NHPC Limited Tender
View complete overview of Sikkim NHPC Tender
NHPC Limited - NHPC Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date6 Aug 2021
Closing Date26 Aug 2021
Tender Amount₹ 24,21,578 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 48,000Document Cost
₹ 590Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_NHPC_642035_1Bid Award Id
ViewTender No
NH/RPS/PHC011(13)/2/2021-PH C/001720/166Tender Authority
NHPC Limited ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Restoration of river training works below Tower No.1 and 2 at right bank of Power House at Rangit Power Station
Restoration of river training works below Tower No.1 and 2 at right bank of Power House at Rangit Power Station
BOQ Items
... More
Providing and Laying in position specified grade of reinforced cement concrete excluding the cost of form work, finishing and reinforcements.1:1.5:3 Mix (1cement, 1.5 coarse sand 3 graded stone aggregate 20mm and down nominal gauge)
93.75
-
-
... More
Supplying, bending and placing in position tor- steel reinforcement in all R.C.C works including cost of binding wires, all complete.
32.3
-
-
... More
Providing, fixing & removing form work for casting R.C.C items for walls with imported timber from outside the state wall.
159.13
-
-
... More
Providing and Laying Random Rubble Stone Masonry in 1:3:6 c.c. (1cement, 3 sand, 6 clean hard graded stone chips, size 40mm gauge) including bond stone, through stone of size 150mm x 150mm x 450mm manufactured in 1:4:8 (1cement, 4 clean coarse sand, 8 clean hard stone aggregate of size 40 mm and down) and curing etc, complete as per the direction of Engineer in Charge, excluding the cost of carriage of materials
17.85
-
-
... More
Providing and Laying in position cement concrete of specified grade including compacting curing etc all complete.1:1.5:3 (1cement, 1.5 coarse sand,3 graded stone aggregate of 20mm & down size)
44.55
-
-
... More
Providing, fixing & removing form work for casting R.C.C items as indicated below: with imported timber from outside the state)--Wall
172.53
-
-
... More
Providing and laying dry stone masonry for any thickness of wall, brought to course roughly with hammer dressed to give uniform face; for construction of wall such as retaining, breast, and gabion or like etcetera with or without batter in straight / curvature (In plan) including laying of bond stone (Through stone, for wall thicker than 60 cm, bond stones may be of two pieces placed side by side overlapping at least 15 cm) up to wall height of 6.00 meter and an initial lead up to 30 meters. The face stone shall be comparatively larger with hammer dressed to secure closed joint so that the stones when laid will come into close proximity and to give uniform front face. (The rate is exclusive of taxes , transportation /mechanical carriage , loading ,unloading and stacking but inclusive of royalty for stone )
38.25
-
-
... More
Supply of GI wire made from 8BWG galvanized steel wire and weaving @2.14kg per sqm for making of mesh having opening size 125x125mm
including launching and fixing of wire net in position, (including overlap & wastage at 15%) for construction of hand packed wall in hilly terrain and like etc complete as per direction of Engineer-in-charge within a lead of 30m. consumption of GI wire for work execution shall be at 2.48kg/sqm (the rate is exclusive of taxes, transportation/ mechanical carriage, loading, unloading and stacking but inclusive of 12% premium over the basic rate of SSOR'12 for GI wire)
217.5
-
-
... More
Head load of non-stock materials for a distance beyond 30 m and within 100 m distance
268.41
-
-
... More
Head load of stock materials for a distance beyond 30 m and within 100m distance.
646.32
-
-
... More
Loading and Unloading of Stone Boulder/ Stone aggregates/ Sand/ Kanker/ Moorum.
646.32
-
-
... More
Loading and Unloading of Cement or Steel by Manual Means and Stacking.
64.63
-
-
... More
Cost of Haulage Excluding Loading and Unloading Surfaced Road.
11145.42
-
-
... More
Head load of stock materials - Cement for a distance beyond 100 m and for every additional lead of 50 meter or part thereof etc complete. The rates will be applicable to net quantities after deduction of prescribed percentage for voids mentioned in the specification under sub- head "Carriage of Materials" (These rates are inclusive of Contractor's profit and over heads but exclusive of GST) upto 200m
60.86
-
-
... More
Head load of stock materials - Steel for a distance beyond 100 m and for every additional lead of 50 meter or part thereof etc complete. The rates will be applicable to net quantities after deduction of prescribed percentage for voids mentioned in the specification under sub- head "Carriage of Materials" (These rates are inclusive of Contractor's profit and over heads but exclusive of GST) upto 200m
3.77
-
-
... More
Head load of non-stock materials - Sand, stone aggregate below 40 mm nominal size for a distance beyond 100 m and for every additional lead of 50 meter or part thereof etc complete. The rates will be applicable to net quantities after deduction of prescribed percentage for voids mentioned in the specification under sub- head "Carriage of Materials" (These rates are inclusive of Contractor's profit and over heads but exclusive of GST) upto 200m
203.63
-
-
... More
Head load of non-stock materials - Soling stone /Stone for a distance beyond 100 m and for every additional lead of 50 meter or part thereof etc complete. The rates will be applicable to net quantities after deduction of prescribed percentage for voids mentioned in the specification under subhead "Carriage of Materials" (These rates are inclusive of Contractor's profit and over heads but exclusive of GST) upto 200m
64.78
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements