Public Health Engineering Department Tender

View complete overview of Sikkim PHED Tender

Public Health Engineering Department - PHED Tender

Works
Eprocure
Opening Date19 Apr 2021
Closing Date22 Jun 2021
Tender Amount₹ 18,09,93,842 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
P/L plum concrete in 1:2:4 cc mix with 50% clean hard selected stone of size not exceeding 15cm i/c shuttering, compacting and curing etc all complete.SOR 2012 12.1

234.15

-

3441.42

... More
Providing and laying hand packed stone soling with clean hard selected stones all complete.SOR 2012 5.5.1

15.56

-

560.28

... More
Providing and laying cement concrete M – 15 grade (1:2:4 mix) i/c centering, shuttering, curing etc, all complete.SOR 2012 8.1c

22.11

-

4608.12

... More
Providing and laying Reinforced cement concrete in M – 20 grade (1:1-1/2 :3 mix) in all RCC works i/c centering, shuttering, curing etc, all complete.SOR 2012 8.1.2

46.44

-

5495.67

... More
Providing, fixing and removing form work for casting RCC items as indicated above:SOR 2012 14.1.1

105.72

-

415.46

... More
Supply, bending and placing in position for Tor steel reinforcement in all RCC works including the cost of bending wire all complete. SOR 2012 18.2

6037.2

-

67.28

... More
P/l 12 mm thick cement plaster in 1:3 mix cement mortar (1 Cement, 2 clean coarse sand) I/c curing etc. all complete. SOR 2012 9.1.1

47.4

-

132.3

... More
Supplying/ fittings and fixing of trash rack with 65 X 65 X 8mm angle iron all complete. SOR 2012 20.3

1280

-

83.43

... More
Gabian Structure for Retaining Earth (Providing and construction of a gabain structure for retaining earth with segments of wire crates of size 7 m x 3 m x 0.6 m each divided into 1.5 m compartments by cross netting, made from 4 mm galvanised steel wire @ 32 kg per 10sqm having minimum tensile strength of 300 Mpa conforming to IS:280 and galvanizing coating conforming to IS:4826, woven into mesh with double twist, mesh size not exceeding 100 x 100 mm, filled with boulders with least dimension of 200 mm, all loose ends to be tied with 4 mm galvanised steel wire SOR 2012 12.5

30.38

-

1786.11

... More
Manufacture, supply and delivery of DI D/F Sluice valves 150 mm dia (Soft seated) Resilient seated soft sealing gate valves (sluice valves) with body bonnet of ductile cast iron of grade GGG40/SG 400/12 or equivalent grade as per IS 3896 part 2 1985 and subsequent rev 150mm dia

4

-

23450

... More
Consumption of stock material

-

-

-

... More
Loading/Unloading/Stacking

69.54

-

153.58

... More
Cost of haulage

69.54

-

445.6

... More
Head Load

695.37

-

300.1

... More
Consumption of Non stock material (Sand)

-

-

-

... More
Loading /Unloading /Stacking

82.85

-

87

... More
Cost of haulage

165.7

-

139.25

... More
Head Load

82.85

-

778.63

... More
Consumption of Non stock material (Stone)

-

-

-

... More
Loading /Unloading /Stacking

341.94

-

87

... More
Cost of haulage

752.27

-

139.25

... More
Head Load

170.97

-

778.63

... More
ESTIMATE FOR LAND DEVELOPMENT AND PROVIDING PROTECTIVE WORK FOR CONSTRUCTION OF SEDIMENTATION TANK FOR GYALSHING WATER SUPPLY SCHEME FROM KUMBOO KHOLA IN WEST SIKKIM

-

-

-

... More
Hill Side cutting in mix soil i/c throwing of spoils for all leads and lifts all complete.

25.5

-

102.2

... More
Excavation in foundation trenches in mixed soil i/c throwing of spoils within 1.5 m lift and 30m lead from worksite.

155.11

-

164.74

... More
P/L coarse Rubble stone Masonry in 1:4: 8 C.C. (1 cement, 4 sand, 8 clean hard graded stone chips of size 40mm and down) including bond stone through stone of size 150mmx 150mm 450mm manufactured in 1:4:8 c.c. i/c curing etc. all complete

183.77

-

2766.09

... More
Consumption of stones.Locally available within 200 m radius

-

-

-

... More
Loading /Unloading /Stacking

207.66

-

87

... More
Cost of haulage

456.85

-

194.95

... More
Head Load

207.66

-

258.1

... More
Consumption of sand to work site.

-

-

-

... More
Loading /Unloading /Stacking

27.57

-

87

... More
Cost of haulage

55.14

-

222.8

... More
Head Load

27.57

-

258.1

... More
Comsumption of stock materials

-

-

-

... More
Loading /Unloading /Stacking

9.4

-

153.53

... More
Cost of haulage

9.4

-

334.2

... More
Head Load

94

-

12.78

... More
ESTIMATE FOR CONSTRUCTION OF SEDIMENTATION TANK FOR GYALSHING WATER SUPPLY SCHEME FROM KUMBOO KHOLA IN WEST SIKKIM

-

-

-

... More
Hill side cutting i/c throwing of spoils for all lead and lift complete (Provide PST 16.1 m x 5.5m x 3.3 m)

41.18

-

102.2

... More
Earth work excavation in foundation trenches in mixed soil i/c throwing of spoils within 1.5m lift and 30m lead from work site.

135.65

-

164.74

... More
Providing and laying hand packed stone soling with clean hard selected stones all complete.

21.55

-

560.28

... More
Providing and laying cement concrete M – 15 grade (1:2:4 mix) i/c centering, shuttering, curing etc, all complete.

38.4

-

4420.2

... More
Providing and laying Reinforced cement concrete in M – 20 grade (1:1-1/2 :3 mix) in all RCC works i/c centering, shuttering, curing etc, all complete.

129.97

-

5495.67

... More
Providing, fixing and removing form work for casting RCC items as indicated above:

1

-

285704

... More
Supply, bending and placing in position for Tor steel reinforcement in all RCC works including the cost of bending wire all complete.

16895.84

-

67.28

... More
P/l 12 mm thick cement plaster in 1:3 mix cement mortar (1 Cement, 2 clean coarse sand) I/c curing etc. all complete.

454.52

-

132.3

... More
Providing box drain of 45 cm x 30 cm internal dimensioned and side wall thickness of 23 cm and 30 cm with standard specification i/c providing and laying guard stones as per direction of Engineer in charge all complete.

75

-

1259.9

... More
Provision for construction of outlet chamber chamber in 1:2:4 RCC

2

-

60000

... More
Consumption of stock material all complete.

-

-

-

... More
Loading /Unloading /Stacking

84.51

-

153.58

... More
Cost of haulage

84.51

-

334.2

... More
Head Load

845.12

-

12.78

... More
Consumption of non-stock material Sand

-

-

-

... More
Loading /Unloading /Stacking

79.99

-

87

... More
Cost of haulage

159.98

-

222.8

... More
Head Load

79.99

-

258.1

... More
Consumption of non-stock material Stone

-

-

-

... More
Loading /Unloading /Stacking

161.43

-

87

... More
Cost of haulage

355.15

-

222.8

... More
Head Load

161.43

-

258.1

... More
ESTIMATE FOR LAYING OF PIPE FOR GYALSHING WATER SUPPLY SCHEME FROM KUMBOO IN WEST SIKKIM

-

-

-

... More
Provision for cutting and remaking of road surfaces etc. (to be paid as per actal measurement)

1000

-

1500

... More
Laying, fitting/fixing of D.I pipe as per design specification and direction of Engineer-in-Charge complete.

-

-

-

... More
For 150mm dia D.I. Pipe

34000

-

492.44

... More
For 150mm dia G.I. Pipe Excavation/ TRENCHING

7425

-

164.74

... More
Construction of RCC anchor block of size 0.6 x 0.6 x 0.6 dimension (Detail Analysis enclosed ) all complete

300

-

6800

... More
Construction of CC saddle block of size 0.6 x 0.6 x 0.6 dimension (Detail Analysis enclosed ) all complete

250

-

3600

... More
Construction of R.C.C. Piller (Detail Analysis enclosed ) all complete

200

-

16600

... More
Construction of RCC THRUST block of size 0.6 x 0.6 x 0.6 dimension (Detail Analysis enclosed ) all complete

180

-

6800

... More
Construction track line along the pipe alignment (foot path for pipe laying and to reach sedimentation tank and at source (Detail Analysis enclosed ) all complete

30000

-

796

... More
Provision for Jhora crossing ect all complete.

7

-

99120

... More
Provision for construction of bye pass chamber at several places all complete.

22

-

60000

... More
Consumption of stock materials from stores to the work site all complete

-

-

-

... More
Loading/Unloading/Stacking

1118

-

153.58

... More
Cost of Haulage 80 km

1118

-

445.6

... More
Head Load 4100m

11180

-

300.37

... More
Consumption of non-stock materials (Sand) from qurry to work site all complete.

-

-

-

... More
Loading/Unloading/Stacking

2161.8

-

87

... More
Cost of Haulage 25 km

4323.6

-

139.25

... More
Head Load 4100m

2161.8

-

2730.61

... More
Consumption of non-stock materials (Stone) from qurry to work site all complete.

-

-

-

... More
Loading/Unloading/Stacking

9441.4

-

87

... More
Cost of Haulage 25 km

20771.08

-

139.25

... More
Head Load 4100m

9441.4

-

1429.29

... More
Carriage of pipes and accessories from stores to the work site by head load etc complete.

1

-

100000

... More
From Utterey to Worksite

3093

-

3000

... More
From Sardung to Worksite

1548

-

2500

... More
From Pelling to Worksite

1548

-

2000

... More
ESTIMATE FOR PROVIDING PROTECTIVE WORK FOR PIPES FOR THE WORK GYALSHING WATER SUPPLY SCHEME IN WEST SIKKIM

-

-

-

... More
Hill cutting in mix soil i/c throwing of spoils for all leads and lifts all complete.

10046.03

-

102.2

... More
Excavation in foundation trenches in mixed soil i/c throwing of spoils within 1.5 m lift and 30m lead from worksite.

3547.24

-

164.74

... More
P/L plum concrete in 1:2:4 cc mix with 50% clean hard selected stone of size not exceeding 15cm i/c shuttering, compacting and curing etc all complete.

927.43

-

3441.42

... More
P/L coarse Rubble stone Masonry in 1:4: 8 C.C. (1 cement, 4 sand, 8 clean hard graded stone chips of size 40mm and down) including bond stone through stone of size 150mmx 150mm 450mm manufactured in 1:4:8 c.c. i/c curing etc. all complete

2334.36

-

2766.09

... More
P/L hand packed stone filling with clean hard selected stone all complete.

294.3

-

359.6

... More
Consumption of stones

-

-

-

... More
Loading /Unloading /Stacking

3794.76

-

87

... More
Cost of haulage @5.57/tonne/km

8348.47

-

139.25

... More
Head. load

3794.76

-

778.63

... More
Consumption of SAND

-

-

-

... More
Loading /Unloading /Stacking

613

-

87

... More
Cost of haulage @5.57/tonne/km

1348.6

-

139.25

... More
H. load

613

-

1429.29

... More
Consumption of STOCK MATERIALS

-

-

-

... More
Loading /Unloading /Stacking

295.6

-

153.53

... More
Cost of haulage @5.57/tonne/km

295.6

-

445.6

... More
H. load

2956

-

79.15

... More
ESTIMATE FOR LAYING OF PIPE FOR GYALSHING WATER SUPPLY SCHEME FROM KUMBOO KHOLA IN WEST SIKKIM

-

-

-

... More
Provision for cutting and remaking of road surfaces etc. (to be paid as per actal measurement)

200

-

500

... More
Laying, fitting/fixing of GI pipe as per design specification and direction of Engineer-in-Charge complete.

-

-

-

... More
For 100mm dia Pipe

500

-

342.61

... More
For 100mm dia Pipe Excavation/ TRENCHING

90

-

164.74

... More
Construction of RCC anchor block of size 0.6 x 0.6 x 0.6 dimension (Detail Analysis enclosed ) all complete

20

-

6800

... More
Construction of CC saddle block of size 0.6 x 0.6 x 0.6 dimension (Detail Analysis enclosed ) all complete

25

-

3600

... More
Construction of R.C.C. Piller (Detail Analysis enclosed ) all complete

4

-

16600

... More
Construction of RCC THRUST block of size 0.6 x 0.6 x 0.6 dimension (Detail Analysis enclosed ) all complete

20

-

6800

... More
Construction track line along the pipe alignment (foot path for pipe laying and to reach sedimentation tank and at source (Detail Analysis enclosed ) all complete

100

-

796

... More
Provision for Jhora crossing ect all complete.

1

-

50000

... More
Provision for construction of bye pass chamber at several places all complete.

1

-

60000

... More
Consumption of stock materials from stores to the work site all complete.

-

-

-

... More
Loading/Unloading/Stacking

16.6

-

153.58

... More
Cost of Haulage 60 km

16.6

-

334.2

... More
H. Load 200m

166

-

12.78

... More
Consumption of non-stock materials (Sand) from qurry to work site all complete.

-

-

-

... More
Loading/Unloading/Stacking

22.74

-

87

... More
Cost of Haulage 40 km

45.48

-

222.8

... More
Head Load 200m

22.74

-

258.1

... More
Consumption of non-stock materials (Stone) from qurry to work site all complete.

-

-

-

... More
Loading/Unloading/Stacking

51.26

-

87

... More
Cost of Haulage 40 km

112.77

-

222.8

... More
Head Load 200m

51.26

-

258.1

... More
Carriage of pipes and accessories from stores to the work site by head load etc complete.

1

-

50000

... More
head load 200m

91

-

200

... More
ESTIMATE FOR PROVIDING PROTECTIVE WORK FOR PIPES FROM RESERVOIR TANK TO ZONAL 1 FOR THE WORK GYALSHING WATER SUPPLY SCHEME IN WEST SIKKIM

-

-

-

... More
Hill cutting in mix soil i/c throwing of spoils for all leads and lifts all complete.

375

-

102.2

... More
Excavation in foundation trenches in mixed soil i/c throwing of spoils within 1.5 m lift and 30m lead from worksite.

177.26

-

164.74

... More
P/L plum concrete in 1:2:4 cc mix with 50% clean hard selected stone of size not exceeding 15cm i/c shuttering, compacting and curing etc all complete.

139.08

-

3441.42

... More
P/L coarse Rubble stone Masonry in 1:4: 8 C.C. (1 cement, 4 sand, 8 clean hard graded stone chips of size 40mm and down) including bond stone through stone of size 150mmx 150mm 450mm manufactured in 1:4:8 c.c. i/c curing etc. all complete

96.69

-

2766.09

... More
P/L hand packed stone filling with clean hard selected stone all complete.

27

-

359.6

... More
Consumption of stones

-

-

-

... More
Loading /Unloading /Stacking

264.9

-

87

... More
Cost of haulage @5.57/tonne/km

582.78

-

222.8

... More
H. load

264.9

-

258.1

... More
Consumption of SAND

-

-

-

... More
Loading /Unloading /Stacking

47.83

-

87

... More
Cost of haulage @5.57/tonne/km

105.23

-

222.8

... More
H. load

47.83

-

258.1

... More
Consumption of STOCK MATERIALS

-

-

-

... More
Loading /Unloading /Stacking

28.3

-

153.53

... More
Cost of haulage @5.57/tonne/km

28.3

-

334.2

... More
H. load

283

-

258.1

... More
LAYING OF PIPE FROM RESERVIR TANK TO ZONAL TANK 2

-

-

-

... More
Provision for cutting and remaking of road surfaces etc. (to be paid as per actal measurement)

1200

-

200

... More
Laying, fitting/fixing of GI pipe as per design specification and direction of Engineer-in-Charge complete.

-

-

-

... More
For 80mm dia Pipe .

5100

-

216.73

... More
For 80mm dia Pipe Excavation/ TRENCHING

675

-

164.74

... More
Construction of RCC anchor block of size 0.6 x 0.6 x 0.6 dimension (Detail Analysis enclosed ) all complete

70

-

6800

... More
Construction of CC saddle block of size 0.6 x 0.6 x 0.6 dimension (Detail Analysis enclosed ) all complete

50

-

3600

... More
Construction of R.C.C. Piller (Detail Analysis enclosed ) all complete

10

-

16600

... More
Construction of RCC THRUST block of size 0.6 x 0.6 x 0.6 dimension (Detail Analysis enclosed ) all complete

30

-

6800

... More
Provision for Jhora crossing ect all complete.

1

-

50000

... More
Provision for construction of bye pass chamber at several places all complete.

10

-

60000

... More
Consumption of stock materials from stores to the work site all complete.

-

-

-

... More
Loading/Unloading/Stacking

39

-

153.58

... More
Cost of Haulage 60 km

39

-

334.2

... More
Head Load 200m

390

-

42.28

... More
Consumption of non-stock materials (Sand) from qurry to work site all complete.

-

-

-

... More
Loading/Unloading/Stacking

53.6

-

87

... More
Cost of Haulage 60 km

107.2

-

222.8

... More
Head Load 200m

53.6

-

258.1

... More
Consumption of non-stock materials (Stone) from qurry to work site all complete.

-

-

-

... More
Loading/Unloading/Stacking

120.9

-

87

... More
Cost of Haulage 60 km

265.98

-

222.8

... More
Head Load 200m

120.9

-

258.1

... More
Carriage of pipes and accessories from stores to the work site by head load etc complete.

1

-

100000

... More
Head Load

852

-

200

... More
ESTIMATE FOR PROVIDING PROTECTIVE WORK FOR PIPES FROM RESERVOIR TANK TO ZONAL TANK 2 FOR THE WORK GYALSHING WATER SUPPLY SCHEME IN WEST SIKKIM

-

-

-

... More
Hill cutting in mix soil i/c throwing of spoils for all leads and lifts all complete.

2190

-

102.2

... More
Excavation in foundation trenches in mixed soil i/c throwing of spoils within 1.5 m lift and 30m lead from worksite.

779.2

-

164.74

... More
P/L plum concrete in 1:2:4 cc mix with 50% clean hard selected stone of size not exceeding 15cm i/c shuttering, compacting and curing etc all complete.

672.72

-

3441.42

... More
P/L coarse Rubble stone Masonry in 1:4: 8 C.C. (1 cement, 4 sand, 8 clean hard graded stone chips of size 40mm and down) including bond stone through stone of size 150mmx 150mm 450mm manufactured in 1:4:8 c.c. i/c curing etc. all complete

375.03

-

2766.09

... More
P/L hand packed stone filling with clean hard selected stone all complete.

27

-

359.6

... More
Consumption of stones

-

-

-

... More
Loading /Unloading /Stacking

1087.34

-

87

... More
Cost of haulage @5.57/tonne/km

2392.15

-

222.8

... More
H. load

1087.34

-

258.1

... More
Consumption of SAND

-

-

-

... More
Loading /Unloading /Stacking

215.28

-

87

... More
Cost of haulage @5.57/tonne/km

473.62

-

222.8

... More
H. load

215.28

-

258.1

... More
Consumption of STOCK MATERIALS

-

-

-

... More
Loading /Unloading /Stacking

131.3

-

153.58

... More
Cost of haulage @5.57/tonne/km

131.3

-

334.2

... More
H. load

1313

-

12.78

... More
LAYING OF PIPE FROM RESERVIR TANK TO ZONAL TANK 3

-

-

-

... More
Provision for cutting and remaking of road surfaces etc. (to be paid as per actal measurement)

1000

-

200

... More
Laying, fitting/fixing of GI pipe as per design specification and direction of Engineer-in-Charge complete.

-

-

-

... More
For 80mm

6000

-

216.73

... More
For 80mm dia Pipe Excavation/ TRENCHING

900

-

164.74

... More
Construction of RCC anchor block of size 0.6 x 0.6 x 0.6 dimension (Detail Analysis enclosed ) all complete

60

-

6800

... More
Construction of CC saddle block of size 0.6 x 0.6 x 0.6 dimension (Detail Analysis enclosed ) all complete

30

-

3600

... More
Construction of R.C.C. Piller (Detail Analysis enclosed ) all complete

10

-

16600

... More
Construction of RCC THRUST block of size 0.6 x 0.6 x 0.6 dimension (Detail Analysis enclosed ) all complete

20

-

6800

... More
Provision for Jhora crossing ect all complete.

1

-

50000

... More
Provision for construction of bye pass chamber at several places all complete.

3

-

60000

... More
Consumption of stock materials from stores to the work site all complete.

-

-

-

... More
Loading/Unloading/Stacking

31

-

153.58

... More
Cost of Haulage 60 km

31

-

334.2

... More
Head Load 200m

310

-

42.28

... More
Consumption of non-stock materials (Sand) from qurry to work site all complete.

-

-

-

... More
Loading/Unloading/Stacking

43.2

-

87

... More
Cost of Haulage 60 km

86.4

-

222.8

... More
Head Load 200m

43.2

-

258.1

... More
Consumption of non-stock materials (Stone) from qurry to work site all complete.

-

-

-

... More
Loading/Unloading/Stacking

97.7

-

87

... More
Cost of Haulage 60 km

214.94

-

222.8

... More
Head Load 200m

97.7

-

258.1

... More
Carriage of pipes and accessories from stores to the work site by head load etc complete.

1

-

100000

... More
Head Load2600m

1002

-

200

... More
ESTIMATE FOR PROVIDING PROTECTIVE WORK FOR PIPES FROM RESERVOIR TANK TO ZONAL TANK 2 FOR THE WORK GYALSHING WATER SUPPLY SCHEME IN WEST SIKKIM

-

-

-

... More
Hill cutting in mix soil i/c throwing of spoils for all leads and lifts all complete.

1125

-

102.2

... More
Excavation in foundation trenches in mixed soil i/c throwing of spoils within 1.5 m lift and 30m lead from worksite.

358.23

-

164.74

... More
P/L coarse Rubble stone Masonry in 1:4: 8 C.C. (1 cement, 4 sand, 8 clean hard graded stone chips of size 40mm and down) including bond stone through stone of size 150mmx 150mm 450mm manufactured in 1:4:8 c.c. i/c curing etc. all complete

424.45

-

2766.09

... More
P/L hand packed stone filling with clean hard selected stone all complete.

27

-

359.6

... More
Consumption of stones

-

-

-

... More
Loading /Unloading /Stacking

508.1

-

87

... More
Cost of haulage @5.57/tonne/km

1117.82

-

222.8

... More
H. load

508.1

-

258.1

... More
Consumption of SAND

-

-

-

... More
Loading /Unloading /Stacking

73.85

-

87

... More
Cost of haulage @5.57/tonne/km

162.47

-

222.8

... More
H. load

73.85

-

258.1

... More
Consumption of STOCK MATERIALS

-

-

-

... More
Loading /Unloading /Stacking

26.8

-

153.53

... More
Cost of haulage @5.57/tonne/km

26.8

-

334.2

... More
H. load

268

-

12.78

... More
Laying of pipe line from Reservoir tank to Zonal Tank 5

-

-

-

... More
Provision for cutting and remaking of road surfaces etc. (to be paid as per actal measurement)

1000

-

200

... More
Laying, fitting/fixing of pipe as per design specification and direction of Engineer-in-Charge complete.

-

-

-

... More
For 100mm dia

6000

-

304.05

... More
For 100mm dia Pipe Excavation/ TRENCHING

1350

-

164.74

... More
Construction of RCC anchor block of size 0.6 x 0.6 x 0.6 dimension (Detail Analysis enclosed ) all complete

80

-

6800

... More
Construction of CC saddle block of size 0.6 x 0.6 x 0.6 dimension (Detail Analysis enclosed ) all complete

60

-

3600

... More
Construction of R.C.C. Piller (Detail Analysis enclosed ) all complete

10

-

16600

... More
Construction of RCC THRUST block of size 0.6 x 0.6 x 0.6 dimension (Detail Analysis enclosed ) all complete

60

-

6800

... More
Construction track line along the pipe alignment (foot path for pipe laying and to reach sedimentation tank and at source (Detail Analysis enclosed ) all complete

1000

-

796

... More
Provision for Jhora crossing ect all complete.

2

-

100000

... More
Provision for construction of bye pass chamber at several places all complete.

10

-

60000

... More
Consumption of stock materials from stores to the work site all complete.

-

-

-

... More
Loading/Unloading/Stacking

49

-

153.58

... More
Cost of Haulage 60 km

49

-

334.2

... More
H. Load 200m

490

-

12.78

... More
Consumption of non-stock materials (Sand) from qurry to work site all complete.

-

-

-

... More
Loading/Unloading/Stacking

66.6

-

87

... More
Cost of Haulage 60 km

133.2

-

222.8

... More
H. Load 200m

66.6

-

258.1

... More
Consumption of non-stock materials (Stone) from qurry to work site all complete.

-

-

-

... More
Loading/Unloading/Stacking

149.9

-

87

... More
Cost of Haulage 60 km

329.78

-

222.8

... More
H. Load 200m

149.9

-

258.1

... More
Carriage of SFMC PPR pipes and accessories from stores to the work site by head load etc complete.

1

-

50000

... More
Head Load 200m

1091

-

100

... More
ESTIMATE FOR PROVIDING PROTECTIVE WORK FOR PIPES FROM RESERVOIR TANK TO ZONAL 5 FOR THE WORK GYALSHING WATER SUPPLY SCHEME IN WEST SIKKIM

-

-

-

... More
Hill cutting in mix soil i/c throwing of spoils for all leads and lifts all complete.

2178

-

102.2

... More
Excavation in foundation trenches in mixed soil i/c throwing of spoils within 1.5 m lift and 30m lead from worksite.

332.65

-

164.74

... More
P/L plum concrete in 1:2:4 cc mix with 50% clean hard selected stone of size not exceeding 15cm i/c shuttering, compacting and curing etc all complete.

278.15

-

3441.42

... More
P/L coarse Rubble stone Masonry in 1:4: 8 C.C. (1 cement, 4 sand, 8 clean hard graded stone chips of size 40mm and down) including bond stone through stone of size 150mmx 150mm 450mm manufactured in 1:4:8 c.c. i/c curing etc. all complete

167.57

-

2766.09

... More
P/L hand packed stone filling with clean hard selected stone all complete.

27

-

359.6

... More
Consumption of stones

-

-

-

... More
Loading /Unloading /Stacking

477.34

-

87

... More
Cost of haulage @5.57/tonne/km

1050.15

-

222.8

... More
H. load

477.34

-

258.1

... More
Consumption of SAND

-

-

-

... More
Loading /Unloading /Stacking

91.19

-

87

... More
Cost of haulage @5.57/tonne/km

200.62

-

222.8

... More
H. load

91.19

-

258.1

... More
Consumption of STOCK MATERIALS

-

-

-

... More
Loading /Unloading /Stacking

55.1

-

153.53

... More
Cost of haulage @5.57/tonne/km

55.1

-

334.2

... More
H. load

551

-

258.1

... More
ESTIMATE FOR LAND DEVELOPMENT AND PROVIDING PROTECTIVE WORK FOR CONSTRUCTION OF RESERVOIR TANK FOR GYALSHING WATER SUPPLY SCHEME IN WEST SIKKIM

-

-

-

... More
Hill Side cutting in mix soil i/c throwing of spoils for all leads and lifts all complete.

42

-

102.2

... More
Excavation in foundation trenches in mixed soil i/c throwing of spoils within 1.5 m lift and 30m lead from worksite.

139.58

-

164.74

... More
P/L coarse Rubble stone Masonry in 1:4: 8 C.C. (1 cement, 4 sand, 8 clean hard graded stone chips of size 40mm and down) including bond stone through stone of size 150mmx 150mm 450mm manufactured in 1:4:8 c.c. i/c curing etc. all complete

165.34

-

2766.09

... More
Consumption of stones.Locally available within 200 m radius

-

-

-

... More
Loading /Unloading /Stacking

186.84

-

87

... More
Cost of haulage @5.57/tonne/km

411.05

-

222.8

... More
H. load

186.84

-

258.1

... More
Consumption of sand to work site.

-

-

-

... More
Loading /Unloading /Stacking

24.8

-

87

... More
Cost of haulage @5.57/tonne/km

54.56

-

222.8

... More
H. load

24.8

-

258.1

... More
Comsumption of stock materials

-

-

-

... More
Loading /Unloading /Stacking

8.4

-

153.58

... More
Cost of haulage @5.57/tonne/km

8.4

-

334.2

... More
H. load

84

-

12.78

... More
ESTIMATE FOR CONSTRUCTION OF RESERVOIR TANK FOR GYALSHING WATER SUPPLY SCHEME IN WEST SIKKIM (13.5 X 9 X 3.3 m )

-

-

-

... More
Hill side cutting i/c throwing of spoils for all lead and lift complete

46.5

-

102.2

... More
Earth work excavation in foundation trenches in mixed soil i/c throwing of spoils within 1.5m lift and 30m lead from work site.

361.59

-

164.74

... More
Providing and laying hand packed stone soling with clean hard selected stones all complete.

27.47

-

560.28

... More
Providing and laying cement concrete M – 15 grade (1:2:4 mix) i/c centering, shuttering, curing etc, all complete.

56.63

-

4420.2

... More
Providing and laying Reinforced cement concrete in M – 20 grade (1:1-1/2 :3 mix) in all RCC works i/c centering, shuttering, curing etc, all complete.

154.34

-

5495.67

... More
Providing, fixing and removing form work for casting RCC items as indicated above:

1

-

424089

... More
Supply, bending and placing in position for Tor steel reinforcement in all RCC works including the cost of bending wire all complete.

20063.62

-

67.28

... More
P/l 12 mm thick cement plaster in 1:3 mix cement mortar (1 Cement, 2 clean coarse sand) I/c curing etc. all complete.

418.5

-

132.3

... More
Providing box drain of 45 cm x 30 cm internal dimensioned and side wall thickness of 23 cm and 30 cm with standard specification i/c providing and laying guard stones as per direction of Engineer in charge all complete.

70

-

1259.9

... More
Provision for construction of outlet chamber chamber in 1:2:4 RCC

2

-

60000

... More
Consumption of stock material

-

-

-

... More
Loading /Unloading /Stacking

103

-

153.58

... More
Cost of haulage @5.57/tonne/km

103

-

334.2

... More
H. load

1029.96

-

12.78

... More
Consumption of non stock material SAND

-

-

-

... More
Loading /Unloading /Stacking

98.12

-

87

... More
Cost of haulage @5.57/tonne/km

196.24

-

222.8

... More
H. load

98.12

-

258.1

... More
Consumption of non stock STONE

-

-

-

... More
Loading /Unloading /Stacking

202.68

-

153.58

... More
Cost of haulage @5.57/tonne/km

405.36

-

222.8

... More
H. load

202.68

-

258.1

... More
ESTIMATE FOR CONSTRUCTION OF ZONAL TANK 1 FOR GYALSHING WATER SUPPLY SCHEME IN WEST SIKKIM 6.2m X 6.2m X 2.7m+0.3FB (1.01 L lit)

-

-

-

... More
Hill side cutting i/c throwing of spoils for all lead and lift complete

48.6

-

102.2

... More
Earth work excavation in foundation trenches in mixed soil i/c throwing of spoils within 1.5m lift and 30m lead from work site.

83.66

-

164.74

... More
Providing and laying hand packed stone soling with clean hard selected stones all complete.

11.9

-

560.28

... More
Providing and laying cement concrete M – 15 grade (1:2:4 mix) i/c centering, shuttering, curing etc, all complete.

20.67

-

4420.2

... More
Providing and laying Reinforced cement concrete in M – 20 grade (1:1-1/2 :3 mix) in all RCC works i/c centering, shuttering, curing etc, all complete.

63.06

-

5495.67

... More
Providing, fixing and removing form work for casting RCC items as indicated above:

1

-

173266

... More
Supply, bending and placing in position for Tor steel reinforcement in all RCC works including the cost of bending wire all complete.

8197.22

-

67.28

... More
P/l 12 mm thick cement plaster in 1:3 mix cement mortar (1 Cement, 2 clean coarse sand) I/c curing etc. all complete.

219.22

-

132.3

... More
Providing box drain of 45 cm x 30 cm internal dimensioned and side wall thickness of 23 cm and 30 cm with standard specification i/c providing and laying guard stones as per direction of Engineer in charge all complete.

40

-

1259.9

... More
Provision for construction of outlet chamber chamber in 1:2:4 RCC

1

-

51000

... More
Consumption of stock material

-

-

-

... More
Loading /Unloading /Stacking

41.65

-

153.58

... More
Cost of haulage @5.57/tonne/km

41.65

-

334.2

... More
H. load

416.45

-

12.78

... More
Consumption of non stock material SAND

-

-

-

... More
Loading /Unloading /Stacking

39.7

-

87

... More
Cost of haulage @5.57/tonne/km

79.4

-

222.8

... More
H. load

39.7

-

258.1

... More
Consumption of non stock STONE

-

-

-

... More
Loading /Unloading /Stacking

81.29

-

87

... More
Cost of haulage @5.57/tonne/km

162.58

-

222.8

... More
H. load

81.29

-

258.1

... More
ESTIMATE FOR LAND DEVELOPMENT AND PROVIDING PROTECTIVE WORK FOR CONSTRUCTION OF ZONAL TANK 1 FOR GYALSHING WATER SUPPLY SCHEME IN WEST SIKKIM

-

-

-

... More
Hill Side cutting in mix soil i/c throwing of spoils for all leads and lifts all complete.

103.79

-

102.2

... More
Excavation in foundation trenches in mixed soil i/c throwing of spoils within 1.5 m lift and 30m lead from worksite.

69.78

-

164.74

... More
P/L coarse Rubble stone Masonry in 1:4: 8 C.C. (1 cement, 4 sand, 8 clean hard graded stone chips of size 40mm and down) including bond stone through stone of size 150mmx 150mm 450mm manufactured in 1:4:8 c.c. i/c curing etc. all complete

82.67

-

2766.09

... More
Consumption of stones.Locally available within 200 m radius

-

-

-

... More
Loading /Unloading /Stacking

93.41

-

87

... More
Cost of haulage @5.57/tonne/km

205.5

-

334.2

... More
H. load

93.41

-

258.1

... More
Consumption of sand to work site.

-

-

-

... More
Loading /Unloading /Stacking

12.4

-

87

... More
Cost of haulage @5.57/tonne/km

27.28

-

222.8

... More
H. load

12.4

-

258.1

... More
Comsumption of stock materials

-

-

-

... More
Loading /Unloading /Stacking

4.2

-

153.53

... More
Cost of haulage @5.57/tonne/km

4.2

-

334.2

... More
H. load

42

-

12.78

... More
ESTIMATE FOR CONSTRUCTION OF ZONAL TANK 2 FOR GYALSHING WATER SUPPLY SCHEME IN WEST SIKKIM 6.60m X 6.6m X 2.7m+0.3FB (1,15,000 lit)

-

-

-

... More
Hill side cutting i/c throwing of spoils for all lead and lift complete

48

-

102.2

... More
Earth work excavation in foundation trenches in mixed soil i/c throwing of spoils within 1.5m lift and 30m lead from work site.

88.28

-

164.74

... More
Providing and laying hand packed stone soling with clean hard selected stones all complete.

12.82

-

560.28

... More
Providing and laying cement concrete M – 15 grade (1:2:4 mix) i/c centering, shuttering, curing etc, all complete.

22.54

-

4420.2

... More
Providing and laying Reinforced cement concrete in M – 20 grade (1:1-1/2 :3 mix) in all RCC works i/c centering, shuttering, curing etc, all complete.

67.43

-

5495.67

... More
Providing, fixing and removing form work for casting RCC items as indicated above:

1

-

185274

... More
Supply, bending and placing in position for Tor steel reinforcement in all RCC works including the cost of bending wire all complete.

8765.32

-

67.28

... More
P/l 12 mm thick cement plaster in 1:3 mix cement mortar (1 Cement, 2 clean coarse sand) I/c curing etc. all complete.

235.38

-

132.3

... More
Providing box drain of 45 cm x 30 cm internal dimensioned and side wall thickness of 23 cm and 30 cm with standard specification i/c providing and laying guard stones as per direction of Engineer in charge all complete.

50

-

1259.9

... More
Provision for construction of outlet chamber chamber in 1:2:4 RCC

1

-

51000

... More
Consumption of stock material

-

-

-

... More
Loading /Unloading /Stacking

44.68

-

153.58

... More
Cost of haulage @5.57/tonne/km

44.68

-

334.2

... More
H. load

446.78

-

12.78

... More
Consumption of non stock material SAND

-

-

-

... More
Loading /Unloading /Stacking

42.66

-

87

... More
Cost of haulage @5.57/tonne/km

85.32

-

222.8

... More
H. load

42.66

-

258.1

... More
Consumption of non stock STONE

-

-

-

... More
Loading /Unloading /Stacking

87.37

-

87

... More
Cost of haulage @5.57/tonne/km

174.74

-

222.8

... More
H. load

87.37

-

258.1

... More
ESTIMATE FOR LAND DEVELOPMENT AND PROVIDING PROTECTIVE WORK FOR CONSTRUCTION OF ZONAL TANK 2 FOR GYALSHING WATER SUPPLY SCHEME IN WEST SIKKIM

-

-

-

... More
Hill Side cutting in mix soil i/c throwing of spoils for all leads and lifts all complete.

100.12

-

102.2

... More
Excavation in foundation trenches in mixed soil i/c throwing of spoils within 1.5 m lift and 30m lead from worksite.

108.52

-

164.74

... More
P/L coarse Rubble stone Masonry in 1:4: 8 C.C. (1 cement, 4 sand, 8 clean hard graded stone chips of size 40mm and down) including bond stone through stone of size 150mmx 150mm 450mm manufactured in 1:4:8 c.c. i/c curing etc. all complete

128.47

-

2766.09

... More
Consumption of stones.Locally available within 200 m radius

-

-

-

... More
Loading /Unloading /Stacking

145.17

-

87

... More
Cost of haulage @5.57/tonne/km

319.37

-

334.2

... More
H. load

145.17

-

258.1

... More
Consumption of sand to work site.

-

-

-

... More
Loading /Unloading /Stacking

19.27

-

87

... More
Cost of haulage @5.57/tonne/km

42.39

-

222.8

... More
H. load

19.27

-

258.1

... More
Comsumption of stock materials

-

-

-

... More
Loading /Unloading /Stacking

6.6

-

153.53

... More
Cost of haulage @5.57/tonne/km

6.6

-

334.2

... More
H. load

66

-

12.78

... More
ESTIMATE FOR CONSTRUCTION OF ZONAL TANK 3 FOR GYALSHING WATER SUPPLY SCHEME IN WEST SIKKIM 5.1m X 5.1m X 2.7m+0.3FB (70,000 lit)

-

-

-

... More
Hill side cutting i/c throwing of spoils for all lead and lift complete

39.6

-

102.2

... More
Earth work excavation in foundation trenches in mixed soil i/c throwing of spoils within 1.5m lift and 30m lead from work site.

53.76

-

164.74

... More
Providing and laying hand packed stone soling with clean hard selected stones all complete.

8.06

-

560.28

... More
Providing and laying cement concrete M – 15 grade (1:2:4 mix) i/c centering, shuttering, curing etc, all complete.

14

-

4420.2

... More
Providing and laying Reinforced cement concrete in M – 20 grade (1:1-1/2 :3 mix) in all RCC works i/c centering, shuttering, curing etc, all complete.

46.6

-

5495.67

... More
Providing, fixing and removing form work for casting RCC items as indicated above:

1

-

128049

... More
Supply, bending and placing in position for Tor steel reinforcement in all RCC works including the cost of bending wire all complete.

6058

-

67.28

... More
P/l 12 mm thick cement plaster in 1:3 mix cement mortar (1 Cement, 2 clean coarse sand) I/c curing etc. all complete.

176.43

-

132.3

... More
Providing box drain of 45 cm x 30 cm internal dimensioned and side wall thickness of 23 cm and 30 cm with standard specification i/c providing and laying guard stones as per direction of Engineer in charge all complete.

30

-

1259.9

... More
Provision for construction of outlet chamber chamber in 1:2:4 RCC

1

-

51000

... More
Consumption of stock material

-

-

-

... More
Loading /Unloading /Stacking

30.48

-

153.58

... More
Cost of haulage @5.57/tonne/km

30.48

-

334.2

... More
H. load

304.75

-

12.78

... More
Consumption of non stock material SAND

-

-

-

... More
Loading /Unloading /Stacking

28.99

-

87

... More
Cost of haulage @5.57/tonne/km

57.98

-

222.8

... More
H. load

28.99

-

258.1

... More
Consumption of non stock STONE

-

-

-

... More
Loading /Unloading /Stacking

58.36

-

87

... More
Cost of haulage @5.57/tonne/km

116.72

-

222.8

... More
H. load

58.36

-

258.1

... More
ESTIMATE FOR LAND DEVELOPMENT AND PROVIDING PROTECTIVE WORK FOR CONSTRUCTION OF ZONAL TANK 3 FOR GYALSHING WATER SUPPLY SCHEME IN WEST SIKKIM

-

-

-

... More
Hill Side cutting in mix soil i/c throwing of spoils for all leads and lifts all complete.

79.37

-

102.2

... More
Excavation in foundation trenches in mixed soil i/c throwing of spoils within 1.5 m lift and 30m lead from worksite.

81.39

-

164.74

... More
P/L coarse Rubble stone Masonry in 1:4: 8 C.C. (1 cement, 4 sand, 8 clean hard graded stone chips of size 40mm and down) including bond stone through stone of size 150mmx 150mm 450mm manufactured in 1:4:8 c.c. i/c curing etc. all complete

96.35

-

2766.09

... More
Consumption of stones.Locally available within 200 m radius

-

-

-

... More
Loading /Unloading /Stacking

108.87

-

87

... More
Cost of haulage @5.57/tonne/km

239.51

-

334.2

... More
H. load

108.87

-

258.1

... More
Consumption of sand to work site.

-

-

-

... More
Loading /Unloading /Stacking

14.45

-

87

... More
Cost of haulage @5.57/tonne/km

31.79

-

222.8

... More
H. load

14.45

-

258.1

... More
Comsumption of stock materials

-

-

-

... More
Loading /Unloading /Stacking

4.9

-

153.53

... More
Cost of haulage @5.57/tonne/km

4.9

-

278.5

... More
H. load

49

-

12.78

... More
ESTIMATE FOR CONSTRUCTION OF ZONAL TANK 5 FOR GYALSHING WATER SUPPLY SCHEME IN WEST SIKKIM 8m X 8m X 2.7m+0.3FB (1,73,000 lit)

-

-

-

... More
Hill side cutting i/c throwing of spoils for all lead and lift complete

57

-

102.2

... More
Earth work excavation in foundation trenches in mixed soil i/c throwing of spoils within 1.5m lift and 30m lead from work site.

106.34

-

164.74

... More
Providing and laying hand packed stone soling with clean hard selected stones all complete.

16.43

-

560.28

... More
Providing and laying cement concrete M – 15 grade (1:2:4 mix) i/c centering, shuttering, curing etc, all complete.

29.91

-

4420.2

... More
Providing and laying Reinforced cement concrete in M – 20 grade (1:1-1/2 :3 mix) in all RCC works i/c centering, shuttering, curing etc, all complete.

83.85

-

5495.67

... More
Providing, fixing and removing form work for casting RCC items as indicated above:

1

-

230394

... More
Supply, bending and placing in position for Tor steel reinforcement in all RCC works including the cost of bending wire all complete.

10899.92

-

67.28

... More
P/l 12 mm thick cement plaster in 1:3 mix cement mortar (1 Cement, 2 clean coarse sand) I/c curing etc. all complete.

294.46

-

132.3

... More
Providing box drain of 45 cm x 30 cm internal dimensioned and side wall thickness of 23 cm and 30 cm with standard specification i/c providing and laying guard stones as per direction of Engineer in charge all complete.

30

-

1259.9

... More
Provision for construction of outlet chamber chamber in 1:2:4 RCC

1

-

51000

... More
Consumption of stock material

-

-

-

... More
Loading /Unloading /Stacking

56.17

-

153.58

... More
Cost of haulage @5.57/tonne/km

56.17

-

334.2

... More
H. load

561.74

-

12.78

... More
Consumption of non stock material SAND

-

-

-

... More
Loading /Unloading /Stacking

53.93

-

87

... More
Cost of haulage @5.57/tonne/km

107.86

-

222.8

... More
H. load

53.93

-

258.1

... More
Consumption of non stock STONE

-

-

-

... More
Loading /Unloading /Stacking

110.66

-

87

... More
Cost of haulage @5.57/tonne/km

221.32

-

222.8

... More
H. load

110.66

-

258.1

... More
ESTIMATE FOR LAND DEVELOPMENT AND PROVIDING PROTECTIVE WORK FOR CONSTRUCTION OF ZONAL TANK 5 FOR GYALSHING WATER SUPPLY SCHEME IN WEST SIKKIM

-

-

-

... More
Hill Side cutting in mix soil i/c throwing of spoils for all leads and lifts all complete.

97.68

-

102.2

... More
Excavation in foundation trenches in mixed soil i/c throwing of spoils within 1.5 m lift and 30m lead from worksite.

94.95

-

164.74

... More
P/L coarse Rubble stone Masonry in 1:4: 8 C.C. (1 cement, 4 sand, 8 clean hard graded stone chips of size 40mm and down) including bond stone through stone of size 150mmx 150mm 450mm manufactured in 1:4:8 c.c. i/c curing etc. all complete

112.4

-

2766.09

... More
Consumption of stones.Locally available within 200 m radius

-

-

-

... More
Loading /Unloading /Stacking

127.01

-

87

... More
Cost of haulage @5.57/tonne/km

279.42

-

334.2

... More
H. load

127.01

-

258.1

... More
Consumption of sand to work site.

-

-

-

... More
Loading /Unloading /Stacking

16.86

-

87

... More
Cost of haulage @5.57/tonne/km

37.09

-

222.8

... More
H. load

16.86

-

258.1

... More
Comsumption of stock materials

-

-

-

... More
Loading /Unloading /Stacking

5.7

-

153.53

... More
Cost of haulage @5.57/tonne/km

5.7

-

278.5

... More
H. load

57

-

12.78

... More
PROVIDING/LAYING OF PIPES FOR DISTRIBUTION LINE ZONE 1

-

-

-

... More
Provision for cutting and remaking of road surfaces etc. (to be paid as per actal measurement)

1000

-

500

... More
Laying, fitting fxing of GI pipe 150mm dia

-

-

-

... More
For 150mm dia

183

-

450.9

... More
For 150mm diaPipe Excavation/ TRENCHING

82.35

-

164.74

... More
For 100mm dia Pipe

681

-

304.05

... More
For 100mm dia Pipe Excavation/ TRENCHING

306.45

-

164.74

... More
For 80mm dia Pipe .

756

-

216.7

... More
For 80mm dia Excavation

340.2

-

164.74

... More
For 65mm dia

400

-

150.92

... More
For 65mm dia Excavation

180

-

164.74

... More
For 50mm dia

1460

-

120.83

... More
For 50mm dia Excavation

657

-

164.74

... More
Construction of RCC anchor block of size 0.6 x 0.6 x 0.6 dimension (Detail Analysis enclosed ) all complete

20

-

6800

... More
Construction of CC saddle block of size 0.6 x 0.6 x 0.6 dimension (Detail Analysis enclosed ) all complete

10

-

3600

... More
Construction of R.C.C. chamber for Bulk Water Meter/ Valve etc.(Detail Analysis enclosed ) all complete

350

-

5700

... More
Construction of R.C.C. chamber for Bulk Water Meter/ Valve etc.(Detail Analysis enclosed ) all complete

1

-

500000

... More
Consumption of stock materials

-

-

-

... More
Loading/Unloading/Stacking

6

-

153.58

... More
Cost of Haulage 60Km

6

-

334.2

... More
Head Load 200m

60

-

12.78

... More
Consumption of non-stock materials (Sand)

-

-

-

... More
Loading/Unloading/Stacking

7.8

-

87

... More
Cost of Haulage 60Km

15.6

-

222.8

... More
Head Load 200m

7.8

-

258.1

... More
Consumption of non-stock materials (Stone)

-

-

-

... More
Loading/Unloading/Stacking

17.4

-

87

... More
Cost of Haulage 60Km

38.28

-

222.8

... More
Head Load 200m

17.4

-

258.1

... More
Carriage of pipes and accessories from stores to the work site etc complete.

-

-

-

... More
Head Load 200m

633

-

200

... More
PROVIDING/LAYING OF PIPES FOR DISTRIBUTION LINE ZONE 2

-

-

-

... More
Provision for cutting and remaking of road surfaces etc. (to be paid as per actal measurement)

1000

-

500

... More
Laying, fitting fxing of GI pipe 150mm dia

-

-

-

... More
For 150mm dia

600

-

450.9

... More
For 150mm diaPipe Excavation/ TRENCHING

270

-

164.74

... More
For 100mm dia Pipe

491

-

304.05

... More
For 100mm dia Pipe Excavation/ TRENCHING

220.95

-

164.74

... More
For 80mm dia Pipe .

450

-

216.7

... More
For 80mm dia Excavation

202.5

-

164.74

... More
For 65mm dia

820

-

150.92

... More
For 65mm dia Excavation

369

-

164.74

... More
For 50mm dia

240

-

120.83

... More
For 50mm dia Excavation

108

-

164.74

... More
For 40mm dia

1860

-

90.66

... More
For 40mm dia Excavation

837

-

164.74

... More
Construction of RCC anchor block of size 0.6 x 0.6 x 0.6 dimension (Detail Analysis enclosed ) all complete

30

-

6800

... More
Construction of CC saddle block of size 0.6 x 0.6 x 0.6 dimension (Detail Analysis enclosed ) all complete

20

-

3600

... More
Construction of R.C.C. chamber for Bulk Water Meter/ Valve etc.(Detail Analysis enclosed ) all complete

300

-

5700

... More
Construction of R.C.C. chamber for Bulk Water Meter/ Valve etc.(Detail Analysis enclosed ) all complete

1

-

500000

... More
Consumption of stock materials

-

-

-

... More
Loading/Unloading/Stacking

10

-

153.58

... More
Cost of Haulage 60Km

10

-

334.2

... More
Head Load 200m

100

-

12.78

... More
Consumption of non-stock materials (Sand)

-

-

-

... More
Loading/Unloading/Stacking

13

-

87

... More
Cost of Haulage 60Km

26

-

222.8

... More
Head Load 200m

13

-

258.1

... More
Consumption of non-stock materials (Stone)

-

-

-

... More
Loading/Unloading/Stacking

29

-

87

... More
Cost of Haulage 60Km

63.8

-

222.8

... More
Head Load 200m

29

-

258.1

... More
Carriage of pipes and accessories from stores to the work site etc complete.

-

-

-

... More
Head Load 200m

813

-

200

... More
PROVIDING/LAYING OF PIPES FOR DISTRIBUTION LINE ZONE 3

-

-

-

... More
Provision for cutting and remaking of road surfaces etc. (to be paid as per actal measurement)

800

-

500

... More
Laying, fitting fxing of GI pipe 150mm dia

-

-

-

... More
For 150mm dia

300

-

450.9

... More
For 150mm diaPipe Excavation/ TRENCHING

90

-

164.74

... More
For 100mm dia Pipe

265

-

304.05

... More
For 100mm dia Pipe Excavation/ TRENCHING

119.25

-

164.74

... More
For 80mm dia Pipe .

426

-

216.7

... More
For 80mm dia Excavation

191.7

-

164.74

... More
For 65mm dia

555

-

150.92

... More
For 65mm dia Excavation

249.75

-

164.74

... More
For 50mm dia

485

-

120.83

... More
For 50mm dia Excavation

218.25

-

164.74

... More
For 40mm dia

1790

-

90.66

... More
For 40mm dia Excavation

805.5

-

164.74

... More
Construction of RCC anchor block of size 0.6 x 0.6 x 0.6 dimension (Detail Analysis enclosed ) all complete

25

-

6800

... More
Construction of CC saddle block of size 0.6 x 0.6 x 0.6 dimension (Detail Analysis enclosed ) all complete

10

-

3600

... More
Construction of R.C.C. chamber for Bulk Water Meter/ Valve etc.(Detail Analysis enclosed ) all complete

400

-

5700

... More
Construction of R.C.C. chamber for Bulk Water Meter/ Valve etc.(Detail Analysis enclosed ) all complete

1

-

500000

... More
Consumption of stock materials

-

-

-

... More
Loading/Unloading/Stacking

7

-

153.58

... More
Cost of Haulage 60Km

7

-

334.2

... More
Head Load 200m

70

-

12.78

... More
Consumption of non-stock materials (Sand)

-

-

-

... More
Loading/Unloading/Stacking

9.1

-

87

... More
Cost of Haulage 60Km

18.2

-

222.8

... More
Head Load 200m

9.1

-

258.1

... More
Consumption of non-stock materials (Stone)

-

-

-

... More
Loading/Unloading/Stacking

20.3

-

87

... More
Cost of Haulage 60Km

44.66

-

222.8

... More
Head Load 200m

20.3

-

258.1

... More
Carriage of pipes and accessories from stores to the work site etc complete.

-

-

-

... More
Head Load 200m

696

-

200

... More
PROVIDING/LAYING OF PIPES FOR DISTRIBUTION LINE ZONE 5

-

-

-

... More
Provision for cutting and remaking of road surfaces etc. (to be paid as per actal measurement)

1000

-

500

... More
Laying, fitting fxing of GI pipe 150mm dia

-

-

-

... More
For 150mm dia

1500

-

450.9

... More
For 150mm diaPipe Excavation/ TRENCHING

675

-

164.74

... More
For 100mm dia Pipe

230

-

304.05

... More
For 100mm dia Pipe Excavation/ TRENCHING

103.5

-

164.74

... More
For 80mm dia Pipe .

650

-

216.7

... More
For 80mm dia Excavation

292.5

-

164.74

... More
For 65mm dia

681

-

150.92

... More
For 65mm dia Excavation

306.45

-

164.74

... More
For 50mm dia

1890

-

120.83

... More
For 50mm dia Excavation

850.5

-

164.74

... More
Construction of RCC anchor block of size 0.6 x 0.6 x 0.6 dimension (Detail Analysis enclosed ) all complete

20

-

6800

... More
Construction of CC saddle block of size 0.6 x 0.6 x 0.6 dimension (Detail Analysis enclosed ) all complete

15

-

3600

... More
Construction of R.C.C. chamber for Bulk Water Meter/ Valve etc.(Detail Analysis enclosed ) all complete

400

-

5700

... More
Construction of R.C.C. chamber for Bulk Water Meter/ Valve etc.(Detail Analysis enclosed ) all complete

1

-

500000

... More
Consumption of stock materials

-

-

-

... More
Loading/Unloading/Stacking

7

-

153.58

... More
Cost of Haulage 60Km

7

-

334.2

... More
Head Load 200m

70

-

12.78

... More
Consumption of non-stock materials (Sand)

-

-

-

... More
Loading/Unloading/Stacking

9.1

-

87

... More
Cost of Haulage 60Km

18.2

-

222.8

... More
Head Load 200m

9.1

-

258.1

... More
Consumption of non-stock materials (Stone)

-

-

-

... More
Loading/Unloading/Stacking

20.3

-

87

... More
Cost of Haulage 60Km

44.66

-

222.8

... More
Head Load 200m

20.3

-

258.1

... More
Carriage of pipes and accessories from stores to the work site etc complete.

-

-

-

... More
Head Load 200m

903

-

200

... More
Construction of Filter house

-

-

-

... More
Earth work excavation in foundation trenches in mixed soil I/c throwing of spoils within 1.5m lift and 30m lead from work site.

129.74

-

164.74

... More
Providing and laying hand packed stone soling with clean hard selected stones all complete.

34.11

-

560.28

... More
Providing and laying cement concrete M – 10 grade (1:3:6 mix) i/c centering, shuttering, curing etc, all complete.

8.74

-

3821.97

... More
Providing and laying coarse rubble stone masonary in 1:3:6 c.c and curing, etc. all completeas per the direction of Engineer in charge excluding the cost of carriage of materials.

23.11

-

2971.66

... More
Mixed filling in plinth in 23 cm layer consolidated to 15 cm I/c watering, ramming etc. all complete.

116.53

-

68.44

... More
Providing and laying cement concrete M – 15 grade (1:2:4 mix) i/c centering, shuttering, curing etc, all complete.

14.55

-

4608.12

... More
P/l 25 mm thick DPC in M-15 grade cement concrete (1:2:4 mix) with water proofing compound compared @ 1.5 Kg/bag of cement I/c curing etc all complete.

194.24

-

224.37

... More
Providing and laying Reinforced cement concrete in M – 15 grade (1:2:4 mix) in all RCC works i/c centering, shuttering, curing etc, all complete.

51.25

-

4849.11

... More
Providing, fixing and removing form work for casting RCC items as indicated above:

347.23

-

371.49

... More
Providing, fixing and removing form work for casting RCC items as indicated above:

218.06

-

473.89

... More
Supply, bending and placing in position for tor steel reinforcement in all RCC works including the cost of bending wire all complete.

6662.5

-

67.28

... More
P/l 1st class brick work in 1/2 brick superstructure of standard size brick with 1:4 cement mortar (1Cement, 4 clean coarse sand) I/c carriage of bricks upto work site, curing etc. all complete.

298.09

-

639.14

... More
P/l 12 mm thick cement plaster in 1:3 mix cement mortar (1 Cement, 3 clean coarse sand) I/c curing etc. all complete.

896.15

-

132.3

... More
P/L 40 mm thick 1:2:4 CC (1 cement, 2 coarse sand, 4 12.5 mm stone aggregate) flooring with floating coat of neat cement to give a smooth surface in panels not exceeding 2 sqm I/c cost of glass strips i/c curing etc all complete in all building floors wherever specified.

140

-

295.73

... More
P/F/F in position collapsible steel shutter with vertical channel (20 x10 x2 )mm and braced with flat iron diagonal (20x5)mm size with top and bottom rail of T- iron (40x 40 x6)mm with 40 mm dia steel putty complete with bolt, nuts, locking arrangment, stoppers and handles including applying of priming coat of approved quality steel primer as per the direction of engineer in charge all complete.

7.2

-

2184.62

... More
Providing, fitting and fixing of dressed sal timber with imported timber from out side state in all types of frames complete.

0.05

-

51541.89

... More
Providing, fitting and fixing 35mm thick water proof flush door shutters, solid block hard core construction with frame of 1st class hard timber with well matched 3mm teak ply decorative type on one faces of the shutters including hinges with screws complete.

2.1

-

2769.08

... More
P/F/F in position steel section windows as per relevant IS code with 4 mm thick glass panes, press handles, stay rod, pins and putty all complete as per the direction of engineer in charge all complete.

428.4

-

83.43

... More
Providing and laying plum concrete in m – 15 grade (1:2:4 mix) cement concrete with 50 % clean hard selected stones of size not exceeding 150 mm i/c shuttering, compacting, curing etc, all complete.

1.35

-

3441.42

... More
P/l 23 cm x 23 cm internal Dimentional 'U' shaped drain as per standard design and specification all complete.

85.9

-

694.29

... More
Providing hold fast of (40 x 5) mm flat iron i/c fixing to frame with 10 mm dia bolts, nut and wooden plugs and embedding in CC 1:3:6 block of size (30 x 10 x 15 ) cm.

34

-

23.19

... More
Providing and fixing MS grill in windows with MS flats with nuts, bolts and smooth finishing of welded joints / surface.

306

-

73.13

... More
Providing and applying priming coat with ready mixed red oxide, Zinccromate primer on steel / Galvanised Iron steel works i/c preparation of the surface complete.

12.96

-

32.71

... More
Providing and painting on steel structure one or more coats with ready mixed paints to give an even shade i/c cleaning of surface of dust etc complete on new surface.

12.96

-

62.12

... More
Providing and distempering with oil bond washable acrylic distemper on new surface of approved brand and manufacture to give an even i/c preparation of surface etc complete.

627.31

-

53.47

... More
Providing and distempering with three or more coats of snowcem, durocem, cemcote etc. of approved quality and make (exterior) to give an even and smooth shade I/c preparation of surface on new surface complete.

268.85

-

65.89

... More
Providing box drain of 45 cm x 30 cm internal dimensioned and side wall thickness of 23 cm and 30 cm with standard specification i/c providing and laying guard stones as per direction of Engineer in charge all complete.

15

-

1259.9

... More
Carriage of stock material within a radius of 24 km by mechanical means all complete.

-

-

-

... More
Cost of loading and unloading

50.07

-

153.58

... More
Cost of haulage @5.57/mt/km

50.07

-

334.2

... More
Cost of head load 200m

500.67

-

12.78

... More
Carriage of Non-stock material within a radius of 20 km by mechanical means all complete.

-

-

-

... More
Cost of loading and unloading

76.78

-

87

... More
Cost of haulage @5.57/mt/km

153.55

-

222.8

... More
Cost of head load 200m

76.78

-

258.1

... More
Carriage of Non-stock material within a radius of 20 km by mechanical means all complete.

-

-

-

... More
Cost of loading and unloading

175.24

-

87

... More
Cost of haulage @5.57/mt/km

385.53

-

222.8

... More
Cost of head load 200m

175.24

-

258.1

... More
ESTIMATE FOR LAND DEVELOPMENT AND PROVIDING PROTECTIVE WORK FOR CONSTRUCTION OF FILTER HOUSE FOR AUGMENTATION OF LEGSHIP WATER SUPPLY SCHEME IN WEST SIKKIM

-

-

-

... More
Hill Side cutting in mix soil i/c throwing of spoils for all leads and lifts all complete.

60

-

102.2

... More
Excavation in foundation trenches in mixed soil i/c throwing of spoils within 1.5 m lift and 30m lead from worksite.

153.14

-

164.74

... More
P/L coarse Rubble stone Masonry in 1:4: 8 C.C. (1 cement, 4 sand, 8 clean hard graded stone chips of size 40mm and down) including bond stone through stone of size 150mmx 150mm 450mm manufactured in 1:4:8 c.c. i/c curing etc. all complete

181.39

-

2766.09

... More
Consumption of stones.Locally available within 200 m radius

-

-

-

... More
Loading /Unloading /Stacking

204.97

-

87

... More
Cost of haulage @5.57/tonne/km

450.93

-

222.8

... More
H. load

204.97

-

258.1

... More
Consumption of sand to work site.

-

-

-

... More
Loading /Unloading /Stacking

27.21

-

87

... More
Cost of haulage @5.57/tonne/km

59.86

-

222.8

... More
H. load

27.21

-

258.1

... More
Comsumption of stock materials

-

-

-

... More
Loading /Unloading /Stacking

9.3

-

153.53

... More
Cost of haulage @5.57/tonne/km

9.3

-

334.2

... More
H. load

93

-

12.78

... More
ESTIMATE FOR PROVIDING BOUNDARY FENCING WITH BRICK WALL AND G.I. WIRE MESH AT TOPFOR WATER SUPPLY SCHEME FOR GYALSHING BAZAAR IN WEST SIKKIM

-

-

-

... More
Earth work excavation in foundation trenches i/c throwing of spoils and stacking of useful materials for 1.5 m lift and 30 m lead form work site all complete.

183.71

-

164.74

... More
Providing and laying hand packed stone soling with clean hard selected stones all complete.

20.41

-

560.28

... More
Providing and laying cement concrete M – 10 grade (1:3:6 mix) ( 1 cement, 3 clean coarse sand, 6 clean hard graded stone chips in 20 mm and down gauge) i/c centering, shuttering, curing etc. all complete.

13.61

-

3821.97

... More
Providing and laying Reinforced cement concrete M- 15 grade (1:2:4 mix) ( 1 cement, 2 clean coarse sand, 4 clean hard graded stone chips in 20 mm and down gauge) in all R.C.C members including centering, shuttering, compacting, curing etc. all complete.

71.25

-

4849.11

... More
Form work for Casting R.C.C. work

589.68

-

415.46

... More
S/B/B and placing in position of Tor Steel Reinforcement as per the design, specification and direction of Engineer in- charge including the cost of binding wire all complete.

9262.89

-

67.28

... More
Supply of G.I wire Mesh

5649

-

60

... More
Supply of ISA 65 X 65X 6 @ 5.80 kgs/m for vertical post for fencing all complete.

1461.6

-

68

... More
P/l 1st class brick work in 1 brick thick superstructure of standard size brick with 1:5 cement mortar (1Cement, 3 clean coarse sand) I/c carriage of bricks upto work site, curing etc. all complete.

188.19

-

5399.93

... More
P/l 12 mm thick cement plaster in 1:3 mix cement mortar (1 Cement,3 clean coarse sand) I/c curing etc. all complete.

376.38

-

132.3

... More
White washing with lime three or more coats to give an even shade all complete.

376.38

-

10.94

... More
Supply of materials required painting of fencing work.

-

-

-

... More
Metal Primer

15

-

250

... More
metal paint aluminum

20

-

250

... More
painting brush

60

-

100

... More
Provision for labour payment for fitting, fixing of MS ISA post and G.I. wire Mesh including painting of fencing all complete.

0.6

-

453079

... More
Providing and fitting of MS gate size 4.0 mx 2.5m with all fitting including painting etc all complete.

7

-

75000

... More
Consumption of stock material

-

-

-

... More
Loading/Unloading/Stacking

52.41

-

153.58

... More
Cost of Haulage

52.41

-

133.68

... More
Head Load 200m

524.09

-

12.78

... More
Consumption of Non-stock material

-

-

-

... More
Loading/Unloading/Stacking

96.55

-

153.58

... More
Cost of Haulage

193.09

-

133.68

... More
Head Load 200m

96.55

-

258.1



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.