. coarse Rubble Stone Masonry in 1:4:8 c.c. ( 1 cement, 4 sand, 8 clean hard graded stone chips of size 40mm and down) including bond stone, through stone of size 150mm x 150mm x 450mm manufactured in 1:4:8 (1cement, 4 clean coarse sand, 8 clean hard stone aggregate of size 40 mm and down), and curing etc, complete as per the direction of Engineer in Charge excluding the cost of carriage of materials.

1993.13

-

-

... More
Gabian Structure for Retaining Earth (Providing and construction of a gabain structure for retaining earth with segments of wire crates of size 7 m x 3 m x 0.6 m each divided into 1.5 m compartments by cross netting, made from 4 mm galvanised steel wire @ 32 kg per 10sqm having minimum tensile strength of 300 Mpa conforming to IS:280 and galvanizing coating conforming to IS:4826, woven into mesh with double twist, mesh size not exceeding 100 x 100 mm, filled with boulders with least dimension of 200 mm, all loose ends to be tied with 4 mm galvanised steel wire.

3900

-

-

... More
Providing and Laying Plum concrete in 1:2:4 c.c. (1cement, 2coarse sand, 4clean hard graded stone chips of 20 mm down nominal gauge) with 50% clean hard stone of sizes not exceeding 15cm including shuttering, compacting and curing complete, as per the direction of Engineer in Charge.

1055.91

-

-

... More
Provision for temporary road diversion for the period of construction of Bridge over Kateng Kali Khola, Namthang.

1

-

-

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading For 50 Km

-

-

-

... More
Loading & Unloading

295.52

-

-

... More
Carriage on Surface road

295.52

-

-

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading of SAND For 50 Km

-

-

-

... More
Loading & Unloading

582.27

-

-

... More
Carriage on Surface road

1071.38

-

-

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading of STONE CHIPS For 50 Km

-

-

-

... More
Loading & Unloading

1127.61

-

-

... More
Carriage on Surface road

2108.63

-

-

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading of STONE For 50 Km

-

-

-

... More
Loading & Unloading

6297.18

-

-

... More
Carriage on Surface road

13853.79

-

-

... More
PROTECTIVE WORK

-

-

-

... More
Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.

1245.6

-

-

... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)

960

-

-

... More
Plain/Reinforced cement concrete, in well foundation complete as per drawing and technical specification (M 25)

270

-

-

... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications

27

-

-

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading For 50 Km

-

-

-

... More
Loading & Unloading

775.5

-

-

... More
Carriage on Surface road

775.5

-

-

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading of SAND For 50 Km

-

-

-

... More
Loading & Unloading

46.98

-

-

... More
Carriage on Surface road

86.443

-

-

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading of STONE CHIPS For 50 Km

-

-

-

... More
Loading & Unloading

89.1

-

-

... More
Carriage on Surface road

163.944

-

-

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading of STONE For 50 Km

-

-

-

... More
Loading & Unloading

226.8

-

-

... More
Carriage on Surface road

499

-

-

... More
STEEL PARTS

-

-

-

... More
Fabrication & Supply of Standard 55 Mtr. Clear Span Steel Bridge - Double Lane of 70 R loading (Width 8.5 mtr. and Carriage Way 7.5 mtr suitable for RCC Decking) over Kateng Kali Khola, Namthang in South Sikkim including Erection / Launching in position Steel Bridge. Scaffolding / Loading - Unloading , Carriage up to Work site, Painting of Bridge and Installation of Bearing . All complete.

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.