Watershed Development And Soil Conservation Department Tender

If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.

Watershed Development And Soil Conservation Department - WDSC Tender

Works
Civil And Construction
Eprocure
Opening Date31 Jan 2025
Closing Date13 Mar 2025
Tender Amount₹ 2,00,99,058 
Notes
Download

Costs

  • EMD

    ₹ 4,01,981
  • Document Cost

    ₹ 2,000
  • Tender Fee

    ₹ 2,000

Summary

Nit 28/2024-25 Block Jaswantpura

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
lsaVfjx ,o 'kVfjx ¼ r[rk ,oa wyk cUnh ½ dk dk;Z Vkads ds fy, 4-5 ehVj ÅapkbZ@xgjkbZ rd ds fy, yxkuk ,oa gVkuk vkfn fo'ks"k fooj.k ds vuqlkjAZ GKN-BSR-Jaswantpura-2024 Item No. 93B

2547.24

209

533876.03

... More
सीमेंट कंक्रीट 1 सीमेंट : 3 बजरी : 6 पत्‍थर एग्रीगेट अनुपात में 20 मिमी नामीय माप की एग्रीगेट के साथ डालना,कूटना तथा तराई आदि सहित । GKN-BSR-Jaswantpura-2024 Item No. 170B

191.04

3843

734355.85

... More
नींव तथा कुर्सी प्रथम श्रेणी ईंट की चिनाई सीमेन्‍ट -बजरी 1:6 मसाले में, मय बगल की झिरी बन्‍द करने तथा तराई सहित। GKN-BSR-Jaswantpura 2024 Item No. 20A

2.28

5287

12055.64

... More
iRFkj ds fljny ¼fyVay½ dh vkiwfrZ dj] 1%4 lhesUV ctjh elkys es yxkukA100 ls 150 feeh eksVkbZ GKN-BSR-Jaswantpura-2024- Item No. 36B

92.74

1819

168725.59

... More
Vkadks ds Åij ifV~V;ksa dh Nr Mkyuk] lhesaV elkyk 1%4 ls tksM+ Hkjuk dk;Z laiwfrZ lfgr] iw.kZ dk;Z 1.5 m to 2.4 m span - GKN-BSR-Jaswantpura-2024 Item No. 45B

304.83

1586

483509.15

... More
Vkads ds Nr esa 50 eh- eh- eksVkbZ esa lhesaV dadzhV 1%2%4 feJ.k ftlesa 1 lhesaV 2 ctjh 4 iRFkj dh ;k bZaV dh 12 eh- eh- eki dh fxV`Vh ds lkFk feykdj Mkyuk] dwVuk] nckuk rFkk rjkbZ vkfn lesrA GKN-BSR-Jaswantpura-2024 Item No. 14A

304.83

420

128056.03

... More
सीमेंट कंक्रीट 1 सीमेंट : 2 बजरी : 4 पत्‍थर एग्रीगेट अनुपात में 12 मिमी नामीय माप की एग्रीगेट के साथ डालना,कूटना तथा तराई आदि सहित । GKN-BSR-Jaswantpura-2024 Item No. 16

26.6

4462

118696.91

... More
सीमेन्‍ट प्‍लस्‍टर दीवार पर 1:4 अनुपात में सीमेन्‍ट - बजरी मिलाकर जोडों को कुरेदने तथा 14 दिन तक नियमित तराई सहित 25 मि.मी. मोटाई (केवल जलरोधी संरचनाओ के उपयोग हेतु)   GKN-BSR-Jaswantpura-2024 Item No 76A

1485.19

317

471651.79

... More
सीमेंट प्‍लास्‍टर दीवार पर 1:6 अनुपात में सीमेंट-बजरी मिलाकर जोड़ों को कुरेदने तथा 14 दिन तक नियमित तराई समेत। 20 मिमी GKN-BSR-Jaswantpura-2024 Item No 77B

206.97

183

37989.34

... More
टांका ढक्कन 2 ft X 2 Ft (Market Rate)

30

1500

45000

... More
110 मिमी व्‍यास के पी.वी.सी. पाईप का डालना मय अन्य आवश्यक सामग्री सहित l GKN-BSR-Jaswantpura-2024 Item No. 181

360

210

75754.8

... More
लोहे की जाली (ग्रेटिंग) 125 मिमी व्‍यास की आपूर्ति करना तथा लगाना।      GKN-BSR-Jaswantpura-2024 Item -  182

30

150

4501.8

... More
इनामिल पेन्‍ट का लेप करना 3 तह में ताकि इकसार आभा हो जाये (To give even shade) नये कार्य/पुराने कार्य पर सम सरफेस बनाना। . GKN-BSR-2024- Jaswantpura-Item - #82A नये कार्य पर।      

10.8

145

1573.45

... More
Lettering with black Japan paint of approved brand and manufacture. PWD BSR 2022 Item 12.62

18750

1

33750

... More
Pakka Check Dam- Jungle Clearance 30cm scrub removal.RDPR BSR-2024/IT-192

3620

3

13032

... More
Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect. WDR BSR-2023 1B/CH-5

698.25

85

59700.46

... More
Cement concrece (1:4:8) well mixed & laid in position complete including curing and finishing etc. Complete.RDPR BSR-2024/IT-170A

130.06

3726

484627.67

... More
Stone kharanja in cement mortar (1:6) including curing etc. complete. RDPR BSR-2024/IT-149B

121.5

698

84831.3

... More
R.R.Stone masonary in cement mortar (1:6) including curing & finishing etc. complete for foundation. RDPR BSR-2024/IT-166A

423.95

3523

1493977.89

... More
R.R.Stone masonary in cement mortar (1:6) including curing & finishing etc. complete for superstructure.RDPR BSR-2024/IT-166A

281.89

3523

993345.83

... More
Cement concrete(1:2:4) well mixed and laid in position complete including curing and finishing.RDPR BSR-2024/IT-13A

29.94

4904

146820.14

... More
25MM thick cement plaster in cement sand mortar (1:4) including racking of joints smooth finishing and curing of etc. Complete RDPR BSR-2024/IT-76A

367.22

317

116618.06

... More
Earth backfill by murrum/black cotton soil I/c loading, unloading and lead of 3 Km. WRD BSR-2023/ch-5-IT-13

91.8

81

7518.42

... More
Dry stone pitching to D\S of H.W.E. (L+R) RDPR BSR-2024/IT-167

43.44

1795

78015.63

... More
Tip Work at PCD head wall, RDPR BSR 2024/IT-79A

97.1

130

12710.39

... More
Earth Work in rough (borrow Area) excavation for embankments in hand soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clouds, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 90 % of standard Proctor's density with initial lift of 1.5 m (Excluding charges for Compaction and watering) including loading and un-loading wherever required complete in all respect , Less 10% CP & for 90% Standard Proctor Density. WRD BSR-2023/ch-5-IT-16A Deduct 17B

4507.8

98

442215.18

... More
Compaction of earth or highly weathered strata By manually or plain roller. (density 90% of Proctor) Less 10% CP. wrd BSR-2023/ch-5-IT-18A

4507.8

22

101425.5

... More
Watering of Earth including cost of carriage of water when souce of water is upto 1km Less 10% CP. wrd BSR-2023/ch-5-IT-28A

4507.8

11

51118.45

... More
Applying enamel paint in 3 layers to give even shade To create an even surface on new/old work. Jaswantpura RDPR BSR 2024-Item - #82A

2.16

145

314.69

... More
Lettering with black Japan paint of approved brand and manufacture. PWD BSR 2022 Item 12.62 (Including Less 10% Contractor profit.)

3750

1

6750

... More
Contour Continuous Trench (CCT)- जंगल की सफाई, भारी झाडि़यों तथा 30 सेमी लपेट तक के पौधों को काटने समेत। ch,lvkj 2024 vkbZVe ua- 192      

205600

3

740160

... More
Mkxcsfyax djuk 5 lseh ls 7.5 lseh xgjkbZ rd ¼thds,u ch,lvkj 2024 vkbZVe ua- 6B½    

205600

1

351576

... More
जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्‍थर को अलग करना (Sorting of grass & pebbles) एवं बण्‍ड (Bund) का सेक्‍शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी. नरम मिट्टी में (साधारण/मुलायम मिट्टी) item no 196 A

10177.2

52

532267.56

... More
जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्‍थर को अलग करना (Sorting of grass & pebbles) एवं बण्‍ड (Bund) का सेक्‍शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी(ब)सख्‍त मिट्टी में/ कंकर मिली मिट्टी में item no. 196 B

23746.8

60

1447842.4

... More
LVkbZyks ?kkl @?kkeu ?kkl ds cht dh vkiwfrZ ¼Forest BSR 2022½ 1 fdyks@ykbu izfr 100 eh- ¼ 2 ykbu esa ½

1028

102

105688.68

... More
LVkbZyks ?kkl @?kkeu ?kkl @ dqeV ds cht dh cqokbZ 2 ykbZu es ¼thds,u 2024 vkbZVe ua- 159½

102800

1

128500

... More
Display Board With Paiting and Lettering

19

2000

38000

... More
Amrit Sarovar- Jungle Clearance 30cm scrub removal RDPR BSR-2024/IT-192

40800

3

146880

... More
Earth Work in rough (borrow Area) excavation for embankments in hand soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clouds, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 90 % of standard Proctor's density with initial lift of 1.5 m (Excluding charges for Compaction and watering) including loading and un-loading wherever required complete in all respect , Less 10% CP & for 90% Standard Proctor Density WRD BSR-2023/ch-5-IT-16A Deduct 17B

10170

98

997677

... More
Compaction of earth or highly weathered strata By manually or plain roller. (density 90% of Proctor) Less 10% CP WRD BSR-2023/ch-5-IT-18A

10170

22

228825

... More
Watering of Earth including cost of carriage of water when souce of water is upto 1km Less 10% CP WRD BSR-2023/ch-5-IT-28a

10170

11

115327.8

... More
जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्‍थर को अलग करना (Sorting of grass & pebbles) एवं बण्‍ड (Bund) का सेक्‍शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी(ब)सख्‍त मिट्टी में/ कंकर मिली मिट्टी में item no. 196 B

74.33

60

4531.9

... More
cement concerete well mixed in cement mortor (1:5:10)laying in position complete including carring with maximum sixe aggrigare upto 40mm (for waste weir) Gkn item 9A

15.62

3103

48483.23

... More
R.r stone massonary in cement mortor (1:6)(a) for fundation, GKN item 166 A

48.02

3523

169219.6

... More
R.r stone massonary in cement mortor (1:6)(a) for superstructure, GKN item 166A

100.34

3523

353592.14

... More
Cement concrete in the ratio of 1 cement : 2 gravel : 4 stone aggregate with aggregate of 12 mm nominal size including pouring, ramming and tamping etc. GKN 16

27.53

4462

122846.84

... More
Cement plaster in cement mortor (1:4) 25 mm GKN Item 76 A

118.8

317

37727.32

... More
Stone kharanja in cement mortar (1:6) including curing etc. complete. GKN Iteam 149B

204

698

142432.8

... More
Dry stone pitching to D\S of Toe Wall GKN 167

18

1795

32326.92

... More
Applying enamel paint in 3 layers to give even shade To create an even surface on new/old work. Jaswantpura RDPR BSR 2024-Item - #82A

1.08

145

157.35

... More
Lettering with black Japan paint of approved brand and manufacture. PWD BSR 2022 Item 12.62

1875

1

3375

... More
Earthen Checkdam- Dagbelling 5 to 7.5 cm depth (GKN 2024-25 item 6B)

6400

1

10944

... More
Jungle clearance, including general cutting of vegetation and bushes. (GKN 2024-25 item 191)

24000

2

68640

... More
JCB Machine/Tractor or scraper for digging of soil, breaking of clods, sorting of grass & pebbles and maintaining section/profile of bund (in cut area) including lifting and lowering of the bund upto initial lead 250 m and lift upto 3 m. Draft based on chapter 5th of irrigation page number 32 to 34 (Valid from 01/02/2017) Unit 1 cubic meter GKN 2024-25 Item 196 A

3901.73

52

204060.48

... More
JCB Machine/Tractor or scraper for digging of soil, breaking of clods, sorting of grass & pebbles and maintaining section/profile of bund (in cut area) including lifting and lowering of the bund upto initial lead 250 m and lift upto 3 m. Draft based on chapter 5th of irrigation page number 32 to 34 (Valid from 01/02/2017) Unit 1 cubic meter GKN 2024-25 Item 196 B

9104.03

60

555072.71

... More
Compaction of earth work by manual ramming or by plain roller (Proctor density 90%) BSR WRD Item No. 18 a Chapter V 2023

13005.75

22

292629.38

... More
Watering of earth including cost of carriage of water when source of water is upto 1 km BSR WRD 2023 Item 28A Chapter V

13005.75

11

147485.21

... More
Single stone pitching 15 to 30 cm thick with all lifting & supply Included. (GKN 2024-25 item 167)

57.6

1795

103446.14

... More
Display Board (with Painting and Lettering)

16

2000

32000

... More
Mini Percolation Tank- Clearing of forest, including cutting of heavy bushes and plants up to 30 cm height.    

48100

3

173160

... More
Earth Work in rough (borrow Area) excavation for embankments in hand soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clouds, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 90 % of standard Proctor's density with initial lift of 1.5 m (Excluding charges for Compaction and watering) including loading and un-loading wherever required complete in all respect , Less 10% CP & for 90% Standard Proctor Density

28368.75

98

2782974.38

... More
Compaction of earth or highly weathered strata By manually or plain roller. (density 90% of Proctor) Less 10% CP

28368.75

22

638296.88

... More
Watering of Earth including cost of carriage of water when souce of water is upto 1km Less 10% CP

28368.75

11

321701.63

... More
Single stone pitching 15 to 30 cm thick with all lifting & supply Included. (GKN 2024-25 item 167)

88.2

1795

158401.91

... More
Display board with painting and Letttering

14

2000

28000

... More
Sub Surface barrier- Clearing of forest, including general cutting of vegetation and bushes. RDPR BSR 2024 Item 191

1377.5

2

3939.65

... More
Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect. Less 10% CP. WRD BSR 2023 CH V/1 A

2233

82

184892.4

... More
Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect. Less 10% CP. WRD BSR 2023 CH V/1 B

957

85

81823.5

... More
Add extra over ietm 1 to 8 for disposal of excavated material above initial lift of 1.5m and for every additional lift of 1.5m or part there of including loading and unloading wherever required. Less 10% CP. WRD BSR 2023 Ch v/11 Lift 1

1087.5

7

8319.38

... More
Add extra over ietm 1 to 8 for disposal of excavated material above initial lift of 1.5m and for every additional lift of 1.5m or part there of including loading and unloading wherever required. Less 10% CP. WRD BSR 2023 Ch v/11 Lift 2

362.5

15

5546.25

... More
Refilling the excavated earth (excluding rock) in trenches, plinth side of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering including cost of water, loading and un-loading wherever required with cost of dewatering wherever required.Less 10% CP. WRD BSR 2023 ch v/13

3190

81

261261

... More
Supplying, laying & spreading of LDPE film of 250 micron on bed and sides including jointing etc. complete as per specifications including cost of LDPE film, overlapping, adhesive tape etc. with transportation charges upto work site complete. Less 10% CP.WRD BSR 2023 ch ix/39

1916.59

53

101770.93

... More
Display Board With Paiting and Lettering

3

2000

6000

... More
Sunken Pond Jungle Clerance removal of Scrubs and ruts GKN BSR 2024 Item 191

6144

2

17571.84

... More
डागबेलिंग करना 5 सेमी. से 7.5 सेमी. गहराई तक GKN-BSR-2024-- Jaswantpura-Item- #6(ब)

1320

1

2257.2

... More
जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्‍थर को अलग करना (Sorting of grass & pebbles) एवं बण्‍ड (Bund) का सेक्‍शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी. मशीनरी कार्य नरम मिट्टी ((in Hard Soil) GKN-BSR-2024-Jaswantpura-Item- #196(B) 

13734

60

837361.98

... More
Display board with painting and Letttering

6

2000

12000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.