NHPC Limited Tender
View complete overview of Sikkim NHPC Tender
NHPC Limited - NHPC Tender
Civil Works Roads
Eprocure
Opening Date23 Dec 2020
Closing Date12 Jan 2021
Tender Amount₹ 34,78,366 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 70,000Document Cost
₹ 560Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_NHPC_605057_1Bid Award Id
ViewTender No
NH/RPS/DC011(11)/1/2020/DAM C/001672/1443Tender Authority
NHPC Limited ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Restoration of damaged road at upstream of reservoir from RD 36 to 123 from Dam axis at Rangit Power Station
Restoration of damaged road at upstream of reservoir from RD 36 to 123 from Dam axis at Rangit Power Station
BOQ Items
... More
Providing, fixing & removing form work for casting R.C.C items as indicated below: with locally available timber). 14.2.4 Floor slab, roof slab, landing, balcony and access platform.
58.89
-
-
... More
Providing and fixing dowel/ anchor bar ( TMT ) including (a) drilling of hole in existing concrete or rock or like the surface, (b)straightening, cutting, bending, placing in position of anchor bar (c) grouting with suitable epoxy mortar or cement capsule , etc all complete up to floor five level in spillway glacis, hill terrain ,stilling basin floor / wall or like the surface etc. The rate is exclusive of taxes, transportation from Siliguri to RPS, loading, unloading and stacking but inclusive of premium @ 12 % over SSOR'12 &@ over 2% DSR'16. Departmental material such as Air compressor, Jackhammer, Electricity, shall be issued on demand by the contractor for executing the work if the same is available, but the rental charges and recovery rate shall be as per the norms of NHPC Ltd.
968.18
-
-
... More
Providing and Laying in position cement concrete of 1:2:4 mix. (1 cement, 2 coarse and, 4 graded stone aggregate of 20mm & down size) including compacting curing etc all complete.
24.66
-
-
... More
Supplying, bending and placing in position tor- steel reinforcement in all R.C.C works including cost of binding wires, all complete.
60.03
-
-
... More
Providing & laying in position specified grade of reinforced cement concrete of nominal mix excluding the cost of form work, finishing & reinforcements. 1:1.5:3 Mix (1 cement, 1.5 coarse sand 3 graded stone aggregate 20mm and down nominal gauge)
51.7
-
-
... More
Providing and Laying Plum concrete in 1:2:4 c.c. (1 cement, 2 coarse sand, 4 clean hard graded stone chips of 20 mm down nominal gauge) with 50% clean hard stone of sizes not exceeding 15cm including shuttering, compacting and curing complete, as per the direction of Engineer in Charge.
245.94
-
-
... More
Supply of GI wire made from 8BWG galvanized steel wire and weaving @2.14kg per sqm for making of mesh having opening size 125x125mm including launching and fixing of wire net in position, (including overlap & wastage at 15%) for construction of hand packed wall in hilly terrain and like etc complete as per direction of Engineer-in-charge within a lead of 30m. consumption of GI wire for work execution shall be at 2.48kg/sqm (the rate is execusive of taxes, transportation/ mechanical carriage, loading, unloading and stacking but inclusive of 12% premium over the basic rate of SSOR'12 for GI wire)
648
-
-
... More
Providing and laying dry stone masonry for any thickness of wall, brought to course roughly with hammer dressed to give uniform face; for construction of wall such as retaining, breast, and gabion or like etcetera with or without batter in straight / curvature (In plan) including laying of bond stone (Through stone, for wall thicker than 60 cm, bond stones may be of two pieces placed side by side overlapping at least 15 cm) up to wall height of 6.00 meter and an initial lead up to 30 meters. The face stone shall be comparatively larger with hammer dressed to secure closed joint so that the stones when laid will come into close proximity and to give uniform front face. (The rate is exclusive of taxes , transportation /mechanical carriage , loading ,unloading and stacking but inclusive of royalty for stone )
162
-
-
... More
Filling for road works Filling by supplying filling materials from outside in road works, in layers not exceeding 20cm in depth excluding carriage of materials and including consolidation of each layer by ramming, watering etc all complete by manual/mechanical means
217.71
-
-
... More
Loading and unloading of Cement or Steel by manual means and stacking.
76.54
-
-
... More
Loading and unloading of stone boulder/stone aggregates/sand/ kanker/moorum.
531.7
-
-
... More
Cost of haulage excluding loading and unloading- Surfaced road).
18095.32
-
-
... More
Head load of non-stock materials for a distance beyond 30 m and within 100 m distance
531.7
-
-
... More
Head load of stock materials for a distance beyond 30 m and within 100m distance.
765.38
-
-
... More
Cost of haulage excluding loading and unloading- Surfaced road:-Non-stock & stock materials.
-
-
-
Evaluation Notes How It Works ?