Watershed Development And Soil Conservation Department Tender
If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.
Costs
EMD
₹ 55,812Document Cost
₹ 500Tender Fee
₹ 500
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_WDSC_415798_1Bid Award Id
ViewTender No
NIT-36/2024-25 JAHAZPUR MJSA2Tender Authority
Watershed Development And Soil Conservation Department ViewPurchaser Address
-Website
http://https://www.karnataka.gov.in/watershed/Pages/home.aspx
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Compaction of earth or highly weathered strata . By manually or plain roller. (density 90% of Proctor).
(Item No. 18a of Irrigation BSR 2023)
19118.3
430161
22.5
Watering of earth including cost of carriage of water when source of water is beyond 250 m but up to 1 Km
(Item No. 28a of Irrigation BSR 2023)
19118
216798
11.34
45x45x45 सेमी माप के गड्डे करना।कठोर मिट्टी BSR RDPR 2024-25 (Item no. 157 (b))
352
4579
13.01
dhVuk'kd dh lIykbZA @ 4 ml per plant each time = (1120*4*4)/1000 (four times)
5.6
1400
250
ikS/ks dk ifjogu 10 fd-eh- nwjhsA (FOREST BSR 2023 Item no 3.1.2 PLANTATION)( 10% extra for miss Handling )
352
619
1.76
ikS/kksa dk [kkn@oehZ dEiksLV ls mipkj djukA( 2 kg per plant two times ) (2*2*480)kg (item 103 hotricultre dept vide letter no 4432-4574 dated 4.01.2021
1408
14080
10
Cost of agro forestry plants ( big Polythene) forest BSR 2023
352
5280
15
okfudh ikS?kksa dk ikS/kjksi.k djuk e; 100 eh- flj ij ifjogu] IykfLVd dh FkSyh dks ikuh esa Mqcksuk] dkVuk] [kM~Ms esa iqu% feV~Vh Hkjuk ,oa ikS/ks dks pkjksa vksj ls dksEisDV djukA (Item no. 158 b ) bsr RD PR 2023 SUWANA
352
2006
5.7
lkekU; tehu ij de ls de 50 lseh- v)ZO;kl dk Fkkoyk cukukA (Item no. 162b) RD PR BSR 2023
352
1186
3.37
ikS/kksa dh fujkbZ @ xqMkbZ %& ikS/kksa ds pkjksa vksj 45 lseh- v)ZO;kl esa [kjirokj gVkuk o 15 lseh- xqMkbZ djuk (two times per year for five year) ( BSR Forest dept 2023 Item No 3.6.2 ) (1120*2*5)=11200
3520
17987
5.11
ikS/kksa dh izwfuax djuk ,oa cMs drju dks ckM ij MkyukA three times BSR Forest dept 2023 (Item no. 3.27.4)
1056
7803
7.39
nks ehVj dh mpkb rd
1056
3442
3.26
पौधों को उपलब्ध पानी पिलाना (15 लीटर प्रति पौधा)।BSR RDPR 2024-25 (Item no. 160)
352
1154
3.28
Supply of Water Tanker of Capacity 4000 Ltr Inclunding transportation cost ((January-May) 3 times per month for 3 years 15 ltr per plant)
200
88000
440
Forestry seed supply shisham
2
232
116.29
Tree seed cht cqokbZ cuk;s x;s fjt ij (3X165=495) Item no. 159 Part A
9501.9
8931
0.94
Tree Seed
160
7200
45
Excavation including loading, unloading, disposal and dressing of excavated
earth within initial lead of 50m and lift up to 1.5m including dressing of
excavated area and dewatering wherever required complete in all respect page no 23 item no 1 (b) wrd 2023Hard soil mixed with Kankar / boulders, Morrum (1C)
42
3452
82.2
Excavation including loading, unloading, disposal and dressing of excavated
earth within initial lead of 50m and lift up to 1.5m including dressing of
excavated area and dewatering wherever required complete in all respect page no 23 item no 1 (b) wrd 2023Hard rock not requiring blasting (2b)
63
6747
107.1
Providing and laying of cement concrete well mixed in cement mortar 1:4:8 laying in position complete excluding curing with maxmium size of aggregate up to 40 mm. As per GKN 2024 item no.15 A
23.17
79169
3416.89
Random rubble stone masonary for foundation & plinth cement sand mortar(1:6) for above 30 cm. Thick wall As per GKN 2024 item no.166A
110
300779
2734.36
Stone Kharanja in cement mortar 1:6 for bed and floor including cpaction etc. complete apron As per GKN 2024 item no.166A
8.3
22695
2734.36
Providing and laying of cement concrete well mixed in cement mortar 1:2:4 laying in position complete excluding curing with maxmium size of aggregate up to 20 mm. etc. complete As per GKN 2024 item no.16
5
21746
4349.36
25 m.m thick plastering on new surface in cement mortar (1:4) As per GKN 2024 item no.76A
81
22154
273.51
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements