Watershed Development And Soil Conservation Department Tender

... More
If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.

Watershed Development And Soil Conservation Department - WDSC Tender

Works
Civil And Construction
Excavation
Eprocure
Opening Date29 Jan 2025
Closing Date18 Feb 2025
Tender Amount₹ 1,69,08,803 
Notes
Download

Costs

  • EMD

    ₹ 3,38,180
  • Document Cost

    ₹ 2,000
  • Tender Fee

    ₹ 2,000

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cement concrete well mixed with cement mortar (1:2:4) laid in position complete excluding curing with aggregate size upto 20 mm .

175.68

5239

920512.25

... More
Transportation of morrum with loading and unloading upto 5 Km

603.86

101

61231.4

... More
Spreading of murrum upto 15cm layers.

603.86

69

41714.65

... More
Benching base and depositing the excavated material including dressing etc. complete within initial lead up to 50m and lift up to 1.5m (25 cm depth

1620.68

72

118147.57

... More
Centering and shuttering for slabs,beams,lintels Columns, trough withor without caps and base including propping and remove for steel   

384.96

313

120738.85

... More
मिटटी का विभिन्न दूरी के लिए परिवहन सामग्री को चढ़ाना, उतारना व स्टेकिंग सहित | (परिवहन की लम्बाई निकटतम रूट से गणना की जावेगी न कि सड़क मार्ग से) UPTO 5 KM

12919.5

126

1636771.46

... More
Compaction of earth or highly weathered strata By manually or plain roller. (density 90% of Proctor)

27669.38

21

597658.61

... More
Cement concrete well mixed with cement mortar (1:4:8) laid in position complete excluding curing with aggregate size 20 mm HB.

78.98

3865

305291.66

... More
( work)

-

-

-

... More
Cement concrete well mixed with cement mortar (1:3:6) laid in position complete excluding curing with aggregate size upto 20 mm .

302

3981

1202337.5

... More
Watering of earth including cost of carriage of water when source of water is up to 2 Km

27669.38

14

395948.83

... More
मूरम,भवन का मलवा,चूना,बजरी,पत्थर की गिट्टी 40mm नोमिनल साइज से कम तक का विभिन्न दूरी के लिए परिवहन सामग्री को चढ़ाना,उतारना व स्टेकिंग सहित । (परिवहन की लम्बाई निकटतम रूट से गणना की जावेगी न कि सड़क मार्ग से) upto 3 km

2829.14

88

250039.02

... More
Earth work in rough (borrow area) excavation for embankment in hard soil, Morrum or highly weathered strata dry or moist, including laying in 20cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc.and dressing when compacted manually or by plain roller with initial lead of 250m and lift up to1.5m (excluding charges for compaction and watering), including loading and un-loading wherever required complete in all respect.In Hard soil

20976.96

111

2341028.74

... More
Cement plaster in cement sand mortar 1:4, 25 mm thick.

384.96

307

118379.05

... More
जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्‍थर को अलग करना (Sorting of grass & pebbles) एवं बण्‍ड (Bund) का सेक्‍शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी.  (gkn 22-23, Item No. 196 a)

43683.4

53

2358466.77

... More
सड़क के निश्चित केम्‍बर तथा ग्रेड में ग्रेवल, कंकर, क्‍वैरी रविश एवं कोर्स एग्रीगेट को 15 सेमी से (बिना कुटी) कम मोटाई में बिछाना, फैलाना तथा 8-10 टन भार के रोलर से दबाना, कूटना तथा समस्‍त लीड के साथ पानी खर्च तथा औजार, मशीनरी का किराया सहित। 

2829.14

102

290976.62

... More
Supply of Morrum (Reduce voides 1/12)

3433

450

1544848.13

... More
Excavation including loading, unloading, disposal and dressing of excavated earth with in initial lead of 50m and lift up to1.5m including dressing of excavated area and dewatering wherever required complete in all respect In Hard soil In Hard soil

380.98

83

31888.03

... More
Supply of Tor steel anchor bars of required diameter, length and shape at site of work complete.

6148.25

86

533544.79

... More
Dhaman/Stylohemata

12.35

300

3705

... More
15 से 30 सेमी मोटे हथोड़े से तरासे हुए एकल पत्‍थर की पिचिंग समस्‍त उठान के साथ, आपूर्ति के साथ । (Item No. 167 )

389.87

1641

639839.05

... More
Jungle Clerance Cutting of Brush/Shrubs

14042.7

2

40162.12

... More
Supply & Fixing 150mm X 150mm X 3.15mm wire mesh for fancing 5 Feet Height (1.23 Kg/m )

1581.8

86

137268.6

... More
Mkx csfyax djuk 5 lseh ls 7-5 lseh xgjkbZ rd

3564.4

1

6095.12

... More
Earth work in execavation including loading unloading,disposaland dressing of execavated earth within initial lead of 50M and lift upto1.5m in dry or moist including dressing of execavated area with cost of dewatering wherever required and all applicable taxes and levies etc.complete in all respect. Hard Soil Mixed With Kanker/Boulders,Murrum

891

103

92218.5

... More
Sowing of seed on bunds

1543.5

1

1929.38

... More
uho] [kkbZ] ijukyk esa 1-5 xgjkbZ rd feêh dh [kqnkbZ djuk] ry dks dwVuk] ikuh Mkyuk] cxy dks laokjuk] [kqnh feêh dks ckgj fudkyuk] uho Hkjus ds ckn [kkyh L‍Fkkuksa dks iqu% feêh ls Hkjuk rFkk cph gqbZ feVVh dks 50 ehVj dh nwjh rd fuL‍rkj.k djuk सख्त] चिकनी] कंकर मिट्टी में

168.2

143

24207.34



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.