Watershed Development And Soil Conservation Department Tender
If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.
Costs
EMD
₹ 1,03,264Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_WDSC_154182_1Bid Award Id
ViewTender No
WSC1920A0248Tender Authority
Watershed Development And Soil Conservation Department ViewPurchaser Address
-Website
http://https://www.karnataka.gov.in/watershed/Pages/home.aspx
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Cutting & clearance of jungle ,bushes ,shrubs ankra/lpomoea julicflora typna etc. on canal and bund in dry/moist/slushy condition including disposal as per instruction of the engineering charge. Cost of the wood has been deducted from rates and thus will be property of contractor after cutting. (WRD BSR Sikar 2014) Unit squar m.Page No. 38 Item No. 1
9000
9900
1.1
Single leveling with compass, survey , chaining pegging for survey work of crosses etc in hilly area. (WRD BSR Sikar 2014) Unit in m.Page No. 50 Item No. 2
1500
1245
0.83
Dag belling 5cm to 7.5cm deep. (WRD BSR Sikar 2014) Unit in m.Page No. 39 Item No. 8
1500
900
0.6
Earth work in rough (borrow area) excavation for embankment ( bund formation) in hard soil, Morrum including laying in 20 cm layers (before compaction) and breaking of clods sorting of grass, pebbles etc and dressing when compacted manually or by plain roller with initial lead of 250 mtr and lift up to 1.5 mtr (excluding charges for compaction and watering ) including loading and unloading wherever required in all respect (Height of embankment may by up to 4 meter) (WRD BSR Sikar 2014) Page No. 15 Item No. 17
21000
1449000
69
एनीकट हेतु पत्थर की चिनाई सीमेंट-बजरी 1%6 मसाले में। इकाई % घन मीटर
850
2109062
2481.25
15 CM STONE KHARANJA IN apron
400
69580
173.95
सीमेंट कंक्रीट 1 सीमेंट] 3 बजरी तथा 6 गिट्टी पत्थर की 20 मिमी नामीय माप की नींव में डालना] कूटना तथा तराई आदि सहित एनीकट के लिए। इकाई % घन मीटर
100
305162
3051.62
सीमेन्ट प्लस्टर दीवार पर 1: 4 अनुपात में सीमेन्ट - बजरी मिलाकर जोडों को कुरेदने तथा 14 दिन तक नियमित तराई सहित 25 मि-मी- मोटाई (केवल जलरोधी संरचनाओ के उपयोग हेतु) इकाई % वर्ग मीटर
850
202359
238.07
ग्रेवल,मूरम,क्वेरी रबिश, कंकर, गिट्टी आदि चाहे गए ग्रेड व केम्बर में अधिकाधिक 15 सेमी मोटी परत में बिछाई का कार्य मय ड्रेसिंग सहित मय lkexzh vkiqrhZ (470+48.72)
150
78244
521.63
सीमेन्ट प्लस्टर दीवार पर 1: 4 अनुपात में सीमेन्ट - बजरी मिलाकर जोडों को कुरेदने तथा 14 दिन तक नियमित तराई सहित 20मि-मी- मोटाई (केवल जलरोधी संरचनाओ के उपयोग हेतु) इकाई % वर्ग मीटर
400
62384
155.96
Rehandling charge of materials by mechanical transport including loading,unloadig and stacking, if stacking is not required no deduction is to be done .(Lead up to 3km.)
1000
66000
66
Rehandling charge of materials by mechanical transport including loading,unloadig and stacking, if stacking is not required no deduction is to be done .(Lead up to 3km.) Cement, bricks, Steel,etc.
50
3300
66
इनामिल पेन्ट का लेप करना 3 तह में ताकि इकसार आभा हो जाये (To give even shade) नये कार्य/पुराने कार्य पर सम सरफेस बनाना। #82(अ) नये कार्य पर।
90
9747
108.31
Printing New letters and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade as per drawings and MoRTH specification clause 801. Hindi (Matras Commas and the like note to be Measured and payed for. Half letters shall be counted as half only.)
1956
1114
0.57
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements