Watershed Development And Soil Conservation Department Tender
If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.
Costs
EMD
₹ 3,88,789Document Cost
₹ 2,000Tender Fee
₹ 2,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_WDSC_412208_1Bid Award Id
ViewTender No
MJSA2.0 NIT03 2024-25 BID 09 SAJJANGARHTender Authority
Watershed Development And Soil Conservation Department ViewPurchaser Address
-Website
http://https://www.karnataka.gov.in/watershed/Pages/home.aspx
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Hard soil mixed with Kankar / boulders, Morrum
5989.72
619935
103.5
... More
Soft / Disintegrated rock
1236.15
172443
139.5
... More
Hard rock without blasting
1540.16
317426
206.1
... More
Cement Concrete 1:3:6 well mixed and laid in position complete including all leads of all construction materials including curing and finishing well graded broken stone aggregate of 20mm size
559.35
2232500
3991.27
... More
cement mortar for apron 1;6, 23cm kharanja for thickness
867.35
442901
510.64
... More
Random rubble stone masonary in cement mortar 1:6 forFoundation and super structure
3290.35
9591642
2915.08
... More
Cement concrete well mixed with cement mortar (1:2:4) laid in position complete excluding curing with aggregate size upto 12mm HB.
526.97
2552814
4844.29
... More
Cement plaster in cement sand mortar 1:4, 25mm thick with curing.
3812.65
1056751
277.17
... More
Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect for Black Cotton Soil for Corewall and Cutoff Trench
1042.97
87296
83.7
... More
Re- handling excavation earth (excluding rock) in trenches, plinth side of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering including cost of water including loading and un-loading wherever required with cost of dewatering wherever required.
1042.97
71338
68.4
... More
Transportation of Black Cotton Soil upto average 5 km lead considering shortest route including Loading, Unloading and Stacking for Corewall and Cutoff Trench
1042.97
186889
179.19
... More
Earth work in rough (borrow area) excavation with JCB or Scraper, for embankment in hard soil, Morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted manually or by plain roller with initial lead of 250 m and lift up to 3m (excluding charges for compaction and watering), including loading and un-loading wherever required complete in all respect.
8327.72
577860
69.39
... More
Dry Stone Pitching 15 to 30 centimeter thick with hammer dressed including all lifts and including supply of stone
346.7
401568
1158.26
... More
Dismelting old cement plaster, skirtin raking out joints and cleaning the surface. (BSR RDPR 2023 Item No.115)
961.96
32889
34.19
... More
Providing and fixing reinforcement for RCC work including straightening, cutting, bending, placing in position and binding (including cost of binding wier) all complete. (BSR RDPR 2023 Item No.61)
2731.62
229756
84.11
... More
Providing of centering & shuttering with steel sheets in RCC for roof, slab, chajja, linten etc. lift upto 4.5m and removing of framework etc. (BSR RDPR 2023 Item No.93 b)
474.71
148888
313.64
... More
Iron works for grill/gate etc complete including cutting, mounting and installation of flat edges, guide Tee and track channel or any part of gate with cost of material complete in all respect (BSR RDPR 2023 Item No.63)
2935.04
275453
93.85
... More
Compaction of earth or highly weathered strata By manually or plain roller. (density 90% of Proctor)
4770.74
103047
21.6
... More
Watering of earth including cost of carriage of water when source of water is up to 3 km lead
4770.74
88878
18.63
... More
Dressing of uneven embankment in required profile
3822.48
40594
10.62
... More
Benching base and depositing the excavated material including dressing etc. complete within initial lead up to 50m and lift up to 1.5m
917.86
66911
72.9
... More
Supply of Dhaman grass Seeds
23.2
2790
120.3
... More
Supply of Ratanjot/Castor Seeds
32
1939
60.61
... More
Sowing of Dhaman grass Seeds in different rows
2320
2644
1.14
... More
Sowing of Ratanjot/Castor Seeds in different rows
1600
1824
1.14
... More
Supply stone, spali and laying Rip rap in required profile properly hand packed using stone of specified size including all lead & lifts 23 cm thickness
12.88
16912
1313.1
... More
display Board (including painting, writing and installation on site)
19
57000
3000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements