Watershed Development And Soil Conservation Department Tender

If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.

Watershed Development And Soil Conservation Department - WDSC Tender

Works
Civil And Construction
Eprocure
Opening Date24 Oct 2024
Closing Date21 Nov 2024
Tender Amount₹ 2,72,44,000 
Notes
Download

Costs

  • EMD

    ₹ 5,44,880
  • Document Cost

    ₹ 2,000
  • Tender Fee

    ₹ 2,000

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्‍थर को अलग करना (Sorting of grass & pebbles) एवं बण्‍ड (Bund) का सेक्‍शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी.  BSR 2024-25 Item No. 196 a & b

-

-

-

... More
मशीनरी कार्य नरम मिट्टी (in Soft Soil) (20%)     

15791.79

71

1124849.2

... More
मशीनरी कार्य सख्‍त मिट्टी (in Hard Soil) (80%)    

63167.5

83

5246060.88

... More
Cost of Grass seed Dhaman ( As per Forest BSR Rate 2022) 1kg/100 m in 03 lines

3589.07

92

332093.06

... More
Sowing of seed on bunds in three rows (BSR 2024-25, Item No 159 ) 

358907.2

1

448634

... More
Laying fixing and Painting of Display Board Size 7'x3'

39

2000

78000

-

-

-

... More
5 ls 7-5 lseh- xgjkbZ dk Mkxcsfyax dk;Z (BSR 2024-25, 6 b)

6439.83

1

11012.11

... More
जंगल की सफाई, साधारण वनस्‍पति तथा झाडि़यों को काटने सहित। BSR 2024-25, item 191

128796.51

2

368358.02

... More
जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्‍थर को अलग करना (Sorting of grass & pebbles) एवं बण्‍ड (Bund) का सेक्‍शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी.  BSR 2024-25 Item No. 196    

-

-

-

... More
मशीनरी कार्य नरम मिट्टी (in Soft Soil)#196(अ)      

1224.37

71

87211.88

... More
मशीनरी कार्य सख्‍त मिट्टी (in Hard Soil) #196(ब)     

2856.87

83

237263.05

... More
जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्‍थर को अलग करना (Sorting of grass & pebbles) एवं बण्‍ड (Bund) का सेक्‍शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी.  BSR 2024-25 Item No. 196    

-

-

-

... More
मशीनरी कार्य नरम मिट्टी (in Soft Soil)#196(अ)      

365.14

71

26008.92

... More
मशीनरी कार्य सख्‍त मिट्टी (in Hard Soil) #196(ब)     

851.99

83

70757.77

... More
Refilling the excavated earth (excluding rock) in trenches, plinth side of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering including cost of water, loading and un-loading wherever required with cost of dewatering wherever required WRD BSR Sirohi 2022 Chapter V Item No. 13

1217.13

68

83251.69

... More
dV vkQ VªsUp o dksj oky gsrq dkyh feV~Vh dk ifjogu lkexzh dks mrkjuk] p+kuk o LdsfVax djuk ¼ifjogu dh nwjh fudVre :V ls dh tkosxh½ vkSlr nsjh 5 fdeh- ¼BSR 2024-25 vkbZVe ua- 185 य)

1217.13

201

245787.23

... More
जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्‍थर को अलग करना (Sorting of grass & pebbles) एवं बण्‍ड (Bund) का सेक्‍शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी.  BSR 2024-25 Item No. 196    

-

-

-

... More
मशीनरी कार्य नरम मिट्टी (in Soft Soil)#196(अ)      

4559.07

71

324742.56

... More
मशीनरी कार्य सख्‍त मिट्टी (in Hard Soil) #196(ब)     

10637.84

83

883472.61

... More
Compaction of earth work by manual or by plain roller (Proctor density 90%) BSR WRD Item No. 18 a Chapter V 2022

15196.92

21

328253.47

... More
Lip cutting and final dressing as per designed section including re-handling and disposal of excavated earth in layers 20 cm on embankments etc. with cost of dewatering wherever required, and complete in all respect (BSR SIROHI WRD 2020, Item 20, Chapter V)

18055.12

25

454989.02

... More
Watering of earth including cost of carriage of water when source of water is upto 5 km BSR WRD 2022 Item 28b Chapter V

15196.92

27

414420.01

... More
जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्‍थर को अलग करना (Sorting of grass & pebbles) एवं बण्‍ड (Bund) का सेक्‍शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी.  BSR 2024-25 Item No. 196    

-

-

-

... More
मशीनरी कार्य नरम मिट्टी (in Soft Soil)#196(अ)      

562.2

71

40045.51

... More
मशीनरी कार्य सख्‍त मिट्टी (in Hard Soil) #196(ब)     

2248.79

83

186762.01

... More
मोरम(बाइंडिंग सामग्री) (1/12 वोइड्स काटें)  (BSR 2024-25 Material item no. 137)

737.9

290

213991

... More
मूरम,भवन का मलवा,चूना,बजरी,पत्थर की गिट्टी 40mm नोमिनल साइज से कम तक का विभिन्न दूरी के लिए परिवहन सामग्री को चढ़ाना,उतारना व स्टेकिंग सहित । (परिवहन की लम्बाई निकटतम रूट से गणना की जावेगी न कि सड़क मार्ग से upto 05 Km) BSR 2024-25 Item No. 186

737.9

161

119281.54

... More
ग्रेवल,मूरम,क्वेरी रबिश, कंकर, गिट्टी आदि चाहे गए ग्रेड व केम्बर में अधिकाधिक 15 सेमी मोटी परत में बिछाई का कार्य मय ड्रेसिंग सहित BSR 2024-25 item no. 145)    

737.9

69

50974.13

... More
Cost of Grass seed Kumtha ( As per Forest BSR Rate 2020) in 05 rows @ 100 gm/row/meter

107.33

111

11994.13

... More
Laying fixing and Painting of Display Board Size 7'x3'

21

2000

42000

... More
Sowing of seed on bunds in one rows (BSR 2024-25, Item No 159 )  total 05 rows

10733.04

1

13416.3

-

-

-

... More
5 ls 7-5 lseh- xgjkbZ dk Mkxcsfyax dk;Z (BSR 2024-25, 6 b)

11328.56

1

19371.84

... More
जंगल की सफाई, साधारण वनस्‍पति तथा झाडि़यों को काटने सहित। BSR 2024-25, item 191

234962.77

2

671993.52

... More
जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्‍थर को अलग करना (Sorting of grass & pebbles) एवं बण्‍ड (Bund) का सेक्‍शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी.  BSR 2024-25 Item No. 196    

-

-

-

... More
मशीनरी कार्य नरम मिट्टी (in Soft Soil)#196(अ)      

2378.16

71

169396.34

... More
मशीनरी कार्य सख्‍त मिट्टी (in Hard Soil) #196(ब)     

5549.11

83

460853.59

... More
जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्‍थर को अलग करना (Sorting of grass & pebbles) एवं बण्‍ड (Bund) का सेक्‍शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी.  BSR 2024-25 Item No. 196    

-

-

-

... More
मशीनरी कार्य नरम मिट्टी (in Soft Soil)#196(अ)      

709.92

71

50567.6

... More
मशीनरी कार्य सख्‍त मिट्टी (in Hard Soil) #196(ब)     

1656.49

83

137571.49

... More
Refilling the excavated earth (excluding rock) in trenches, plinth side of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering including cost of water, loading and un-loading wherever required with cost of dewatering wherever required WRD BSR Sirohi 2022 Chapter V Item No. 13

2366.41

68

161862.44

... More
dV vkQ VªsUp o dksj oky gsrq dkyh feV~Vh dk ifjogu lkexzh dks mrkjuk] p+kuk o LdsfVax djuk ¼ifjogu dh nwjh fudVre :V ls dh tkosxh½ vkSlr nsjh 5 fdeh- ¼BSR 2024-25 vkbZVe ua- 185 य)

2366.41

201

477872.84

... More
जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्‍थर को अलग करना (Sorting of grass & pebbles) एवं बण्‍ड (Bund) का सेक्‍शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी.  BSR 2024-25 Item No. 196    

-

-

-

... More
मशीनरी कार्य नरम मिट्टी (in Soft Soil)#196(अ)      

9804.24

71

698356.02

... More
मशीनरी कार्य सख्‍त मिट्टी (in Hard Soil) #196(ब)     

22876.56

83

1899898.31

... More
Compaction of earth work by manual or by plain roller (Proctor density 90%) BSR WRD Item No. 18 a Chapter V 2022

32680.8

21

705905.28

... More
Lip cutting and final dressing as per designed section including re-handling and disposal of excavated earth in layers 20 cm on embankments etc. with cost of dewatering wherever required, and complete in all respect (BSR SIROHI WRD 2020, Item 20, Chapter V)

34760.85

25

875973.42

... More
Watering of earth including cost of carriage of water when source of water is upto 5 km BSR WRD 2022 Item 28b Chapter V

32680.8

27

891205.42

... More
जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्‍थर को अलग करना (Sorting of grass & pebbles) एवं बण्‍ड (Bund) का सेक्‍शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी.  BSR 2024-25 Item No. 196    

-

-

-

... More
मशीनरी कार्य नरम मिट्टी (in Soft Soil)#196(अ)      

611.11

71

43529.37

... More
मशीनरी कार्य सख्‍त मिट्टी (in Hard Soil) #196(ब)     

2444.45

83

203011.57

... More
मोरम(बाइंडिंग सामग्री) (1/12 वोइड्स काटें)  (BSR 2024-25 Material item no. 137)

1298.06

290

376437.4

... More
मूरम,भवन का मलवा,चूना,बजरी,पत्थर की गिट्टी 40mm नोमिनल साइज से कम तक का विभिन्न दूरी के लिए परिवहन सामग्री को चढ़ाना,उतारना व स्टेकिंग सहित । (परिवहन की लम्बाई निकटतम रूट से गणना की जावेगी न कि सड़क मार्ग से upto 05 Km) BSR 2024-25 Item No. 186

1298.06

161

209831.4

... More
ग्रेवल,मूरम,क्वेरी रबिश, कंकर, गिट्टी आदि चाहे गए ग्रेड व केम्बर में अधिकाधिक 15 सेमी मोटी परत में बिछाई का कार्य मय ड्रेसिंग सहित BSR 2024-25 item no. 145)    

1298.06

69

89669.98

... More
Cost of Grass seed Kumtha ( As per Forest BSR Rate 2020) in 05 rows @ 100 gm/row/meter

188.8

111

21098.4

... More
Laying fixing and Painting of Display Board Size 7'x3'

22

2000

44000

... More
Sowing of seed on bunds in one rows (BSR 2024-25, Item No 159 )  total 05 rows

18880.94

1

23601.18

-

-

-

... More
5 ls 7-5 lseh- xgjkbZ dk Mkxcsfyax dk;Z (BSR 2024-25, item 6 b)

1929.96

1

3300.23

... More
जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी को 15 सेमी. परत में दबाना (compaction) एवम् बण्‍ड (Bund) का सेक्शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढ़ाना एवम् उतारना प्रारंभिक लीड 250 मी. एवम् लिफ्ट 3 मी. तक। ईकाई 1 घन मी. Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य)  (BSR 2024-25, Item 196 a & b)    

-

-

-

... More
मशीनरी कार्य नरम मिट्टी (in Soft Soil) (20%)     

22194.59

71

1580920.65

... More
मशीनरी कार्य सख्‍त मिट्टी (in Hard Soil) (80%)    

5548.65

83

460815.38

... More
Add extra over item No. 1 to 8 for disposal of excavated material above initial lift of 1.5m and for every additional lift of 1.5m or part there of including loading and un- loading wherever required WRD BSR 2022 Ch-V item 11

4583.67

7

35065.08

... More
Supply of ISI marked Low Density Ply Ethylen (LDPE) film black high impact resistant heavy duty grade 030 in thickness 250 mcron in the form of flat sheet of 6 to 9 mt in width without having any joint as per IS: 2508-1984. WRD BSR 2022 Ch-II item 25

3846.78

171

657799.38

... More
Labour charges for laying & spreading of LDPE film of 250 micron on bed and sides including jointing etc. complete as per specifications excluding cost of LDPE film and including cost of overlapping and cost of adhesive tape etc. with transportation charges upto work site complete. Qty as per above item WRD BSR 2022 Ch-IX Item 39

12822.71

51

657805.02

... More
Re-handling of excavated material including loading, unloading and dressing within initial lead of 50 m and lift of 1.5 m with cost of dewatering wherever required and all applicable taxes and levies etc. complete in all respect. Mixed strata muck Ch-V item 8(a)

27743.23

78

2172294.91

... More
Making iron display board including Laying,fixing,painting and installation

9

2000

18000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.