Watershed Development And Soil Conservation Department Tender
If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.
Costs
EMD
₹ 1,35,000Document Cost
₹ 1,000Tender Fee
₹ 1,500
Summary
Construction Of Various Water Harvesting Structures Under Mjsa 2.0 Phase-i In Block-bhaniyana
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_WDSC_436696_1Tender No
NIB/JAISALMER/05/2024-25Tender Authority
Watershed Development And Soil Conservation Department ViewPurchaser Address
-Website
http://https://www.karnataka.gov.in/watershed/Pages/home.aspx
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Morrum, building debris, lime, gravel, stone ballast less than 40 mm nominal size for various distance transportation including loading, unloading and stacking. (The length of the transport will be calculated from the nearest route and not by road) lead upto 3Km
2377.35
235
559580.64
... More
Excavation by machine including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect (BHANIYANA BSR RD&PR 2024-25) Hard soil
6578.51
80
528451.71
... More
Cement concrete mix (1:5:10) well mixed and laid in position complete including all leads of all construction materials including curing and finishing having well graded crusher broken stone aggregate of maximum size upto 40mm including watering, loading and un-loading wherever required complete in all respect.(BHANIYANA BSR RD&PR 2024-25)
24.66
3041
75013.01
... More
R.R. stone Masonry (using R. R. stones where stones to be not less than 15 cm in size in any direction) for foundation including all leads of all construction materials including curing etc. complete in 1: 6 Cement Mortar (BHANIYANA BSR RD&PR 2024-25)
309.25
3872
1197573.72
... More
R.R. stone Kharnja in 1: 6 Cement Mortar and laid in position complete including all leads of all construction materials including curing and finishing(BHANIYANA BSR RD&PR 2024-25)
54
690
37269.18
... More
50mm thick Cement concrete (1:2:4) M-15 well mixed and laid in position complete including all leads of all construction materials including curing and finishing having well graded crusher broken stone aggregate of maximum size upto 20mm,
522.27
421
220230.39
... More
25 mm thick cement plaster on wall with 1:4 ratio with joint scraping and regular leveling for 14 days (BHANIYANA BSR RD&PR 2024-25)
464.78
313
145581.47
... More
Flush or ruled pointing on stone masonry including racking of joints and curing etc. complete including all leads of all construction materials in mortar ratio (BHANIYANA BSR RD&PR 2024-25)
196.91
126
25006.11
... More
Yojna Disply Board with work details
6
1100
6600
... More
Cement concrete mix (1:4:8) well mixed and laid in position complete including all leads of all construction materials including curing and finishing having well graded crusher broken stone aggregate of maximum size upto 40mm (BHANIYANA BSR RD&PR 2024-25)
24.18
3308
79996.69
... More
lintel Supply of stone lintel and fixing in mortar used in masonry. 75 to 100 mm thickness.(BHANIYANA BSR RD&PR 2024-25)
10.22
1480
15137.71
... More
P/L stone slabs, filling with cement in 1:4 ratio with top and bottom joints with stone chips, 2.4 m. from 3.0m span (BHANIYANA BSR RD&PR 2024-25)
105.76
2146
226987.24
... More
Unpolished rough kota stone/ jaisalmeri stone should be leveled directly on top of 20 mm thick cement mortar 1:4 and joints should be filled with cement mortar 1:3 and flush tipped.
696.41
691
481676.17
... More
Lumpsump fitting of iron door, inlet/outlet iron grill jaali, disply board and photograph
10
2200
22000
... More
Supply and laying of HDPE Geomembrane 500 micron,excluding GST (Horticulture letter 39-134 Date 20.04.2023)
6528.66
101
659394.86
... More
Laying, welding & testing of 1mm HDPE Liner (WRD BSR CH-V ITEM NO 45) 2023
6528.66
16
105764.32
... More
110 mm diameter P.V.C. Laying of pipe along with other necessary materials
48
280
13470.24
... More
150cm height fencing with iron post 35X35X5mm at 3m distance and 30cm deep in ground, cement concrete 1:3:6 (.30X.30X.60m) corners and every 10th post supported by 35X35X5mm iron post, along with black barbed wire in 4 lines, GI staple wire between 2 posts including tying and fitting. Analysis for upto 27m length fencing, including earth excavation work (0.54 cm concrete)
591.09
339
200741.09
... More
Iron work in grills/gates etc. which includes cutting, mounting and fitting of flat cones, T's and channels etc.
80
129
10387.2
... More
Yojna Disply Board of work details
4
900
3600
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%